Attachment_4_-_Section_L_Phase_2.pdf

PDF 72 KB Posted

Attached to
Wind Tunnel Compressor Rotor Blades Federal contract opportunity
Solicitation number
FA9101-17-R-1000
Issued by
Department of the Air Force Materiel Command Test Center

About this file

Atch 4 - Section L, Phase II

View the file

Other files for this federal contract opportunity

Other files attached to Wind Tunnel Compressor Rotor Blades, newest first.
File Type Posted
Industry_Day_2_Slides_-_scan.pdf PDF
Amendment_0002_-_FBO.pdf PDF
Amendment_0001.pdf PDF
Current_Spacer_Seal_Configuration.xlsx XLSX spreadsheet
Amendment_0001_Answers_to_Industry_Questions.pdf PDF
Slides_Industry_Day_12_April_17_-_FBO.pdf PDF
Revised_Atch_2_16T_C1_Compressor_Blades_Equipment_Specification.pdf PDF
Attachment_L-8,_Cross_Reference_Matrix_for_Phase_2.xlsx XLSX spreadsheet
AEDC_Map.pdf PDF
Flying_into_Nashville_and_Driving_to_AEDC.pdf PDF
Map_to_GLC.pdf PDF
run03_r3_pressure.csv CSV file
FA9101-17-R-1000.pdf PDF
run06_r3_pressure.csv CSV file
Attachment_3_-_Section_L.pdf PDF
run04_r1_pressure.csv CSV file
run05_r2_pressure.csv CSV file
run06_r2_pressure.csv CSV file
Attachment_6__-_Section_M_Phase_2.pdf PDF
Attachment_L-5,_Subcontractor_Consent_Letter.pdf PDF
run04_r3_pressure.csv CSV file
run01_r1_pressure.csv CSV file
run05_r3_pressure.csv CSV file
Attachment_L-1_PPI_Tool.accdb —
run07_r3_pressure.csv CSV file
run05_r1_pressure.csv CSV file
run03_r2_pressure.csv CSV file
Attachment_L-1,_PPI_Tool_Instruction.pdf PDF
SKRO6199.pdf PDF
run06_r1_pressure.csv CSV file
PG108760_C_2_CALSP_stamp_stamp.pdf PDF
PG631713.01_B.stp STP file
PG209017_A_1_stamp_stamp_stamp.pdf PDF
PU630917.01_A_2_SVEPA_stamp_stamp_stamp.pdf PDF
16T_Blade_Pin_Aero_Surface.SLDPRT —
RowB_Blade_Assembly_For_Information_Only.stp STP file
RowA_Blade_Assembly_For_Information_Only.stp STP file
PG108761_C_2_CALSP_stamp_stamp.pdf PDF
PG108760_C_1_CALSP_stamp_stamp.pdf PDF
PG108761.stp STP file
Attachment_L-9,_Cost_Model.xlsx XLSX spreadsheet
C1_compressor_blade_synopsis.pdf PDF
Draft_RFP_Cover_Letter_-_signed.pdf PDF
Industry_Day_Attendee_List.pdf PDF
Industry_Day_-_Morning_Presentation.pdf PDF
PWT_16T_Comp_C1_Blades_RFI_v_04.pdf PDF
16T_C1_Blade_Design_SOW_14424-002-17.pdf PDF
3202100.6_H_0106_AROIN_stamp_stamp.pdf PDF
Transonic_C1_Compressor_Fiberglass_Blade_Construction.pdf PDF
PWT_16T_Comp_C1_Blades_RFI_Draft_v_03.pdf PDF
Show all 50

Wind Tunnel Compressor Rotor Blades has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Compressor Rotor Blades

FA9101-17-R-1000

Attachment 4

SECTION L

AEDC-L002, INFORMATION TO OFFERORS (ITO) – Final Downselect for Phase II, Wind Tunnel Compressor Blade Manufacture

L-1.0. Overview

Final Downselect for Phase II will be based on an evaluation of data presented at Technical Design Review (TDR) (see criteria outlined in AEDC-M002, Evaluation Factors for Award, Final Downselect for Phase II, Wind Tunnel Compressor Blade Manufacture. In addition, updated pricing for contract line item numbers (CLINs) 0005-0014 and 0019-0020 will constitute the basis for selection of the manufacturing contractor for the compressor rotor blades. A modification of the contract to exercise option CLINs 0003-0004 will constitute the authority to proceed.

L-2.0. General Instructions

The same instructions from AEDC-L001, Initial Source Selection for Phase I, Wind Tunnel Compressor Blade Design, will be applicable for the preparation and submittal of the offeror’s proposal for the Final Downselect for Phase II, Wind Tunnel Compressor Blade Manufacture.

L-2.1. Organization / Number of Copies / Page Limits

Table 2.0 - Proposal Organization

Volume Paragraph Number

Volume Title Copies (Electronic

/ Paper)

Page Limit / Goal

I 3.0 Cost / Price (2 / 1) NA II 4.0 Contract Documentation (2 / 2) NA

L-3.0. Volume IV – Cost / Price

L-3.1. General Instructions

After evaluation of the information submitted for TDR, the Government will release a request for updated pricing. Specific instructions for this submittal will be provided at that time. However, for planning purposes, Government will request revised pricing to address the following options:

L-3.1.1. Option CLIN 0005: Tooling

L-3.1.2. Option CLIN 0006: Manufacturing Process, Testing and Prototypes

Atch 4

L-3.1.3. Option CLIN 0008: Production and testing of low rate initial production (LRIP) blades

L-3.1.4. Option CLIN 0010: Production of first run of blades

L-3.1.5. Option CLIN 0011: Repair Course

L-3.1.6. Option CLIN 0013: Production of second run of blades, if funding available

L-3.1.7. Option CLIN 0015: If funding is not available for Option CLIN 0012, First partial run of 49 blades

L-3.1.8. Option CLIN 0017: If funding is not available for Option CLIN 0012, second partial run of 48 blades

L-3.1.9. Option CLIN 0019: Blade Tip Cap Spares

L-3.1.10. Option CLIN 0020: Blade Cuff Spares

L-3.2. For the Final Downselect for Phase II, the offerors shall submit the requirements of Attachment L-9, Cost Model.

L-4.0. Volume II - Contract Documentation

L-4.1. Section A – Solicitation / Contract Form

Complete Block 15A of the Standard Form (SF) 30, Amendment of Solicitation / Modification of Contract; sign and date in Blocks 15B and 15C. An official having the authority to contractually bind your company shall sign the SF30 IAW FAR 4.102. The "original" copy should be clearly marked under separate cover and should be provided without any punched holes.

L-4.2. Section B - Supplies or Services and Costs / Prices

Provide a revised Section B of the contract for Option CLINs 0005-0020 only if proposing a downward adjustment. If no adjustment is being made to prices for those CLINs, the offerors shall submit a letter stating that no downward adjustment to contract pricing is being proposed.

L-4.3 Cross-Reference Matrix (CRM)

Offerors for the Downselect Phase II evaluation will be required to submit Attachment L-8, CRM for Phase II, to address the TDR submittals.

Compressor Rotor Blades
FA9101-17-R-1000
L-1.0. Overview
L-2.0. General Instructions
L-3.0. Volume IV – Cost / Price
L-3.1. General Instructions
L-3.2. For the Final Downselect for Phase II, the offerors shall submit the requirements of Attachment L-9, Cost Model.
L-4.0. Volume II - Contract Documentation

File details come from the government source that posted it. Updated .