Questions Answers-12 Mar 09.doc

DOC document 33 KB Posted

Attached to
Flight Line Tow Tractors Federal contract opportunity
Solicitation number
FA853308R24092
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

Questions Answers_March 12 2009

View the file

Other files for this federal contract opportunity

Other files attached to Flight Line Tow Tractors, newest first.
File Type Posted
FA853308R24092______0004.pdf PDF
FA853308R24092______0003.pdf PDF
Q A_24092_3.doc DOC document
FA853308R24092______0002.pdf PDF
Q A_24092.doc DOC document
FA853308R24092______0001.pdf PDF
Attch_5_Questionnaire_Performance.rtf RTF text file
Attachment1(FACTS Sheet)_24092.doc DOC document
CDRLs - Modified.pdf PDF
TMCR_0824092_00_1.pdf PDF
Attachment 6_Quantity Ranges.doc DOC document
FLTT CID Published A-A-59312C 31July06.pdf PDF
RFP_FA853308R24092_ Final.doc DOC document
Attch_2_Client_Ltr.doc DOC document
FLTT CID Continuation Sheet Form 762 23June08.pdf PDF
SPI.pdf PDF
AFMC158.pdf PDF
Attch_4_Transmittal_Ltr.doc DOC document
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA8533-08-R-24092

FLIGHT LINE TOW TRACTOR

QUESTIONS AND ANSWERS

MARCH 12, 2009

Question: The CID provided with the solicitation calls for EMI testing to CS114, CS115, and CS116 for Air Force ground equipment. Is the requirement for test CS114, CS115, and CS116 accurate?

Answer: The requirement for CS114, CS115, and CS116 is due to the J560b connector for the trailer towing and is a valid requirement.

Question: Paragraph 4.3, Verification, of the CID states that prior to delivery of the first tow tractor of each configuration (two-wheel drive and four-wheel drive), the contractor shall demonstrate or test at his facility, each requirement of the CID or reference documents.

CLIN 0001 is only for a 4X2 pre-production unit and I do not see a CLIN for a 4X4 pre-production unit. Is it the Government’s intention to only do a pre-production unit for the 4X2 units and just test the first 4X4 production unit?

Answer: It is the Government’s intention to test and inspect a pre-production unit for the 4X2 unit only. Because this does conflict with the CID in that the CID asks for each configuration (two-wheel and four-wheel) to be demonstrated or tested, Amendment 0002 will be issued to incorporate CID Continuation Sheet dated 10 March 2009 which requires testing and demonstration of either the two-wheel unit or the four-wheel unit.

Question: Reference paragraph 2.16, Lighting, of the CID: The last sentence states “The spotlight shall be installed in the driver’s door to windshield pillar, and steerable from the driver’s position, inside the cab.”

Does this mean that the Government wants the driver to be able to operate the light from the inside of the cab remotely or is it the Government’s intent for the driver to extend his hand outside the window to adjust the spotlight manually?

Answer: As stated in the CID, the driver should be able to operate the light remotely from inside of the cab.