Tab_H_-_Youngstown_QAs_from_amended_RFP_and_PWS-Responses.docx

DOCX document 15 KB Posted

Attached to
Base Operations and Support Services (BOS) at Youngstown ARS, OH
Solicitation number
FA6656-15-R-0002
Issued by

About this file

Q and A Tab H

View the file

Other files

File Type Posted
CBA_30_Nov_16.PDF PDF
FA6656-15-R-0002-0018.docx DOCX document
CBA_WD.htm HTM file
FA6656-15-R-0002-0017.docx DOCX document
Attachment_12_Pricing_Matrix_Rev_7,_5_Dec_2016.xlsx XLSX spreadsheet
Youngstown_BOS_PWS_Revision_6_28_Nov_2016.docx DOCX document
Summary_of_Changes_-_28_Nov_2016.docx DOCX document
Attachment_12_Pricing_Matrix_Rev_6_30_Nov.xlsx XLSX spreadsheet
FA6656-15-R-0002-0016.docx DOCX document
Round_1_Tab_C_-_Youngstown_QAs_responses_21_Nov.docx DOCX document
Round_1_Tab_D_-_Youngstown_QAs_responses_21_Nov.docx DOCX document
Attach_11_-_Over_and_Above_Rates_17_Nov_16.docx DOCX document
PWS_SUMMARY_OF_CHANGES_-_21_Nov_2016.docx DOCX document
Attachment_12_Pricing_Matrix_Rev_5_21_Nov.xlsx XLSX spreadsheet
Tab_G_-_Youngstown_QAs_from_amended_RFP_and_PWS-Response.docx DOCX document
FA6656-15-R-0002-0015.docx DOCX document
Youngstown-GFP-MASTER_as_of_21_Nov_2016.xlsx XLSX spreadsheet
Youngstown_BOS_PWS_Revision_5_21_Nov_2016.docx DOCX document
Tab_B_Youngstown_QAs_from_amended_RFP_and_PWS_21_Nov_2016.docx DOCX document
FA6656-15-R-0002-0015conformed.docx DOCX document
Tab_F_-_Youngstown_QAs_from_amended_RFP_and_PWS_21_Nov_2016.docx DOCX document
Attachment_12_Pricing_Matrix_Rev_4_16_Nov.xlsx XLSX spreadsheet
FA6656-15-R-0002-0014.docx DOCX document
Attachment_12_Pricing_Matrix_Rev_3_10_Nov.xlsx XLSX spreadsheet
FA6656-15-R-0002-0013.docx DOCX document
Youngstown-GFP-MASTER_as_of_13_July_2016.xlsx XLSX spreadsheet
WD_2005-3013 _Rev_1.docx DOCX document
FA6656-15-R-0002-0012.docx DOCX document
WD_OH160122 _Mod_6.docx DOCX document
Youngstown_BOS_PWS_Revision_4-31_Jul_2016.docx DOCX document
WD_OH160002 _Mod_19.txt TXT text file
Youngstown_FA6656-15-R-0002-0011.docx DOCX document
FA6656-15-R-0002-0010.pdf PDF
Attachment_12_Pricing_Matrix_Rev_2_7_Dec_15 _FA6656-15-R-0002.xlsx XLSX spreadsheet
FA6656-15-R-0002_0009.pdf PDF
FA6656-15-R-0002_0008.pdf PDF
FA6656-15-R-0002_0007.pdf PDF
Attach_1_-_Youngstown_BOS_PWS_13_Nov_2015.pdf PDF
FA6656-15-R-0002_0006.pdf PDF
Questions_from_Responses__4.pdf PDF
FA6656-15-R-0002_0005.pdf PDF
FA6656-15-R-0002_0004.pdf PDF
C-1_Grounds_Maintenance_Oct15Update.pdf PDF
Tab_F_Questions_Round_4.pdf PDF
RFP_Questions_Round_4.pdf PDF
Attach_1_-_Youngstown_BOS_PWS_30_Sep_2015_Rev_2.pdf PDF
Attach_11_-_Over_and_Above_Rates_Rev_2.docx DOCX document
FA6656-15-R-0002_0003.pdf PDF
TAB_B_QUESTIONS_Responses.pdf PDF
TAB_H_Responses.pdf PDF
Show 40 more

Latest 50 of 118 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Youngstown Q&As from amended RFP and PWS TAB H Airfield Management

1. Reference PWS H.3.1, in a change from the previous revision of the PWS, this paragraph states “AM does not have operational responsibility for the runway(s), therefore, is authorized to have one qualified AMSL on duty as workload permits during hours the airfield is open, with at least one qualified AMSL on each shift.” Please clarify this statement.

