SOO-29 April 2011.pdf
PDF 84 KB Posted
- Attached to
- Bi-Parting Empennage Enclosure for C-5 MTE-1
- Solicitation number
- FA6606-11-R-0002
About this file
Revised SOO (April 29 2011)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Final BPEE Questions and Answers.pdf | ||
| Final BPEE Questions and Answers.docx | DOCX document | |
| Questions and Answers 12 May 2011.pdf | ||
| Q A 10 May 2011.docx | DOCX document | |
| Q A 10 May 2011.pdf | ||
| Participant List for Site Visit.pdf | ||
| Site Visit Q A.pdf | ||
| BPEE Q A 1 docx.pdf | ||
| BPEE Attachments 1 thru 5.pdf | ||
| MTE SITE VISIT NOTICE.pdf | ||
| BPEE SOW Template 4-19-11.doc | DOC document | |
| MTE SITE VISIT NOTICE.docx | DOCX document | |
| Drawings.pdf | ||
| 0 Statement of Objective_14 April 11.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Objective Page 1 of 25
STATEMENT OF OBJECTIVE
For Design, Fabrication and Installation of Bi-Parting Empennage Enclosure
Westover Air Reserve Base, MA
20 November 2008 Revision: 29 April 2011
1.0 PURPOSE
1.1 The purpose of this Statement of Objective is to define the requirements for the installation of a Bi-Parting Empennage Enclosure for C5 Galaxy aircraft for the 439th Airlift Wing at Westover Air Reserve Base (WARB), MA.
2.0 SCOPE
2.1 The scope of the objective under this contract includes all services to plan, fabricate and install a Bi-Parting Empennage Enclosure (BPEE) to enclose the empennage of C5 Galaxy aircraft and a mobile T-tail maintenance stand at the Double Cantilevered (DC) Hangar, Building 7000, in accordance with the criteria, operational parameters and requirements set forth herein. The work shall include all site investigations, plan development, plan review submittals, fabrications, erection, installations, testing, operational training, operation and maintenance manuals and warranty of the equipment and installation provided.
2.2 The Contractor shall consider energy conservation, pollution prevention, and waste reduction to the maximum extent practicable. The Contractor shall incorporate recycled materials required by the U.S. Environmental Protection Agency. The Contractor shall use the Air Force Affirmative Action Procurement Program guidelines. Products specified as part of this project and delivered under this contract shall comply with these guidelines. The Contractor shall complete and submit the Hazardous Materials Reporting Form, Recycled Materials Determination Form, Waste Management Plan and Waste Management Summary Form for the installation activities of this project. These forms are provided under Attachment 1, General Conditions.
2.3 Special Qualifications: The Contractor shall provide documentation to verify experience in the successful planning and installation of mobile empennage enclosures similar to this project in the last fifteen years. The Contractor shall provide a listing of past projects with a description of roles and responsibilities, a detailed description of the structure to include environmental parameters, size, structural fabrication, drive system, appurtenances and amenities and photographs. Provide installation location and contact information for reference. This information will be submitted with the Offeror’s proposal. The Contractor shall provide documentation to verify experience and qualifications of the contractor’s key personnel in the successful planning and installation of mobile empennage enclosures similar to this project in the last fifteen years.
Statement of Objective Page 2 of 25
2.3.1 The Contractor must also document and certify that a Registered Professional Civil Engineer, a Registered Professional Structural Engineer, a Registered Professional Fire Protection Engineer, a Registered Professional Mechanical Engineer and a Registered Professional Electrical Engineer licensed in any of the United States of America or its territories, will be responsible to plan the work and approve and certify all engineering work plans, calculations and shop drawings of their respective disciplines. All planning and engineering work, including shop drawings, must be accomplished by or under the supervision of these Engineers. All planning work must subsequently be certified by these Engineers by affixing his/her professional seal onto drawings, calculations and plans before any fabrication or installation work may begin.
2.4 Project Background and Concept
2.4.1 One half of the DC Hangar, Building 7000, serves as a nose dock for Isochronical (ISO) Inspections and Maintenance. Aircraft access to the ISO Dock is at the southwesterly quadrant of the hangar facility. Currently, when an aircraft is in position for servicing, the rear fuselage and the tail of the aircraft, or empennage, extends through an aperture opening in the center leaves of the main hangar doors and is exposed to the elements. Inspection and repairs to the tail of the aircraft is accessed by a separate, self-propelled mobile maintenance stand which, when in position, partially encompasses this portion of the aircraft.
2.4.2 With this portion of the aircraft outside the hangar, extensive inspection and maintenance delays are experienced during periods of inclement weather. To mitigate this situation, it is necessary for the tail of the aircraft and the maintenance stand surrounding the tail to be enclosed for the adequate protection of the aircraft and maintenance personnel against climatic conditions that prohibit performing the necessary servicing and to facilitate an accelerated inspection and maintenance schedule.
2.4.3 Due to the geometric alignment and configurations of existing site features which create aircraft centerline and wing tip clearance issues, a bi-parting enclosure will be necessary.
2.4.4 An aerial photograph of the facility depicting the location of the new BPEE is enclosed as Attachment No. 2.
3.0 EXISTING CONDITIONS DATA
3.1 The following existing condition data is approximate, provided only for informational purposes and only to represent conditions of relevant site features to describe scope and magnitude. The Contractor is responsible for ascertaining and verifying all pertinent existing conditions and dimensions affecting the installation of the BPEE during the pre-proposal activities.
