DRAFT Appendix G - Level of Effort
View the file
Other files for this federal contract opportunity
Show all 50
Forward Operating Location - Base Operating Support (FOL-BOS) Curacao has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No. FA4890-13-R-0117
DRAFT
APPENDIX G
Level of Effort
1.0. General. The attached spreadsheets reflect the historical/projected workload data for use in determining contract level of effort. These documents combined with applicable Appendices should provide estimates of the workload within the program.
1.1 Traffic Management Transportation Freight Volume Jan-10, -Dec 12
1.2 SBSS transaction histories. Transaction Identification Code (MSI) was processed by deployed forces and shall not be included in computations and turn-in shall be reduced by the number of MSIs.
Curacao M-32 data Aug 12 to May 13
1.3 Government Furnished Property List. This listing represents all government property provided: real property is not included. This listing shall be use to determine level of effort as related to supply and all other functional areas. It shall also be used as a master authorization list in determining approved property levels. CA/CRL assets shall be managed using government systems (ES-S and AFEMS).
1.3.1 Supply Point Listing. Provides authority to store POS at the TACAN maintenance facility.
1.4 PMI workload
1.5 Exercises Schedule
The following chart provides a conceptual guide to various exercises conducted by the site to ensure readiness / proficiency. The list below does not include fire department only training/exercises nor does it include security forces exercises/training such as random access measures (RAMs) at the Entry Control Point. This list reflects the major exercises and may be augmented with additional training if there are performance issues found during the exercises.
| Event |
| Description |
| Level of Effort |
| Major Accident Response Exercise (MARE) |
| Conducted at least twice a year to focus on MASS Casuality, HAZMAT, Riot Response, etc. |
| Involves contractor leadership for multiple days to include potential table top rehearsels prior to full event. |
| Anti-Terrorism Exercise |
| Conducted at least twice a year to focus on IED, CBRNE, etc. response |
| Same as above but one day event. |
| Natural Disaster Exercise |
| Conducted once a year to test response to severe weather that may impact ops such as flooding. |
| One day exercise with contractor leadership but may involve more section leaders to test all facets of the response. |
| Operational Readiness Exercise (ORE) |
| Annual test of pre-trans and/or post-attack scenarios. |
| Depending on the scenario can be multiple day test with focused contractor leadership. |
1.6 POL Level of Effort
1.7 MWR
1.8 ITAR
image1.emf
Transportation Freight Data FY10 - FY13 Rollup.xlsx Freight Data FY10
FY10 - MICAP (P1)
Column1 Oct-09 Nov-09 Dec-09 Jan-10 Feb-10 Mar-10 Apr-10 May-10 Jun-10 Jul-10 Aug-10 Sep-10
Total Shipments 0 0 18 24 12 5 3 10 6 21 8 3
Avg. Transit Days 0.0 0.0 4.3 5.2 3.7 3.3 2.5 2.3 1.8 2.8 3.3 2.0
Total Over 4-days 0 0 9 15 4 0 0 0 0 1 0 0
% On-Time Deliveries 0.0% 0.0% 50.0% 37.5% 66.7% 100.0% 100.0% 100.0% 100.0% 95.2% 100.0% 100.0%
Total Frustrated 0 0 1 2 0 0 0 0 0 0 1 0
Total Weight (lbs) 0 0 1547 1905 476 99 17 665 48 1127 699 80
Total Costs $0.00 $0.00 $15,917.57 $11,380.24 $7,811.93 $2,874.40 $1,673.30 $6,799.13 $3,674.77 $17,270.10 $6,045.02 $2,066.12
FY10- PRIORITY AIR (P2)
Column1 Oct-09 Nov-09 Dec-09 Jan-10 Feb-10 Mar-10 Apr-10 May-10 Jun-10 Jul-10 Aug-10 Sep-10
Total Shipments 0 0 4 14 5 6 0 2 1 5 5 4
Avg. Transit Days 0.0 0.0 10.2 6.3 6.6 7.1 0.0 10.5 1.7 3.9 3.1 4.1
Total Over 7-days 0 0 2 5 1 2 0 0 0 0 0 0
% On-Time Deliveries 0.0% 0.0% 50.0% 64.3% 80.0% 66.7% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0%
Total Frustrated 0 0 2 1 0 0 0 1 0 0 0 0
Total Weight (lbs) 0 0 2973 1156 1058 4550 0 101 17 88 311 197
Total Costs $0.00 $0.00 $18,751.97 $5,145.68 $5,023.57 $11,330.93 $0.00 $1,439.69 $594.61 $3,825.67 $3,666.58 $2,846.23
FY10 - CONSOLIDATED AIR (P3)
Column1 Oct-09 Nov-09 Dec-09 Jan-10 Feb-10 Mar-10 Apr-10 May-10 Jun-10 Jul-10 Aug-10 Sep-10
Total Shipments 0 0 3 7 9 9 23 25 52 24 22 13
Avg. Transit Days 0.0 0.0 6.0 9.4 19.4 18.4 12.8 12.0 9.6 9.6 7.5 5.0
Total Over 14-days 0 0 0 2 4 3 6 5 0 1 0 0
% On-Time Deliveries 0.0% 0.0% 100.0% 71.4% 55.6% 66.7% 73.9% 80.0% 100.0% 95.8% 100.0% 100.0%
Total Frustrated 0 0 0 0 0 0 1 0 0 1 0 0
Total Weight (lbs) 0 0 3726 1494 2087 2874 14845 4661 24293 13796 6774 4100
Total Costs $0.00 $0.00 $12,202.22 $6,515.47 $13,287.63 $12,571.51 $51,498.59 $29,384.25 $96,226.57 $53,014.24 $30,010.86 $12,232.59
FY10 - CONSOLIDATED OCEAN (P4)
Column1 Oct-09 Nov-09 Dec-09 Jan-10 Feb-10 Mar-10 Apr-10 May-10 Jun-10 Jul-10 Aug-10 Sep-10
Total Shipments 0 0 0 0 1 0 1 3 3 1 3 7
Avg. Transit Days 0.0 0.0 0.0 0.0 31.0 0.0 29.2 23.4 24.6 34.9 27.2 23.0
Total Over 70-days 0 0 0 0 0 0 0 0 0 0 0 0
% On-Time Deliveries 0.0% 0.0% 0.0% 0.0% 100.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
Total Frustrated 0 0 0 0 0 0 0 0 0 0 0 0
Total Weight (lbs) 0 0 0 0 2246 0 6860 16138 25895 9534 1875 20181
Total Costs $0.00 $0.00 $0.00 $0.00 $4,698.00 $0.00 $7,630.01 $35,837.54 $30,073.39 $9,712.20 $8,029.55 $40,709.42
FY10 - HAND CARRY or OTHER THAN P1-P4 (P5)
Column1 Oct-09 Nov-09 Dec-09 Jan-10 Feb-10 Mar-10 Apr-10 May-10 Jun-10 Jul-10 Aug-10 Sep-10
Total Shipments 0 0 0 1 0 0 0 0 0 0 0 0
Avg. Transit Days 0.0 0.0 0.0 6.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Over 70-days 0 0 0 0 0 0 0 0 0 0 0 0
% On-Time Deliveries 0.0% 0.0% 0.0% 100.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
Total Frustrated 0 0 0 1 0 0 0 0 0 0 0 0
Total Weight (lbs) 0 0 0 6 0 0 0 0 0 0 0 0
Total Costs $0.00 $0.00 $0.00 $80.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
FY10 - MONTHLY GRAND TOTALS
Column1 Oct-09 Nov-09 Dec-09 Jan-10 Feb-10 Mar-10 Apr-10 May-10 Jun-10 Jul-10 Aug-10 Sep-10
Total Shipments 0 0 25 45 27 20 27 40 62 51 38 27
Avg. Transit Days 0.0 0.0 6.8 7.0 15.2 9.6 14.8 12.0 9.4 12.8 10.3 8.5
Total Late Deliveries 0 0 11 22 9 5 6 5 0 2 0 0
% On-Time Deliveries 0.0% 0.0% 56.0% 51.1% 66.7% 75.0% 77.8% 87.5% 100.0% 96.1% 100.0% 100.0%
Total Frustrated 0 0 3 3 0 0 1 1 0 1 1 0
Total Weight (lbs) 0 0 8245 4555 5867 7523 21722 21565 50253 24545 9659 24558
Total Costs $0.00 $0.00 $46,871.76 $23,041.39 $30,821.13 $26,776.84 $60,801.90 $73,460.61 $130,569.34 $83,822.21 $47,752.01 $57,854.36
FY10 - GRAND TOTALS
Column1 Oct-09 Nov-09 Dec-09 Jan-10 Feb-10 Mar-10 Apr-10 May-10 Jun-10 Jul-10 Aug-10 Sep-10
Total Shipments 0 0 25 70 97 117 144 184 246 297 335 362
Avg. Transit Days 0.0 0.0 6.8 6.9 9.7 9.7 10.7 10.9 10.7 11.0 10.9 10.6
Total Late Deliveries 0 0 11 33 42 47 53 58 58 60 60 60
% On-Time Deliveries 0.0% 0.0% 56.0% 52.9% 56.7% 59.8% 63.2% 68.5% 76.4% 79.8% 82.1% 83.4%
Total Frustrated 0 0 3 6 6 6 7 8 8 9 10 10
