Seed Project SOW.doc
DOC document 198 KB Posted
- Attached to
- Built Up Roofing IDIQ Federal contract opportunity
- Solicitation number
- FA8201-12-R-0016
About this file
Seed project Statement of Work
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 10 July Site Visit Q A.docx | DOCX document | |
| Bldg 590 East Annex SOW.doc | DOC document | |
| Bldg 590 Cost Estimate.xls | XLS spreadsheet | |
| Roofing Solicitation Amendment.doc | DOC document | |
| Box Elder WD.doc | DOC document | |
| 16859 Heating Cable.doc | DOC document | |
| Davis DW.docx | DOCX document | |
| 01000 General Requirements Bur.doc | DOC document | |
| 16610 Lightning Protection.doc | DOC document | |
| Weber WD.doc | DOC document | |
| BUR Solicitation.doc | DOC document | |
| Detail Cost Estimate Final Submittal.xls | XLS spreadsheet | |
| 07510 Built-up Bituminous Roofing.doc | DOC document |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
75TH CIVIL ENGINEER SQUADRON (AFMC)
HILL AIR FORCE BASE, UTAH 84056
Replace Built-up Roof
Bldg 843 Bays G and J
KRSM 112079
WO# 54738
Project Manager: Alan Dailey 75th CEG/CEOS
19 July 2011
STATEMENT OF WORK
1. Repair by replacement the built-up roof on Building 843 Bay G and J.
2. Remove existing non-friable asbestos flashings. The contractor shall adhere to OSHA regulations 1926 and specifically 1926.1101 regarding the removal of non-friable asbestos containing roof materials. (Note: Asbestos flashings shall be removed by the Base approved asbestos abatement contractor)
3. Remove existing built-up roof system, drip edge, flashings and counter flashings.
4. Furnish and install approximately 81,000 SF of ¾” perlite cover board, hot-mopped to deck.
5. Furnish and install a 3-ply, hot-mopped 20 year BUR.
6. Install base flashings, metal counter flashings, wall counter-flashings, parapet cap, pitch pockets, and roof drains.
7. Performance period for this contract is 90 days after receipt of task order.