Statement of Objective Page 3 of 25
3.1.1 The height of the main hangar doors is 60’-0”. The height of the hangar roof is 69’- 0”. Refer to Attachment No. 3 for existing building drawings (8 sheets) furnished for informational and reference purposes only.
3.1.2 A new tail maintenance stand has been erected. Refer to Attachment No. 4 for a drawing of the maintenance stand assembly included for reference only. The Contractor is responsible for verifying all critical dimensions. The existing exterior utility pit providing power and compressed air to the tail stand shall be maintained.
3.1.3 The hangar apron is 14-inch thick non-reinforced concrete pavement, sloped for surface drainage. Refer to Attachment No. 5 for a recent elevation site survey of the apron for informational purposes. The maximum wheel load of the C5 aircraft is 33.4 kips for each of its 28 wheels.
3.1.4 Electrical power to the facility is 480 volt, 3 phase.
3.1.5 The hangar is heated by natural gas fired infra red heaters suspended from the underside of the roof structure.
3.1.6 The fire suppression system in the ISO bay is high expansion foam with zoned pre-action sprinklers, draft curtains with linear thermistor heat detection.
3.1.7 Existing structural steel should be considered and treated as being coated with lead based paint. There are no other known existing material hazards associated with the work. During any time during the performance of the work should there be an unforeseen encounter of asbestos, lead paint or any suspected regulated material, the Contractor shall immediately take prudent precautionary measures and immediately notify the Contracting Officer upon the discovery of such materials.
4.0 BPEE PLANNING CRITERIA AND OPERATIONAL PARAMETERS
4.1 The following is a brief listing of the major planning criteria and operational parameters for the BPEE which shall include, but not be limited to, these items. The scope of activities included in this contract includes providing all labor, transportation, materials, tools, and facilities necessary to plan, fabricate and install the BPEE and appurtenances as specified below. For descriptive purposes, the BPEE will be considered to have three positional modes: fully closed around the aircraft empennage, fully opened at the storage position and in motion or travelling.
4.1.1 General: The BPEE shall consist of two self-supporting, three-sided and roofed structures mounted on a dual flanged steel wheel and rail track system and be fully self-propelled to open and close around the C5 empennage. The structures shall be stable, rigid and sway resistant in any position. Fabric structures are not allowable. The length of travel of each section of the enclosure to the fully opened mode shall be at least half the full wing span of the aircraft and beyond the minimum wing tip clearance requirements for safe movement of aircraft into and out of the ISO Dock. The appearance
Statement of Objective Page 4 of 25 of the BPEE shall be compatible with the existing hangar and the exterior color shall match as closely as possible the existing hangar color.
4.1.1.1 When in the closed mode, the enclosure shall be sized to completely enclose the aircraft empennage and maintenance tail stand described in paragraph 3.1.2 above with a minimum interior clearance of 10 feet ,with a desirable of 15 feet, at all points on each side of the tail stand; a minimum interior clearance of 25 feet to the rear of the tail stand;
and the minimum interior clearance necessary for the safe operation of the jib crane.
Minimum clearances shall account for the depth of structural roof framing and structural deflections. Due to snow loading anticipated to be imposed onto the existing hangar roof, the BPEE shall be no more than 15 feet taller than the existing roof and a minimum width of 110 feet. Due to the existing site geometry, the easterly enclosure segment will obstruct the Fuel Cell vehicle access door when in the fully opened mode.
4.1.1.2 The enclosure shall be fabricated with all necessary structural members, trusses, purlins, bracing, gussets, siding, roofing, insulation, etc. to withstand wind, snow and seismic loadings in accordance with the most current edition of ASCE-7 and Unified Facilities Criteria for this geographic location in the fully closed mode with the following special additional requirements: Each enclosure segment shall be fabricated to travel at a maximum rate of 30 feet per minute at zero wind load; shall be fabricated to be able to travel during winds at a speed of 25 mph; shall be fabricated to withstand the full design wind loads while anchored in the fully opened mode for prolonged durations during fair weather seasons of the year.
4.1.1.3 The enclosure shall fully operate within the temperature range of -20 to 110 degrees F and withstand 1-inch diameter hail.
4.1.1.4 The Contractor shall determine and install all foundation requirements for the BPEE to include all elements required for the travel of the enclosure segments from the fully closed to the fully opened modes and all subsurface foundation requirements for trackage, anchors and/or tie downs. The Contractor shall perform all structural calculations to determine the size, configuration and reinforcement of all foundation elements and provide complete layouts, drawings and details of these requirements. No part of the foundation/rail system shall protrude above the existing concrete apron surface. The existing apron surface slopes for drainage which must be taken into consideration to maintain the level travel of the enclosures. Each rail shall be equipped with a positive mechanical end stop. The track or rail system is to be equipped with a snow/ice melting system and adequate drainage of the melt water. The flangeways, or wheel to track locking arrangement if so equipped, will be provided with a means to continuously cover any depressions or openings in the finished pavement to prevent the entering and accumulation of water, dirt and debris. This cover arrangement must be easily retracted before and re-deployed after movement of the enclosure segments and not hinder vehicular traffic and snow removal operations. The Contractor shall be responsible for all tasks to completely restore the site to pre-existing conditions.
