Attachment_L-7,_Cross_Reference_Matrix.xlsx

XLSX spreadsheet 18 KB Posted

Attached to
Wind Tunnel Compressor Rotor Blades
Solicitation number
FA9101-17-R-1000
Issued by

About this file

Atch L-7 - Cross Reference Matrix, Phase I

View the file

Other files

File Type Posted
FA9101-17-R-1000_award_notice_amendment.pdf PDF
Answers_to_Industry_Questions_16_May_2017.pdf PDF
Atch_L-3,_PPQ_Cover_Letter_-_revised.pdf PDF
Amendment_0003.pdf PDF
Amendment_0002_-_FBO.pdf PDF
Attachment_3_-_Revised_Section_L.pdf PDF
Industry_Day_2_Slides_-_scan.pdf PDF
Current_Spacer_Seal_Configuration.xlsx XLSX spreadsheet
Industry_Day_2_Attendees.pdf PDF
CFD_Condition_Chart_Blade_RFP.pdf PDF
Amendment_0001.pdf PDF
AEDC_Blade_Load_Test_Rig.pdf PDF
Revised_Atch_1_16T_C1_Compressor_Blades_SOW.pdf PDF
Slides_Industry_Day_12_April_17_-_FBO.pdf PDF
Revised_Atch_2_16T_C1_Compressor_Blades_Equipment_Specification.pdf PDF
Amendment_0001_Answers_to_Industry_Questions.pdf PDF
Attachment_L-6,__Relevancy_Matrix.xlsx XLSX spreadsheet
Attachment_L-7,_Cross_Reference_Matrix.xlsx XLSX spreadsheet
Attachment_L-8,_Cross_Reference_Matrix_for_Phase_2.xlsx XLSX spreadsheet
AEDC_Map.pdf PDF
Industry_Day_12_April_17_Agenda.pdf PDF
Flying_into_Nashville_and_Driving_to_AEDC.pdf PDF
Map_to_GLC.pdf PDF
SKRO6199.pdf PDF
Attachment_L-8,_Cross_Reference_Matrix_for_Phase_2.xlsx XLSX spreadsheet
run01_r1_pressure.csv CSV file
run02_r3_pressure.csv CSV file
Attachment_1_-_14424-17-004_16T_C1_Compressor_Blades_SOW.pdf PDF
run06_r1_pressure.csv CSV file
run01_r2_pressure.csv CSV file
run04_r2_pressure.csv CSV file
run02_r2_pressure.csv CSV file
run03_r3_pressure.csv CSV file
run03_r1_pressure.csv CSV file
FA9101-17-R-1000.pdf PDF
Attachment_3_-_Section_L.pdf PDF
run06_r3_pressure.csv CSV file
Attachment_4_-_Section_L_Phase_2.pdf PDF
Attachment_L-4,_Client_Authorization_Letter.pdf PDF
run07_r2_pressure.csv CSV file
Attachment_5__-_Section_M.pdf PDF
run02_r1_pressure.csv CSV file
run01_r3_pressure.csv CSV file
Attachment_L-6,__Relevancy_Matrix.xlsx XLSX spreadsheet
Attachment_L-3,_PPQ_Cover_Letter.pdf PDF
run04_r1_pressure.csv CSV file
run05_r2_pressure.csv CSV file
run06_r2_pressure.csv CSV file
Attachment_6__-_Section_M_Phase_2.pdf PDF
Attachment_L-5,_Subcontractor_Consent_Letter.pdf PDF
Show 40 more

Latest 50 of 116 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet2

Section LSection MProposal
Subfactor 1: Design and Analysis CapabilityL-4.2.4.M-2.2.3.
Design RequirementsL-4.2.4.1.M-2.2.3.1.
Design RequirementsL-4.2.4.1.1.M-2.2.3.1.
Design RequirementsL-4.2.4.1.2.M-2.2.3.1.
Design RequirementsL-4.2.4.1.3.M-2.2.3.1.
Analysis RequirementsL-4.2.4.2.M-2.2.3.2.
Analysis RequirementsL-4.2.4.2.1.M-2.2.3.2.
Analysis RequirementsL-4.2.4.2.2.M-2.2.3.2.
Technical ResourcesL-4.2.4.3.M-2.2.3.3.
Technical ResourcesL-4.2.4.3.1.M-2.2.3.3.
Technical ResourcesL-4.2.4.3.2.M-2.2.3.3.
Subfactor 2: Testing ApproachL-4.2.5.M-2.2.4.
Testing CapabilitiesL-4.2.5.1.M-2.2.4.1.
Testing CapabilitiesL-4.2.5.1.1.M-2.2.4.1.
Testing CapabilitiesL-4.2.5.1.2.M-2.2.4.1.
Testing MethodologyL-4.2.5.2.M-2.2.4.2.
Testing MethodologyL-4.2.5.2.1.M-2.2.4.2.
Testing MethodologyL-4.2.5.2.2.M-2.2.4.2.
Subfactor 3: Manufacturing CapabilityL-4.2.6.M-2.2.5.
Manufacturing CapabilityL-4.2.6.1.M-2.2.5.1.
Manufacturing CapabilityL-4.2.6.2.M-2.2.5.1.
Manufacturing CapabilityL-4.2.6.3.M-2.2.5.1.
Subfactor 3: Program ManagementL-4.2.7.M-2.2.6.
Integrated Master ScheduleL-4.2.7.1.1.M-2.2.6.1.
Integrated Master ScheduleL-4.2.7.1.2.M-2.2.6.1.
Configuration ManagementL-4.2.7.2.M-2.2.6.2.
Risk ManagementL-4.2.7.3.M-2.2.6.3.
Risk ManagementL-4.2.7.3.1M-2.2.6.3.
Risk ManagementL-4.2.7.3.2M-2.2.6.3.
Quality ControlL-4.2.7.4.M-2.2.6.4

&"-,Bold"ATTACHMENT L-7 Cross Reference Matrix Compressor Rotor Blades

FA9101-17-R-1000

Attachment L-7

Atch 3.7

File details come from the government source that posted it. Updated .