Total Weight (short tons) 0.0 0.0 4.1 6.4 9.3 13.1 24.0 34.7 59.9 72.1 77.0 89.2
Total Costs $0.00 $0.00 $46,871.76 $69,913.15 $100,734.28 $127,511.12 $188,313.02 $261,773.63 $392,342.97 $476,165.18 $523,917.19 $581,771.55
&"Times New Roman,Regular"&28Freight Data FY10&"-,Regular"&11
Freight Data FY11
FY11 - MICAP (P1)
Column1 Oct-10 Nov-10 Dec-10 Jan-11 Feb-11 Mar-11 Apr-11 May-11 Jun-11 Jul-11 Aug-11 Sep-11
Total Shipments 4 11 17 14 11 9 4 14 9 20 24 16
Avg. Transit Days 2.8 2.9 3.2 3.4 2.8 3.1 1.8 2.2 3.0 1.6 2.3 3.1
Total Over 4-days 0 0 0 0 0 0 0 0 0 0 2 2
% On-Time Deliveries 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 91.7% 87.5%
Total Frustrated 0 1 3 1 0 1 0 0 0 0 0 2
Total Weight (lbs) 86 691 910 827 761 281 64 375 366 12633 3172 310
Total Costs $2,679.11 $7,558.71 $11,485.16 $9,360.43 $8,501.37 $6,803.13 $2,511.74 $9,165.11 $5,943.17 $40,760.72 $20,874.88 $10,232.25
FY11- PRIORITY AIR (P2)
Column1 Oct-10 Nov-10 Dec-10 Jan-11 Feb-11 Mar-11 Apr-11 May-11 Jun-11 Jul-11 Aug-11 Sep-11
Total Shipments 3 7 3 5 4 11 8 2 4 8 2 5
Avg. Transit Days 5.2 4.5 4.7 5.0 5.0 4.6 4.9 5.5 3.3 2.0 1.0 9.9
Total Over 7-days 0 0 0 0 0 0 0 0 0 0 0 2
% On-Time Deliveries 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 60.0%
Total Frustrated 0 1 0 1 1 1 1 0 0 0 0 3
Total Weight (lbs) 238 1326 16 497 446 6005 759 56 1451 331 114 224
Total Costs $2,277.24 $8,969.24 $1,811.00 $3,484.84 $2,700.00 $20,272.56 $7,377.38 $1,224.55 $5,272.50 $5,077.55 $1,251.75 $3,145.05
FY11 - CONSOLIDATED AIR GOV'T (P3)
Column1 Oct-10 Nov-10 Dec-10 Jan-11 Feb-11 Mar-11 Apr-11 May-11 Jun-11 Jul-11 Aug-11 Sep-11
Total Shipments 15 23 10 12 27 31 3 7 4 6 7 27
Avg. Transit Days 7.4 6.3 9.0 8.1 7.2 7.3 8.4 5.1 5.8 4.3 8.1 9.3
Total Over 14-days 0 0 0 0 0 0 0 0 0 0 0 6
% On-Time Deliveries 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 77.8%
Total Frustrated 0 0 1 0 1 1 0 0 0 0 0 0
Total Weight (lbs) 3253 5865 3376 6368 9416 7572 1154 5376 574 1976 6692 14371
Total Costs $12,866.40 $26,516.50 $14,369.06 $18,976.82 $30,426.68 $27,860.37 $5,037.79 $16,340.12 $3,607.04 $7,221.19 $24,109.07 $66,960.58
FY11 - CONSOLIDATED AIR ITT (P4)
Column1 Oct-10 Nov-10 Dec-10 Jan-11 Feb-11 Mar-11 Apr-11 May-11 Jun-11 Jul-11 Aug-11 Sep-11
Total Shipments 4 5 2 4 2 5 4 3 4 3 6 2
Avg. Transit Days 13.4 12.1 31.0 13.5 8.0 7.4 9.3 9.7 12.0 15.3 10.2 13.1
Total Over 14-days 1 2 0 0 0 0 1 0 2 2 1 0
% On-Time Deliveries 75.0% 60.0% 100.0% 100.0% 100.0% 100.0% 75.0% 100.0% 50.0% 33.3% 83.3% 100.0%
Total Frustrated 0 0 1 0 0 0 0 0 0 0 0 0
Total Weight (lbs) 3829 1838 18361 3492 1200 4287 1549 2029 7117 2068 4785 3257
Total Costs $9,862.33 $6,571.52 $12,330.60 $8,076.29 $3,134.28 $11,834.34 $5,971.38 $6,140.82 $16,221.60 $5,440.00 $10,392.87 $6,888.28
FY11 - CONSOLIDATED OCEAN (P5)
Column1 Oct-10 Nov-10 Dec-10 Jan-11 Feb-11 Mar-11 Apr-11 May-11 Jun-11 Jul-11 Aug-11 Sep-11
Total Shipments 1 1 9 0 5 7 3 5 2 0 10 3
Avg. Transit Days 12.0 28.6 29.2 0.0 22.1 12.4 42.5 20.0 19.0 0.0 10.6 43.4
Total Over 70-days 0 0 0 0 0 0 0 0 0 0 0 1
% On-Time Deliveries 100.0% 100.0% 100.0% 0.0% 100.0% 100.0% 100.0% 100.0% 100.0% 0.0% 100.0% 66.7%
Total Frustrated 0 0 5 0 1 0 3 0 0 0 0 1
Total Weight (lbs) 414 6999 29205 0 5273 31639 8294 25716 4686 0 16185 1401
Total Costs $944.73 $5,785.75 $33,186.67 $0.00 $9,256.23 $20,238.00 $9,236.67 $21,895.46 $5,606.73 $0.00 $19,862.39 $4,119.95
FY11 - MONTHLY GRAND TOTALS
Column1 Oct-10 Nov-10 Dec-10 Jan-11 Feb-11 Mar-11 Apr-11 May-11 Jun-11 Jul-11 Aug-11 Sep-11
Total Shipments 26 46 32 35 44 56 19 26 21 37 39 50
Avg. Transit Days 7.2 6.5 12.0 7.5 5.8 5.6 6.1 5.6 6.0 5.8 5.4 8.8
Total Late Deliveries 1 2 0 0 0 0 1 0 2 2 3 11
% On-Time Deliveries 96.2% 95.7% 100.0% 100.0% 100.0% 100.0% 94.7% 100.0% 90.5% 94.6% 92.3% 78.0%
Total Frustrated 0 2 5 2 2 3 1 0 0 0 0 5
Total Weight (lbs) 7406 9720 22663 11184 11823 18145 3526 7836 9508 17008 14763 18162
Total Costs $27,685.08 $49,615.97 $39,995.82 $39,898.38 $44,762.33 $66,770.40 $20,898.29 $32,870.60 $31,044.31 $58,499.46 $56,628.57 $87,226.16
FY11 - GRAND TOTALS
Column1 Oct-10 Nov-10 Dec-10 Jan-11 Feb-11 Mar-11 Apr-11 May-11 Jun-11 Jul-11 Aug-11 Sep-11
Total Shipments 26 72 104 139 183 239 258 284 305 342 381 431
Avg. Transit Days 7.2 6.8 8.5 8.3 7.8 7.4 7.2 7.0 6.9 6.8 6.7 6.9
Total Late Deliveries 1 3 3 3 3 3 4 4 6 8 11 22
% On-Time Deliveries 96.2% 95.8% 97.1% 97.8% 98.4% 98.7% 98.4% 98.6% 98.0% 97.7% 97.1% 94.9%
Total Frustrated 0 2 7 9 11 14 15 15 15 15 15 20
Total Weight (short tons) 3.7 8.6 19.9 25.5 31.4 40.5 42.2 46.2 50.9 59.4 66.8 75.9
Total Costs $27,685.08 $77,301.05 $117,296.87 $157,195.25 $201,957.58 $268,727.98 $289,626.27 $322,496.87 $353,541.18 $412,040.64 $468,669.21 $555,895.37
&"Times New Roman,Bold"&28Freight Data FY11
Freight Data FY12
FY12 - MICAP (P1)
Column1 Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12
Total Shipments 17 15 9 9 9 7 6 4 16 21 22 15
Avg. Transit Days 2.5 3.5 2.1 3.2 2.0 2.1 1.5 1.3 2.3 3.4 2.8 2.8
Total Over 4-days 1 2 0 0 0 0 0 0 0 0 0 0
% On-Time Deliveries 94.1% 86.7% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
Total Frustrated 1 2 1 3 0 0 0 0 0 2 0 1
Total Weight (lbs) 648 475 62 1773 176 68 111 8 466 1327 1167 450
Total Costs $13,538.58 $11,850.00 $6,773.00 $9,108.63 $6,614.76 $4,793.80 $4,064.00 $2,672.00 $11,526.35 $17,656.43 $17,846.00 $11,420.60
FY12- PRIORITY AIR (P2)
Column1 Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12
Total Shipments 2 5 1 3 4 5 5 0 3 3 2 3
Avg. Transit Days 11.0 6.2 8.0 6.3 6.0 9.6 7.0 0.0 4.7 8.0 6.5 13.3
Total Over 7-days 2 2 0 0 0 2 2 0 0 2 0 0
% On-Time Deliveries 0.0% 60.0% 100.0% 100.0% 100.0% 60.0% 60.0% 0.0% 100.0% 33.3% 100.0% 100.0%
Total Frustrated 1 0 1 2 0 4 2 0 0 2 1 2
Total Weight (lbs) 200 697 33 492 655 142 352 0 124 82 85 2022
Total Costs $1,347.25 $4,408.58 $675.00 $2,555.87 $3,417.64 $3,132.90 $4,114.38 $0.00 $1,898.55 $1,976.35 $1,276.70 $9,159.26
FY12 - CONSOLIDATED AIR GOV'T (P3)
Column1 Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12
Total Shipments 16 32 25 14 27 20 17 29 19 23 7 5
Avg. Transit Days 21.8 18.9 19.6 16.7 17.3 20.1 18.2 18.8 15.0 18.0 19.4 18.2
Total Over 14-days 7 24 0 0 15 1 10 0 5 0 0 0
% On-Time Deliveries 56.3% 25.0% 100.0% 100.0% 44.4% 95.0% 41.2% 100.0% 73.7% 100.0% 100.0% 100.0%
Total Frustrated 2 15 7 7 2 17 13 21 10 18 3 4
Total Weight (lbs) 3688 10228 5632 3106 9924 9760 3141 5652 10697 3631 1772 807
Total Costs $20,201.93 $39,801.72 $29,428.05 $16,688.81 $38,106.01 $28,209.61 $16,967.65 $30,448.81 $38,597.04 $20,674.82 $8,529.70 $4,861.10
FY12 - CONSOLIDATED AIR ITT (P4)
Column1 Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12
Total Shipments 4 10 3 4 5 6 6 13 6 6 6 7
Avg. Transit Days 29.8 30.1 31.3 34.0 18.0 20.7 18.7 18.0 20.5 18.8 17.5 23.4
Total Over 14-days 3 7 0 0 3 4 0 0 0 1 0 0
% On-Time Deliveries 25.0% 30.0% 100.0% 100.0% 40.0% 33.3% 100.0% 100.0% 100.0% 83.3% 100.0% 100.0%
