General Decision Number: NY080015 12/19/2008 NY15
Superseded General Decision Number: NY20070015
State: New York
Construction Types: Heavy and Highway
HEAVY & HIGHWAY CONSTRUCTION
County: Oneida County in New York.
HEAVY AND HIGHWAY CONSTRUCTION PROJECTS
Modification Number Publication Date
0 02/08/2008
1 02/22/2008
2 04/04/2008
3 05/23/2008
4 05/30/2008
5 06/06/2008
6 06/27/2008
7 07/04/2008
8 08/08/2008
9 12/19/2008
BRNY0002-009 06/01/2008
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 27.23 13.98
FOOTNOTE:
a. Paid Holidays: Memorial Day, July the 4th, Labor Day, and Thanksgiving Day (provided the employee is employed one
(1) day before and one (1) day after the holiday).
CARP0120-002 07/01/1999
HEAVY & HIGHWAY CONSTRUCTION
Rates Fringes
Carpenters:
Carpenters, Millwrights, Piledrivers................$ 21.31 6.765
* ELEC0043-001 12/01/2008
Rates Fringes
CABLE SPLICER....................$ 31.90 15.49
ELECTRICIAN......................$ 29.00 15.49
ELEC0181-001 06/01/1993
REMAINDER OF COUNTY:
Rates Fringes
ELECTRICIAN......................$ 18.50 5.73+3%
ELEC1249-003 05/05/2008
Rates Fringes
LINE CONSTRUCTION: Lineman
(LIGHTING AND TRAFFIC SIGNAL
Including any and all Fiber
Optic Cable necessary for
Traffic Signal Systems, Traffic Monitoring systems and Road Weather information systems)
Flagman.....................$ 21.83 12.00+6.5%+a
Groundman Truck Driver
(tractor trailer unit)......$ 30.92 12.00+6.5%+a
Groundman Truck Driver......$ 29.10 12.00+6.5%+a
Lineman & Technician........$ 36.38 12.00+6.5%+a
Mechanic....................$ 29.10 12.00+6.5%+a
FOOTNOTE:
a. New Year's Day, Memorial Day, Independence Day, Labor
Day, Thanksgiving Day, Christmas Day, plus President's Day, Good Friday, Decoration Day, Election Day for the President of the United States and Election Day for the Governor of the State of New York, provided the employee works the day before or the day after the holiday.
ELEC1249-004 05/05/2008
Rates Fringes
Line Construction:
Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities (where no other trades are or have been involved):
Cable Splicer..............$ 43.64 12.00+7%+a
Flagman....................$ 23.80 12.00+7%+a
Groundman digging machine operator...................$ 35.70 12.00+7%+a
Groundman truck driver
(tractor trailer unit).....$ 33.72 12.00+7%+a
Groundman Truck driver.....$ 31.74 12.00+7%+a
Lineman and Technician.....$ 39.67 12.00+7%+a
Mechanic...................$ 31.74 12.00+7%+a
Overhead transmission line work (where 40.09other trades are or have been involved):
Cable Splicer..............$ 46.41 12.00+7%+a
Overhead transmission line work (where other trades are or have been involved):
Flagman....................$ 25.31 12.00+7%+a
Groundman digging machine operator...................$ 37.97 12.00+7%+a
Groundman truck driver
(tractor trailer unit).....$ 35.86 12.00+7%+a
Groundman truck driver.....$ 33.75 12.00+7%+a
Lineman and Technician.....$ 42.19 12.00+7%+a
Mechanic...................$ 33.75 12.00+7%+a
Substation:
Cable Splicer..............$ 43.64 12.00+7%+a
Flagman....................$ 23.80 12.00+7%+a
Ground man truck driver....$ 31.74 12.00+7%+a
Groundman digging machine operator...................$ 35.70 12.00+7%+a
Groundman truck driver
(tractor trailer unit).....$ 33.72 12.00+7%+a
Lineman & Technician.......$ 39.67 12.00+7%+a
Mechanic...................$ 31.74 12.00+7%+a
Switching structures;
railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation
Cable Splicer..............$ 45.08 12.00+7%+a
Flagman....................$ 24.59 12.00+7%+a
Groundman Digging Machine
Operator...................$ 36.88 12.00+7%+a
Groundman Truck Driver
(tractor-trailer unit).....$ 34.83 12.00+7%+a
Groundman Truck Driver.....$ 32.78 12.00+7%+a
Lineman & Technician.......$ 38.87 11.75+7%+a
Mechanic...................$ 32.78 12.00+7%+a
TELEPHONE, CATV
FIBEROPTICS CABLE AND
EQUIPMENT
Cable splicer/Central
Office Person..............$ 23.07 3.05+3%
Groundman..................$ 11.61 3.05+3%
Installer Repairman-
Teledata
Lineman/Tecnician-
Equipment Operator.........$ 21.91 3.05+3%
TREE TRIMMER................$ 18.92 4.05+3%+b
FOOTNOTE:
a. PAID HOLIDAYS: New Year's Day, Presidents' Day, Memorial
Day, Good Friday, Independence Day, Labor Day, Thanksgiving
Day, Christmas Day, and Election Day for the President of the United States and Election Day for the Governor of New
York State, provided the employee works two days before or two days after the holiday.
b. New Years Day, Washington's Birthday, Good Friday, Decoration Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, Day after Thanksgiving Day and Christmas
Day.
