This document contains questions and answers from a site visit related to a solicitation for three engine work platforms for TF33 engines. The platforms must have five duplex 110V receptacles each, with three on the back wall and one each on the two side walls near the front opening. Structural dimensions and hoist locations for three areas (Y47, BB47, and Y29) are provided in attachments. Additional vertical lighting is required on the back wall and sides near the front opening. Desired stop heights are specified as Level 1 through Level 4 in the solicitation. Controls should use momentary not constant functions for safety. Area Y29 can be used as a laydown space. The max floor load is 600 pounds per square foot and platforms must travel from 2 to 13 feet in height. Photos of automated lift locks are provided in attachments. The government will remove existing equipment and utilities, and a fifth level is not required.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOW Paragraph, Synopsis/Solicitation, or Attachment Reference
Page Number
Contractor Question Government Response
SOW Part I para 4(k) 2 What specific type of outlets are required for the front of the platform? There are none on the exisiting platforms, but the technicians expressed concern with trip hazards with extension cords used on the back recepticles.
Each platform must have five duplex 110V receptacles; Three each on the back wall and one each on the two side walls near the front opening of the platform.
SOW Part I para 6 4 Can you please provide all structural dimensions for all three areas (Y47, BB47 & Y29) including hoist locations and center points?
Diagrams of each location are provided in the Attachments to CSS.
SOW Part I para 17 and Photograph 2 4 and 6 Verify the need for additional verticle lighting at motor enterance side.
Technician expressed lack of light when loading Engine.
Include light fixtures on back wall and on the two sides near the front opening of the platform as shown in Photograph 2 on page 4 of the SOW.
SOW Part I para 4(e),(g),(h),(q),(r),(s),(t),(u),(v) 2‐3 Provide all desired stop heights. No change. Desired stop heights are called out in the SOW as "Level 1", "Level 2", "Level 3", and "Level 4".
SOW Part I para 4(n),(o),(p),(q),(v) 2‐3 Do you have any specific recommendions/preferences for the lift controls?
**Suggested momentary controls for lifting the platform. Currently there is a constant function which is not wanted and deemed dangerous by technicians.**
No change. Please refer to the SOW.
N/A N/A Please designate a laydown area for the equipment. Area Y29 can be used as a laydown area between building columns Y28 and Y29.
SOW Part I para 4(b) 2 Provide max floor load capabilities. The max floor load capability is approximately 600 pounds per square foot.
SOW Part I para 4(e) 2 Can you please provide us all of the required travel distances for all three lifts? No change. SOW states: From ground level, the platforms should be capable of traveling from a 2 ft. height to a 13 ft. height.
SOW Part I para 4(i) 2 Provide photos of the automated lift locks on backside of P‐Flow lifts to be added to spec for (3) new TF33 Lifts. Photos are provided in the Attachments to CSS.
Additional Questions ‐ 10 Feb 2023 SOW (Rv 1) Part 1 para 10 6 Will our contractors have to demo or move anything out of the way before starting the installation process?
No. The Government will remove the existing equipment and utilities as necessary.
N/A N/A Will a 5th level will be added to this product/project? No.