01_FACTS_Sheet.docx

DOCX document 31 KB Posted

Attached to
U-30 Tow Tractors
Solicitation number
FA8534-18-R-0015
Issued by

About this file

Attachment 1

View the file

Other files

File Type Posted
Q&A's_7.pdf PDF
FA8534-18-R-0015_0003.pdf PDF
Q&A's_6.pdf PDF
Q&A's_5.pdf PDF
Q&A's_4.pdf PDF
FA8534-18-R-0015_0002.pdf PDF
Q&A's_3.pdf PDF
Q&A's_2.pdf PDF
Question_and_Answers__1.pdf PDF
FA8534-18-R-0015_0001.pdf PDF
04_Transmittal_Letter.docx DOCX document
12_A0003_CDRL_Technical_Review_Data_Package.pdf PDF
07_Special_Packaging_Instructions.pdf PDF
02_Consent_Form.docx DOCX document
FA8534-18-R-0015_FINAL.pdf PDF
18_QuantityPrice_Ranges.pdf PDF
10_A0001_CDRL_Pre-production_Test_Procedure.pdf PDF
03_Past_Performance_Questionnaire.doc DOC document
08_PackagingRequirements.pdf PDF
15_A0006_CDRL_Request_for_Variance.pdf PDF
14_A0005_CDRL_Engineering_Change_Proposal.pdf PDF
11_A0002_CDRL_Pre-production_Test_Report.pdf PDF
16_DD-1423_TOW_TRACTOR.pdf PDF
13_A0004_CDRL_Product_Base_Line_Index.pdf PDF
05_ClientAuthorizationLetter.docx DOCX document
06_CID_Continuation_Sheet.doc DOC document
17_TMCR_U-30_TOW_TRACTOR.DOC DOC document
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP FA8534-18-R-0015

ATTACHMENT 1

FACTS Sheet

SOURCE SELECTION INFORMATION - See FAR 2.101 and 3.104

FOR OFFICIAL USE ONLY

Present/Past Performance “FACTS Sheet”

(TO BE COMPLETED BY OFFEROR OR JOINT VENTURE MEMBER)

Request the offeror/joint venture member, if applicable, complete a separate FACTS Sheet for each relevant contract. See Clause L – Proposal Requirements of this RFP for detailed instructions and limits on number and recency of contracts. Offeror/joint venture member is requested to provide frank, concise comments regarding present/past performance on the program identified in B. below.

If the contract being submitted is an ordering type contractual vehicle (for example, including but not limited to an Indefinite Delivery “D” type contract per FAR 16.5), only after issuance of a delivery/task order does performance occur. The Contract Number, Total Contract Dollar Value, Period of Performance, and Quantities Produced/Repaired submitted here should be for the order or series of orders, the offeror has performed under this ordering type contractual vehicle.

If a series of orders is being submitted, the offeror shall include a list that includes the order numbers, each order’s Total Contract Dollar Value, each order’s Period of Performance, and each order’s Quantity Produced. If the series of orders contains more than 5 orders, include this information on a separate attachment. See Section L – Proposal Requirements, Paragraph C for more information on proposal submission and Section M – Evaluation Factors for Award, paragraph II(c).1. for evaluation information.

A. OFFEROR:

(1) Name (Company/Division)

(2) Address

(3) CAGE Code

B. PROGRAM/PROJECT TITLE and CONTRACT NUMBER:

(If submitting Ordering Type Contract: List the Basic Contract Number and each Order Number or Order Number within the a Series of Orders)

C. Role of the Offeror In Effort: __________ Prime Contractor __________ Subcontractor

Note that the information provided in the FACTS Sheet shall reflect the role that the offeror/joint venture member performed in the effort, i.e. an offeror who performed as a subcontractor shall identify the contract type, dollar value, description, etc. of its subcontract with the prime contractor.

D. NAME OF CONTRACTING ACTIVITY OR CUSTOMER:

E. CONTRACT TYPE(S) – CHECK ALL THAT APPLY

a. Firm Fixed Price _____

b. Time and Materials _____

c. Cost _____

d. Other (Explain)

F. TOTAL CONTRACT DOLLAR VALUE: (If you performed work as a subcontractor, identify your total contract dollar value and the PRIME’s total contract dollar value, if known. Describe any changes in dollar value that may have occurred from time of contract award to the conclusion of the effort or the present, whichever is applicable). If submitting an Ordering Type Contract, list the Original and Current Total Contract Dollar Values, for each Order or Order within the Series of Orders. If your series of orders consists of more than 5 individual orders include the information in a separate attachment.