4.1.1.5 Based on the height clearance requirement listed in Paragraph 4.1.1.1 above, the BPEE will be taller than the existing hangar roof. The configuration of the BPEE shall
Statement of Objective Page 5 of 25 not impose any new or additional lateral loads or roof loads onto the existing hangar in any operational mode other than snow drifting when in the closed mode. The BPEE shall be shaped so as not to allow any excessive snow accumulation on the existing hangar roof. The roof structure of the BPEE shall be sufficiently pitched or shaped and surfaced with a material to induce sliding of accumulated ice and snow to the ground for removal.
Roof material shall also be of a non-glare black finish. It is expected that the BPEE will have to be in the closed mode during snow events.
4.1.1.6 When in the fully closed mode, the enclosure shall be fitted with a complete and automatic system of all season weathering at all of the interfaces of the enclosure and the exterior surfaces of the hangar and at the juncture of each enclosure segment’s roof and end wall. While also in the fully closed mode, the main hangar doors must remain fully operational to allow maintenance equipment and vehicles to pass in and out of the hangar as well as access to the hangar for firefighting equipment. The weathering system against the hangar wall may be retractable to prevent damage in the travelling mode of either the BPEE or the doors. A safety interlock shall be provided to prevent movement of either the BPEE or the hangar doors before the weatherseal is retracted.
4.1.1.7 The interior surfaces of the BPEE shall be sheathed with metal siding panels to protect the interior structural members, insulation, mechanical and electrical equipment and appurtenances of each enclosure segment from corrosion or malfunction due to exposure to the elements while stored in the fully opened mode for prolonged periods during any time of the year.
4.1.1.8 The enclosures shall be planned and fitted with all necessary structural anchors and tie downs to provide structural stability in both the open and closed modes under the prescribed conditions. All anchor foundations and assemblies shall be flush with the existing concrete apron pavement. All anchoring systems will be self contained and assembled to be easily deployed and retracted. Storage compartments shall be provided in convenient locations for any temporarily loose component parts of the anchoring systems.
4.1.1.9 Operating systems shall comply with all requirements of United Facilities Guide Specification Section 08 34 16.10, Steel Sliding Hangar Doors, as applicable to the BPEE and as summarized below.
4.1.1.9.1 Each enclosure shall have a separate, traction-drive operating unit driving one or more of the bottom wheels. Each enclosure shall have a motor-mounted, spring-set, solenoid-released motor brake with manual release. Each enclosure shall move independently and will require operating personnel to walk with the enclosure as it moves.
4.1.1.9.2 Each operating unit shall move its enclosure at maximum rate of 30 feet per minute at zero wind load conditions and to be operable up to and including a maximum wind speed of 25 mph. Provide variable speed as necessary for properly controlled soft start and stop operation for safe docking at the fully closed mode and for parking at the
Statement of Objective Page 6 of 25 fully opened mode. The operating units shall consist of suitable motors and gear reducers/transmissions and brakes. The systems shall be provided with overload protection for the drive units and a means for emergency tractor towing operation.
Motors shall be of sufficient size to operate the enclosure segments at not more than 75 percent of their rated capacity under zero wind load conditions. Gear reduction units shall allow a reversal of effort through the gears without damage to the units. Operating mechanisms shall be suitable sheltered from the weather and readily accessible for maintenance by removable or hinged gasketed covers. Provide a suitable, reliable and safe method of providing power to the operating units in all positional modes.
4.1.1.9.3 Braking systems shall be provided and shall ensure stoppage of the enclosures under normal, dry rail conditions within the safety edge overtravel limit. The braking systems shall be either a magnetic, spring-set, solenoid-released brake or hydraulic type.
Provide a hand release to release the brake when it becomes necessary to move the leaf with an outside force. In this manual mode, the brake shall only be allowed to be disengaged by physically holding the release mechanism and walking along with the enclosure. When the manual release is let go, the brake shall engage. The hand release shall be an automatic reset type so that the brake will be operable during subsequent electrical operation of the enclosure. Rail ends shall be fitted with adequate fixed mechanical wheel stops to prevent accidental over-travel of the enclosure off the end of the rail in either automatic or manual operation.
4.1.1.9.4 Enclosures shall be controlled by constant pressure push buttons or joy stick control mounted at convenient locations on the enclosures. All potential personnel crush hazards or pinch points shall be easily observable from any of the operator stations which may require some locations to be remotely operated. Removing pressure from the button shall stop the movement. The control equipment shall conform to NEMA ICS 1 and NEMA ICS 2. Interior push buttons shall be mushroom head type, mounted in heavy-duty, oil-tight enclosures conforming to NEMA ICS 6, Type 13, except that enclosure for reversing starter with disconnect switch shall be Type 1 or Type 12. In locations considered to be exterior, push buttons shall be in watertight enclosures conforming to NEMA ICS 6, Type 4. Each enclosure shall have the buttons mounted on both the exterior and interior faces and remotely if and as necessary to ensure safe operation. The button at each edge of each enclosure shall allow the enclosure to travel with that edge as the leading edge only. The controls shall not be reversible.
