Text version
DD FORM 1423-1, FEB 2001
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
B
Command & Control Switching Systems Raytheon Company
B001 Telecommunications System Installation Plan (TSIP) Site Installation Plan (SIP)
DI-GDRQ-80150 PWS 1.4.4.1, 1.12.1.2.1 AFLCMC/HBZBH
DD
A C
As Required
N/A
See Blk 16
See Blk 16
AFLCMC/HBZBH 1 1 0
DISA/NS223 1 1 0
DCMA 1 1 0
AFLCMC/PZZKB 1 1 0
4 4 0
Use DID as a guide only. Contractor format is acceptable.
Block 4: The SIP shall contain the following:
A. Introduction/Overview B. Requirements C. Systems Integration D. Installation E. Testing F. Engineering Support G. Contract Deliverables Requirements List H. Responsibilities I. Milestones Timeline J. Documentation K. Terms & Acronyms L. Cable demarcations, GFE, and CFM
Block 8: The letter “A” (Approval) in Block 8 of the CDRL, identifies data items that require approval.
Blocks 12 & 13: Draft plan shall be submitted NLT 30 calendar days after completion of the Site Survey. The Government will provide comments or approval within 14 calendar days of receipt. The contractor shall submit a final plan within 14 calendar days of receipt of Government comments or approval.
Block 14a: See distribution list for distribution addresses.
Digitally signed by HORR.MICHAEL.J.1008768125 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USAF, cn=HORR.MICHAEL.J.1008768125 Date: 2014.03.13 13:39:48 -06'00'
13 Mar 2014 HALL.JACK.J.JR.112898516
Digitally signed by HALL.JACK.J.JR.1128985162 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USAF, cn=HALL.JACK.J.JR.1128985162 Date: 2014.03.13 13:51:22 -06'00'
13 Mar 2014
1 1 Adobe Professional 8.0
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
B
Command & Control Switching Systems Raytheon Company
B002 Installation and Acceptance Test Plan (IATP) Site Cutover Plan
DI-QCIC-80154A PWS 1.4.4.5, 1.4.5.5.1, 1.12.1.2.2 AFLCMC/HBZBH
DD
A C
As Required
N/A
See Blk 16
See Blk 16
AFLCMC/HBZBH 1 1 0
DISA/NS223 1 1 0
DCMA 1 1 0
AFLCMC/PZZKB 1 1 0
4 4 0
Use DID as a guide only. Contractor format is acceptable.
Block 4: This cutover approach, at a minimum, shall contain the following information:
A. A pre-cutover checklist that ensures all portions of the system are correctly installed, tested, and operational prior to cutover B. A list of steps to complete cutover C. A list to verify operation of the system after cutover D. A section for the Government to sign verifying the on-site implementation of the task order is satisfactorily completed.
Block 8: The letter “A” (Approval) in Block 8 of the CDRL, identifies data items that require approval.
Blocks 12 & 13: Draft plan shall be submitted NLT 90 calendar days prior to cutover date.
The Government will provide comments or approval NLT 15 calendar days after receipt.
Final plan shall be submitted NLT 10 calendar days after receipt of final Government comments.
Block 14a: See distribution list for distribution addresses.
Digitally signed by HORR.MICHAEL.J.1008768125 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USAF, cn=HORR.MICHAEL.J.1008768125 Date: 2014.03.13 13:40:11 -06'00'
13 Mar 2014 HALL.JACK.J.JR.112898516
Digitally signed by HALL.JACK.J.JR.1128985162 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USAF, cn=HALL.JACK.J.JR.1128985162 Date: 2014.03.13 13:50:44 -06'00'
13 Mar 2014
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
B
Command & Control Switching Systems Raytheon Company
B003 Telecommunications System Installation Plan (TSIP) Site Configuration Records
DI-GDRQ-80150 PWS 1.4.5.6, 1.12.1.2.3 AFLCMC/HBZBH
DD
A C
As Required
N/A
See Blk 16
See Blk 16
AFLCMC/HBZBH 1 1 0
DISA/NS223 1 1 0
DCMA 1 1 0
AFLCMC/PZZKB 1 1 0
4 4 0
Use DID as a guide only. Contractor format is acceptable.
Block 8: The letter “A” (Approval) in Block 8 of the CDRL, identifies data items that require approval.
Blocks 12 & 13: Red-line copies shall be left on site after installation. Draft Site Configuration Records shall be submitted within 30 calendar days after the completion of installation activities. The Government will provide comments or approval within 14 calendar days of receipt. The contractor shall submit a final plan in the formats identified in the SIP within 14 calendar days of receipt of Government comments or approval.
Block 14a: See distribution list for distribution addresses.
