Attach_15_B_CDRLs.pdf

PDF 468 KB Posted

Attached to
Depot Logistics Support for the Command and Control Switching System Federal contract opportunity
Solicitation number
FA8218-14-R-5000
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

Attach 15 DD1423 Exhibit B

View the file

Other files for this federal contract opportunity

Other files attached to Depot Logistics Support for the Command and Control Switching System, newest first.
File Type Posted
SAF-AQ_signed_CCSS_JA_7Mar14_Redacted.pdf PDF
FA821814R5000_______0003.pdf PDF
Attach_01_PWS.pdf PDF
Attach_08_S-List.pdf PDF
Attach_12_AFPAC.pdf PDF
Attach_04_Logistic_Support_at_Germany.pdf PDF
Attach_02_Customer_List.pdf PDF
Attach_09_A_CDRLs.pdf PDF
Attach_10_B_CDRLS.pdf PDF
Attach_03_DD254.pdf PDF
Attach_07_R-List.pdf PDF
Attach_05_GFP.pdf PDF
Attach_06_Consideration.pdf PDF
FA821814R5000_______0002.pdf PDF
Attach_11_Advance_Agreement.pdf PDF
Attach_13_Instructions.pdf PDF
Attach_17_Instructions.pdf PDF
FA821814R5000_______0001.pdf PDF
Attach_10_GFP_25Feb14.pdf PDF
Attach_12_R-List.pdf PDF
Attach_13_S-List.pdf PDF
Attach_09_Taxes_Duties.pdf PDF
Attach_16_AFPAC.pdf PDF
Attach_07_USFK_IC_Clause.pdf PDF
Attach_14_A_CDRLs.pdf PDF
Attach_08_USFK_Emergency_Clause.pdf PDF
Attach_06_Japan.pdf PDF
Attach_11_Consideration.pdf PDF
Attach_04_Mgmt_Obs_Parts.pdf PDF
Attach_02_Customer_List.pdf PDF
FA821814R5000.pdf PDF
Attach_03_DD254.pdf PDF
Attach_05_Germany.pdf PDF
Attach_01_PWS.pdf PDF
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

B

Command & Control Switching Systems Raytheon Company

B001 Telecommunications System Installation Plan (TSIP) Site Installation Plan (SIP)

DI-GDRQ-80150 PWS 1.4.4.1, 1.12.1.2.1 AFLCMC/HBZBH

DD

A C

As Required

N/A

See Blk 16

See Blk 16

AFLCMC/HBZBH 1 1 0

DISA/NS223 1 1 0

DCMA 1 1 0

AFLCMC/PZZKB 1 1 0

4 4 0

Use DID as a guide only. Contractor format is acceptable.

Block 4: The SIP shall contain the following:

A. Introduction/Overview B. Requirements C. Systems Integration D. Installation E. Testing F. Engineering Support G. Contract Deliverables Requirements List H. Responsibilities I. Milestones Timeline J. Documentation K. Terms & Acronyms L. Cable demarcations, GFE, and CFM

Block 8: The letter “A” (Approval) in Block 8 of the CDRL, identifies data items that require approval.

Blocks 12 & 13: Draft plan shall be submitted NLT 30 calendar days after completion of the Site Survey. The Government will provide comments or approval within 14 calendar days of receipt. The contractor shall submit a final plan within 14 calendar days of receipt of Government comments or approval.

Block 14a: See distribution list for distribution addresses.

Digitally signed by HORR.MICHAEL.J.1008768125 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USAF, cn=HORR.MICHAEL.J.1008768125 Date: 2014.03.13 13:39:48 -06'00'

13 Mar 2014 HALL.JACK.J.JR.112898516

Digitally signed by HALL.JACK.J.JR.1128985162 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USAF, cn=HALL.JACK.J.JR.1128985162 Date: 2014.03.13 13:51:22 -06'00'

13 Mar 2014

1 1 Adobe Professional 8.0

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

B

Command & Control Switching Systems Raytheon Company

B002 Installation and Acceptance Test Plan (IATP) Site Cutover Plan

DI-QCIC-80154A PWS 1.4.4.5, 1.4.5.5.1, 1.12.1.2.2 AFLCMC/HBZBH

DD

A C

As Required

N/A

See Blk 16

See Blk 16

AFLCMC/HBZBH 1 1 0

DISA/NS223 1 1 0

DCMA 1 1 0

AFLCMC/PZZKB 1 1 0

4 4 0

Use DID as a guide only. Contractor format is acceptable.

Block 4: This cutover approach, at a minimum, shall contain the following information:

A. A pre-cutover checklist that ensures all portions of the system are correctly installed, tested, and operational prior to cutover B. A list of steps to complete cutover C. A list to verify operation of the system after cutover D. A section for the Government to sign verifying the on-site implementation of the task order is satisfactorily completed.

Block 8: The letter “A” (Approval) in Block 8 of the CDRL, identifies data items that require approval.

Blocks 12 & 13: Draft plan shall be submitted NLT 90 calendar days prior to cutover date.

The Government will provide comments or approval NLT 15 calendar days after receipt.

Final plan shall be submitted NLT 10 calendar days after receipt of final Government comments.

Block 14a: See distribution list for distribution addresses.

Digitally signed by HORR.MICHAEL.J.1008768125 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USAF, cn=HORR.MICHAEL.J.1008768125 Date: 2014.03.13 13:40:11 -06'00'

13 Mar 2014 HALL.JACK.J.JR.112898516

Digitally signed by HALL.JACK.J.JR.1128985162 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USAF, cn=HALL.JACK.J.JR.1128985162 Date: 2014.03.13 13:50:44 -06'00'

13 Mar 2014

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

B

Command & Control Switching Systems Raytheon Company

B003 Telecommunications System Installation Plan (TSIP) Site Configuration Records

DI-GDRQ-80150 PWS 1.4.5.6, 1.12.1.2.3 AFLCMC/HBZBH

DD

A C

As Required

N/A

See Blk 16

See Blk 16

AFLCMC/HBZBH 1 1 0

DISA/NS223 1 1 0

DCMA 1 1 0

AFLCMC/PZZKB 1 1 0

4 4 0

Use DID as a guide only. Contractor format is acceptable.