4.1.1.9.5 Provide limit switches to prevent overtravel and bumping. Safety edges shall not be used as limit switches. Provide adjustable mechanical or optical type limit switches at each edge of each enclosure. Mechanical limit switches shall be actuated by 3/4 inch diameter stainless steel rods of adjustable length, guided at both ends with nonmetallic bearings and with tape-type constant force springs to return the rods to their normal position after actuation. The actuating rods shall have sufficient overtravel so that the leaves cannot bump one another or any portion of the building or be damaged when being towed. Each rod shall be adjustable 6 inches plus or minus from its normal position. Optical limit switches shall operate by a light beam sensor.
Statement of Objective Page 7 of 25
4.1.1.9.6 Provide fail-safe safety edges on each edge of each enclosure from one inch above the pavement to the top of the enclosure. Provide a single run of safety edge the full width or thickness of the enclosure wall. Provide safety edges to provide a minimum of 3-1/2 inches of overtravel after actuation until solid resistance is met and enclosure motion comes to a complete stop. If the enclosure requires more than 3 ½ inches to come to a complete stop, provide additional overtravel built into safety edge the distance required for enclosure motion to come to a complete stop. Use electric safety edges of reinforced polyvinyl chloride cover or other government-approved material with chemical resistance to diesel and JP-8 fuel, hydraulic fluids, SAE-30 oil and salt water.
Use cover that provides hermetic seal for weather and moisture resistant protection of internal foam and contact elements. Internal foam may be polyurethane and/or latex foam per military specification MIL-R-5001, medium density. Use two contact elements separated by perforated foam or other government-approved materials and able to perform the switching function when the sensing edge encounters an obstruction along any portion of its active length. Actuation of the safety edge on the leading edge of an enclosure shall stop movement of the enclosure. Actuation of a safety edge shall lock out the motor control in the direction of travel until reset, but shall permit the enclosure to be reversed away from the obstruction which tripped the safety edge. Safety edges shall be alive only when enclosure segments are moving. Safety edges shall be reset by moving segments away from the obstruction. The lower portion of the safety edges to a height of approximately 5 feet shall be independently removable for convenience in servicing or repair. The remainder of the edge may be in one piece up to a maximum of 20 feet. Each edge provided with a safety edge shall be protected by a spring type bumper(s). Bumper shall be able to absorb 150 percent of the enclosure drive force when enclosure is pushed in an emergency. For continuous safety edges, bumpers shall extend to the sides. For sectional safety edges, the bumper can interrupt the safety edge for a distance not greater than 12 inches. Provide a keyed bypass to the enclosure controls to render the safety edges in a temporary "repair" mode. The enclosure drive shall be restored from its "fail safe" mode by activation of the keyed bypass. Connect the safety edge in series with the necessary relays and resistors to make the system complete. The service shall be not more than 24 volts and the circuit shall be normally energized so that the malfunction of any of the component parts will make the enclosure inoperative. Wire sensing edges to provide for reliable 4-wire operation of each enclosure so that any power loss to the sensing edges is experienced, then the enclosure becomes inoperable until power is restored and a reset operation is initiated. Install sensing edges to operate through a normally energized relay so that when the sensing edge is compressed the relay contacts open. Install relay contacts to also open if any component in the sensing edge control circuit is broken so as to break continuity. Use 110 volts electrical service to the control circuit. Ensure service to the sensing edge does not exceed a nominal 24 volts. Install a large red indicator light and a loud siren, to be simultaneously activated with the actuation of any sensing edge, to indicate the presence of an obstruction.
4.1.1.9.7 Provide safety and warning devices, markings and signage in accordance with ETL 21-101. Provide a clearly audible signal on each enclosure. The warning devices shall operate when the push button is actuated for movement of the enclosure in either direction; sound 5 seconds before the enclosure moves, and while the enclosure is
Statement of Objective Page 8 of 25 moving; and consist of not less than a 6 inch diameter bell or equivalent decibel-rated horn, loud enough to be heard in the hangar and on the apron. Provide all necessary warning signs, placards and markings per the referenced standard.
4.1.1.9.8 The enclosures shall be fabricated and equipped so that they can be operated manually or by tractors from the pavement in case of power failure. Manual or mechanical operation of the enclosures shall be so arranged to prevent damage to the structure, safety edges and weathering.
4.1.1.9.9 Provide tractor pulls so that enclosures can be safely towed by a tractor or similar equipment in the event of power failure.
4.1.1.9.10 Provide track cleaning devices to clear debris from the rail head and wheel flange grooves as the enclosures are in the travel mode. Provide an automatic safety shut down to immediately stop travel of the enclosures when rails are obstructed.
4.1.1.9.11 Provide the proper electrical equipment for power and controls built in accordance with the latest NEMA standards in the environment of fueled aircraft.
Equipment, control circuits, and safety edge circuits shall conform to NFPA 70.
Electrical equipment shall be explosion-proof as defined in NFPA 70, Article 513.
Manual or automatic control devices necessary for motor operation of the enclosures shall be provided including push button stations, limit switches, combination fused disconnect switches and magnetic reversing starters, control circuit transformers, relays, timing devices and warning devices.
4.1.1.10 Provide screened air relief vents as determined necessary to relieve internal pressure. Provide vents or louvers between the hangar and the enclosures for ventilation and heat transfer.
4.1.1.11 Provide personnel egress doors, 3’- 0” wide X 7’- 0” high minimum, for each enclosure. Doors and frames shall be of insulated steel construction with vision lites, located per NFPA 101 to comply with emergency egress requirements and be fitted with necessary hinges, closers, latches, exit devices and weatherstripping. Provide an exterior lighting fixture and interior exit light at each door.
