Weber WD.doc
DOC document 44 KB Posted
- Attached to
- Built Up Roofing IDIQ Federal contract opportunity
- Solicitation number
- FA8201-12-R-0016
About this file
Weber County Wage Determination
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bldg 590 East Annex SOW.doc | DOC document | |
| Bldg 590 Cost Estimate.xls | XLS spreadsheet | |
| Roofing Solicitation Amendment.doc | DOC document | |
| 10 July Site Visit Q A.docx | DOCX document | |
| Box Elder WD.doc | DOC document | |
| 16859 Heating Cable.doc | DOC document | |
| Davis DW.docx | DOCX document | |
| 01000 General Requirements Bur.doc | DOC document | |
| Seed Project SOW.doc | DOC document | |
| BUR Solicitation.doc | DOC document | |
| Detail Cost Estimate Final Submittal.xls | XLS spreadsheet | |
| 07510 Built-up Bituminous Roofing.doc | DOC document | |
| 16610 Lightning Protection.doc | DOC document |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Decision Number: UT120016 06/08/2012 UT16
Superseded General Decision Number: UT20100046
State: Utah
Construction Type: Building
County: Weber County in Utah.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Modification Number Publication Date
0 01/06/2012
1 06/08/2012
BRUT0001-002 06/01/2009
Rates Fringes
BRICKLAYER.......................$ 20.75 6.55
* ELEC0354-008 06/01/2011
Rates Fringes
ELECTRICIAN, Excludes Low
Voltage Wiring and
Installation of
HVAC/Temperature Controls........$ 27.84 4.3%+$8.88
ENGI9993-011 09/01/2011
Rates Fringes
OPERATOR: Power Equipment
(CRANES & ATTACHMENTS)
(1) Up to 35 tons...........$ 25.50 14.41
(2) Over 35 tons to 100 tons........................$ 26.79 14.41
(3) Over 100 tons...........$ 28.13 14.41
OPERATOR: Power Equipment
(1) Mechanic................$ 27.35 14.41
(2a) Grader/Blade...........$ 25.69 14.41
(3) Front End loader
(over 5 cu. yds)...........$ 25.17 14.41
(4) Bulldozer, Front End
Loader (2 to 5 cu. yds.)....$ 24.17 14.41
(5) Asphalt Roller, Front
End Loader (Under 2 cu.
yds.), Oil Distributor......$ 23.17 14.41
(6) Screed..................$ 22.21 14.41
(7) Roller (Dirt and Grade
Compaction).................$ 21.30 14.41
* IRON0027-014 01/01/2012
Rates Fringes
IRONWORKER, STRUCTURAL AND
ORNAMENTAL.......................$ 26.18 15.10
IRON0847-001 01/01/2010
Rates Fringes
IRONWORKER, REINFORCING..........$ 26.61 11.60
LABO0295-007 07/01/2010
Rates Fringes
Laborer: Mason Tender (Brick, Cement/Concrete).................$ 15.65 5.75
PAIN0077-001 08/02/2010
Rates Fringes
PAINTER: Brush, Roller and
Spray............................$ 18.85 5.45
* PLUM0140-008 09/12/2011
Rates Fringes
PIPEFITTER, Excludes HVAC
Pipe Installation................$ 30.77 11.21
PLUM0140-009 09/12/2011
Rates Fringes
PLUMBER (Including HVAC Pipe
Installation)....................$ 30.77 11.21
SFUT0669-001 04/01/2011
Rates Fringes
SPRINKLER FITTER.................$ 28.80 16.25
* SUUT2008-010 07/14/2008
Rates Fringes
CARPENTER, Includes
Acoustical Ceiling
Installation, Drywall
Hanging, Foam Insulation, Form Work, and Metal Stud
Installation.....................$ 15.88 0.00
CEMENT MASON/CONCRETE FINISHER...$ 15.68 2.36
ELECTRICIAN (HVAC
Electrical/Temperature
Controls and Wiring
Installation)....................$ 21.00 4.61
HVAC MECHANIC (HVAC Duct and
System Installation Only)........$ 17.00 6.28
LABORER: Common or General......$ 12.02 3.45
LABORER: Landscape..............$ 10.52 0.00
LABORER: Power Tool Operator
(Hand Drill, Jackhammer and
Power Saw Only)..................$ 11.70 0.00
OPERATOR: Backhoe/Excavator.....$ 16.28 6.55
ROOFER...........................$ 13.70 1.17
SHEET METAL WORKER, Excludes
HVAC Duct and System
Installation.....................$ 23.61 5.45
* TEAM0222-011 07/01/2011
Rates Fringes
TRUCK DRIVER (Articulated).......$ 21.18 10.53
TRUCK DRIVER (Flat Rack, Bulk
Cement, Semi-trailers, Mud/Banding and Paint)
Less than 10 tons...........$ 18.51 10.53
10 tons to less than 15 tons........................$ 18.66 10.53
15 tons and less than 20 tons........................$ 18.76 10.53
20 tons and over............$ 18.91 10.53
Pickup Truck................$ 18.44 10.53
TRUCK DRIVER (Oil Spreader)......$ 18.86 8.43
TRUCK DRIVER (Transit Mix)
0 cu. yds. to 8 cu. yds.....$ 18.94 10.53
Over 8 cu. yds. to 14 cu.
yds.........................$ 18.84 10.53
TRUCK DRIVER (Water, Fuel &
Oil Tank)
0 to less than 1,200 gal....$ 18.04 8.43
1,200 gal. to less than
2,500 gal...................$ 18.16 8.43
2,500 gal. to less than
4,000 gal...................$ 18.31 8.43
4,000 gal. to less than
6,000 gal...................$ 18.61 8.43
6,000 gal. to less than
10,000 gal..................$ 18.86 8.43
10,000 gal. to less than
15,000 gal..................$ 19.11 8.43
15,000 gal. to less than
20,000 gal..................$ 18.36 8.43
20,000 gal. to less than
25,000 gal..................$ 19.71 8.43
Over 25,000 gal.............$ 19.86 8.43
TRUCK DRIVER, Includes Dump
Truck (Includes Bottom-end or side)
Less than 8 cu. yds.........$ 18.61 10.53
8 cu. yds. and less than
14 cu. yds..................$ 18.76 10.53
14 cu. yds. and less than
35 cu. yds..................$ 18.91 10.53
35 cu. yds. and less than
55 cu. yds..................$ 19.11 10.53
55 cu. yds. and less than
75 cu. yds..................$ 19.31 10.53
75 cu. yds. and less than
95 cu. yds..................$ 19.51 10.53
95 cu. yds. and less than
105 cu. yds.................$ 19.71 10.53
105 cu. yds. and less than
130 cu. yds.................$ 19.83 10.53
TRUCK DRIVER: Lowboy Truck......$ 21.68 10.53
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.
Union Identifiers
An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be
July 1, 2011 in the above example.
Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rate.
Non-Union Identifiers
Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007
5/13/2010. SU indicates the rates are not union rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.
Survey wage rates will remain in effect and will not change until a new survey is conducted.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
File details come from the government source that posted it. Updated .