Q&A's_7.pdf
PDF 107 KB Posted
- Attached to
- U-30 Tow Tractors
- Solicitation number
- FA8534-18-R-0015
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA8534-18-R-0015_0003.pdf | ||
| Q&A's_6.pdf | ||
| Q&A's_5.pdf | ||
| Q&A's_4.pdf | ||
| FA8534-18-R-0015_0002.pdf | ||
| Q&A's_3.pdf | ||
| Q&A's_2.pdf | ||
| Question_and_Answers__1.pdf | ||
| FA8534-18-R-0015_0001.pdf | ||
| 01_FACTS_Sheet.docx | DOCX document | |
| 04_Transmittal_Letter.docx | DOCX document | |
| 12_A0003_CDRL_Technical_Review_Data_Package.pdf | ||
| 07_Special_Packaging_Instructions.pdf | ||
| 02_Consent_Form.docx | DOCX document | |
| FA8534-18-R-0015_FINAL.pdf | ||
| 18_QuantityPrice_Ranges.pdf | ||
| 10_A0001_CDRL_Pre-production_Test_Procedure.pdf | ||
| 03_Past_Performance_Questionnaire.doc | DOC document | |
| 08_PackagingRequirements.pdf | ||
| 15_A0006_CDRL_Request_for_Variance.pdf | ||
| 14_A0005_CDRL_Engineering_Change_Proposal.pdf | ||
| 11_A0002_CDRL_Pre-production_Test_Report.pdf | ||
| 16_DD-1423_TOW_TRACTOR.pdf | ||
| 13_A0004_CDRL_Product_Base_Line_Index.pdf | ||
| 05_ClientAuthorizationLetter.docx | DOCX document | |
| 06_CID_Continuation_Sheet.doc | DOC document | |
| 17_TMCR_U-30_TOW_TRACTOR.DOC | DOC document |
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U-30 TOW TRACTOR
FA8534-18-R-0015
Questions and Answers #7
13 December 2018
1. Will the USAF accept a 3 hour time limit for meeting the preparation and restoration of the tow tractor air transportability requirement?
At this time, the USAF will not accept a 3 hour time limit. The 30 minute time limit referenced in Attachment 06, CID Continuation Sheet, 3.5.1.5 does not apply to the removable ballast weights.
See the last sentence of 3.5.1.5 for the exception.
2. What is the address for mailing U-30 Tow Tractor proposals?
Support Equipment & Vehicle Division
AFLCMC/WNKAC
Attention: Oya Harrison or Philip Holt 235 Byron Street, Ste 19A Bldg. 300 CML PHN 478-222-1922 Robins AFB, GA 31098-1670
3. Can the USAF clarify whether shoring is or is not permitted?
Shoring is permitted.
4. Is the USAF calling out FAR 52.219-8 and FAR 52.219-9 in this RFP? Is the government looking for a detailed small business plan for this submittal?
In accordance with Section L, Proposal Requirements, & Section M, Evaluation Factors for Award, of the RFP, FAR 52.219-8 applies to all businesses.
Volume III requires a Small Business Concern Participation proposal. On page 75 of the RFP, Section M, it states that 52.219-8 applies to all offerors and 52.219-9 applies to large businesses.
File details come from the government source that posted it.