QAttachment 19- 29.docx

DOCX document 16 KB Posted

Attached to
Renovate Vandenberg Hall Phase 5 & Phase 6
Solicitation number
FA7000-10-R-0036
Issued by

About this file

Response to questions 19 - 29

View the file

Other files

File Type Posted
REVISED Q 93.docx DOCX document
CS5-6 - 08.23.10 - Revision 2 - 096519 - Resilient Tile Flooring.doc DOC document
CS5-6 - 08.23.10 - Revision 2 - 081113 - Hollow Metal Doors and Frames.doc DOC document
Millwork Details-Optimized.pdf PDF
Amendment 0004 Vandeneberg.doc DOC document
08.26.2010 - Addendum No. 003.doc DOC document
CS5-6 - 08.23.10 - Revision 2 - 081416 - Flush Wood Doors.doc DOC document
Vandenberg Hall CS 5 - CS 6 - Bid Questions and Answers - 83-95.doc DOC document
Attendance Sheet 1.pdf PDF
08 24 2010 - Vandenberg Hall CS 5 - CS 6 - Bid Questions and Answers - 61 - 82 edited.docx DOCX document
01 33 00.pdf PDF
01 45 01.pdf PDF
01 35 26.doc DOC document
01 32 01.00 10.pdf PDF
01 42 00 - Sources for Ref Publications.pdf PDF
01 45 01.10.pdf PDF
Amendment 0003.docx DOCX document
Glass Installers Past Project Experience.docx DOCX document
Addendum No 002 Vandenberg.doc DOC document
Joint Venture JA.pdf PDF
08 23 2010 - Vandenberg Hall CS 5 - CS 6 - Bid Questions and Answers 30 -60.docx DOCX document
Joint Venture JA.pdf PDF
Addendum 001.pdf PDF
Amendment 0002.pdf PDF
GENERAL DECISION CO20100006 CO6.docx DOCX document
Questions 1-18.docx DOCX document
Site visit 11 Aug 10.pdf PDF
Amendment.pdf PDF
J A Brand Name items.pdf PDF
J A Brand Name items.pdf PDF
Attendance Sheet Walk 1.pdf PDF
Atch 5 Performance Questionnaire.doc DOC document
Atch 4 DB Wage Decision Building 16 Jul 10.pdf PDF
FA7000-10-R-0036.pdf PDF
Joint Venture JA.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

18. Q Attachment 2: CS 5 and Attachment 3; CS-6 drawings are identified as 100 percent. However, the drawings are not signed and sealed by designers of record. Are the solicitation drawings considered 100% for Construction?

100% Construction Documents are Dated July 07th, 2010. Independent signed and sealed originals reside in the office of CE.

19. QMoveable partition head detail on A5.X.13 references sheet A2.3.01. Should this reference be to sheet A.2.2.01, as no reference to a partition is on sheet A.2.3.01 and there is a movable partition shown on A.2.2.01?
ADetail 5 on Sheet A5.X.13 shall reference Sheet A2.2.01.
20. QContractor is responsible for fire suppression design. Designs should have sprinkler heads installed directly in the center of the corridors. E3 series drawings show communications cable trays to be installed in the center of the corridors. Previously, the cable trays for communications wiring were installed in soffits. Are the drawings showing notional locations of the cable trays so that sprinklers can be installed in the center of the corridors?
AFor purposes of clarity, each discipline is depicted in their own sheet. The General Contractor is responsible for coordinating all the trades and interpret the design intent, considering the space limitations for each building component. Communications trays and fire suppression have been installed both in the ACT area (grid) of the corridor ceilings.
21. QThe Specifications say that working hours are from 6 am to 7 pm M-F, with no work on the weekends. Will the contractor be permitted to work 7 days per week due to the aggressive timelines for this project?
AThe contractor may be permitted to work weekends with prior coordination and approval of 10 CES, U.S. Army Corps of Engineers and the Contracting Offficer. Approval would be based on scheduled Cadet activities and type of work being performed.
22. QKey note 8 on A1 series drawings state that the contractor is responsible for replacing any part of the heater covers that is damaged. Can the Government quantify any existing damage to these covers for bidding purposes?
ADemolition Activities have not yet occurred, therefore this data, at this time is unquantifiable. However, for bidding purposes, 14 shall be considered for CS 5 and 12 shall be considered for CS 6.
23. QAre the Cadet Room medicine wall cabinets to have a mirror face?
APlease refer to Specification Section 102800 – Toilet, Bath and Laundry Accessories, Page 15 of 15 for a cut sheet of the upper, wall medicine cabinet.
24. QWhat is the expectation of the restored millwork finish? There was a wide range of finishes seen on the walk-through. Does the wood need to be stripped and completely refinished, or can it be touched-up, glazed, and clear coated?
APlease refer to Sheet A7.X.01 – Typical Millwork Elevations, Photographic Examples and Notes. In addition to the drawings, refer to Specification Section 064023 – Interior Architectural Woodwork and Specification Section 099300 – Staining and Transparent Finishing.
25. QPlease identify the wall types for the “non-structural partitions” being demolished. i.e. CMU or Lath & Plaster or Metal stud and drywall. Reference demolition key note 8 on the demolition plans.
APlease refer to Sheet A6.X.00 – Enlarged Plan – Typical Cadet Room and Wall Types.
26. QLevel 5 drywall finishing is mentioned in specification section 092900 2.4 C.5. Is it required everywhere?
APlease refer Specification Section 092900 Gypsum Board, Subsection 3.5 D, Items 1 – 3.
27. QMany of the existing walls that remain have some type of texture on them. Are all the new walls to receive texture, and if so, what type?
AThe new walls shall match the existing knock down texture that will be maintained in the corridors.
28. QAre area wells on Vandenberg Drive accessible to use for loading material in the basement?
ACoordination with the USAFA at time of Construction shall occur. In the past, various area wells on the North side of the building have been used, with the proper safety perimeter. Please refer to Detail 1 on Sheet G0.0.01 for removable slab over area well.
29.QThe period of performance states “259 days” is this just for the base CLIN?
AYes, the option CLINs do not figure into the stated period of performance. Period of Performance would be indicated if/when the options are exercised.

File details come from the government source that posted it. Updated .