Total Frustrated 0 1 2 2 0 1 3 8 5 5 3 7
Total Weight (lbs) 1425 5001 919 649 2840 4648 2551 1612 1978 1922 6571 6163
Total Costs $7,600.96 $23,422.55 $6,415.18 $4,792.94 $11,319.39 $17,942.59 $11,684.03 $14,805.92 $10,490.59 $7,836.09 $20,389.00 $23,831.02
FY12 - CONSOLIDATED OCEAN (P5)
Column1 Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12
Total Shipments 2 7 10 4 4 6 6 5 3 4 29 30
Avg. Transit Days 73.6 62.7 36.5 44.5 41.5 33.0 34.5 36.6 42.3 31.5 27.9 16.4
Total Over 70-days 0 3 0 0 0 0 0 0 0 0 0 0
% On-Time Deliveries 100.0% 57.1% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
Total Frustrated 1 7 7 4 2 4 0 0 0 0 0 0
Total Weight (lbs) 506 19446 35309 4251 11767 7165 5320 12522 6722 34476 11724 5319
Total Costs $2,154.93 $19,093.68 $30,104.90 $7,049.44 $25,611.63 $11,845.50 $11,084.23 $18,760.19 $12,029.14 $30,824.27 $37,235.58 $27,449.37
FY12 - MONTHLY GRAND TOTALS
Column1 Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12
Total Shipments 39 62 38 30 45 38 34 46 44 53 37 30
Avg. Transit Days 16.3 14.7 15.3 15.1 10.8 13.1 11.3 12.7 10.6 12.0 11.6 14.4
Total Late Deliveries 13 38 0 0 18 7 12 0 5 3 0 0
% On-Time Deliveries 66.7% 38.7% 100.0% 100.0% 60.0% 81.6% 64.7% 100.0% 88.6% 94.3% 100.0% 100.0%
Total Frustrated 4 18 11 14 2 22 18 29 15 27 7 14
Total Weight (lbs) 5961 16401 6646 6020 13595 14618 6155 7272 13265 6962 9595 9442
Total Costs $42,688.72 $79,482.85 $43,291.23 $33,146.25 $59,457.80 $54,078.90 $36,830.06 $47,926.73 $62,512.53 $48,143.69 $48,041.40 $49,271.98
FY12 - GRAND TOTALS
Column1 Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12
Total Shipments 39 101 139 169 214 252 286 332 376 429 466 496
Avg. Transit Days 16.3 15.5 15.4 15.3 14.4 14.2 13.8 13.7 13.3 13.2 13.0 13.2
Total Late Deliveries 13 51 51 51 69 76 88 88 93 96 96 96
% On-Time Deliveries 66.7% 49.5% 63.3% 69.8% 67.8% 69.8% 69.2% 73.5% 75.3% 77.6% 79.4% 80.6%
Total Frustrated 4 22 33 47 49 71 89 118 133 160 167 181
Total Weight (short tons) 3.0 11.2 14.5 17.5 24.3 31.6 34.7 38.3 45.0 48.4 53.2 58.0
Total Costs $42,688.72 $122,171.57 $165,462.80 $198,609.05 $258,066.85 $312,145.75 $348,975.81 $396,902.54 $459,415.07 $507,558.76 $555,600.16 $604,872.14
&"Times New Roman,Bold"&28Freight Data FY12
Freight Data FY13
FY13 - MICAP (P1)
Column1 Oct-12 Nov-12 Dec-12 Jan-13 Feb-13 Mar-13 Apr-13 May-13 Jun-13 Jul-13 Aug-13 Sep-13
Total Shipments 8 7 4 6 5 1 1 0 0 0 0 0
Avg. Transit Days 2.4 2.7 3.3 2.8 2.6 1.0 2.0 0.0 0.0 0.0 0.0 0.0
Total Over 4-days 0 0 0 0 0 0 0 0 0 0 0 0
% On-Time Deliveries 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 0.0% 0.0% 0.0% 0.0% 0.0%
Total Frustrated 0 0 0 1 0 0 0 0 0 0 0 0
Total Weight (lbs) 46 150 320 75 237 4 311 0 0 0 0 0
Total Costs $5,467.60 $4,902.70 $3,404.94 $3,340.40 $3,683.21 $513.20 $1,426.91 $0.00 $0.00 $0.00 $0.00 $0.00
FY13- PRIORITY AIR (P2)
Column1 Oct-12 Nov-12 Dec-12 Jan-13 Feb-13 Mar-13 Apr-13 May-13 Jun-13 Jul-13 Aug-13 Sep-13
Total Shipments 2 0 1 1 2 2 6 2 0 0 0 0
Avg. Transit Days 6.5 0.0 4.0 5.0 7.0 12.5 7.0 9.5 0.0 0.0 0.0 0.0
Total Over 7-days 0 0 0 0 1 2 1 1 0 0 0 0
% On-Time Deliveries 100.0% 0.0% 100.0% 100.0% 50.0% 0.0% 83.3% 50.0% 0.0% 0.0% 0.0% 0.0%
Total Frustrated 1 0 0 0 1 2 1 1 0 0 0 0
Total Weight (lbs) 15 0 176 30 37 17 649 76 0 0 0 0
Total Costs $1,568.00 $0.00 $738.00 $633.00 $1,003.33 $753.73 $2,825.91 $665.06 $0.00 $0.00 $0.00 $0.00
FY13 - CONSOLIDATED AIR GOV'T (P3)
Column1 Oct-12 Nov-12 Dec-12 Jan-13 Feb-13 Mar-13 Apr-13 May-13 Jun-13 Jul-13 Aug-13 Sep-13
Total Shipments 7 9 7 15 15 18 14 16 0 0 0 0
Avg. Transit Days 23.4 16.2 13.0 12.1 10.4 13.8 12.1 11.8 0.0 0.0 0.0 0.0
Total Over 14-days 0 0 0 0 0 9 1 0 0 0 0 0
% On-Time Deliveries 100.0% 100.0% 100.0% 100.0% 100.0% 50.0% 92.9% 100.0% 0.0% 0.0% 0.0% 0.0%
Total Frustrated 5 5 2 4 1 9 1 0 0 0 0 0
Total Weight (lbs) 3074 1818 1951 6743 6532 4635 6015 2744 0 0 0 0
Total Costs $9,028.48 $9,188.96 $7,972.74 $23,414.20 $26,307.21 $19,622.40 $19,290.66 $13,492.06 $0.00 $0.00 $0.00 $0.00
FY13 - CONSOLIDATED AIR ITT (P4)
Column1 Oct-12 Nov-12 Dec-12 Jan-13 Feb-13 Mar-13 Apr-13 May-13 Jun-13 Jul-13 Aug-13 Sep-13
Total Shipments 4 6 3 10 7 10 9 11 0 0 0 0
Avg. Transit Days 23.0 21.5 14.3 -58.5 11.1 14.1 14.0 12.5 0.0 0.0 0.0 0.0
Total Over 14-days 1 0 0 0 1 4 1 1 0 0 0 0
% On-Time Deliveries 75.0% 100.0% 100.0% 100.0% 85.7% 60.0% 88.9% 90.9% 0.0% 0.0% 0.0% 0.0%
Total Frustrated 4 5 0 3 1 4 1 3 0 0 0 0
Total Weight (lbs) 5715 1830 289 5144 3171 2169 3596 1980 0 0 0 0
Total Costs $17,179.28 $8,386.29 $2,587.89 $24,895.20 $9,898.58 $11,485.16 $14,408.85 $13,004.00 $0.00 $0.00 $0.00 $0.00
FY13 - CONSOLIDATED OCEAN (P5)
Column1 Oct-12 Nov-12 Dec-12 Jan-13 Feb-13 Mar-13 Apr-13 May-13 Jun-13 Jul-13 Aug-13 Sep-13
Total Shipments 18 11 18 28 9 3 3 3 0 0 0 0
Avg. Transit Days 17.8 29.5 21.8 25.9 39.9 30.7 30.7 28.3 0.0 0.0 0.0 0.0
Total Over 70-days 0 0 0 0 0 0 0 0 0 0 0 0
% On-Time Deliveries 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 0.0% 0.0% 0.0% 0.0%
Total Frustrated 0 0 0 1 0 0 0 0 0 0 0 0
Total Weight (lbs) 5320 27059 8601 156955 14449 5123 6581 114364 0 0 0 0
Total Costs $22,244.24 $63,504.39 $31,796.71 $96,235.16 $20,726.39 $9,287.34 $9,757.75 $41,904.44 $0.00 $0.00 $0.00 $0.00
FY13 - MONTHLY GRAND TOTALS
Column1 Oct-12 Nov-12 Dec-12 Jan-13 Feb-13 Mar-13 Apr-13 May-13 Jun-13 Jul-13 Aug-13 Sep-13
Total Shipments 21 22 15 32 29 31 30 29 0 0 0 0
Avg. Transit Days 13.8 13.5 8.7 -12.8 7.8 10.4 8.8 11.3 0.0 0.0 0.0 0.0
Total Late Deliveries 1 0 0 0 2 15 3 2 0 0 0 0
% On-Time Deliveries 95.2% 100.0% 100.0% 100.0% 93.1% 51.6% 90.0% 93.1% 0.0% 0.0% 0.0% 0.0%
Total Frustrated 10 10 2 8 3 15 3 4 0 0 0 0
Total Weight (lbs) 8850 3798 2736 11992 9977 6825 10571 4800 0 0 0 0
Total Costs $33,243.36 $22,477.95 $14,703.57 $52,282.80 $40,892.33 $32,374.49 $37,952.33 $27,161.12 $0.00 $0.00 $0.00 $0.00
FY13 - GRAND TOTALS
Column1 Oct-12 Nov-12 Dec-12 Jan-13 Feb-13 Mar-13 Apr-13 May-13 Jun-13 Jul-13 Aug-13 Sep-13
Total Shipments 21 43 58 90 119 150 180 209 209 209 209 209
Avg. Transit Days 13.8 13.7 12.0 12.0 10.9 10.8 10.5 10.6 10.6 10.6 10.6 10.6
Total Late Deliveries 1 1 1 1 3 18 21 23 23 23 23 23
% On-Time Deliveries 95.2% 97.7% 98.3% 98.9% 97.5% 88.0% 88.3% 89.0% 89.0% 89.0% 89.0% 89.0%
Total Frustrated 10 20 22 30 33 48 51 55 55 55 55 55
Total Weight (short tons) 4.4 6.3 7.7 13.7 18.7 22.1 27.4 29.8 29.8 29.8 29.8 29.8
Total Costs $33,243.36 $55,721.31 $70,424.88 $122,707.68 $163,600.01 $195,974.50 $233,926.83 $261,087.95 $261,087.95 $261,087.95 $261,087.95 $261,087.95
&"Times New Roman,Bold"&28Freight Data FY13 image2.emf
M32-31 Aug 12.txt
31 AUG 12 FB4540 CURACAO N/S 4540 A4 BASE SUPPLY MANAGEMENT REPORT (M32) NGV808/030822 12243 12244 PAGE 1
INDEX
TITLE PAGE(S)
AVERAGE INVENTORY INVESTMENT 37
BENCH STOCK SUMMARY 17
CUSTOMER WAIT TIME 28
CUSTOMER SUPPORT EFFECTIVENESS
WEAPON MAINTENANCE ORGANIZATIONS 2- 3
COMMUNICATIONS MAINTENANCE ORGANIZATIONS 4- 5
CIVIL ENGINEER ORGANIZATIONS 6- 7
