Atch 4 - Section L, Phase II
View the file
Other files for this federal contract opportunity
Show all 50
Wind Tunnel Compressor Rotor Blades has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Compressor Rotor Blades
FA9101-17-R-1000
Attachment 4
SECTION L
AEDC-L002, INFORMATION TO OFFERORS (ITO) – Final Downselect for Phase II, Wind Tunnel Compressor Blade Manufacture
L-1.0. Overview
Final Downselect for Phase II will be based on an evaluation of data presented at Technical Design Review (TDR) (see criteria outlined in AEDC-M002, Evaluation Factors for Award, Final Downselect for Phase II, Wind Tunnel Compressor Blade Manufacture. In addition, updated pricing for contract line item numbers (CLINs) 0005-0014 and 0019-0020 will constitute the basis for selection of the manufacturing contractor for the compressor rotor blades. A modification of the contract to exercise option CLINs 0003-0004 will constitute the authority to proceed.
L-2.0. General Instructions
The same instructions from AEDC-L001, Initial Source Selection for Phase I, Wind Tunnel Compressor Blade Design, will be applicable for the preparation and submittal of the offeror’s proposal for the Final Downselect for Phase II, Wind Tunnel Compressor Blade Manufacture.
L-2.1. Organization / Number of Copies / Page Limits
Table 2.0 - Proposal Organization
Volume Paragraph Number
Volume Title Copies (Electronic
/ Paper)
Page Limit / Goal
I 3.0 Cost / Price (2 / 1) NA II 4.0 Contract Documentation (2 / 2) NA
L-3.0. Volume IV – Cost / Price
L-3.1. General Instructions
After evaluation of the information submitted for TDR, the Government will release a request for updated pricing. Specific instructions for this submittal will be provided at that time. However, for planning purposes, Government will request revised pricing to address the following options:
L-3.1.1. Option CLIN 0005: Tooling
L-3.1.2. Option CLIN 0006: Manufacturing Process, Testing and Prototypes
Atch 4
L-3.1.3. Option CLIN 0008: Production and testing of low rate initial production (LRIP) blades
L-3.1.4. Option CLIN 0010: Production of first run of blades
L-3.1.5. Option CLIN 0011: Repair Course
L-3.1.6. Option CLIN 0013: Production of second run of blades, if funding available
L-3.1.7. Option CLIN 0015: If funding is not available for Option CLIN 0012, First partial run of 49 blades
L-3.1.8. Option CLIN 0017: If funding is not available for Option CLIN 0012, second partial run of 48 blades
L-3.1.9. Option CLIN 0019: Blade Tip Cap Spares
L-3.1.10. Option CLIN 0020: Blade Cuff Spares
L-3.2. For the Final Downselect for Phase II, the offerors shall submit the requirements of Attachment L-9, Cost Model.
L-4.0. Volume II - Contract Documentation
L-4.1. Section A – Solicitation / Contract Form
Complete Block 15A of the Standard Form (SF) 30, Amendment of Solicitation / Modification of Contract; sign and date in Blocks 15B and 15C. An official having the authority to contractually bind your company shall sign the SF30 IAW FAR 4.102. The "original" copy should be clearly marked under separate cover and should be provided without any punched holes.
L-4.2. Section B - Supplies or Services and Costs / Prices
Provide a revised Section B of the contract for Option CLINs 0005-0020 only if proposing a downward adjustment. If no adjustment is being made to prices for those CLINs, the offerors shall submit a letter stating that no downward adjustment to contract pricing is being proposed.
L-4.3 Cross-Reference Matrix (CRM)
Offerors for the Downselect Phase II evaluation will be required to submit Attachment L-8, CRM for Phase II, to address the TDR submittals.
| Compressor Rotor Blades |
| FA9101-17-R-1000 |
| L-1.0. Overview |
| L-2.0. General Instructions |
| L-3.0. Volume IV – Cost / Price |
| L-3.1. General Instructions |
| L-3.2. For the Final Downselect for Phase II, the offerors shall submit the requirements of Attachment L-9, Cost Model. |
| L-4.0. Volume II - Contract Documentation |
File details come from the government source that posted it. Updated .