4.1.1.12 Provide one 8’-0” wide by 10’-0” high overhead rolling door in the rear or southerly elevation of one of the enclosure segments. Door shall be insulated steel slats with vision lites, motor operated with full hood and weatherstripping. Provide an exterior lighting fixture over the head of the door.
4.1.1.13 Provide energy efficient general lighting within the enclosure to provide 60 foot candles of illumination at ground level in the fully closed mode. Fixtures shall be rated for exterior use. Lighting controls shall be located for safe and convenient operation.
Provide exterior lighting if determined necessary for adequate illumination for safe night time operation.
Statement of Objective Page 9 of 25
4.1.1.14 Provide a means of maintaining an interior air temperature of 70 degrees F, using electricity as a source of energy, to accommodate hot bonding operations on the empennage during winter conditions. A well insulated enclosure must be considered.
4.1.1.15 Provide fire suppression within the BPEE to comply with ETL 02-15 by means of high expansion foam and a pre-action dry pipe sprinkler system within the BPEE for full coverage of a high hazard classification. Provide linear thermistor heat detection system for system alarm and activation. Provide draft curtains as required. Provide manual pull station notification devices at each egress door connected to the building fire alarm system. Provide mass notification system devices as required. Provide piping and alarm and notification systems wiring for connection to the existing hangar foam, sprinkler and alarm systems.
4.1.1.16 Develop and provide means of quick connect and disconnect of all supporting utility connections such as power, fire suppression system piping, fire detection and alarm, etc. to minimize this effort when the enclosures are to transfer positional modes.
Connecting and disconnecting of utilities shall be performed without tools. There shall be no electrical cords running along the ground when the enclosure is in the closed position.
4.1.1.17 Develop and provide a lightning risk assessment in accordance with NFPA 780 Annex L and document the required level of protection. If lightning protection is a design requirement, provide a lightning protection system in accordance with NFPA 780, UL 96A, AFI 32-1065, and MIL-HDBK-1004/6 criteria; and provide a UL Lightning Protection Inspection Certificate for the BPEE.
4.1.1.18 Upon completion of the installation, the Contractor shall provide eight hours of on-site training to Base operating and maintenance personnel on the proper operation, preventative and long term maintenance of the installation. The training session(s) will be video and audio taped in digital format.
4.1.1.19 Upon completion of the work, the Contractor shall provide As-Built drawings of the final installation and comprehensive Operation and Maintenance manuals for the equipment provided.
5.0 SPECIAL PLANNING REQUIREMENTS AND PROJECT COORDINATION
5.1 The Contractor shall be responsible for the development of complete planning requirements for the fabrication and installation of the fully functional BPEE in accordance with the requirements set forth. These elements are defined as work permanently fixed on or within the existing hangar. This work shall include any underground utilities, structural or architectural alterations to the existing hangar or any modifications to or extensions of existing mechanical and/or electrical systems to support the functionality of the BPEE.
5.2 It will be incumbent on the Contractor to fully identify and define all such requirements and make them available to the government. The government intends to enter into a separate contract to fully develop these necessary modifications into
Statement of Objective Page 10 of 25 construction contract documents and in turn, separately contract the physical execution of this work.
5.3 The Contractor will be responsible to identify and define the following items which are anticipated to be necessary and to be accomplishment in this manner.
5.3.1 Determine all new or additional structural loads that will be imposed on the existing structure in all positions of the BPEE during all seasons of the year shall be considered.
5.3.2 Identify all modifications to the building infrastructure that will be necessary to accommodate the BPEE to include modifications or relocation of existing heating, plumbing, fire suppression, mechanical and/or electrical equipment and systems.
5.3.3 Identify any necessary architectural modifications or additional construction necessary to accommodate the BPEE.
5.3.4 Identify all utility requirements to support the BPEE to include the type and capacity of each utility such as power, water, compressed air, fire detection and suppression, etc. necessary for the installation to be fully functional and compliant. The specific location and type of termination to allow for convenient and expedient connection and disconnection of each shall also be determined. Determine if there is a need for additional exterior lighting for safe night time operation.
5.3.5 Identify any and all other necessary elements that require physical alteration or addition to the existing facility or site for the installation and operation of the BPEE.
5.4 It is also incumbent on the Contractor to identify, plan and finalize these requirements and provide the necessary information to the government at the 65% plan submittal to allow this construction to be completed in advance of or in conjunction with of the site fabrication of the BPEE.
5.5 It is expected that the Contractor will work in close coordination with the design agent of the government through the Contracting Officer to allow a smooth, complete and timely exchange of information and requirements.
6.0 GENERAL PLANNING AND SUBMITTAL REQUIREMENTS
6.1 The Contractor shall perform all services required to complete investigations and fabrication and installation plans related to this procurement. To meet the contract requirements, the contractor shall prepare and furnish complete technical calculations, survey results, sketches, drawings, planning analyses, fabrication schedules, submittal schedules, and as-built drawings as required for the accomplishment of the project scope in accordance with the requirements of this Statement of Objective. The Contractor shall provide all drawings, complete details, material samples, product data from manufacturers/suppliers and the proposed work schedule for Air Force review and approval prior to commencement of any work. Fabrication planning drawings and specifications shall be submitted for review and approval at the 10%, 65%, 100% and
Statement of Objective Page 11 of 25
100% Final Plan development stages. Fabrication shall not begin until Contracting Officer has approved these planning documents.