VEHICLE MAINTENANCE ORGANIZATIONS 8- 9
DEPOT MAINTENANCE ORGANIZATIONS 10- 11
OTHER MAINTENANCE ORGANIZATIONS 12- 13
OVERALL SUMMARY 14- 15
WEAPON SYSTEM SUPPORT EFFECTIVENESS N/A
DUE-IN SUMMARY SUPPLIES-EQUIPMENT 35
DUE-OUT ANALYSIS 25- 26
DUE-OUT CANCELLATION SUMMARY 32- 33
DUE-OUT SCHEDULE
SUPPLIES 29
EQUIPMENT 30
OVERALL SUMMARY 31
EXCESS STRATIFICATION 38
FILE STATUS 38
FOLLOW-UP FREQUENCY 38
GROSS/NET AVAILABILITY 16
INVENTORY ACCURACY STRATIFICATION - MONTHLY 43
INVENTORY ACCURACY STRATIFICATION - CUMULATIVE 44
INVENTORY CONTROL DATA 36
ITEM RECORD DATA 42
MICAP CAUSE/DELETE CODE ANALYSIS 21- 24
REASON FOR NON-AVAILABILITY 27
REASON FOR STOCKAGE CATEGORY 37
RELEVELING FREQUENCY 38
REPAIR CYCLE ASSET CONTROL DATA 19- 20
REQUISITION SUMMARY SUPPLIES-EQUIPMENT 34
REQUISITION/M O V SUMMARY 45
SALES/VARIANCE ANALYSIS RETAIL OUTLET 18
SIFS REPORTING (XV9) CLEARED 38
SUPPLY RECORD COUNT 41
TRANSACTION SUMMARY 39- 40
WORKLOAD FACTORS - SUPPLY 46
31 AUG 12 FB4540 CURACAO N/S 4540 A4 BASE SUPPLY MANAGEMENT REPORT (M32) NGV808/030822 12243 12244 PAGE 2
CUSTOMER SUPPORT EFFECTIVENESS
WEAPON MAINTENANCE ORGNS
ISSUE ISSUE STKGE STKGE
CATEGORY L/I UNITS L/I UNITS L/I UNITS EFFECT EFFECT L/I UNITS EFFECT EFFECT
REQSTD REQUESTED ISSUED ISSUED B/O B/O (L/I) (UNIT) B/O 4W B/O 4W (L/I) (UNIT)
OGDEN ALC (FGZ)
READINESS BASED LEVEL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
BASE COMPUTED LEVEL(MSD) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
NATO 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
OTHER AFMC 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
SUB-TOTAL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
OKLAHOMA CITY ALC (FHZ)
READINESS BASED LEVEL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
BASE COMPUTED LEVEL(MSD) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
NATO 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
OTHER AFMC 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
SUB-TOTAL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
SACRAMENTO ALC (FFZ)
READINESS BASED LEVEL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
BASE COMPUTED LEVEL(MSD) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
NATO 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
OTHER AFMC 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
SUB-TOTAL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
SAN ANTONIO ALC (FPZ)
READINESS BASED LEVEL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
BASE COMPUTED LEVEL(MSD) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
NATO 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
OTHER AFMC 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
SUB-TOTAL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
WARNER ROBINS ALC (FLZ)
READINESS BASED LEVEL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
BASE COMPUTED LEVEL(MSD) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
NATO 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
OTHER AFMC 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
SUB-TOTAL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
31 AUG 12 FB4540 CURACAO N/S 4540 A4 BASE SUPPLY MANAGEMENT REPORT (M32) NGV808/030822 12243 12244 PAGE 3
WEAPON MAINTENANCE ORGNS
ISSUE ISSUE STKGE STKGE
CATEGORY L/I UNITS L/I UNITS L/I UNITS EFFECT EFFECT L/I UNITS EFFECT EFFECT
REQSTD REQUESTED ISSUED ISSUED B/O B/O (L/I) (UNIT) B/O 4W B/O 4W (L/I) (UNIT)
TOTAL AF LOG COMMAND (AFMC)
READINESS BASED LEVEL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
BASE COMPUTED LEVEL(MSD) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
NATO 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
OTHER AFMC 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
TOTAL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
DLA HEADQUARTERS (SMS) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
CONST/ELECT CEN(S9C/S9E) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
GENERAL SUPP CEN (S9G) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
INDUST. SUPP CEN (S9I) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
TOTAL DEF LOG AGENCY (DLA) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
GSA 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
LP (JBB/JBF/JBG/JBH) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
OTHER 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
OVERALL TOTAL
REPAIR CYCLE - XD 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
REPAIR CYCLE - XF 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
EOQ 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
SUB-TOTAL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
EQUIPMENT 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
BENCH STOCK 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
31 AUG 12 FB4540 CURACAO N/S 4540 A4 BASE SUPPLY MANAGEMENT REPORT (M32) NGV808/030822 12243 12244 PAGE 4
COMM MAINTENANCE ORGNS
ISSUE ISSUE STKGE STKGE
CATEGORY L/I UNITS L/I UNITS L/I UNITS EFFECT EFFECT L/I UNITS EFFECT EFFECT
REQSTD REQUESTED ISSUED ISSUED B/O B/O (L/I) (UNIT) B/O 4W B/O 4W (L/I) (UNIT)
OGDEN ALC (FGZ)
READINESS BASED LEVEL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
BASE COMPUTED LEVEL(MSD) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
NATO 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
OTHER AFMC 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
SUB-TOTAL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
OKLAHOMA CITY ALC (FHZ)
READINESS BASED LEVEL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
BASE COMPUTED LEVEL(MSD) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
NATO 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
OTHER AFMC 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
SUB-TOTAL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
SACRAMENTO ALC (FFZ)
READINESS BASED LEVEL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
BASE COMPUTED LEVEL(MSD) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
NATO 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
OTHER AFMC 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
SUB-TOTAL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
SAN ANTONIO ALC (FPZ)
READINESS BASED LEVEL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
BASE COMPUTED LEVEL(MSD) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
NATO 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
OTHER AFMC 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
SUB-TOTAL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
WARNER ROBINS ALC (FLZ)
READINESS BASED LEVEL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
BASE COMPUTED LEVEL(MSD) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
NATO 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
OTHER AFMC 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
SUB-TOTAL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