ENGI0545-002 07/01/2008
HEAVY & HIGHWAY
Rates Fringes
Power equipment operators:
GROUP 1.....................$ 28.15 19.75+a
GROUP 2.....................$ 27.27 19.75+a
GROUP 3.....................$ 23.99 19.75+a
GROUP 4.....................$ 29.50 19.75+a
POWER EQUIPMENT OPERATORS CLASSIFICATIONS (HEAVY & HIGHWAY)
GROUP 1: Automated Concrete Spreader (CMI Type); Automatic
Fine Grader; Backhoe (Except Tractor Mounted, Rubber
Tired); Belt Placer (CMI Type); Blacktop Plant (Automated);
Boom Truck 100' & over (jib and Boom); Cableway; Caisson
Auger; Central Mix Concrete Plant (Automated); Cherry
Picker (over 5 tons capacity); Concrete Curb Machine, Self-propelled, Slipform; Concrete Pump 8" and over; Crane;
Derricks; Dragline; Dredge; Dual Drum Paver; Excavator (All
Purpose-Hydraulically operated) (Gradall or Similar); Front
End Loader (4cu. yd. and over); Head Tower (Sauerman or equal); Hoist (Two or Three Drum); Holland Loader;
Hydrodemolition equipment (self contained); Maintenance
Engineer; Mine Hoist; Mucking Machine or Mole; Overhead
Crane (Straddle Type); Pavement Profiler (over 300 horsepower); Pile Driver; Power Grader; Quad 9; Quarry
Master (or equivalent); Scraper; Shovel; Side Boom;
Slipform Paver (If a second man needed, he shall be an oiler); Tractor Drawn Belt-Type Loader; Truck Crane; Truck or Trailer Mounted Log Chipper (self Feeder); Tug Operator
(Manned Rented Equipment Excluded); Tunnel shovel
GROUP 2: Bituminous Spreader and Mixer; Blacktop Plant (Non-
Automated); Blast or Rotary Drill (Truck or Tractor
Mounted); Boring machine; Cage Hoist; Central Mix Plant
(Non Automated) and all Concrete Batching Plants; Cherry
Picker (5 Tons capacity and under); Compressors (4 or less) exceeding 2,000 C.F.M. combined capacity; Concrete Paver
(over 16s); Concrete Pump (under 8"); Crawler Drill
(self-contained); Crusher; Diesel Power Unit; Drill Rigs, Tractor Mounted; Front End Loader (under 4 cu. yd.);
Greaser man, Hi-Pressure Boiler (15 lbs. and over); Hoist
(One Drum); Kolman Plant Loader & Similar Type Loaders;
L.C.M. Work Boat Operator; Locomotive; Mixer (for stabilizad base self- propelled); Monorail Machine; Plant
Engineer; Pump Crete; Ready Mix Concrete Plant;
Refrigeration Equipment (for soil stablization); Road
Widener; Roller (all above sub-grade); Sea Mule; Seamule;
Tractor with Dozer and/or Pusher; Trecher; Tugger Hoist;
Welder; Winch; Winch Cat
GROUP 3: A Frame Truck; Ballast Regulator, Ride on;
Compressors (4 not to exceed 2,000 c.f.m. combined capacity; or 3 or less with more than 1,200 c.f.m. but not to exceed 2,000 c.f.m.); Compressors, Dust Collectors, Generators Pumps, Welding Machines, Light Plants (4 of any type or combination); Concrete Pavement Spreader and
Finishers; Conveyer; Drill (core); Electric Pump used in conjunction with well-point system; Farm Tractor with accessories; Fine grade machine; Fork lift (under 15 ft.);
Grout Pump; Gunite Machine; Hammers (Hydraulic self-propelled); Hydra Spiker, ride on; Hydro-blaster
(water); Post Hole Digger and Post Driver; Power Sweeper;
Roller (Grader and fill); Scarifier, ride on; Span-Saw, ride on; Submersible Electric Pump (when used in lieu of well point system); Tamper, ride on; Tie extractor, ride on; Tie Handler; Tie Inserter, ride on; Tie Spacer, ride on; Track Liner, ride on; Tractor with towed accessories;
Vibatory Compactor; Well Point; Vibro Tamp
GROUP 4: Master Mechanic
PREMIUMS: Hazmat Work 2.50
CRANE PREMIUMS (Add to Group 1 Rate)
Tower Crane (under 115 ft) 1.00
Boom length incl. jib over 115 - 149 ft 2.50
Boom length incl. jib over 150 ft 3.50
FOOTNOTE:
a. New Year's Day, Memorial Day, Independence Day, Labor
Day, Thanksgiving Day, Christmas Day provided the employee has worked the working day before and the working day after the holiday.