1. Original Total Contract Dollar Value:

(If submitting Ordering Type Contract: List the Original Total Contract Dollar Value for each Order or Order within the Series of Orders)

2. Current Total Contact Dollar Value:

(If submitting Ordering Type Contract: List the Current Total Contract Dollar Value for each Order or Order within the Series of Orders)

3. Explain the differences in Total Contract Value, if applicable: Enter an explanation of the difference between the Original Total Contract Dollar Value and the Current Total Contract Dollar Value as of the time of proposal submission.

4. If Award Fee Contract, what percentages of the fee have been awarded in each of last 3 years?

G. PERIOD OF PERFORMANCE: (includes start and end dates, i.e. Jan 2004 – Dec 2007) If submitting an Ordering Type Contract, the “Period of Performance” submitted here should be for the order (or series of orders), the offeror has performed under this ordering type contractual vehicle. The offeror shall submit the “Start Date” for the individual order or the first order in the series. The offeror shall submit the “Original End Date” for the individual order or the last order in the series. If the “End Date” on the individual order or last order within the series of orders has changed, these changes would need to be reflected in the “Current End Date” Section below. Also, if submitting a series of orders, list the Start Date, Original End Date and Current End Date for each order. If your series of orders consists of more than 5 individual orders include the information in a separate attachment.

1. Start Date: Input start date of contract/order/series of orders.

2. Original End Date: Input original end date of contract/order/series of orders based on award.

3. Current End Date (if changed): Input end date, as the contract/order/series of orders stands at time of proposal submission.

H. Quantities of Items Involved in the Effort:

If submitting an Ordering Type Contract, the “Quantities” submitted here should be for the order (or series of orders), the offeror has produced under this ordering type contractual vehicle. If a series of orders is being submitted, the offeror should list the quantity produced, for each order within the series of orders. Only list the quantities that have been delivered, on the individual order or orders within the series of orders. If more than 5 orders are in the series of orders, include the information in a separate attachment.

1. Quantities produced:

I. BRIEF DESCRIPTION OF EFFORT:

1. As a part of this narrative description, highlight portions considered most relevant to the current acquisition; addressing how and to what extent the proposed effort relates to the program identified in B. above. To supplement the data provided in response to this paragraph, complete the following regarding relevancy of the effort identified in paragraph B to the proposed effort. This is limited to two pages beyond the page limitation of the FACTS sheet information.

2. This paragraph shall also include details to support the offeror’s record for on-time delivery, technical quantity and cost control for this effort identified in paragraph B. above.

RELEVANCY TABLE

(Complete with each effort submitted for evaluation)

This table will assist the PCO in evaluating the relevancy of the proposed effort to the instant requirement (fill in instant requirement). Offeror/joint venture member, if applicable, shall only complete column three. Offeror’s/joint venture member’s answers are applicable only to the effort identified in paragraph B. above, not the offeror’s/joint venture member’s proposed solutions to the instant effort. If additional space is needed, please attach a separate sheet to your response (limited to two pages). Please be as specific as possible with the fill-in information provided.

This table should be tailored in such a manner that it will be easy for the performance evaluation team to make a relevancy determination based on the established relevancy definitions for a program.

Category
Fill-in for the Proposed Effort (GOVT has completed this column)

(DO NOT CHANGE)

Fill-in for the Effort Identified in para. B Above (Offeror/Joint Venture Member completes) The effort in para B. required:

1. Nature of Business Area(s) Involved
Design and Manufacture or Overhaul* and Remanufacture*

2. Required Levels of Technology

2. (a) Aircraft Tow Tractor or Heavy-Duty Special Purpose Vehicle such as a Truck or Tractor
Please specify in fill-in column
2. (b) Gross Vehicle Weight (GVW)
Please specify GVW in fill-in column
2. (c) Drawbar Pull (DBP)
Please specify DBP in fill-in column
2. (d) Self-Contained
Yes or No – Please specify in fill-in column
2. (e) Trailer-Mounted
Yes or No – Please specify in fill-in column
2. (f) Rated Tons
Please specify rated tons in fill-in column

3. *Overhaul and Remanufacture

3. (a) Disassembling, Inspecting, Cleaning and Repairing (resurfacing as applicable, replacing expendables, fabricating as needed, refinishing, reassembling and adjusting) components of subsystems to return used vehicles to “zero” hour or like new condition
Please specify in fill-in column. Please be as specific as possible for 3. (a) through 3. (e) in describing the work involved in the fill-in column