31 AUG 12 FB4540 CURACAO N/S 4540 A4 BASE SUPPLY MANAGEMENT REPORT (M32) NGV808/030822 12243 12244 PAGE 5
COMM MAINTENANCE ORGNS
ISSUE ISSUE STKGE STKGE
CATEGORY L/I UNITS L/I UNITS L/I UNITS EFFECT EFFECT L/I UNITS EFFECT EFFECT
REQSTD REQUESTED ISSUED ISSUED B/O B/O (L/I) (UNIT) B/O 4W B/O 4W (L/I) (UNIT)
TOTAL AF LOG COMMAND (AFMC)
READINESS BASED LEVEL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
BASE COMPUTED LEVEL(MSD) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
NATO 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
OTHER AFMC 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
TOTAL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
DLA HEADQUARTERS (SMS) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
CONST/ELECT CEN(S9C/S9E) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
GENERAL SUPP CEN (S9G) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
INDUST. SUPP CEN (S9I) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
TOTAL DEF LOG AGENCY (DLA) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
GSA 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
LP (JBB/JBF/JBG/JBH) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
OTHER 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
OVERALL TOTAL
REPAIR CYCLE - XD 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
REPAIR CYCLE - XF 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
EOQ 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
SUB-TOTAL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
EQUIPMENT 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
BENCH STOCK 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
31 AUG 12 FB4540 CURACAO N/S 4540 A4 BASE SUPPLY MANAGEMENT REPORT (M32) NGV808/030822 12243 12244 PAGE 6
CIVIL ENGINEER ORGNS
ISSUE ISSUE STKGE STKGE
CATEGORY L/I UNITS L/I UNITS L/I UNITS EFFECT EFFECT L/I UNITS EFFECT EFFECT
REQSTD REQUESTED ISSUED ISSUED B/O B/O (L/I) (UNIT) B/O 4W B/O 4W (L/I) (UNIT)
OGDEN ALC (FGZ)
READINESS BASED LEVEL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
BASE COMPUTED LEVEL(MSD) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
NATO 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
OTHER AFMC 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
SUB-TOTAL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
OKLAHOMA CITY ALC (FHZ)
READINESS BASED LEVEL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
BASE COMPUTED LEVEL(MSD) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
NATO 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
OTHER AFMC 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
SUB-TOTAL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
SACRAMENTO ALC (FFZ)
READINESS BASED LEVEL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
BASE COMPUTED LEVEL(MSD) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
NATO 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
OTHER AFMC 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
SUB-TOTAL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
SAN ANTONIO ALC (FPZ)
READINESS BASED LEVEL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
BASE COMPUTED LEVEL(MSD) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
NATO 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
OTHER AFMC 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
SUB-TOTAL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
WARNER ROBINS ALC (FLZ)
READINESS BASED LEVEL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
BASE COMPUTED LEVEL(MSD) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
NATO 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
OTHER AFMC 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
SUB-TOTAL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
31 AUG 12 FB4540 CURACAO N/S 4540 A4 BASE SUPPLY MANAGEMENT REPORT (M32) NGV808/030822 12243 12244 PAGE 7
CIVIL ENGINEER ORGNS
ISSUE ISSUE STKGE STKGE
CATEGORY L/I UNITS L/I UNITS L/I UNITS EFFECT EFFECT L/I UNITS EFFECT EFFECT
REQSTD REQUESTED ISSUED ISSUED B/O B/O (L/I) (UNIT) B/O 4W B/O 4W (L/I) (UNIT)
TOTAL AF LOG COMMAND (AFMC)
READINESS BASED LEVEL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
BASE COMPUTED LEVEL(MSD) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
NATO 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
OTHER AFMC 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
TOTAL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
DLA HEADQUARTERS (SMS) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
CONST/ELECT CEN(S9C/S9E) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
GENERAL SUPP CEN (S9G) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
INDUST. SUPP CEN (S9I) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
TOTAL DEF LOG AGENCY (DLA) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
GSA 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
LP (JBB/JBF/JBG/JBH) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
OTHER 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
OVERALL TOTAL
REPAIR CYCLE - XD 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
REPAIR CYCLE - XF 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
EOQ 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
SUB-TOTAL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
EQUIPMENT 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
BENCH STOCK 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
31 AUG 12 FB4540 CURACAO N/S 4540 A4 BASE SUPPLY MANAGEMENT REPORT (M32) NGV808/030822 12243 12244 PAGE 8
VEHICLE MAINTENANCE ORGNS
ISSUE ISSUE STKGE STKGE
CATEGORY L/I UNITS L/I UNITS L/I UNITS EFFECT EFFECT L/I UNITS EFFECT EFFECT
REQSTD REQUESTED ISSUED ISSUED B/O B/O (L/I) (UNIT) B/O 4W B/O 4W (L/I) (UNIT)
OGDEN ALC (FGZ)
READINESS BASED LEVEL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
BASE COMPUTED LEVEL(MSD) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
NATO 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
OTHER AFMC 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
SUB-TOTAL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
OKLAHOMA CITY ALC (FHZ)
READINESS BASED LEVEL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
BASE COMPUTED LEVEL(MSD) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
NATO 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
OTHER AFMC 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
SUB-TOTAL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
SACRAMENTO ALC (FFZ)
READINESS BASED LEVEL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
BASE COMPUTED LEVEL(MSD) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
NATO 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
OTHER AFMC 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
SUB-TOTAL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
SAN ANTONIO ALC (FPZ)
READINESS BASED LEVEL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
