Detail Cost Estimate Final Submittal.xls
XLS spreadsheet 54 KB Posted
- Attached to
- Built Up Roofing IDIQ Federal contract opportunity
- Solicitation number
- FA8201-12-R-0016
About this file
Detail Cost Estimate Final Submittal
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bldg 590 Cost Estimate.xls | XLS spreadsheet | |
| Roofing Solicitation Amendment.doc | DOC document | |
| 10 July Site Visit Q A.docx | DOCX document | |
| Bldg 590 East Annex SOW.doc | DOC document | |
| 07510 Built-up Bituminous Roofing.doc | DOC document | |
| 16610 Lightning Protection.doc | DOC document | |
| Box Elder WD.doc | DOC document | |
| 16859 Heating Cable.doc | DOC document | |
| Davis DW.docx | DOCX document | |
| 01000 General Requirements Bur.doc | DOC document | |
| Seed Project SOW.doc | DOC document | |
| Weber WD.doc | DOC document | |
| BUR Solicitation.doc | DOC document |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Hill
| 2012 Built-Up Roofs IDIQ Detail Cost Estimate Final Submittal Prepared by : | |||||||||||||||||
| Hill AFB, Little Mountain, UTTR Date: | |||||||||||||||||
| Year 1 (Basic) | Year 2 | Year 3 | Year 4 | Year 5 | |||||||||||||
| LINE ITEM DESCRIPTION | UNIT | Quantity | Amount | TOTAL | Quantity | Amount | TOTAL | Quantity | Amount | TOTAL | Quantity | Amount | TOTAL | Quantity | Amount | TOTAL | |
| A | REMOVE EXISTING 4-PLY BUILT-UP ROOF | SF | 100,000 | 100,000 | 100,000 | 100,000 | 100,000 | ||||||||||
| B | REMOVE COAL TAR PITCH BUR | SF | 6,000 | 6,000 | 6,000 | 6,000 | 6,000 | ||||||||||
| C | REMOVE EXISTING SINGLE LAYER SHINGLED ROOF | SF | 3,000 | 3,000 | 3,000 | 3,000 | 3,000 | ||||||||||
| D | REMOVE EXISTING INSULATION | SF | 100,000 | 100,000 | 100,000 | 100,000 | 100,000 | ||||||||||
| E | REMOVE LIGHTWEIGHT CONCRETE GYPSUM FILL | SF | 3,000 | 3,000 | 3,000 | 3,000 | 3,000 | ||||||||||
| F | REMOVE AND INSTALL NEW ROOF DRAINS | EA | 40 | 40 | 40 | 40 | 40 | ||||||||||
| G | REMOVE / INSTALL LIGHTNING PROTECTION | LF | 1,500 | 1,500 | 1,500 | 1,500 | 1,500 | ||||||||||
| H | REMOVE EXISTING GUTTERS AND DOWNSPOUTS | LF | 1,500 | 1,500 | 1,500 | 1,500 | 1,500 | ||||||||||
| I | SET-UP ( EAVE HEIGHT 15' - 30' ) | LS | 5 | 5 | 5 | 5 | 5 | ||||||||||
| J | SET- UP ( EAVE HEIGHT 30' AND ABOVE ) | LS | 5 | 5 | 5 | 5 | 5 | ||||||||||
| K | INSTALL A 3-PLY (20 YEAR) BUILT-UP ROOF WITH MODIFIED CAP SHEET | SF | 20,000 | 20,000 | 20,000 | 20,000 | 20,000 | ||||||||||
