F-TE-7-A-1a_CATHODIC_PROTECTION_SYSTEMS_2_of_3.pdf
PDF 413 KB Posted
- Solicitation number
- FA6656-15-R-0002
About this file
Cathodic Protection Systems 2 of 3
View the file
Other files
Show 40 more
Latest 50 of 118 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B
B
T.S. # 3
SYSTEM # 3
8- Braided Polyester Rope
Supports
8- Styrofoam Flotation Blocks
8- Steel Eye Rings Welded to
Tank Wall
2- CuCuSo4 Permanent Reference
Electrodes
1- Platinized Niobium Anode Wire
1- 1/2" Galvanized Rigid Conduit
Containing 3-#12-7 Str. &
1-#18-2C TW Wires
9" Segments on #8 RHW Use Wire
String Containing 17-1 1/8" x
2- Hi Silicon Cast Iron Anode
2- CuCuSo4 Permanent Reference
Electrodes
1- Pressure Fittings- 6x6 Plastic Box
1- Harco Corp. 20 Amp, 40 Volt, TASC (Tank Automatic Sampling
Controller) Rectifier
TS # 17 ( IN RECT.)
1- 3/4" Galvanized Rigid Conduit
18" Below Surface Containing
1-# 18 3C TW Wire & 2- # 17 STR.
115/60/10 A.C. Supply By Other
SYSTEM # 10
Not To Scale
SYSTEM # 11A & 11B
SYSTEM # 11B
SYSTEM # 11A
T.S. 19
T.S. 40
6" Gas Line
6" Gas Line
S u b
S t a t i o n
G a s
M e t r a n i f o l d
T
S
K i n g
G r a v s
R o a d
B
B
B
SYSTEM # 13
4" Steam, 2" Cond.
SYSTEM # 24
B
B
B
B
B515
B517
B511
7 Test S tatio ns
No's 10 - 1
Oil/W ater S eparator
Oil/W ater S eparator
Test S tatio n # 8
SYSTEM # 23
Scale: 1 " = 100'
Scale: 1 " = 100'
Scale: 1" = 100'
Scale: 1 " = 100'
Scale: 1 " = 100'
T.S.
44'-0"
32'-6-5/8"
103'-0"
25'
T.S.
B
B
B
B
B
SYSTEMS # 25, 26 & 27
Oil/W ater S eparator
System #26
Oil/W ater S eparator
System #25
Oil/W ater S eparator
System #27
Scale: 1 " = 100'
SYSTEM # 28
Scale: 1 " = 100'
Oil/W ater S eparator
System #28
B
B517
B513
8'
COND.
STM.
B515
B
F
B
B
B113
B
B
B
SYSTEM # 30 & 31
Oil/W ater S eparator
Oil/W ater S eparator
System #30
System #31
T.S.
Oil/W ater S eparator
B517
B515
B
SYSTEM # 32
Scale: 1 " = 100'
FLUSH-TO-GRADE TEST STATION
ABOVE GRADE TEST STATION
MAGNESIUN ANODE
STEAM DRIP TRAP ASSEMBLY
CONDENSATE
ABOVE GROUND PIPELINES
BELOW GROUND PIPELINES
COND.
STM. STEAM
THIS DOCUMENT IS FOR OFFICIAL USE ONLY.
THIS MAP/IMAGE WAS PRODUCED THROUGH THE U.S. DEPARTMENT OF
DEFENSE (DOD) OFFICE OF THE UNITED STATES AIR FORCE RESERVE
COMMAND (AFRC) BY THE YOUNGSTOWN AIR RESERVE STATION, CIVIL
ENGINEERING DEPARTMENT – VIENNA, OH. ALL IMAGERY IS THE SOLE
PROPERTY OF THE UNITED STATES GOVERNMENT AND IS NOT TO BE
REPRODUCED WITHOUT THE CONSENT OF THE OFFICE OF THE AFRC, SUCH
AN ACT WILL BE A CLEAR VIOLATION OF U.S. COPYRIGHT LAWS.
YOUNGSTOWN ARS CIVIL ENGINEERING DEPARTMENT SHALL NOT BE
LIABLE FOR ERRORS, OMISSIONS OR DAMAGES THAT RESULT FROM
INAPPROPRIATE USE OF THIS DOCUMENT.
1 inch = ??? feet
Feet
Legend
F-TE-7-A-1a
AIR FORCE RESERVE COMMAND
Youngstown Air Reserve Station
Document Information
910th MSG/CE
DEPARTMENT OF THE AIR FORCE
Date Revised: 17 April 2015 By: Brian R. Phillips
(2 of 3)
CATHODIC PROTECTION SYSTEMS
O M
S G
C
E c e c a d
G e o
B a s e
C
A D
T I T L E B
L O
C K
C
A T H
O D
I C
P
R O
T E C
T I O
N
S Y
S T E M
S
F T E A a o f d w g
P
File details come from the government source that posted it. Updated .