BASE COMPUTED LEVEL(MSD) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
NATO 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
OTHER AFMC 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
SUB-TOTAL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
WARNER ROBINS ALC (FLZ)
READINESS BASED LEVEL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
BASE COMPUTED LEVEL(MSD) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
NATO 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
OTHER AFMC 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
SUB-TOTAL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
31 AUG 12 FB4540 CURACAO N/S 4540 A4 BASE SUPPLY MANAGEMENT REPORT (M32) NGV808/030822 12243 12244 PAGE 9
VEHICLE MAINTENANCE ORGNS
ISSUE ISSUE STKGE STKGE
CATEGORY L/I UNITS L/I UNITS L/I UNITS EFFECT EFFECT L/I UNITS EFFECT EFFECT
REQSTD REQUESTED ISSUED ISSUED B/O B/O (L/I) (UNIT) B/O 4W B/O 4W (L/I) (UNIT)
TOTAL AF LOG COMMAND (AFMC)
READINESS BASED LEVEL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
BASE COMPUTED LEVEL(MSD) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
NATO 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
OTHER AFMC 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
TOTAL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
DLA HEADQUARTERS (SMS) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
CONST/ELECT CEN(S9C/S9E) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
GENERAL SUPP CEN (S9G) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
INDUST. SUPP CEN (S9I) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
TOTAL DEF LOG AGENCY (DLA) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
GSA 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
LP (JBB/JBF/JBG/JBH) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
OTHER 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
OVERALL TOTAL
REPAIR CYCLE - XD 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
REPAIR CYCLE - XF 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
EOQ 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
SUB-TOTAL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
EQUIPMENT 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
BENCH STOCK 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
31 AUG 12 FB4540 CURACAO N/S 4540 A4 BASE SUPPLY MANAGEMENT REPORT (M32) NGV808/030822 12243 12244 PAGE 10
DEPOT MAINTENANCE ORGNS
ISSUE ISSUE STKGE STKGE
CATEGORY L/I UNITS L/I UNITS L/I UNITS EFFECT EFFECT L/I UNITS EFFECT EFFECT
REQSTD REQUESTED ISSUED ISSUED B/O B/O (L/I) (UNIT) B/O 4W B/O 4W (L/I) (UNIT)
OGDEN ALC (FGZ)
READINESS BASED LEVEL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
BASE COMPUTED LEVEL(MSD) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
NATO 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
OTHER AFMC 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
SUB-TOTAL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
OKLAHOMA CITY ALC (FHZ)
READINESS BASED LEVEL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
BASE COMPUTED LEVEL(MSD) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
NATO 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
OTHER AFMC 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
SUB-TOTAL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
SACRAMENTO ALC (FFZ)
READINESS BASED LEVEL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
BASE COMPUTED LEVEL(MSD) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
NATO 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
OTHER AFMC 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
SUB-TOTAL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
SAN ANTONIO ALC (FPZ)
READINESS BASED LEVEL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
BASE COMPUTED LEVEL(MSD) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
NATO 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
OTHER AFMC 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
SUB-TOTAL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
WARNER ROBINS ALC (FLZ)
READINESS BASED LEVEL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
BASE COMPUTED LEVEL(MSD) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
NATO 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
OTHER AFMC 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
SUB-TOTAL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
31 AUG 12 FB4540 CURACAO N/S 4540 A4 BASE SUPPLY MANAGEMENT REPORT (M32) NGV808/030822 12243 12244 PAGE 11
DEPOT MAINTENANCE ORGNS
ISSUE ISSUE STKGE STKGE
CATEGORY L/I UNITS L/I UNITS L/I UNITS EFFECT EFFECT L/I UNITS EFFECT EFFECT
REQSTD REQUESTED ISSUED ISSUED B/O B/O (L/I) (UNIT) B/O 4W B/O 4W (L/I) (UNIT)
TOTAL AF LOG COMMAND (AFMC)
READINESS BASED LEVEL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
BASE COMPUTED LEVEL(MSD) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
NATO 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
OTHER AFMC 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
TOTAL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
DLA HEADQUARTERS (SMS) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
CONST/ELECT CEN(S9C/S9E) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
GENERAL SUPP CEN (S9G) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
INDUST. SUPP CEN (S9I) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
TOTAL DEF LOG AGENCY (DLA) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
GSA 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
LP (JBB/JBF/JBG/JBH) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
OTHER 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
OVERALL TOTAL
REPAIR CYCLE - XD 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
REPAIR CYCLE - XF 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
EOQ 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
SUB-TOTAL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
EQUIPMENT 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
BENCH STOCK 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
31 AUG 12 FB4540 CURACAO N/S 4540 A4 BASE SUPPLY MANAGEMENT REPORT (M32) NGV808/030822 12243 12244 PAGE 12
OTHER MAINTENANCE ORGNS
ISSUE ISSUE STKGE STKGE
CATEGORY L/I UNITS L/I UNITS L/I UNITS EFFECT EFFECT L/I UNITS EFFECT EFFECT
REQSTD REQUESTED ISSUED ISSUED B/O B/O (L/I) (UNIT) B/O 4W B/O 4W (L/I) (UNIT)
OGDEN ALC (FGZ)
READINESS BASED LEVEL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
BASE COMPUTED LEVEL(MSD) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
NATO 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
OTHER AFMC 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
SUB-TOTAL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
OKLAHOMA CITY ALC (FHZ)
READINESS BASED LEVEL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
BASE COMPUTED LEVEL(MSD) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