IAW AFI 13-204V3, para 16.2.1., During airfield operating hours, at least two qualified AM personnel will be on duty to support flying operations and airfield activities (e.g., snow removal operations, RCR/RSC checks, airfield inspections, aircraft emergencies, BASH/Wildlife responses, etc.). Exception: Units at airports (normally shared- use) where AM does not have operational responsibility for the runway(s), are authorized to have one qualified AMOS/AMSL or higher position qualification on duty as workload permits.

Youngstown does not have operational responsibility for the runway – it is the responsibility of Youngstown Warren Regional Airport. Therefore only one qualified AMSL is required to be on duty during the hours the airfield is open.

2. Reference PWS H.3.1, If Airfield Management does not have operational control of the runway(s) and only needs a minimum of one person per shift, is Airfield Management still required to perform daily airfield checks and inspections?

Yes. Youngstown Airfield Management personnel are responsible for at a minimum of inspecting/checking the AFRC Aircraft Parking Ramp, Taxiways A, B, C and D that are in conjunction with the AFRC Aircraft Parking Ramp and the Assault Landing Zone. The types of required daily airfield checks and inspections includes the following IAW IAW AFI 13-204V3:

17.1. Airfield Inspection. Minimum requirement: one per day. (Obstacles and Obstructions, Construction Areas, Airfield Markings, Airfield Signs, Airfield Lighting and Pavement Areas)

17.2. Airfield Check. An airfield check is not a substitute for the required daily airfield inspection.

17.2.5. Conduct and document an airfield check before the start of wing flying activities each day and as required throughout the day to identify, document and report FOD/BASH/Habitat control, ponding, etc. for correction.

17.2.6. Conduct and document a daily lighting serviceability and marking retro-reflectivity check

17.3. Additional Airfield Inspections.

17.3.1. A monthly joint airfield inspection

17.3.2. Conduct and document an inspection with representatives from CE and SE, before and after completion of any airfield construction, changes or additions to the flying mission or changes affecting existing aircraft parking/taxi procedures.

17.3.3. Conduct and document an annual Airfield Certification/Safety Inspection. See AFI 13-204 Volume 2.

3. Reference PWS paragraph H6.1 AMS Vehicle Support, this paragraph states that “At a minimum, all KTR vehicles will meet the following requirements: 4x4 capable to allow for year-round (snow/rain) inspection and response to infield and perimeter airfield areas, capable of carrying additional passengers for monthly inspections, waiver reviews, etc.,…”. In a review of the GFP Master List, we do not see a vehicle that meets these criteria. Is the KTR responsible for providing this vehicle? Yes

4. While the requirement is to “use” an alternate facility, we assume that this will be a government provided facility and that the provisions (Evacuation kit, office supplies, administrative line, etc.) will also be provided by the government. Does the government concur? If not, what are the KTR responsibilities and requirements as they relate to H6.3?

Yes. The Alternate Facility, to include administrative line will be government provided.

Reference: H6.3. Alternate AM Facility. The Ktr shall use an alternate facility to provide AM services in the event of an evacuation. The location must be located near/on the airfield for easy access to conduct airfield related duties. The government in conjunction with the KTR shall ensure the alternate facility have the following, but not limited to: Evacuation kit, office supplies, administrative lines to make/receive DSN, local and long distance calls, and the capability to file flight plans, process and track inbound/outbound flight movement messages with ARTCC, FSS or other flight planning facilities IAW AFI 13-204 Volume 3. Review and update the Evacuation/Relocation Kit at least quarterly IAW AFI 13-204 Volume 3. Conduct recurring training on emergency evacuation and alternate facility procedures at least annually IAW AFI 13-204 Volume 3.

KTR is responsible for establishing and maintaining and evacuation kit that includes the office supplies. Alternate locations vary from base to base, therefore, Youngstown Airfield Management will need to determine what other AM related items should be included in the evacuation kit to ensure they have the capability to file flight plans, process and track inbound/outbound flight movement messages with ARTCC, FSS or other flight planning facilities.

File details come from the government source that posted it. Updated .