| L | FURNISH AND INSTALL A 3-PLY, HOT MOPPED, 20 YEAR BUR WITH AN SBS MODIFIED CAP SHEET | SF | 100,000 | 100,000 | 100,000 | 100,000 | 100,000 | ||||||||||
| M | INSTALL A 4-PLY (20 YEAR) BUILT-UP ROOF | SF | 20,000 | 20,000 | 20,000 | 20,000 | 20,000 | ||||||||||
| N | INSTALL 3/4" PERLITE BOARD (MOPPED ON) | SF | 100,000 | 100,000 | 100,000 | 100,000 | 100,000 | ||||||||||
| O | INSTALL 3/4" SHEATHING | SF | 3,000 | 3,000 | 3,000 | 3,000 | 3,000 | ||||||||||
| P | INSTALL PRIME COAT AND ROSIN PAPER TO ROOF DECK | SF | 30,000 | 30,000 | 30,000 | 30,000 | 30,000 | ||||||||||
| Q | INSTALL TAPERED INSULATION | BD | 50,000 | 50,000 | 50,000 | 50,000 | 50,000 | ||||||||||
| R | INSTALL ASPHALT SHINGLES WITH #30 FELT | SQ | 3,000 | 3,000 | 3,000 | 3,000 | 3,000 | ||||||||||
| S | PROVIDE AND INSTALL MEMBRANE ROOF RESTORATION | SF | 10,000 | 10,000 | 10,000 | 10,000 | 10,000 | ||||||||||
| T | INSTALL SCUPPER | EA | 30 | 30 | 30 | 30 | 30 | ||||||||||
| U | INSTALL PITCH POCKETS | EA | 120 | 120 | 120 | 120 | 120 | ||||||||||
| V | INSTALL 1/2" PLYWOOD FOR FASCIA OR SHEATHING | SF | 3,000 | 3,000 | 3,000 | 3,000 | 3,000 | ||||||||||
| W | FURNISH AND INSTALL WOOD CURBS | LF | 150 | 150 | 150 | 150 | 150 | ||||||||||
| X | INSTALL GALV. METAL COUNTER FLASHING ON EQUIPMENT AND CURBS | LF | 3,000 | 3,000 | 3,000 | 3,000 | 3,000 | ||||||||||
| Y | INSTALL GALV. METAL GRAVEL STOP WITH 6" FACE | LF | 1,500 | 1,500 | 1,500 | 1,500 | 1,500 | ||||||||||
| Z | INSTALL METAL DRIP EDGE WITH 4" FACE | LF | 1,500 | 1,500 | 1,500 | 1,500 | 1,500 | ||||||||||
| AA | LIFT AND RESET EQUIPMENT SMALLER THAN 4' X 4' | EA | 90 | 90 | 90 | 90 | 90 | ||||||||||
| AB | LIFT AND RESET EQUIPMENT LARGER THAN 4' X 4' | EA | 30 | 30 | 30 | 30 | 30 | ||||||||||
| AC | REMOVE NON-FRIABLE ASBESTOS BASE FLASHING, INCLUDES OFF-BASE DUMPING AND HAULING CHARGES | SF | 10,000 | 10,000 | 10,000 | 10,000 | 10,000 | ||||||||||
| AD | REMOVE MISC. EQUIPMENT, PIPES, OR HOODS | EA | 15 | 15 | 15 | 15 | 15 | ||||||||||
| AE | INSTALL EXPANSION JOINT | LF | 300 | 300 | 300 | 300 | 300 | ||||||||||
| AF | INSTALL ANCHORS / GUY LINES TO EQUIPMENT OR STACKS | EA | 30 | 30 | 30 | 30 | 30 | ||||||||||
| AG | INSTALL NEW CLEAN-OUTS TO EXISTING DRAIN SYSTEM | EA | 30 | 30 | 30 | 30 | 30 | ||||||||||
| AH | PROVIDE 24 GA. METAL TO COVER PENETRATIONS, EQUIPMENT, OR WINDOWS (PRIMED & PAINTED), AND INSULATED AS REQUIRED | SF | 600 | 600 | 600 | 600 | 600 | ||||||||||
| AI | INSTALL 5" ALUMINUM GUTTERS AND DOWNSPOUTS | LF | 600 | 600 | 600 | 600 | 600 | ||||||||||