Block 8: The letter “A” (Approval) in Block 8 of the CDRL, identifies data items that require approval.

Blocks 12 & 13: Red-line copies shall be left on site after installation. Draft Site Configuration Records shall be submitted within 30 calendar days after the completion of installation activities. The Government will provide comments or approval within 14 calendar days of receipt. The contractor shall submit a final plan in the formats identified in the SIP within 14 calendar days of receipt of Government comments or approval.

Block 14a: See distribution list for distribution addresses.

Digitally signed by HORR.MICHAEL.J.1008768125 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USAF, cn=HORR.MICHAEL.J.1008768125 Date: 2014.03.13 13:40:37 -06'00'

13 Mar 2014 HALL.JACK.J.JR.112898516

Digitally signed by HALL.JACK.J.JR.1128985162 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USAF, cn=HALL.JACK.J.JR.1128985162 Date: 2014.03.13 13:51:54 -06'00'

13 Mar 2014

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

B

Command & Control Switching Systems Raytheon Company

B004 Acceptance Test Plan Factory Acceptance Test (FAT) Plan

DI-QCIC-80553 PWS 1.5.2.2, 1.12.1.2.4 AFLCMC/HBZBH

DD

A C

As Required

N/A

See Blk 16

See Blk 16

AFLCMC/HBZBH 1 1 0

DISA/NS223 1 1 0

DCMA 1 1 0

AFLCMC/PZZKB 1 1 0

4 4 0

Use DID as a guide only. Contractor format is acceptable.

Block 8: The letter “A” (Approval) in Block 8 of the CDRL, identifies data items that require approval.

Blocks 12 & 13: Draft plan shall be submitted 45 calendar days prior to the test. The Government will provide comments or approval within 14 calendar days of receipt. The contractor shall submit a final plan within 14 calendar days of receipt of Government comments or approval.

Block 14a: See distribution list for distribution addresses.

Digitally signed by HORR.MICHAEL.J.1008768125 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USAF, cn=HORR.MICHAEL.J.1008768125 Date: 2014.03.13 13:41:01 -06'00'

13 Mar 2014 HALL.JACK.J.JR.112898516

Digitally signed by HALL.JACK.J.JR.1128985162 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USAF, cn=HALL.JACK.J.JR.1128985162 Date: 2014.03.13 13:52:20 -06'00'

13 Mar 2014

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

B

Command & Control Switching Systems Raytheon Company

B005 Installation and Acceptance Test Plan (IATP) Site Pre-Cutover Installation Test (SPCIT)

DI-QCIC-80154A PWS 1.4.5.5, 1.5.2.4, 1.12.1.2.5 AFLCMC/HBZBH

DD

A C

As Required

N/A

See Blk 16

See Blk 16

AFLCMC/HBZBH 1 1 0

DISA/NS223 1 1 0

DCMA 1 1 0

AFLCMC/PZZKB 1 1 0

4 4 0

Use DID as a guide only. Contractor format is acceptable.

Block 8: The letter “A” (Approval) in Block 8 of the CDRL, identifies data items that require approval.

Blocks 12 & 13: Draft plan shall be submitted NLT 60 calendar days prior to scheduled cut-over start date. The Government will provide comments or approval NLT 14 calendar days after receipt. Final plan shall be submitted NLT 14 calendar days after receipt of final Government comments.

Block 14a: See distribution list for distribution addresses.

Digitally signed by HORR.MICHAEL.J.1008768125 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USAF, cn=HORR.MICHAEL.J.1008768125 Date: 2014.03.13 13:41:26 -06'00'

13 Mar 2014 HALL.JACK.J.JR.112898516

Digitally signed by HALL.JACK.J.JR.1128985162 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USAF, cn=HALL.JACK.J.JR.1128985162 Date: 2014.03.13 13:57:00 -06'00'

13 Mar 2014

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

B

Command & Control Switching Systems Raytheon Company

B006 Installation and Acceptance Test Plan (IATP) Site Post-Cutover Acceptance Test Procedure

DI-QCIC-80154A PWS 1.5.2.5, 1.12.1.2.6 AFLCMC/HBZBH

DD

A C

As Required

N/A

See Blk 16

See Blk 16

AFLCMC/HBZBH 1 1 0

DISA/NS223 1 1 0

DCMA 1 1 0

AFLCMC/PZZKB 1 1 0

4 4 0

Use DID as a guide only. Contractor format is acceptable.

Block 8: The letter “A” (Approval) in Block 8 of the CDRL, identifies data items that require approval.

Blocks 12 & 13: Draft plan shall be submitted NLT 45 calendar days prior to testing start date. The Government will provide comments or approval within 14 calendar days of receipt. The contractor shall submit a final plan within 14 calendar days of receipt of Government comments or approval.

Block 14a: See distribution list for distribution addresses.

Digitally signed by HORR.MICHAEL.J.1008768125 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USAF, cn=HORR.MICHAEL.J.1008768125 Date: 2014.03.13 13:42:25 -06'00'

13 Mar 2014 HALL.JACK.J.JR.112898516

Digitally signed by HALL.JACK.J.JR.1128985162 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USAF, cn=HALL.JACK.J.JR.1128985162 Date: 2014.03.13 13:57:32 -06'00'

13 Mar 2014

File details come from the government source that posted it. Updated .