NATO 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
OTHER AFMC 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
SUB-TOTAL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
SACRAMENTO ALC (FFZ)
READINESS BASED LEVEL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
BASE COMPUTED LEVEL(MSD) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
NATO 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
OTHER AFMC 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
SUB-TOTAL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
SAN ANTONIO ALC (FPZ)
READINESS BASED LEVEL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
BASE COMPUTED LEVEL(MSD) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
NATO 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
OTHER AFMC 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
SUB-TOTAL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
WARNER ROBINS ALC (FLZ)
READINESS BASED LEVEL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
BASE COMPUTED LEVEL(MSD) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
NATO 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
OTHER AFMC 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
SUB-TOTAL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
31 AUG 12 FB4540 CURACAO N/S 4540 A4 BASE SUPPLY MANAGEMENT REPORT (M32) NGV808/030822 12243 12244 PAGE 13
OTHER MAINTENANCE ORGNS
ISSUE ISSUE STKGE STKGE
CATEGORY L/I UNITS L/I UNITS L/I UNITS EFFECT EFFECT L/I UNITS EFFECT EFFECT
REQSTD REQUESTED ISSUED ISSUED B/O B/O (L/I) (UNIT) B/O 4W B/O 4W (L/I) (UNIT)
TOTAL AF LOG COMMAND (AFMC)
READINESS BASED LEVEL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
BASE COMPUTED LEVEL(MSD) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
NATO 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
OTHER AFMC 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
TOTAL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
DLA HEADQUARTERS (SMS) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
CONST/ELECT CEN(S9C/S9E) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
GENERAL SUPP CEN (S9G) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
INDUST. SUPP CEN (S9I) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
TOTAL DEF LOG AGENCY (DLA) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
GSA 1 1 0 0 1 1 .00% .00% 1 1 .00% .00%
LP (JBB/JBF/JBG/JBH) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
OTHER 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
OVERALL TOTAL
REPAIR CYCLE - XD 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
REPAIR CYCLE - XF 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
EOQ 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
SUB-TOTAL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
EQUIPMENT 1 1 0 0 1 1 .00% .00% 1 1 .00% .00%
BENCH STOCK 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
31 AUG 12 FB4540 CURACAO N/S 4540 A4 BASE SUPPLY MANAGEMENT REPORT (M32) NGV808/030822 12243 12244 PAGE 14
OVERALL SUMMARY
ISSUE ISSUE STKGE STKGE
CATEGORY L/I UNITS L/I UNITS L/I UNITS EFFECT EFFECT L/I UNITS EFFECT EFFECT
REQSTD REQUESTED ISSUED ISSUED B/O B/O (L/I) (UNIT) B/O 4W B/O 4W (L/I) (UNIT)
OGDEN ALC (FGZ)
READINESS BASED LEVEL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
BASE COMPUTED LEVEL(MSD) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
NATO 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
OTHER AFMC 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
SUB-TOTAL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
OKLAHOMA CITY ALC (FHZ)
READINESS BASED LEVEL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
BASE COMPUTED LEVEL(MSD) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
NATO 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
OTHER AFMC 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
SUB-TOTAL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
SACRAMENTO ALC (FFZ)
READINESS BASED LEVEL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
BASE COMPUTED LEVEL(MSD) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
NATO 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
OTHER AFMC 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
SUB-TOTAL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
SAN ANTONIO ALC (FPZ)
READINESS BASED LEVEL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
BASE COMPUTED LEVEL(MSD) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
NATO 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
OTHER AFMC 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
SUB-TOTAL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
WARNER ROBINS ALC (FLZ)
READINESS BASED LEVEL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
BASE COMPUTED LEVEL(MSD) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
NATO 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
OTHER AFMC 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
SUB-TOTAL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
31 AUG 12 FB4540 CURACAO N/S 4540 A4 BASE SUPPLY MANAGEMENT REPORT (M32) NGV808/030822 12243 12244 PAGE 15
OVERALL SUMMARY
ISSUE ISSUE STKGE STKGE
CATEGORY L/I UNITS L/I UNITS L/I UNITS EFFECT EFFECT L/I UNITS EFFECT EFFECT
REQSTD REQUESTED ISSUED ISSUED B/O B/O (L/I) (UNIT) B/O 4W B/O 4W (L/I) (UNIT)
TOTAL AF LOG COMMAND (AFMC)
READINESS BASED LEVEL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
BASE COMPUTED LEVEL(MSD) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
NATO 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
OTHER AFMC 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
TOTAL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
DLA HEADQUARTERS (SMS) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
CONST/ELECT CEN(S9C/S9E) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
GENERAL SUPP CEN (S9G) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
INDUST. SUPP CEN (S9I) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
TOTAL DEF LOG AGENCY (DLA) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
GSA 1 1 0 0 1 1 .00% .00% 1 1 .00% .00%
LP (JBB/JBF/JBG/JBH) 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
OTHER 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
OVERALL TOTAL
REPAIR CYCLE - XD 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
REPAIR CYCLE - XF 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
EOQ 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
SUB-TOTAL 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
EQUIPMENT 1 1 0 0 1 1 .00% .00% 1 1 .00% .00%
BENCH STOCK 0 0 0 0 0 0 .00% .00% 0 0 .00% .00%
31 AUG 12 FB4540 CURACAO N/S 4540 A4 BASE SUPPLY MANAGEMENT REPORT (M32) NGV808/030822 12243 12244 PAGE 16
GROSS/NET AVAILABILITY
TOTAL NBR TOTAL NBR TOTAL NBR TOTAL NBR TOTAL NBR TOTAL NBR GROSS NET
ISSUED D/O (ALL) D/O (4W) WRM W/D TRN (MNT) TRN (SUP) AVAIL. AVAIL.