| AJ | INSTALL 4" GALVANIZED GUTTERS AND DOWNSPOUTS | LF | 1,200 | 1,200 | 1,200 | 1,200 | 1,200 | ||||||||||
| AK | INSTALL R-19 RIGID INSULATION | SF | 60,000 | 60,000 | 60,000 | 60,000 | 60,000 | ||||||||||
| AL | INSTALL R-19 GLASS BATT INSULATION | SF | 20,000 | 20,000 | 20,000 | 20,000 | 20,000 | ||||||||||
| AM | REPAIR / MATCH EXISTING SIDING | SF | 7,500 | 7,500 | 7,500 | 7,500 | 7,500 | ||||||||||
| AN | INSTALL METAL PARAPET CAP | LF | 3,000 | 3,000 | 3,000 | 3,000 | 3,000 | ||||||||||
| AO | INSTALL 3' WALKWAY | LF | 300 | 300 | 300 | 300 | 300 | ||||||||||
| AP | INSTALL SERVICE AND CONTROLS FOR HEAT TAPE TO INCLUDE UNIT, PILOT SWITCH, WIRE AND CONDUIT TO 50' | LS | 8 | 8 | 8 | 8 | 8 | ||||||||||
| AQ | INSTALL ADDITIONAL POWER SUPPLY TO INCLUDE WIRE AND CONDUIT BEYOND 50' | LS | 3 | 3 | 3 | 3 | 3 | ||||||||||
| AR | INSTALL ADDITIONAL CONTROLS FOR HEAT TAPE | LF | 300 | 300 | 300 | 300 | 300 | ||||||||||
| AS | INSTALL ADDITIONAL HEAT CABLE | LF | 750 | 750 | 750 | 750 | 750 | ||||||||||
| AT | HAULING DEBRIS TO DUMP/LANDFILL | TON | 300 | 300 | 300 | 300 | 300 | ||||||||||
| AU | APPLY CAULK / SEALANT AS NEEDED | LF | 1,500 | 1,500 | 1,500 | 1,500 | 1,500 | ||||||||||
| AV | CLEAN OUT GUTTERS, DOWNSPOUTS, AND DRAINS | LF | 3,000 | 3,000 | 3,000 | 3,000 | 3,000 | ||||||||||
| AW | INFRARED SURVEY | SF | 5,000 | 5,000 | 5,000 | 5,000 | 5,000 | ||||||||||
| AX | EPDM REPAIRS ( 60 MIL ) | SF | 12,000 | 12,000 | 12,000 | 12,000 | 12,000 | ||||||||||
| AY | RENTAL TRUCK MOUNTED CRANE, 25 TON WITH 10' RADIUS PER DAY | EA | 8 | 8 | 8 | 8 | 8 | ||||||||||
| AZ | RENTAL TRUCK MOUNTED CRANE, 25 TON WITH 10' RADIUS PER WEEK | EA | 8 | 8 | 8 | 8 | 8 | ||||||||||
| GROUND COVERED ROOF FACILITIES | 0 | 0 | 0 | 0 | |||||||||||||
| BA | PROVIDE AND INSTALL HOT RUBBERIZED ASPHALT WATERPROOFING SYSTEM WITH DRAINAGE AND PROTECTION BOARD | SF | 7,500 | 7,500 | 7,500 | 7,500 | 7,500 | ||||||||||
| BB | PROVIDE AND INSTALL SELF ADHERING WATERPROOFING MEMBRANE WITH DRAINAGE AND PROTECTION BOARD | SF | 7,500 | 7,500 | 7,500 | 7,500 | 7,500 | ||||||||||
| BC | REMOVE EXISTING WATERPROOFING | SF | 7,500 | 7,500 | 7,500 | 7,500 | 7,500 | ||||||||||
| BD | REMOVE EARTH BERM AND BACKFILL | CY | 600 | 600 | 600 | 600 | 600 | ||||||||||
| BE | INSTALL REQUIRED EARTH BERM | CY | 600 | 600 | 600 | 600 | 600 | ||||||||||
| BF | INSTALL VEGETATION, GRASS | SF | 4,800 | 4,800 | 4,800 | 4,800 | 4,800 | ||||||||||
| TOTAL FOR EACH UNIT COST WEIGHT | |||||||||||||||||
| ESTIMATED CONTRACT TOTAL | $0.00 |