Seed Project Bldg 590 Cost Estimate Submittal
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 10 July Site Visit Q A.docx | DOCX document | |
| Bldg 590 East Annex SOW.doc | DOC document | |
| Roofing Solicitation Amendment.doc | DOC document | |
| Box Elder WD.doc | DOC document | |
| 16859 Heating Cable.doc | DOC document | |
| Davis DW.docx | DOCX document | |
| 01000 General Requirements Bur.doc | DOC document | |
| Seed Project SOW.doc | DOC document | |
| 16610 Lightning Protection.doc | DOC document | |
| Weber WD.doc | DOC document | |
| BUR Solicitation.doc | DOC document | |
| Detail Cost Estimate Final Submittal.xls | XLS spreadsheet | |
| 07510 Built-up Bituminous Roofing.doc | DOC document |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Hill
| Government Cost Estimate | |||||
| Replace Built-Up Roof | |||||
| Bldg 590 East Annex | |||||
| W/O # 54034 | |||||
| KRSM 122046 | |||||
| Date: 3 May 2012 | |||||
| LINE ITEM DESCRIPTION | UNIT | Quantity | Amount | TOTAL | |
| A | REMOVE EXISTING 4-PLY BUILT-UP ROOF | SF | 10,800 | ||
| B | REMOVE COAL TAR PITCH BUR | SF | |||
| C | REMOVE EXISTING SINGLE LAYER SHINGLED ROOF | SF | |||
| D | REMOVE EXISTING INSULATION | SF | |||
| E | REMOVE LIGHTWEIGHT CONCRETE GYPSUM FILL | SF | |||
| F | REMOVE AND INSTALL NEW ROOF DRAINS | EA | |||
| G | REMOVE / INSTALL LIGHTNING PROTECTION | LF | |||
| H | REMOVE EXISTING GUTTERS AND DOWNSPOUTS | LF | 290 | ||
| I | SET-UP ( EAVE HEIGHT 15' - 30' ) | LS | 1 | ||
| J | SET- UP ( EAVE HEIGHT 30' AND ABOVE ) | LS | |||
| K | INSTALL A 3-PLY (20 YEAR) BUILT-UP ROOF WITH MODIFIED CAP SHEET | SF | |||
| L | FURNISH AND INSTALL A 3-PLY, HOT MOPPED, 20 YEAR BUR WITH AN SBS MODIFIED CAP SHEET | SF | 10,800 | ||
| M | INSTALL A 4-PLY (20 YEAR) BUILT-UP ROOF | SF | |||
| N | INSTALL 3/4" PERLITE BOARD (MOPPED ON) | SF | 10,800 | ||
| O | INSTALL 3/4" SHEATHING | SF | |||
| P | INSTALL PRIME COAT AND ROSIN PAPER TO ROOF DECK | SF | |||
| Q | INSTALL TAPERED INSULATION | BD | |||
| R | INSTALL ASPHALT SHINGLES WITH #30 FELT | SQ | |||
| S | PROVIDE AND INSTALL MEMBRANE ROOF RESTORATION | SF | |||
| T | INSTALL SCUPPER | EA | |||
| U | INSTALL PITCH POCKETS | EA | |||
| V | INSTALL 1/2" PLYWOOD FOR FASCIA OR SHEATHING | SF | |||
| W | FURNISH AND INSTALL WOOD CURBS | LF | |||
| X | INSTALL GALV. METAL COUNTER FLASHING ON EQUIPMENT AND CURBS | LF | 500 | ||
| Y | INSTALL GALV. METAL GRAVEL STOP WITH 6" FACE | LF | |||
| Z | INSTALL METAL DRIP EDGE WITH 4" FACE | LF | 266 | ||
| AA | LIFT AND RESET EQUIPMENT SMALLER THAN 4' X 4' | EA | |||
| AB | LIFT AND RESET EQUIPMENT LARGER THAN 4' X 4' | EA | 1 | ||
| AC | REMOVE NON-FRIABLE ASBESTOS BASE FLASHING, INCLUDES OFF-BASE DUMPING AND HAULING CHARGES | SF | 200 | ||
| AD | REMOVE MISC. EQUIPMENT, PIPES, OR HOODS | EA | 24 | ||
| AE | INSTALL EXPANSION JOINT | LF | |||
| AF | INSTALL ANCHORS / GUY LINES TO EQUIPMENT OR STACKS | EA | |||
| AG | INSTALL NEW CLEAN-OUTS TO EXISTING DRAIN SYSTEM | EA | |||
| AH | PROVIDE 24 GA. METAL TO COVER PENETRATIONS, EQUIPMENT, OR WINDOWS (PRIMED & PAINTED), AND INSULATED AS REQUIRED | SF | |||
| AI | INSTALL 5" ALUMINUM GUTTERS AND DOWNSPOUTS | LF | 299 | ||
| AJ | INSTALL 4" GALVANIZED GUTTERS AND DOWNSPOUTS | LF | |||
| AK | INSTALL R-19 RIGID INSULATION | SF | |||
| AL | INSTALL R-19 GLASS BATT INSULATION | SF | |||
| AM | REPAIR / MATCH EXISTING SIDING | SF | 800 | ||
| AN | INSTALL METAL PARAPET CAP | LF | |||
| AO | INSTALL 3' WALKWAY | LF | |||
| AP | INSTALL SERVICE AND CONTROLS FOR HEAT TAPE TO INCLUDE UNIT, PILOT SWITCH, WIRE AND CONDUIT TO 50' | LS | |||
| AQ | INSTALL ADDITIONAL POWER SUPPLY TO INCLUDE WIRE AND CONDUIT BEYOND 50' | LS | |||
| AR | INSTALL ADDITIONAL CONTROLS FOR HEAT TAPE | LF | |||
| AS | INSTALL ADDITIONAL HEAT CABLE | LF | |||
| AT | HAULING DEBRIS TO DUMP/LANDFILL | TON | 35 | ||
| AU | APPLY CAULK / SEALANT AS NEEDED | LF | |||
| AV | CLEAN OUT GUTTERS, DOWNSPOUTS, AND DRAINS | LF | |||
| AW | INFRARED SURVEY | SF | |||
| AX | EPDM REPAIRS ( 60 MIL ) | SF | |||
| AY | RENTAL TRUCK MOUNTED CRANE, 25 TON WITH 10' RADIUS PER DAY | EA | |||
| AZ | RENTAL TRUCK MOUNTED CRANE, 25 TON WITH 10' RADIUS PER WEEK | EA | |||
| GROUND COVERED ROOF FACILITIES | |||||
| BA | PROVIDE AND INSTALL HOT RUBBERIZED ASPHALT WATERPROOFING SYSTEM WITH DRAINAGE AND PROTECTION BOARD | SF | |||
| BB | PROVIDE AND INSTALL SELF ADHERING WATERPROOFING MEMBRANE WITH DRAINAGE AND PROTECTION BOARD | SF | |||
| BC | REMOVE EXISTING WATERPROOFING | SF | |||
| BD | REMOVE EARTH BERM AND BACKFILL | CY | |||
| BE | INSTALL REQUIRED EARTH BERM | CY | |||
| BF | INSTALL VEGETATION, GRASS | SF | |||
| Total Estimated Cost | $0.00 |