Digitally signed by HORR.MICHAEL.J.1008768125 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USAF, cn=HORR.MICHAEL.J.1008768125 Date: 2014.03.13 13:40:37 -06'00'
13 Mar 2014 HALL.JACK.J.JR.112898516
Digitally signed by HALL.JACK.J.JR.1128985162 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USAF, cn=HALL.JACK.J.JR.1128985162 Date: 2014.03.13 13:51:54 -06'00'
13 Mar 2014
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
B
Command & Control Switching Systems Raytheon Company
B004 Acceptance Test Plan Factory Acceptance Test (FAT) Plan
DI-QCIC-80553 PWS 1.5.2.2, 1.12.1.2.4 AFLCMC/HBZBH
DD
A C
As Required
N/A
See Blk 16
See Blk 16
AFLCMC/HBZBH 1 1 0
DISA/NS223 1 1 0
DCMA 1 1 0
AFLCMC/PZZKB 1 1 0
4 4 0
Use DID as a guide only. Contractor format is acceptable.
Block 8: The letter “A” (Approval) in Block 8 of the CDRL, identifies data items that require approval.
Blocks 12 & 13: Draft plan shall be submitted 45 calendar days prior to the test. The Government will provide comments or approval within 14 calendar days of receipt. The contractor shall submit a final plan within 14 calendar days of receipt of Government comments or approval.
Block 14a: See distribution list for distribution addresses.
Digitally signed by HORR.MICHAEL.J.1008768125 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USAF, cn=HORR.MICHAEL.J.1008768125 Date: 2014.03.13 13:41:01 -06'00'
13 Mar 2014 HALL.JACK.J.JR.112898516
Digitally signed by HALL.JACK.J.JR.1128985162 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USAF, cn=HALL.JACK.J.JR.1128985162 Date: 2014.03.13 13:52:20 -06'00'
13 Mar 2014
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
B
Command & Control Switching Systems Raytheon Company
B005 Installation and Acceptance Test Plan (IATP) Site Pre-Cutover Installation Test (SPCIT)
DI-QCIC-80154A PWS 1.4.5.5, 1.5.2.4, 1.12.1.2.5 AFLCMC/HBZBH
DD
A C
As Required
N/A
See Blk 16
See Blk 16
AFLCMC/HBZBH 1 1 0
DISA/NS223 1 1 0
DCMA 1 1 0
AFLCMC/PZZKB 1 1 0
4 4 0
Use DID as a guide only. Contractor format is acceptable.
Block 8: The letter “A” (Approval) in Block 8 of the CDRL, identifies data items that require approval.
Blocks 12 & 13: Draft plan shall be submitted NLT 60 calendar days prior to scheduled cut-over start date. The Government will provide comments or approval NLT 14 calendar days after receipt. Final plan shall be submitted NLT 14 calendar days after receipt of final Government comments.
Block 14a: See distribution list for distribution addresses.
Digitally signed by HORR.MICHAEL.J.1008768125 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USAF, cn=HORR.MICHAEL.J.1008768125 Date: 2014.03.13 13:41:26 -06'00'
13 Mar 2014 HALL.JACK.J.JR.112898516
Digitally signed by HALL.JACK.J.JR.1128985162 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USAF, cn=HALL.JACK.J.JR.1128985162 Date: 2014.03.13 13:57:00 -06'00'
13 Mar 2014
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
B
Command & Control Switching Systems Raytheon Company
B006 Installation and Acceptance Test Plan (IATP) Site Post-Cutover Acceptance Test Procedure
DI-QCIC-80154A PWS 1.5.2.5, 1.12.1.2.6 AFLCMC/HBZBH
DD
A C
As Required
N/A
See Blk 16
See Blk 16
AFLCMC/HBZBH 1 1 0
DISA/NS223 1 1 0
DCMA 1 1 0
AFLCMC/PZZKB 1 1 0
4 4 0
Use DID as a guide only. Contractor format is acceptable.
Block 8: The letter “A” (Approval) in Block 8 of the CDRL, identifies data items that require approval.
Blocks 12 & 13: Draft plan shall be submitted NLT 45 calendar days prior to testing start date. The Government will provide comments or approval within 14 calendar days of receipt. The contractor shall submit a final plan within 14 calendar days of receipt of Government comments or approval.
Block 14a: See distribution list for distribution addresses.
Digitally signed by HORR.MICHAEL.J.1008768125 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USAF, cn=HORR.MICHAEL.J.1008768125 Date: 2014.03.13 13:42:25 -06'00'
13 Mar 2014 HALL.JACK.J.JR.112898516
Digitally signed by HALL.JACK.J.JR.1128985162 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USAF, cn=HALL.JACK.J.JR.1128985162 Date: 2014.03.13 13:57:32 -06'00'
13 Mar 2014