IRON0440-001 05/01/2008
REMANINDER OF COUNTY
Rates Fringes
Ironworkers:
Structural, Ornamental, Rodman, Machinery Mover, Rigger, Fence Erector, Reinforcement, and Stone
Derrickman..................$ 23.13 18.76
LABO0035-002 07/01/2006
Rates Fringes
Laborers:
GROUP 1.....................$ 21.70 11.84+a
GROUP 2.....................$ 21.90 11.84+a
GROUP 3.....................$ 22.10 11.84+a
GROUP 4.....................$ 22.30 11.84+a
GROUP 5.....................$ 23.70 11.84+a
FOOTNOTE:
a. Memorial Day, Independence Day, Labor Day, Thanksgiving
Day, Christmas Day and New Year's Day provided the employee must work the day before and the work the day after a holiday to receive holiday pay.
GROUP 1: Laborers, flagman, outboard and handboats
GROUP 2: Bull Float, Chain Saw, Concrete aggregate bin, Concrete Bootman, Gin Buggy, Hand or Machine Vibrator, Jackhammer, Mason Tender, Mortor Mixer, Pavement Breaker, Handlers of all steel mesh, Small generators for laborers's tools, Installation of bridge drainage; Pipelayers, Vibrator type rollers, Tamper, Drill doctor, Tail or Screw
Operator on asphalt paver, Water pump operator (1 1/2" and single diaphram), Nozzle (aphlat, gunnite, seeding and sand blasting), Laborers on chain link fence erection, Rock splitter and power unit, Pusher type concrete saw and all other gas, electric, oil, and Air tool operators, Wrecking laborers
GROUP 3: All rock or drilling machine operators (except quarry master and similar type), Acetylene torch operators, and Asphalt paver, Powerman
GROUP 4: Blasterers, form setters, stone and granite curb setters
GROUP 5: Hazardous waste removal
PAIN0004-020 08/01/2007
Rates Fringes
Painters:
BUILDING CONSTRUCTION
Brush & Roll, Drywall
Taping/Finishing...........$ 20.00 10.58
Spray, Sandblasting, Structural Steel...........$ 20.50 10.58
HEAVY & HIGHWAY
CONSTRUCTION
Bridges....................$ 31.00 16.10
PAIN0677-002 05/01/2008
Rates Fringes
GLAZIER..........................$ 21.06 10.43
PLUM0112-005 05/01/2008
Rates Fringes
Plumber and Steamfitter
Northern Zone...............$ 28.15 15.10
SFNY0669-001 04/01/2008
Rates Fringes
SPRINKLER FITTER.................$ 29.90 16.30
TEAM0182-001 06/01/1996
Rates Fringes
Truck drivers:
GROUP 1.....................$ 17.37 7.70+a
GROUP 2.....................$ 17.42 7.70+a
GROUP 3.....................$ 17.47 7.70+a
GROUP 4.....................$ 17.62 7.70+a
GROUP 5.....................$ 17.77 7.70+a
FOOTNOTES:
PAID HOLIDAYS: A-New Year's Day, B-Memorial Day, C-Independence Day, D-Labor Day, E-Thanksgiving Day, F-Christmas Day
a. Paid Holidays: Independence Day and Labor Day provided the employee works his scheduled day before and his scheduled day after the holiday and is on the payroll week in which the holiday falls.
TRUCK DRIVERS:
GROUP 1: Pickups, panel trucks, flatboy material truck
(straight jobs), single axle dump trucks, dumpsters, receives, greasers, truck tiremen.
GROUP 2: Tandems, batch trucks, mechanics.
GROUP 3: Semi-trailers, low-boy trucks, asphalt distributors trucks, agitator, mixer trucks and dumpcrete type vehicles, truck mechanic, fuel truck.
GROUP 4: Specialized earth moving equipment-euclid type or similar off-highway equipment where not self-loader, and straddle (ross) carrier, self contained concrete unit
GROUP 5: Off-highway tandem back-dump, twin engine equipment and double hitched equipment where not self-loaded.
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION