DRAFT_C-21_CLS_Industry_Day_Group_Briefing.pdf

PDF 431 KB Posted

Attached to
Solicitation for C-21 Contractor Logistics Support
Solicitation number
FA8106-18-R-5000
Issued by

About this file

This document contains a market survey and sources sought synopsis for contractor logistics support services for the C-21 aircraft fleet. The Air Force is seeking a contractor to provide organizational and depot level maintenance, a contractor operated and maintained base supply system, modification design and installation support, and launch and recovery services for nineteen C-21 aircraft located at Scott Air Force Base, Joint Base Andrews, Ramstein Air Base in Germany, and other deployment locations. Interested parties should respond by April 20, 2018 with their capabilities, including any subcontracting plans. A draft request for proposals is expected in Fall 2018 with proposals due in early 2019 and contract award anticipated by April 2020. The contract will have a two-year base period and eight one-year options. The estimated value was not provided.

Draft Industry Day Slides for Group Brief

View the file

Other files

File Type Posted
Follow_up_to_RFP_FA8134-19-R-5000_Questions_and_Answers.pdf PDF
Attachment_5_Addendum_to_FAR_52.212-1_(Instructions_to_Offerors)_Revision_01_(Amendment_0001).pdf PDF
Attachment_6_Addendum_to_FAR_52.212-2_(Evaluation_Factors_for_Award)_Revision_01_(Amendment_0001).pdf PDF
FA813419R5000_______0001.pdf PDF
RFP_FA8134-19-R-5000_Questions_and_Answers.pdf PDF
ppi_tool.accdb MDB file
FA813419R5000.pdf PDF
More_Questions_for_Second_Draft_RFP_and_Pre-Solicitation_Conference_Questions_and_Answers.pdf PDF
C-21_CLS_Pre-Solicitation_Conference_Attendence_List.pdf PDF
Second_Draft_RFP_and_Pre-Solicitation_Conference_Questions_and_Answers.pdf PDF
Attachment_1_-_2nd_Round_Draft_C-21_CLS_PWS.docx DOCX document
DRAFT_Government_Furnished_Property_List_.xlsx XLSX spreadsheet
Attachment_5_-_1st_Round_Draft_Addendum_to_FAR_52.212-1_(Instructions_to_Offerors).docx DOCX document
Attachment_6_-_1st_Round__Draft_Addendum_to_FAR_52.212-2_(Evaluation_Factors_for_Award).docx DOCX document
Attachment_6_-_2nd_Round_DRAFT_Addendum_to_FAR_52.212-2_(Evaluation_Factors_for_Award).docx DOCX document
Pre-Solicitation_FBO_Announcement.pdf PDF
Map_of_Pre-Solicitation_Conference_Location.pdf PDF
Attachment_3_-_DRAFT_C-21_CLS_DD-254.pdf PDF
DRAFT_CDRL_A017.pdf PDF
DRAFT_CDRL_A002.pdf PDF
DRAFT_CDRL_A007.pdf PDF
DRAFT_CDRL_A012.pdf PDF
DRAFT_CDRL_A003.pdf PDF
DRAFT_CDRL_A005.pdf PDF
DRAFT_CDRL_A013.pdf PDF
DRAFT_CDRL_A016.pdf PDF
DRAFT_CDRL_A009.pdf PDF
DRAFT_CDRL_A004.pdf PDF
Attachment_1_-_DRAFT_C-21_CLS_PWS.pdf PDF
DRAFT_CDRL_A015.pdf PDF
DRAFT_CDRL_A001.pdf PDF
Attachment_15_-_Mission_Essential_Contractor_Services.pdf PDF
DRAFT_CDRL_A008.pdf PDF
DRAFT_CDRL_A010.pdf PDF
DRAFT_C-21_CLS_RFP_-_FA813419R5000.pdf PDF
Attachment_6_-_DRAFT_Addendum_to_FAR_52.212-2_(Evaluation_Factors_for_Award).pdf PDF
First_Draft_RFP_Questions_and_Answers.pdf PDF
Draft_RFP_FBO_Announcement.pdf PDF
Attachment_3_-_DRAFT_C-21_CLS_DD-254.pdf PDF
Attachment_6_-_DRAFT_Addendum_to_FAR_52.212-2_(Evaluation_Factors_for_Award).pdf PDF
Attachment_2_-_DRAFT_Price_Matrix.xlsx XLSX spreadsheet
Industry_Day_Questions_and_Answers.pdf PDF
DRAFT_PWS_-_1_Aug_18_(Industry_Day).pdf PDF
C-21_CLS_Industry_Day_R1.pdf PDF
Map_of_Industry_Day_Location.pdf PDF
RFI__3_Questions_and_Answers.pdf PDF
C-21_CLS_RFI___3.pdf PDF
C-32_CLS_RFI_Q&A.pdf PDF
C-21_CLS_RFI_-_Amend_1.pdf PDF
C-21_CLS_RFI.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AFLCMC… Providing the Warfighter’s Edge

C-21 CLS Industry Day 6 August 2018

Michael Kreft, Acq Program Manager michael.kreft@us.af.mil 405-734-2053

Matthew Tonay, Contracting Officer matthew.tonay.1@us.af.mil 405-739-4148

AF Life Cycle Management Center

• 0800 – 0900

– Welcome and Introductions

– Sign in

– Question Forms

– Group Briefing

• 0910 – 1600

– One on one discussions

Agenda

• Any presentation points in the following briefing or any ensuing discussions DO NOT constitute direction to the contractor

• The acquisition strategy has not been approved;

therefore, all information provided is preliminary and subject to change

• Government is not currently soliciting proposals

• All questions must be submitted in writing to the

PCO

– Official written responses will be posted on FedBizOps website with non-attribution

– Verbal questions and answers are not binding

• Email contact only through the PCO with courtesy copy to Mr. Kreft

Disclaimer

• Aircraft and Locations

• C-21 Warfighter Support

• Program Description

• Requirements Overview

• Preliminary Solicitation Overview

• Preliminary Milestones

• Discussion

• Questions/Answers

Overview

C-21 Aircraft

C-21 Sites

Scott AFB

AMC HQ

Xx aircraft

Joint Base Andrews MD Xx aircraft

Ramstein AB GE Xx aircraft

Tinker AFB OK Program Office

AFLCMC/WLV

• Special Air Missions

– World-wide transport for Senior Leaders (VIP)

– World-wide light cargo transport

– Medevac

• Multi-based

– Scott AFB

– JB Andrews

– Ramstein AB

C-21 Warfighter Support

• C-21 Aircraft Fleet is a derivative of Learjet 35A commercial business jets

• Modified to meet DoD requirements

• Powered by two Garrett Engines

• Maintained to FAA certification

• Maintained under the CLS concept

Program Description

• All Organizational and Depot Level Maintenance

– Maintain FAA certification

• Contractor Operated and Maintained Base Supply

(COMBS)

– Government provides very few required parts, material, and equipment

– Contractor responsible for most spares necessary to meet supply rate

Requirements Overview Fleet Logistics Support

• COMBS

– Government provides a portion of required parts, material, & equipment

– Contractor responsible for any additional spares above GFP levels necessary to meet supply rate

– Operations, Inventory Management (levels, storage and reporting)

– Worldwide supply support to include MOB, Depot and Off-station

– Packaging, handling, shipping and transportation

• Current Contractor’s C-21 spare parts at the MOB COMBS will not transfer to the next contract

– The Government does not own these spare parts

– Government will not pay direct costs for establishing initial spare levels

• Contractor shall be responsible for providing a supply management system to meet performance rates in the

PWS

Fleet Logistics Support

• The Government owns C-21 spare engines

• A comprehensive engine management system shall be employed

– The only authorized over and above charges will be related to causes outside contractor’s control

• FOD, accident, misuse or non-Engine Management Program required SBs

C-37 Engine Management

• All Depot Level Maintenance FAA FAR 145 Aircraft Depot Maintenance & Repair

– Maintain FAA certification and support Military Air

Worthiness Certification processes

– Scheduled/Drop-in Maintenance

– Field team/Deployment support

– Modification/Technical Order (TCTO) Kit purchase/installation

– Aircraft status reporting

– VIP quality paint

– Interior refurbishment

Fleet Sustainment Support

• Higher Level Quality Management System IAW commercial standards

– ISO 9001 or AS 9110

• Reliability and Maintainability analysis, trends and forecasting and Deficiency Reporting per T.O. 00-35D-54

– Root cause analysis/tear-down analysis/corrective action validation

• Diminishing Manufacturing Sources and

Material Shortages analysis, forecasting and resolution

• Security

– DD 254, Contract Security Classification

• DSS Facility Clearance Required (Secret)

– Secret clearance required – most personnel

– OPSEC awareness and compliance

– Common Access Card

– Protection and control of For Official Use Only and

Classified material

• Must be able to transmit and receive sensitive information

• MOB Experience

– Site leads must possess an A&P and Learjet airframe experience

– Mechanics must be experienced with Learjet aircraft 14

• Scott AFB, JB Andrews, Ramstein AB, GE, are Full

CLS

– Provide flight line (O-level) maintenance personnel

– FAA Airframe and Powerplant (A&P) licensed as necessary

– Ability to maintain/support all aircraft and mission systems

• Scheduled and unscheduled maintenance

– Service Actions/TCTOs

• Germany requires special Technical Expert Status Accreditation (TESA) for non-local employees at Ramstein

Full CLS Sites

• Metrics* – all locations

– Home Station Departure Reliability ≥ 95%

– Mission Capable (MC) ≥ 80%

– Not Mission Capable Supply < 3%

Metrics

• Performance Based Requirements

– Performance Work Statement (PWS)

• Government states minimum requirements in outcome based terms

• Offeror’s proposed approach/solutions to meeting the requirements by offering industry innovations, best practices and commercial enhancements, etc.

– Goal of Performance Based Requirements is to allow offerors to use their own processes and procedures that save time, reduce schedule and cost

Program Management

• Program Management Plan

– Transition Plan

• Configuration management

• Quality program

• COMBS operations

– Supply chain management

• Data deliverables – CDRLs

– Maximize on-line submissions to Government

• Subcontract management

• Secret security clearances required for most personnel

• Contractor-hosted annual Program Review in

OKC

• Support program meetings

– System Safety Working Group

– Aircraft Information Working Group

– Maintenance Working Group

• Service Action Review Board support

• Technical Interchange Meetings

• Bi-weekly status telecom

• Services Contract Act

• Wage Determination

• Collective Bargaining Agreement

• Performance Price Trade Off approach

• Contract Type

– Indefinite Delivery Indefinite Quantity (IDIQ)

– Example Contract Number FA8106-19-D-XXXX

– Work authorized on task orders

– Commercial FAR Part 12

– Firm-fixed-price

Solicitation Overview

• Phase-in/Transition (120 days)

– Address risk and mitigation

• Special Contract Terms

– Changes in aircraft fleet quantity

• Increase/decrease in fleet size

• Site activation/de-activation

– Small Business

• Subcontracting requirement for percentage of total obligated dollars

• Technical factors evaluated as pass/fail

– Additional credit will not be given to proposals exceeding requirements

• Past performance evaluated and assigned a performance confidence rating

• Price will be evaluated for reasonableness

• Contractor statement of work is not required

– PWS will be incorporated into the contract

• Small business subcontracting plan required

– If full and open

• Firm-fixed-price (FFP)*

– Recurring

• Base Operations

• Flying Hours

• Data- NSP (not separately priced)

• Overseas Tuition

• Southwest Asia Deployment

– Non-Recurring

• Transition/phase-in

• Engine Inspections

• Phase Inspections

• Main/Nose Gear Replacement

• 20K Hour Flight Control Replacement

• Demil/Disposal

*Not all Inclusive, may be other requirements 23

Preliminary CLIN Structure

• Firm-fixed-price (FFP)

– Over and Above CLINs

• Depot Maintenance

• Organization Maintenance

• Other Maintenance

• Travel

• Transportation

Preliminary CLIN Structure Cont.

Preliminary Milestones

• Issue Draft RFP

• Aug – Sep 2018

• Pre-Solicitation Conf

• Aug – Sep 2018

• Issue Formal RFP

• Nov – Jan 2018

• Phase-in/Transition – 120 Days

• Sep 2020

• Full Contract Performance Begins

• Jan 2021

• This strategy is preliminary and subject to change

• The final RFP will detail the final strategy

• Draft PWS provided for comment via FedBizOps

• Draft RFP will be provided for comment via

FedBizOps

• Pre-proposal conference is expected within 2-3 weeks following release of draft RFP

Discussion

File details come from the government source that posted it. Updated .