Seed Project SOW.doc

DOC document 198 KB Posted

Attached to
Built Up Roofing IDIQ Federal contract opportunity
Solicitation number
FA8201-12-R-0016
Issued by
Department of the Air Force Materiel Command Ogden Air Logistics Complex

About this file

Seed project Statement of Work

View the file

Other files for this federal contract opportunity

Other files attached to Built Up Roofing IDIQ, newest first.
File Type Posted
10 July Site Visit Q A.docx DOCX document
Bldg 590 East Annex SOW.doc DOC document
Bldg 590 Cost Estimate.xls XLS spreadsheet
Roofing Solicitation Amendment.doc DOC document
Box Elder WD.doc DOC document
16859 Heating Cable.doc DOC document
Davis DW.docx DOCX document
01000 General Requirements Bur.doc DOC document
16610 Lightning Protection.doc DOC document
Weber WD.doc DOC document
BUR Solicitation.doc DOC document
Detail Cost Estimate Final Submittal.xls XLS spreadsheet
07510 Built-up Bituminous Roofing.doc DOC document
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

75TH CIVIL ENGINEER SQUADRON (AFMC)

HILL AIR FORCE BASE, UTAH 84056

Replace Built-up Roof

Bldg 843 Bays G and J

KRSM 112079

WO# 54738

Project Manager: Alan Dailey 75th CEG/CEOS

19 July 2011

STATEMENT OF WORK

1. Repair by replacement the built-up roof on Building 843 Bay G and J.

2. Remove existing non-friable asbestos flashings. The contractor shall adhere to OSHA regulations 1926 and specifically 1926.1101 regarding the removal of non-friable asbestos containing roof materials. (Note: Asbestos flashings shall be removed by the Base approved asbestos abatement contractor)

3. Remove existing built-up roof system, drip edge, flashings and counter flashings.

4. Furnish and install approximately 81,000 SF of ¾” perlite cover board, hot-mopped to deck.

5. Furnish and install a 3-ply, hot-mopped 20 year BUR.

6. Install base flashings, metal counter flashings, wall counter-flashings, parapet cap, pitch pockets, and roof drains.

7. Performance period for this contract is 90 days after receipt of task order.