6.2 Investigative Requirements
6.2.1 The Contractor shall perform all investigation necessary to accomplish the intent of the work contained this Statement of Objective. The Contractor’s services shall include any surveying required for completion of the plan. The Contractor shall also furnish all materials and equipment to accomplish this investigative work.
6.2.2 The Contractor also shall investigate the accuracy of all drawings and other as-built records applicable to the project scope and update them as necessary. The Contractor shall be responsible for physically investigating all accessible areas as required. Non-accessible areas can be opened by base personnel with prior coordination if the Contractor determines that the inspection is necessary to properly define the plan. The Contractor shall provide the Contracting Officer 14-day advance written notice prior to any scheduled inspection of concealed spaces which require government assistance.
6.3 Planning Documents
6.3.1 The text for delivered documents shall be prepared on standard letter size white bond paper (8.5" x 11"). Preliminary and final documents shall be printed double sided (head to head). Attachments shall be fully identified, referenced in the text and folded to conform to the size paper used in the report. All documents will be produced both electronically and hard copy and will become property of the U.S. Air Force upon completion of the plan. The Contractor shall also deliver copies of any analyses, reports, etc. using Microsoft Office on compatible program media version to the Contracting Officer.
6.4 Drawings
6.4.1 All drawings to be furnished shall be well prepared, complete, and accomplished in accordance with the best professional practice to show clearly and concisely the type and extent of work to be performed. The drawings will be prepared utilizing AutoCAD 2008 software and dimensioned completely and accurately. Each sheet or drawing will include a border and a graphic scale bar to indicate the appropriate scale for the work shown.
Drawing dimensions shall be in English units. Standard fonts, material indications and symbols for mechanical and electrical equipment shall be used. Project title sheets shall have an index that lists the drawing number, drawing name, sheet number of total sheet number, i.e. Sheet X of Y, and CAD file name.
6.4.2 Drawings shall be prepared on 24" X 36" sheets unless specifically waived by the Contracting Officer on a case-by-case basis. The drawings shall be legible when reduced to one half the original sizes.
Statement of Objective Page 12 of 25
6.5 Preliminary Plan Development Submittal (10 Percent)
6.5.1 A 10% preliminary plan submittal is required for this project. Accordingly, the contractor shall complete and submit preliminary plan development (10 percent completion), including all prerequisite requirements for completion. The contractor shall provide those services necessary to prepare drawings and other documents to present the preliminary concepts, means and methods to accomplish the requirement. The 10% preliminary plan submittal includes, but is not limited to, the following:
6.5.1.1 Drawings: Drawings shall consist of preliminary plans to include the information as described below:
(a.) Civil – Site drawings to indicate general layout of the BPEE in relation to the hangar and tail stand in all operational modes.
(b.) Structural - Drawings indicating preliminary structural requirements of the BPEE enclosure and foundation systems.
(c.) Mechanical, Fire Protection and Electrical – Drawings indicating preliminary mechanical and electrical support requirements.
6.5.1.2 Plan Analysis: An analysis indicating and describing assumptions and calculations used in the preliminary plan.
6.5.1.3 Meeting Minutes: The contractor shall submit meeting minutes of all plan review meetings and meetings with government personnel prior to this submittal.
6.6 Plan Development Submittal (65 Percent) Due 60 days from notice to proceed.
6.6.1 A 65% plan submittal are required for this project. Referring to Paragraph 5 above, the Contractor shall provide the requirements, information and data necessary for the government to add or alter existing real property elements of the site and facility to support the fabrication and utilization of the BPEE. It is anticipated that the interim submittal shall constitute the development and furnishing of these requirements, information, data, etc., as soon as it becomes available at any time during the refinement of the planning process. This includes all site, foundation and utility requirements as well as any modifications or additional structural or architectural work required to be implemented on the existing hangar necessary to accommodate the BPEE.
Accordingly, the contractor shall complete and submit a plan development phase (65 percent completion), including all prerequisite requirements for completion. The contractor shall provide those services necessary to prepare drawings and other documents to fabricate the BPEE for review. The 65% plan submittal includes, but is not limited to, the following:
Statement of Objective Page 13 of 25
6.6.1.1 Drawings: Drawings shall consist of comprehensive plans to include the sections, profiles, details and elevations as described in Paragraph 6.4.1.1 above and as necessary to fabricate the BPEE.
6.6.1.2 Plan Analysis: Corrected, updated Plan Analysis.
6.6.1.3 Final information necessary to allow the government to design and contract the additions and/or alterations to the existing site and structure.
6.6.1.4 Catalog Cuts: Copies of catalog information, manufacturer’s data for materials, and equipment should be used as the basis for the plan and calculations.
6.6.1.5 Contractor’s Response to 10% Comments: The Contractor shall provide a type-written response to all 10% government review comments.
6.6.1.6 Meeting Minutes: The contractor shall submit meeting minutes of all plan review meetings and meetings with government personnel prior to this submittal.
