5-Draft_CDRL_A001-03_RIS_O M.doc

DOC document 44 KB Posted

Attached to
Aerial Targets Operations and Maintenance Services Federal contract opportunity
Solicitation number
FA4890-14-R-0012
Issued by
Department of the Air Force Air Combat Command

About this file

5-DRAFT CDRL A001-03 RIS O M

View the file

Other files for this federal contract opportunity

Other files attached to Aerial Targets Operations and Maintenance Services, newest first.
File Type Posted
FBO_RFP_Notice_for_Combined_Synopsis-Solicitation_FA4890-14-R-0012.pdf PDF
Govt_Responses_to_Industry_RFP_Ques_(FBO_3Nov14).pdf PDF
2-PPC-Site_Visit_Info_(FBO_24Oct14).pdf PDF
1-Prelim_Site_Visit-Conf_Info_10Sep14.pdf PDF
Govt_Req_for_Comments_4Aug14.pdf PDF
Draft_AT_14R0012_PWS_App_K_(Workload_Data)_1Jul14.docx DOCX document
Draft_AT_14R0012_PWS_App_I_(Illustrations)_1Apr14.docx DOCX document
Draft_AT_14R0012_PWS_App_C_(Pubs_Forms)_1Apr14.docx DOCX document
Draft_RFP_14R0012_1Aug14_1500.pdf PDF
REV_Draft_PWS_App_G_(Quality_Mgmt_Sys)_AT_14R0012_1Jul14.pdf PDF
Req_for_OCI_Mitigation_Plan_11Jun14_(due_29Jul14).pdf PDF
7-Rev_CM_Draft_AT_14R0012_CLIN_Structure_22May14.pdf PDF
AT_Industry_Day_Briefing_(posted_to_FBO_22May14).pdf PDF
12-Draft_PWS_App_L_(QF-4_to_QF-16_Trans_HMN)_AT.docx DOCX document
11-Draft_PWS_App_J_(Proposal_Inc)_AT_14R0012_1Feb14.docx DOCX document
Draft_PWS_App_H_(GFV)_AT_14R0012_1Apr14.docx DOCX document
2-Draft_App_D_ADPE.pdf PDF
6-Draft_App_D_Hangar_5_TAS.pdf PDF
1-Draft_App_D_GFE_Annual_Inventory.xls XLS spreadsheet
5-Draft_App_D_Full_Scale_R14s.pdf PDF
13-Draft_App_D_DS2_TAS_Listing_Holloman.pdf PDF
Draft_PWS_App_D_(GFE)_AT_14R0012_1Apr14.pdf PDF
5-Draft_App_C_AFI_Instructions.xlsx XLSX spreadsheet
11-Draft_App_C_RCC_Charts.xlsx XLSX spreadsheet
6-Draft_App_C_AFI_21-101_Matrix.xlsx XLSX spreadsheet
3-Draft_App_C_TO_GDRCS.xlsx XLSX spreadsheet
8-Draft_App_C_Plans.xlsx XLSX spreadsheet
27-Draft_CDRL_A012_DD1423.pdf PDF
41-Draft_CDRL_A019_DD1423.pdf PDF
29-Draft_CDRL_A013_DD1423.pdf PDF
38-Draft_CDRL_A017_DI_-IPSC-81442A_DID.pdf PDF
43-Draft_CDRL_A020_DD1423.pdf PDF
31-Draft_CDRL_A014_DD1423.pdf PDF
26-Draft_CDRL_A011_Spill_Rpt_Form_DD1423.pdf PDF
23-Draft_A010_DI-ILSS-81251_DID.pdf PDF
15-Draft_CDRL_A006_DI-ENVR-81375_DID.pdf PDF
7-Draft_CDRL_A001_DID_DI-MGMT-80227.pdf PDF
24-Draft_CDRL_A011_DD1423.pdf PDF
2-Draft_CDRL_A001_DID_DI-ADMN-80447A.pdf PDF
14-Draft_CDRL_A006_DD1423.pdf PDF
21-Draft_CDRL_A009_DI-MISC-80393A_DID.pdf PDF
6-Draft_CDRL_A002_DD1423.pdf PDF
3-Draft_CDRL_A001-01_FSAT_O M.docx DOCX document
17-Draft_CDRL_A007_DI-MISC-81420_DID.pdf PDF
8-Draft_CDRL_A003_DD1423.pdf PDF
4-Draft_CDRL_A001-02_SSAT_O M.docx DOCX document
20-Draft_CDRL_A009_DD1423.pdf PDF
12-Draft_CDRL_A005_DD1423.pdf PDF
1-Draft_PWS_14R0012_Aerial_Targets_1Apr14.docx DOCX document
AT_Mkt_Research_Questionnaire_25Apr14.docx DOCX document
Show all 50

Aerial Targets Operations and Maintenance Services has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAFT AERIAL TARGETS PWS

Solicitation No. FA4890-14-R-0001

APPENDIX B – CONTRACT DATA REQUIREMENTS LIST (CDRL)

Tab 03 (CDRL A001-03)

Range Instrumentation System (RIS) Operations & Maintenance (O&M) Activities

Monthly Reports for RIS O&M shall include the following:

· Operational Availability or A(o) for the Tellabs Switch and Data/Comm circuits

· Report shall include the most recent month and a rolling average of the preceding 12 months. Calculate A(o) IAW PWS Table 1.6 Service Summary section 3.

· Mission Availability or M(a) for the GRDCS, BC3, Orion Communication System, MCS Vans, TPS-75 RADAR, and the Mission Video System,

· Report shall include the most recent month and a rolling average of the preceding 12 months. Calculate M(a) IAW PWS Table 1.6 Service Summary section 3.

· Summary of maintenance actions for RIS equipment/circuits and GRDCS Tracking Pods. Include the following data:

· The number of missions cancelled due to an outage of the GRDCS, BC3, Orion Communication System, MCS Vans, or TPS-75 RADAR equipment.

· Start Date/Time, Stop Date/Time, Duration, Outage, Equipment, Repair Actions, Parts Used.

· Operating hours for GRDCS and BC3, including the number of hours devoted to:

· Mission support.

· Maintenance.

· Engineering and systems programming efforts.

· Administrative or other overhead functions.

· Maintenance and Logistics Problems:

· List of top 5 parts most frequently ordered during preceding 12-month period.

· List of top 5 parts ordered with longest time on order.

· Describe areas which have impacted past mission accomplishment.

· Identify problems which may affect future mission capabilities.

· Summary of information regarding range tower conditions affecting safety or mission operations.

· Summary of Scheduled Maintenance actions for RIS equipment:

· Due in the next 45 days.

· Accomplished during the preceding calendar month.

· Current status of accounts authorized for GRDCS and BC3 operations

· The first report shall include:

· Amount of time used by each account during the month in hours of fractions.

· Name of the individual to whom the account was issued.

· Degree of access provided.

· Subsequent reports shall contain:

· Changes to account status.

· Additions and deletions.

· The times utilized by each account are required each month.

· Synopsis of engineering and systems programming tasks in progress, identified by:

· Short title.

· Date initiated.

· Estimated date of completion.

· Current status.

· Problems anticipated or encountered.

· Special Projects: Provide a summary of GRDCS/BC3/Telecommunications related test projects supported.

AERIAL TARGETS DRAFT PWS

B-A001-03-1

File details come from the government source that posted it. Updated .