3. (b) Mode-selectable steering system (having both two and four-wheel power steering modes)

3. (c) Hydraulic system (typically part of the steering systems and/or brake systems and consisting of fittings, hard and flexible hose piping, manifolds, regulators, relays, servos, valves, accumulators, filters, cylinders, coolers, and pumps)

3. (d) Power train system components including diesel engines, power-shift type automatic transmissions typically featuring integral, limited slip inter-axle differentials, and planetary-drive/steer axles with internal wet brake systems

3. (e) Electronic control systems to monitor and control the steering system and the power train

4. Quantities produced or other quantitative data
Units per year or units per month – Please specify in fill-in column

3. If you are small business, or, if you are a large business and a Small Business Subcontracting Plan per FAR 52.219-9 was NOT required by this effort, indicate your compliance with FAR 52.219-8, Utilization of Small Business Concerns, by completing the following. That is, when subcontracting possibilities existed on this effort, did you award subcontracts to small business concerns, veteran-owned small business concerns, service-disabled veteran-owned small business concerns, HUBZone small business concerns, small disadvantaged business concerns, and women-owned small business concerns to the fullest extent consistent with efficient contract performance? If FAR 52.219-8 was NOT included in this effort, whenever subcontracting possibilities existed in the performance of this effort, address whether or not it was your policy to utilize small business concerns, veteran-owned small business concerns, service-disabled veteran-owned small business concerns, HUBZone small business concerns, small disadvantaged business concerns, and women-owned small business concerns to the fullest extent consistent with efficient contract performance.

Utilization of Small Business Concerns
Small Business
Large Business

No subcontracting possibilities

In compliance

Not in compliance (address why)

4. If you are a large business, identify whether a subcontracting plan in accordance with FAR 52.219-9, Small Business Subcontracting Plan, was required by this effort. If one was required, complete the following regarding subcontracting goals and status-to-date. If goals were not met, please explain. This is applicable to large businesses only.

_____ Required

_____ Not Required

Category
Goals
Achieved-to-Date

Small Business

Small Disadvantaged Business

Women-Owned Small Business

HUBZone Small Business

Veteran-Owned Small Business

Service-Disabled Veteran Owned Small Business

HBCU/MI

J. PRIMARY POINTS OF CONTACT: (The offeror/joint venture member is responsible for exerting its best efforts to ensure that current information is provided for all individuals.)

Name and Office Symbol
Phone Number
FAX Number
1. Procuring Contracting Officer
DSN & Comm
DSN & Comm
2. Program Manager
DSN & Comm
DSN & Comm
3. Administrative Contracting Officer
DSN & Comm
DSN & Comm
4. Other (Please Specify)
DSN & Comm
DSN & Comm

K. Summarize contract issues relative to the number and severity of quality deficiencies recorded/contract discrepancy reports issued, cure notices, show cause letters, termination for default or cause, disputes, claims, latent defects; and, corrective actions taken for the contract listed in paragraph B. above.

L. Additionally, for those efforts where you are cognizant of unfavorable and/or marginal past performance ratings/reports previously assessed by customers or clients, but feel that significant progress has been made but not yet credited or formally documented, provide the program name, contract number, customer location and a narrative explaining "fixes" made to date, or any other information regarding the unfavorable/marginal assessment. This narrative portion is limited to one (1) additional page beyond the FACTS sheet required page limitation. It is not presumed that performance has been perfect. Rather, the proposal should contain evidence of the offeror's/joint venture member’s ability to isolate the root causes of problems and should describe programs or actions taken to resolve those causes. Demonstrated corrective actions (not just planned or promised), and the overall work record will be considered. Problems not addressed, but found by the Government during the evaluation of the information in this volume, will be assumed to still exist. Note: In the case of Contractor Performance Assessment Report System (CPARS), if your input has already been provided and the rationale/ circumstances have not changed, DO NOT repeat them here.

M. Was this contract effort (as identified in paragraph B. above) submitted as a past performance source of data for a previous WR-ALC procurement. Yes No . If yes, identify the buyer and/or contracting officer, their phone number and office symbol and solicitation number of the procurement for which this effort was submitted.

PLEASE NOTE: The Government is not bound by the offeror's opinion of relevancy. The Government will perform an independent assessment of relevancy of the data provided or obtained.

SOURCE SELECTION INFORMATION – See FAR 2.101 and 3.104
FOR OFFICIAL USE ONLY

File details come from the government source that posted it.