6.7 Final Plan Submittal (100 Percent Plan)
6.7.1 Based on previous data and on comments furnished by the government, the contractor shall develop the approved 65% plan submittal into the final working drawings for fabrication. In the 100% plan submittal, the Contractor shall provide those services necessary to prepare drawings and other documents setting forth in detail the requirements for fabrication of the project for approval by the Contracting Officer. This work shall include, but not be limited to, the following:
6.7.1.1 Plan Analysis: Corrected, updated Plan Analysis.
6.7.1.2 Drawings: Drawings shall be final, complete and include, but not be limited to, the sections, profiles, details and elevations as described in Paragraph 6.4.1.1 above and as necessary to fabricate the BPEE.
6.7.1.3 In accordance with Paragraph 2.3.1 above, both the Plan Analysis and the Drawings shall bear the professional seal of a Registered Professional Civil Engineer, a Registered Professional Structural Engineer, a Registered Professional Fire Protection Engineer, a Registered Professional Mechanical Engineer and a Registered Professional Electrical Engineer certifying the accuracy of the planning work of these respective disciplines. All planning work must be certified by these Engineers before any fabrication or installation work may begin.
6.7.1.4 Fabrication Schedule: The contractor shall provide a detailed fabrication schedule. The schedule shall indicate all work tasks, including but not limited to, material and equipment delivery time frames, and indicate the anticipated critical path. See Paragraph 12.0, Installation Schedule, for specific details and requirements.
Statement of Objective Page 14 of 25
6.7.1.5 Catalog Cuts: Complete package of catalog cuts and manufacturer’s data used in the plan, including, but not limited to, the following: Structural Components, Roofing Material, Siding Material, Weathering Materials, Anchoring Systems, Wheels/Tires, Drive and Brake Mechanisms and Systems, Controls, Safety Edges, Warning Devices, Power and Lighting Equipment and Systems, Mechanical Equipment and Systems, Fire Detection and Suppression Equipment and Systems.
6.7.1.6 Contractor’s Response to 65% Comments: The Contractor shall provide a type-written response to all 65% government review comments.
6.7.1.7 Meeting Minutes: The contractor shall submit meeting minutes of all plan review meetings and meetings held with the government personnel prior to this submittal.
6.7.1.8 Project Disk: A single 650MB compact disk (CD) containing the following:
A. All updated 100% drawing files in AutoCAD. All external reference files, or X-Refs, shall be fully resolved or bound such that each drawing is a stand alone file.
B. The entire Final Plan Analysis package for use on Microsoft Word or compatible software.
C. Fabrication Schedule.
6.8 Corrected Final Plan Submittal (100 Percent Final Plan)
6.8.1 Based on review comments furnished by the government during the 100% Plan Submittal Review, the Contractor shall make necessary revisions and/or corrections and submit any and all changed documents to the 100% deliverables with their corresponding electronic files.
6.9 Conferences and Meetings
6.9.1 In addition to normal plan review meetings, a formal interchange meeting may be held if deemed necessary by the government. Otherwise, the Contractor may informally call or visit the Contracting Officer at any time to clarify the work or expedite the preparation of the plan. The Contractor shall be responsible for making memoranda for the record of any conversations and minutes of any meetings with government personnel concerning this project.
6.10 Plan Development Deliverables
6.10.1 Provide Plan Development Deliverables in accordance with the following Table.
POC/OFFICE SYMBOL DELIVERABLES/SUBMITTALS
Statement of Objective Page 15 of 25
Submittal
10%
65%
100% Final Plan
No. of Copies
HQ AFRC/A7PM X X X X 1
439 CONF/LGC X X X X 4
Electronic Products:
Use the latest version of Microsoft WORD or compatible software for all narrative and text files. Utilize CADD Files of CADD Drawings on CD-ROM with index. All external reference files, or X-Refs, shall be fully resolved or bound such that each drawing is a stand-alone file.
6.10.2 The Contractor shall send one set of each submittal package to HQ AFRC/A7PM for their review and comment at the following mailing addresses.
Mr. Robert Comerford
HQ AFRC/A7PM
255 Richard Ray Blvd.
Robins AFB, GA 31098-1637
A copy of the cover letters and shipping invoices indicating delivery of the submittals to the HQ/AFRC and USACE addresses shall accompany the Contractor’s scheduled delivery to CONF/LGC, Westover ARB.
6.10.3 Government Review: The Contractor shall allow twenty one (21) calendar days for government review of all deliverables.
7.0 SCHEDULE RESTRICTIONS AND PLANNING REQUIREMENTS
7.1 Winter Exclusionary Period
7.1.1 The Contractor shall not be allowed to perform any activities at the project site which prevents the government from utilizing the hangar during the time frame of November 1 through March 31 due to on-going ISO inspection and maintenance operations. During this period, the Contractor may request to complete portions of the project that will not interfere with the operation and utilization of the hangar.
7.2 ISO Relocation
7.2.1 On or about April 1, the network of C-5 maintenance stands occupying the ISO dock will be removed from the hangar by the government. All ISO aircraft maintenance
Statement of Objective Page 16 of 25 operations will be vacated from the DC Hangar until project completion or until on or about October 15, whichever occurs first. This will allow total and uninterrupted access to the work area during this period.
7.3 Infrastructure Alterations
7.3.1 The actual installation schedule of the BPEE may be interdependent or concurrent with the separate work administered by the government to construct necessary structural and/or architectural alterations and modifications and/or extensions to the utility systems to support the installation and functionality of the BPEE as determined during the Plan Development described in Paragraph 5.0 above. Close coordination and cooperation will be essential for the successful scheduling and implementation of the Plan.
