Attachment_L-6,__Relevancy_Matrix.xlsx

XLSX spreadsheet 20 KB Posted

Attached to
Wind Tunnel Compressor Rotor Blades Federal contract opportunity
Solicitation number
FA9101-17-R-1000
Issued by
Department of the Air Force Materiel Command Test Center

About this file

Atch L-6 - Relevancy Matrix

View the file

Other files for this federal contract opportunity

Other files attached to Wind Tunnel Compressor Rotor Blades, newest first.
File Type Posted
Industry_Day_2_Slides_-_scan.pdf PDF
Amendment_0002_-_FBO.pdf PDF
Amendment_0001.pdf PDF
Current_Spacer_Seal_Configuration.xlsx XLSX spreadsheet
Attachment_L-7,_Cross_Reference_Matrix.xlsx XLSX spreadsheet
AEDC_Map.pdf PDF
run03_r3_pressure.csv CSV file
FA9101-17-R-1000.pdf PDF
run06_r3_pressure.csv CSV file
Attachment_3_-_Section_L.pdf PDF
run04_r1_pressure.csv CSV file
run05_r2_pressure.csv CSV file
run06_r2_pressure.csv CSV file
Attachment_6__-_Section_M_Phase_2.pdf PDF
Attachment_L-5,_Subcontractor_Consent_Letter.pdf PDF
run04_r3_pressure.csv CSV file
run01_r1_pressure.csv CSV file
run03_r1_pressure.csv CSV file
Attachment_L-3,_PPQ_Cover_Letter.pdf PDF
Attachment_2_-_14424-17-003_16T_C1_Compressor_Blades_Spec.pdf PDF
Attachment_L-2,_Past_Performance_Questionnaire.pdf PDF
run07_r1_pressure.csv CSV file
PG631713.01.pdf PDF
RFP_Cover_Letter_Signed.pdf PDF
PG108760_C_2_CALSP_stamp_stamp.pdf PDF
Industry_Responses_1_FBO.pdf PDF
Industry_Day_registration_requirements.pdf PDF
AR1001B-101.stp STP file
AR1001C-101.stp STP file
AR1001A_C_01_stamp.pdf PDF
PG631713.01_C.stp STP file
PG108745_C_2_CALSP_stamp_stamp.pdf PDF
AR1001A-101.stp STP file
PG632883.05_A_01_stamp.pdf PDF
PG631713.01_A.stp STP file
Draft_RFP_Cover_Letter_-_signed.pdf PDF
Industry_Day_Attendee_List.pdf PDF
Industry_Day_-_Morning_Presentation.pdf PDF
Industry_Day_-_Afternoon_Presentation.pdf PDF
PWT_16T_Comp_C1_Blades_RFI_v_05.pdf PDF
Map_to_GLC.pdf PDF
PWT_16T_Comp_C1_Blades_RFI_v_04.pdf PDF
16T_C1_Blade_Design_SOW_14424-002-17.pdf PDF
3202100.6_H_0106_AROIN_stamp_stamp.pdf PDF
Transonic_C1_Compressor_Fiberglass_Blade_Construction.pdf PDF
3202100.23_G__AROIN_stamp_stamp.pdf PDF
3202100.6_H_0606_AROIN_stamp_stamp.pdf PDF
3202100.6_H_0306_AROIN_stamp_stamp.pdf PDF
16T_C1_Blade_Design_Specification_14424-001-17.pdf PDF
PWT_16T_Comp_C1_Blades_RFI_Draft_v_03.pdf PDF
Show all 50

Wind Tunnel Compressor Rotor Blades has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Offeror:PrimeReference 1Reference 2Reference 3
TECHNICAL CAPABILITIES
Design and Analysis Capability
D/A 1Use of 3D design software
D/A 2Use of Finite Element Analysis software
D/A 3Design of composite structures
D/A 4Analysis of composite structures
D/A 5Design of composite structures with a length >/= to 81 inches
D/A 6Analysis of composite structures with a length >/= to 81 inches
D/A 7Integration of design to properly interact with existing components
D/A 8Design of composite rotor or compressor blades
D/A 9Analysis and design to integrate composite compressor or rotor blades to properly interact with existing components
D/A 10Design rotor blades with a length >/= to 81 inches
D/A 11Analysis of rotor blades with a length >/= to 81 inches
D/A 12Design of compressor blades with a length >/= to 81 inches
D/A 13Analysis of compressor blades with a length >/= to 81 inches
D/A 14Design of Compressor or rotor blades with cord length >/= to 22 inches
D/A 15Analysis of Compressor or rotor blades with cord length >/= to 22 inches
D/A 16Design of fiberglass/carbon fiber tooling
D/A 17Design of fiberglass/carbon fiber tooling >/= 81 inches in length
Testing Approach
T 1Develop a composite test plan
T 2Implement a composites test plan
T 3Analysis of composite test results
T 4Develop a composite repair plan
T 5Develop a composite test plan of a rotor or compressor blade
T 6Implement a composites test plan of a rotor or compressor blade
T 7Analysis of composite test results of a rotor or compressor blade
T 8Develop a composite repair plan for a rotor or compressor blade
Manufacturing Capability
M 1Composite structures
M 2Composite structures with a length >/= to 81 inches
M 3Rotor blades
M 4Rotor blades with a length >/= to 81 inches
M 5Compressor blades
M 6Compressor blades with a length >/= to 81 inches
M 7Composite compressor blades
M 8Composite compressor blades with a length >/= to 81 inches
M 9Compressor or rotor blades with cord length >/= to 22 inches
M 10Fiberglass composite fabrication
M 11Carbon fiber composite fabrication
M 12Composite tooling >/= 81 inches in length
M 13Fiberglass/carbon fiber tooling for rotor or compressor blades
M 14Fiberglass/carbon fiber tooling for rotor or compressor blades >/= 81 inches in length
M 15Production run of a single composite structure design >/= 200 units
M 16Production run of a single composite rotor or compressor blade design >/= 200 units
Program Management
M-2.2.6.1.Integrated Master Schedule
M-2.2.6.2.Configuration Management
M-2.2.6.3.Risk Management
M-2.2.6.4.Quality Control

&"-,Bold"ATTACHMENT L-6 Relevancy Matrix Compressor Rotor Blades

FA9101-17-R-1000

Attachment L-6

Atch 3.6

File details come from the government source that posted it. Updated .