OPERATIONAL RPC
LINE ITEMS 0 2 2 12 0 0 .00% .00%
UNITS 0 2 2 12 0 0 .00% .00%
OPERATIONAL EOQ (LESS BSS)
LINE ITEMS 6 10 10 137 0 0 3.92% 4.19%
UNITS 9 82 82 754 0 0 1.06% 1.17%
OPERATIONAL EOQ (BSS)
LINE ITEMS 0 0 0 0 0 0 .00% .00%
UNITS 0 0 0 0 0 0 .00% .00%
TOTAL OPERATIONAL ORGNS
LINE ITEMS 6 12 12 149 0 0 3.59% 3.87%
UNITS 9 84 84 766 0 0 1.04% 1.16%
SUPPORT RPC
LINE ITEMS 0 1 1 0 0 0 .00% .00%
UNITS 0 1 1 0 0 0 .00% .00%
SUPPORT EOQ (LESS BSS)
LINE ITEMS 7 101 100 0 0 0 6.48% 87.50%
UNITS 36 1601 1591 0 0 0 2.19% 78.26%
SUPPORT EOQ (BSS)
LINE ITEMS 0 0 0 0 0 0 .00% .00%
UNITS 0 0 0 0 0 0 .00% .00%
TOTAL SUPPORT ORGNS
LINE ITEMS 7 102 101 0 0 0 6.42% 87.50%
UNITS 36 1602 1592 0 0 0 2.19% 78.26%
TOTAL ALL ORGNS
LINE ITEMS 13 114 113 149 0 0 4.71% 7.97%
UNITS 45 1686 1676 766 0 0 1.80% 5.48%
31 AUG 12 FB4540 CURACAO N/S 4540 A4 BASE SUPPLY MANAGEMENT REPORT (M32) NGV808/030822 12243 12244 PAGE 17
BENCH STOCK SUMMARY
CATEGORY L/I AUTH L/I DUE-OUT AVAIL. RATE DUE-OUT <STD DELAYED D/O DELAY RATE
WEAPONS MAINTENANCE ORGNS
TOTAL 0 0 .00% 0 0 .00%
DOFD < 120 0 0 .00% 0 0 .00%
COMM. MAINTENANCE ORGNS
TOTAL 0 0 .00% 0 0 .00%
DOFD < 120 0 0 .00% 0 0 .00%
CIVIL ENGINEER ORGNS
TOTAL 0 0 .00% 0 0 .00%
DOFD < 120 0 0 .00% 0 0 .00%
VEHICLE MAINTENANCE ORGNS
TOTAL 0 0 .00% 0 0 .00%
DOFD < 120 0 0 .00% 0 0 .00%
OTHER MAINTENANCE ORGNS
TOTAL 0 0 .00% 0 0 .00%
DOFD < 120 0 0 .00% 0 0 .00%
OVERALL SUMMARY
TOTAL 0 0 .00% 0 0 .00%
DOFD < 120 0 0 .00% 0 0 .00%
31 AUG 12 FB4540 CURACAO N/S 4540 A4 BASE SUPPLY MANAGEMENT REPORT (M32) NGV808/030822 12243 12244 PAGE 18
SALES/VARIANCE ANALYSIS RETAIL OUTLET
SALES ANALYSIS
........... ISU ........... ........... DUO ........... ........... DOR ........... ........... TIN
L/I UNITS $ VALUE L/I UNITS $ VALUE L/I UNITS $ VALUE L/I UNITS $ VALUE
IEU 0 0 $0 0 0 $0 0 0 $0 0 0 $0
TIC 0 0 $0 0 0 $0 0 0 $0 0 0 $0
BSS OTHER 0 0 $0 0 0 $0 0 0 $0 0 0 $0
TOTAL 0 0 $0 0 0 $0 0 0 $0 0 0 $0
VARIANCE ANALYSIS (IAD)
............ OVERAGE ............ ........... SHORTAGE
L/I UNITS $ VALUE L/I UNITS $ VALUE
IEU 0 0 $0 0 0 $0
TIC 0 0 $0 0 0 $0
BSS OTHER 0 0 $0 0 0 $0
TOTAL 0 0 $0 0 0 $0
INVENTORY DOLLAR VALUE
L/I L/I ZERO BAL $ VALUE
IEX E 0 0 $0
IEX K 0 0 $0
TOTAL 0 0 $0
31 AUG 12 FB4540 CURACAO N/S 4540 A4 BASE SUPPLY MANAGEMENT REPORT (M32) NGV808/030822 12243 12244 PAGE 19
REPAIR CYCLE ASSET CONTROL DATA
ALL OTHER ORGANIZATIONS
% WITHN
..WITHIN STD. ..EXCEED STD. ...TOTAL UNITS. ...TOTAL RCT. ....AVG RCT.. ....TOTAL AWP.. ....AVG AWP.. STNDARD
ACTION TAKEN IN UNITS XF XD XF XD XF XD XF XD XF XD XF XD XF XD XF XD
MPC 3, C, L, T
RTS (INCL AWP)(MEMO) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
RTS (EXCL AWP) 0 0 0 0 0 0 0 0 0 0 0 0
RTS (AWP N/ACC) 0 0 0 0 0 0 0 0 0 0 0 0
TOTAL RTS 0 0 0 0 0 0 0 0 0 0 0 0
NRTS (INCL AWP)(MEMO) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
NRTS 1 (EXCL AWP) 0 0 0 0 0 0 0 0 0 0 0 0
NRTS OTH (EXCL AWP) 0 0 0 0 0 0 0 0 0 0 0 0
NRTS 1 (AWP N/ACC) 0 0 0 0 0 0 0 0 0 0 0 0
NRTS OTH (AWP N/ACC) 0 0 0 0 0 0 0 0 0 0 0 0
TOTAL NRTS 1 0 0 0 0 0 0 0 0 0 0 0 0
TOTAL NRTS OTHER 0 0 0 0 0 0 0 0 0 0 0 0
TOTAL NRTS 0 0 0 0 0 0 0 0 0 0 0 0
COND (INCL AWP)(MEMO) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
COND (EXCL AWP) 0 0 0 0 0 0 0 0 0 0 0 0
COND (AWP N/ACC) 0 0 0 0 0 0 0 0 0 0 0 0
TOTAL COND 0 0 0 0 0 0 0 0 0 0 0 0
TOTAL THIS MPC 0 0 0 0 0 0 0 0 0 0 0 0
TOTAL UNITS: RTS 0 0% NRTS 0 0% COND 0 0%
MPC 4, 7
RTS (INCL AWP)(MEMO) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
RTS (EXCL AWP) 0 0 0 0 0 0 0 0 0 0 0 0
RTS (AWP N/ACC) 0 0 0 0 0 0 0 0 0 0 0 0
TOTAL RTS 0 0 0 0 0 0 0 0 0 0 0 0
NRTS (INCL AWP)(MEMO) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
NRTS 1 (EXCL AWP) 0 0 0 0 0 0 0 0 0 0 0 0
NRTS OTH (EXCL AWP) 0 0 0 0 0 0 0 0 0 0 0 0
NRTS 1 (AWP N/ACC) 0 10 0 0 0 10 0 13 0 1 0 100
NRTS OTH (AWP N/ACC) 0 0 0 0 0 0 0 0 0 0 0 0
TOTAL NRTS 1 0 10 0 0 0 10 0 13 0 1 0 100
TOTAL NRTS OTHER 0 0 0 0 0 0 0 0 0 0 0 0
TOTAL NRTS 0 10 0 0 0 10 0 13 0 1 0 100
COND (INCL AWP)(MEMO) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
COND (EXCL AWP) 0 0 0 0 0 0 0 0 0 0 0 0
COND (AWP N/ACC) 2 0 0 0 2 0 2 0 1 0 100 0
TOTAL COND 2 0 0 0 2 0 2 0 1 0 100 0
TOTAL THIS MPC 2 10 0 0 2 10 2 13 1 1 100 100
TOTAL UNITS: RTS 0 0% NRTS 10 83% COND 2 16%
31 AUG 12 FB4540 CURACAO N/S 4540 A4 BASE SUPPLY MANAGEMENT REPORT (M32) NGV808/030822 12243 12244 PAGE 20
REPAIR CYCLE ASSET CONTROL DATA
ALL OTHER ORGANIZATIONS
% WITHN
..WITHIN STD. ..EXCEED STD. ...TOTAL UNITS. ...TOTAL RCT. ....AVG RCT.. ....TOTAL AWP.. ....AVG AWP.. STNDARD
ACTION TAKEN IN UNITS XF XD XF XD XF XD XF XD XF XD XF XD XF XD XF XD
OVERALL MPC
RTS (INCL AWP)(MEMO) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
RTS (EXCL AWP) 0 0 0 0 0 0 0 0 0 0 0 0
RTS (AWP N/ACC) 0 0 0 0 0 0 0 0 0 0 0 0
TOTAL RTS 0 0 0 0 0 0 0 0 0 0 0 0
NRTS (INCL AWP)(MEMO) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
NRTS 1 (EXCL AWP) 0 0 0 0 0 0 0 0 0 0 0 0
NRTS OTH (EXCL AWP) 0 0 0 0 0 0 0 0 0 0 0 0
NRTS 1 (AWP N/ACC) 0 10 0 0 0 10 0 13 0 1 0 100
NRTS OTH (AWP N/ACC) 0 0 0 0 0 0 0 0 0 0 0 0
TOTAL NRTS 1 0 10 0 0 0 10 0 13 0 1 0 100
TOTAL NRTS OTHER 0 0 0 0 0 0 0 0 0 0 0 0
TOTAL NRTS 0 10 0 0 0 10 0 13 0 1 0 100
COND (INCL AWP)(MEMO) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
COND (EXCL AWP) 0 0 0 0 0 0 0 0 0 0 0 0
COND (AWP N/ACC) 2 0 0 0 2 0 2 0 1 0 100 0
TOTAL COND 2 0 0 0 2 0 2 0 1 0 100 0
OVERALL TOTAL - MPC 2 10 0 0 2 10 2 13 1 1 100 100
TOTAL UNITS: RTS 0 0% NRTS 10 83% COND 2 16%
31 AUG 12 FB4540 CURACAO N/S 4540 A4 BASE SUPPLY MANAGEMENT REPORT (M32) NGV808/030822 12243 12244 PAGE 21
MICAP CAUSE CODE ANALYSIS
ALL OTHER SRDS
CAUSE CODE REP CYCLE XD REP CYCLE XF EOQ ITEMS EQMT ITEMS TOTAL
NBR PCT NBR PCT NBR PCT NBR PCT NBR PCT
A-NO STK LVL-NO DEMAND 2 100 1 100 6 100 0 0 9 100
B-NO STK LVL-W/DEMANDS 0 0 0 0 0 0 0 0 0 0
C-IM/SM PROHIBITS LVL 0 0 0 0 0 0 0 0 0 0
D-BASE DECISION-NO LVL 0 0 0 0 0 0 0 0 0 0
F-FULL STOCK-0 BALANCE 0 0 0 0 0 0 0 0 0 0
G-FULL STOCK-ASSETS AWP 0 0 0 0 0 0 0 0 0 0
H-<FULL STK-RQN > STD 0 0 0 0 0 0 0 0 0 0
J-<FULL STK-RQN < STD 0 0 0 0 0 0 0 0 0 0
K-FULL STK-NO DUE IN 0 0 0 0 0 0 0 0 0 0
P-COMMAND UNIQUE 0 0 0 0 0 0 0 0 0 0
R-FULL STK-INACCESSIBLE 0 0 0 0 0 0 0 0 0 0
S-<FULL STK (G/H) 0 0 0 0 0 0 0 0 0 0
T-<FULL STK (G/J) 0 0 0 0 0 0 0 0 0 0
X-<FULL STK (G/K) 0 0 0 0 0 0 0 0 0 0
Z-INITIAL SHORTAGE 0 0 0 0 0 0 0 0 0 0
TOTAL 2 1 6 0 9
SAALC WRALC SMALC OGALC OCALC DLA OTHER TOTAL
NBR PCT NBR PCT NBR PCT NBR PCT NBR PCT NBR PCT NBR PCT NBR PCT
A-NO STK LVL-NO DEMAND 0 0 0 0 0 0 0 0 0 0 3 100 6 100 9 100
B-NO STK LVL-W/DEMANDS 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
C-IM/SM PROHIBITS LVL 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
D-BASE DECISION-NO LVL 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
F-FULL STOCK-0 BALANCE 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
G-FULL STOCK-ASSETS AWP 0 0 0 0 0 0 0 0 0 0 0 0