7.4 Installation Requirements and Coordination
7.4.1 The Contractor must coordinate all materials, equipment and Subcontractors so as to minimize the duration of the work which prohibits the use of the hangar. Being a critical facility and operation, minimum duration of the installation is essential. The Contractor shall not begin any fabrication or perform any other physical work at the site until all prerequisite tasks are complete, planning submittal materials are received and approved by the Contracting Officer and all approved materials have been delivered to the Base.
7.4.2 The Contractor shall maximize off-site fabrication of components and sub-assemblies and utilize the south ramp for the field assembly of these items to the extent possible.
8.0 FABRICATION AND INSTALLATION EXECUTION
8.1 General Scope
8.1.1 The Contractor shall provide all labor, materials and equipment to fabricate, install and complete the work planned in accordance with the provisions of this Statement of Objective. The Contractor shall also comply with Attachment No. 1, General Conditions.
8.2 Field Engineering
8.2.1 The Contractor shall provide for field engineering services required for the project, including the following:
8.2.1.1 Survey work required for the execution of the project to accurately lay out the work in proper horizontal and vertical alignment.
8.2.1.2 Civil, structural or other professional engineering services required to execute the Contractor’s fabrication and installation methods.
8.3 Quality Assurance and Quality Control
Statement of Objective Page 17 of 25
8.3.1 The Contractor shall provide the manpower, equipment, material, services and necessary support to ensure oversight services throughout the accomplishment of the fabrication and installation operations. The Contractor shall be responsible for all Quality Assurance and Control of the work. Rework or remove and replace any non-compliant work. Perform tests in the presence of the Contracting Officer and the Base Civil Engineer or their representatives to determine conformance with the specified requirements.
8.4 Mechanical and Electrical Equipment Start-up and Preliminary Tests
8.4.1 The Contractor shall conduct complete start up procedures and preliminary tests which shall encompass all aspects of system operation. Individually test all components and accessories to demonstrate proper functioning per the manufacturer’s start up and testing instructions. When tests have been completed and all necessary corrections made, the Contractor shall submit to the Contracting Officer a signed and dated certificate attesting to the satisfactory completion of all testing and stating that the system is in operating condition. A written request for a Pre-Final Inspection and formal inspections and tests shall be submitted to the Contracting Officer five days in advance of the desired inspection date.
9.0 PRE-FINAL INSPECTION
9.1 The Contractor shall conduct a pre-final walk through inspection to assess the conformance of the work to this Statement of Objective and Final Plan. The Contractor shall publish the pre-final inspection findings in a pre-final inspection report including complete testing records and reports and submit to the Contracting Officer. The Contractor shall submit Operation and Maintenance manuals and conduct training sessions to Base personnel as specified and required.
9.2 Additional Tests
9.2.1 When deficiencies, defects or malfunctions develop during the operational tests required, all further testing of the system shall be suspended until proper adjustments, corrections or revisions have been made to assure proper performance of the system. If these revisions require more than a nominal delay, the Contracting Officer shall be notified when the additional work has been completed, to arrange a new inspection and test of the system. All tests required shall be repeated prior to final acceptance, unless directed otherwise.
10.0 FINAL INSPECTION
10.1 The Contractor and Contracting Officer shall conduct a final inspection of the installation. The inspection shall concentrate on the items identified at the pre-final inspection and recorded in the pre-final report. The Contractor shall publish the findings in a Final Inspection Report. The report shall: (1) Certify that all items of the Plan have been implemented and that the installation is complete; (2) Furnish operational test
Statement of Objective Page 18 of 25 results and reports; (3) Furnish Operational and Maintenance data; (4) Include a record of “signed and sealed” as-built drawings verifying that all developmental standards have been met.
10.2 Test Reports
10.2.1 The Contractor shall submit three bound copies of certifications for all inspections and tests specified. The following systems tests are to be included as a minimum:
a. Drive and Braking Systems and Controls
b. Anchoring and Tie-Down Systems
c. Weathering Systems
d. Operational Warning Systems
e. Electrical and Lighting Systems
f. Heating/Ventilating Systems
g. Fire Alarm and Sprinkler Systems
h. Final Acceptance Test
10.3 Operation and Maintenance Data
10.3.1 Submit operation and maintenance data for all system components provided.
Three bound copies of complete operating and maintenance instructions for all equipment installed shall be provided. Instructions shall clearly indicate all necessary steps for the operation and maintenance of the system. Furnish one complete set of data prior to the time that final acceptance tests are performed, and furnish the remaining sets at contract completion.
10.4 Close-Out Submittals
10.4.1 As-built drawings for the entire project with one electronic copy on CD ROM in the format specified in Paragraph 6.4.
10.5 Delivery/Warranty
10.5.1 Following final inspection, the Contractor shall deliver to the Government all warranty documentation. The warranty shall be issued in accordance with FAR 52.246-
21. Extended warranties offered by the Contractor and its subcontractors or suppliers may be accepted by the Government at its discretion.
11.0 GENERAL REQUIREMENTS
11.1 Work Scheduling and Planning Requirements
Statement of Objective Page 19 of 25
11.1.1 The work site…
This is the start of the file's text. The full file is on GovTribe.