09r0006 rfp atch 4a wage det ny14 27 mar 09.doc

DOC document 38 KB Posted

Attached to
Pavements Maintenance and Repair IDIQ
Solicitation number
FA8751-09-R-0006
Issued by

About this file

FA8751-09-R-0006 Atch 4A Wage Determination NY14

View the file

Other files

File Type Posted
09r0006 rfp addtl info 4.doc DOC document
09r0006 rfp addtl info 3.doc DOC document
09r0006 rfp addtl info 2.doc DOC document
09r0006 rfp atch 2 price sched REVISED 29 apr 09.xls XLS spreadsheet
09r0006 rfp atch 3 cost adj formulas REVISED 30 apr 09.doc DOC document
09r0006 rfp amend 02.pdf PDF
09r0006 rfp amend 02 atch ta-ihr-spec REVISED uldf980022 29 apr 09.doc DOC document
09r0006 rfp addtl info 1 site visit.doc DOC document
09r0006 rfp addtl info 1 q&a.doc DOC document
09r0006 rfp addtl info 1 past idiqs.pdf PDF
09r0006 rfp addtl info 1 annual qtys.xls XLS spreadsheet
09r0005 rfp addt'l info 1.doc DOC document
09r0006 rfp atch 5 ppq.doc DOC document
TA-IHR-AF3000 ULDF980022 IHR AF3000.pdf PDF
TA-NR-SPEC ULDF090007 Newport Road SOW.pdf PDF
TA-NR-DRWG ULDF090007 Newport Road DRWG.pdf PDF
TA-IHR-SPEC ULDF980022 IHR SOW 31 mar 09.pdf PDF
TA-IHR-DRWG ULDF980022 IHR Final Plans.zip ZIP file
09r0006 rfp amend 01.pdf PDF
ULDF090007 DRAW Tanner Hill.pdf PDF
ULDF980022 IHR Final Plans.zip ZIP file
ULDF980022 AF3000 Irish Hill.pdf PDF
09r0006 sow 31 mar 09.pdf PDF
ULDF090007 SOW Tanner Hill.pdf PDF
09r0006 rfp atch 5 ppq.doc DOC document
09r0006 rfp atch 4b wage det ny15 19 dec 08.doc DOC document
09r0006 rfp.doc DOC document
09r0006 rfp atch 2 price sched 30 mar 09.xls XLS spreadsheet
09r0006 rfp atch 3 cost adj formulas.doc DOC document
09r0006 rfp atch 1 specs 03 feb 09.pdf PDF
09r0006 rfp atch 6 site visit.doc DOC document
09r0006 index rioc.doc DOC document
09r0006 ppq.doc DOC document
09r0006 bid sched.xls XLS spreadsheet
09r0006 specs.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Decision Number: NY080014 03/27/2009 NY14

Superseded General Decision Number: NY20070014

State: New York

Construction Type: Building

County: Oneida County in New York.

BUILDING CONSTRUCITON PROJECTS (excluding single family homes and apartment up to and including 4 stories)

Modification Number Publication Date

0 02/08/2008

1 02/22/2008

2 04/04/2008

3 05/23/2008

4 05/30/2008

5 06/06/2008

6 06/27/2008

7 07/04/2008

8 07/18/2008

9 08/08/2008

10 12/19/2008

11 03/27/2009

BRNY0002-005 07/01/2008

UTICA CHAPTER

Rates Fringes

BRICKLAYER

BRICKLAYERS, STONE MASONS,

CEMENT MASONS, PLASTERERS,

POINTERS, CLEANERS &

CAULKERS....................$ 25.16 12.80

Marble, Tile & Terrazzo

Finisher.........................$ 20.11 11.95

Marble, Tile & Terrazzo

Workers..........................$ 23.16 12.55

CARP0747-003 07/01/2008

Rates Fringes

CARPENTER

BUILDING CONSTRUCTION

Carpenters, Millwrights....$ 22.64 11.55

Piledriver.................$ 22.89 11.55

HEAVY & HIGHWAY

CONSTRUCTION................$ 27.64 11.55

ELEC0043-001 12/01/2008

Rates Fringes

CABLE SPLICER....................$ 31.90 15.49

ELECTRICIAN......................$ 29.00 15.49

* ELEV0035-002 01/01/2009

Rates Fringes

Elevator Constructor.............$ 36.46 18.285

FOOTNOTES:

a. 8 PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving

Day, and the day after Thanksgiving Day, Christmas Day.

b. Employer contributes 8% of basic hourly rate for 5 years or more of service or 6% of basic hourly rate for 6 months to 5 years of service as vacation pay credit.

ENGI0545-006 06/01/2008

Rates Fringes

Power Equipment Operator

Backhoe, Bulldozer, Forklift....................$ 25.50 17.10+a

Crane, Loader, Roller.......$ 27.15 17.10+a

FOOTNOTE:

a. PAID HOLIDAYS: New Year's day, Memorial day, Independence Day, Labor day, Thanksgiving Day and Christmas

Day, provided the employee has worked five consecutive working days before the holiday and the working day after the holiday

CRANE PREMIUMS (ADD TO GROUP 1 RATE):

Boom length incl. jib over 150 1.25

Boom length incl. jib over 200 ft 2.25

Boom length incl. jib over 300 ft 3.25

IRON0440-001 05/01/2008

REMANINDER OF COUNTY

Rates Fringes

Ironworkers:

Structural, Ornamental, Rodman, Machinery Mover, Rigger, Fence Erector, Reinforcement, and Stone

Derrickman..................$ 23.13 18.76

LABO0035-003 07/01/2002

BUILDING CONSTRUCTION

Rates Fringes

Laborers:

(Hazardous waste removal includes, wetting, stripping, removal, scrapping, vaccuming, bagging and disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems)........$ 19.00 6.84

Asbestos Removal...........$ 18.50 6.19

Blasters, Form Setters, Motor-Buggy Operator

(Ryder Type)...............$ 17.50 6.19

Laborers...................$ 17.00 6.19

Pipelayers, Motor Mixers, Motor Buggy Operator

(Walk Behind), Power Lift

(Walk Behind) Wagon Drill

Operator...................$ 17.15 6.19

Wagon Drill Operator.......$ 17.40 6.19

PAIN0004-021 08/01/2007

Rates Fringes

Painters:

Brush & Roller, Drywall

Taping/Finishing............$ 20.00 10.58

Spray/Sandblasting/Structural

Steel.......................$ 20.50 10.58

PAIN0677-002 05/01/2008

Rates Fringes

GLAZIER..........................$ 21.06 10.43

PLUM0112-005 05/01/2008

Rates Fringes

Plumber and Steamfitter

Northern Zone...............$ 28.15 15.10

ROOF0195-001 06/01/2008

Rates Fringes

ROOFER, Including Built Up, Composition and Single Ply

Roofs............................$ 23.25 13.32

SFNY0669-001 04/01/2008

Rates Fringes

SPRINKLER FITTER.................$ 29.90 16.30

SHEE0058-001 05/01/2008

Rates Fringes

Sheet Metal Worker

Projects 10 million or less.$ 25.40 15.01

Projects over $10 million...$ 26.40 15.01

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

File details come from the government source that posted it. Updated .