Appx_A_DefinitionsAbbreviationsAcronyms(13Sep13)DRAFT.docx
DOCX document 54 KB Posted
- Attached to
- Forward Operating Location - Base Operating Support (FOL-BOS) Curacao Federal contract opportunity
- Solicitation number
- FA4890-13-R-0117
About this file
Draft Appendix A
View the file
Other files for this federal contract opportunity
Show all 50
Forward Operating Location - Base Operating Support (FOL-BOS) Curacao has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No. FA4890-13-R-0117
DRAFT
APPENDIX A
DEFINITIONS, ABBREVIATIONS AND ACRONYMS
1.0 GENERAL DEFINITIONS
ACC AMIC PROGRAM OFFICE. The Air Force office with responsibility for technical management of the FOL BOS contract which includes the FOL BOS Program Manager located at Langley AFB, VA.
AIRCRAFT CLEAR-RINSE. A clear water wash without any soap substance (this is accomplished in areas where there is a high concentration of sea salt and/or spray).
CONTRACT ADMINISTRATOR. A qualified contracting individual appointed by the Contracting Officer to administer a particular contract.
CONTRACTING OFFICER (CO). An individual specifically appointed by the Secretary of the Air Force, or his or her designee, with the authority to enter into, administer, or terminate contracts and execute related determinations and findings within the limits of the authority delegated. Only a contracting officer has the authority to contractually bind the government on behalf of the Air Force.
CONTRACTING OFFICER’S REPRESENTATIVE (COR). A functionally qualified person who performs quality assurance functions for a contracted service.
CONTRACTOR FURNISHED EQUIPMENT (CFE). Equipment provided by the contractor to supplement government furnished equipment. Use and maintenance of CFE is solely at the expense of the contractor. The contractor shall remove CFE from government facilities at the end of the contract.
DAYS AFTER CONTRACT START (DAC). Days after contract start of 1 Oct 2014.
FIRE CHIEF. Chief of the fire protection function. Responsible for establishing and carrying out effective fire protection and prevention programs.
FUNCTIONAL AREA. The organization having responsibility for the actual performance of services. Under this contract, the applicable organization is ACC AMIC.
GOVERNMENT FURNISHED EQUIPMENT (GFE). EAID, non-EAID, and government leased equipment in the possession of, or acquired by, the government and subsequently delivered or otherwise made available to the contractor. GFE includes, but is not limited to, items such as TMDE, telephones, copy machines, personal computers, etc.
GOVERNMENT FURNISHED PROPERTY (GFP). Property in the possession of, or acquired by the government, and subsequently delivered or otherwise made available to the contractor. GFP includes, but is not limited to, consumable items such as batteries, transistors, semiconductors, lubricating oil, etc.
LOT. The total number of potential service outputs in an audit period.
LOT SIZE. The number of service outputs in a lot.
MAINTENANCE MANGEMENT. Organizing, directing, staffing, controlling, and planning for effective and efficient use of resources to ensure equipment and facilities are in a safe, serviceable, and operational condition to meet mission needs. Personnel have the proper skills, training, and procedures to accomplish all maintenance to standard.
OBJECTIVE. Desirable capability above the threshold. This is a capability desired by the user, and which the program manager would like to obtain.
QUALITY ASSURANCE. A planned and systematic pattern of all actions necessary to provide confidence that adequate technical requirements are established. Products and services conform to established technical requirements. Satisfactory
QUALITY ASSURANCE SURVEILLANCE PLAN. An organized written document specifying the audit methodology to be used for auditing of contractor performance. The QASP is for government use only.
QUALITY CONTROL. Those actions taken by a contractor to control the production of outputs to ensure they conform to the contract requirements or services so that they meet the requirements of the contract.
RANDOM SAMPLING. A sampling method in which each service output in a lot has an equal chance of being selected for a quality assurance audit.
SAMPLE. A sample consists of one or more service outputs drawn from a lot for a quality assurance audit.
SAMPLING GUIDE. The part of the QASP that contains all the information needed to perform audits of the service output(s) by the random sampling method of auditing.
SERVICES SUMMARY. A listing of the service outputs under the contract that are to be evaluated by the COR on a regular basis, and the performance requirement of the listed outputs.
THRESHOLD. Minimum capability required to satisfy user's need. If a threshold is not achieved, it is considered unacceptable.
2.0 TECHNICAL DEFINITIONS
AEROSPACE GROUND EQUIPMENT. Powered and non-powered support equipment used to support a flying mission.
AS-BUILTS: Original facility design drawings, replacement master drawings, or the master computer aided design and drafting (CADD) drawing file. Civil Engineer units use these drawings to document all as-built conditions of a facility and modifications as they occur over the years.
CONTINGENCY. Unanticipated or unforeseen occurrence.
DISASSEMBLY. Tear down of an item as necessary for repair, inspection, or transport.
EMERGENCY WORK: Work that must be accomplished immediately.
EXPENDABLE MATERIAL. Property that may be incorporated into or attached to a deliverable end item (lose their identity) or that may be consumed or expended in performing a contract. It includes assemblies, components, parts, raw and processed materials, and small tools that may be consumed in normal use in performing a contract.
FACILITY MANAGER. A designated contractor employee who is responsible for initiating trouble calls and requesting facility problem corrections and improvements.
FISCAL YEAR (FY). The US government's accounting period of 12 months spanning the period 1 October through 30 September.
INTERFACE. Is a common boundary between two organizations or activities.
MAINTENANCE. Action taken to retain equipment in a serviceable condition or to restore it to a serviceable condition. It includes inspections, testing, modifications, servicing, repair, rebuilding, reclamation and preventive.
MAINTENANCE AND REPAIR (ROUTINE WORK). Work required to preserve or restore an existing facility. Examples include: repainting, replacing floor tile or light fixtures, and repairing heating systems.
MAINTENANCE CAPABILITY. The ability to keep assigned equipment in serviceable condition and proper configurations.
MAINTENANCE MANAGEMENT. The process of developing workload requirements, forecasts and planning, organizing, programming, directing, and controlling industrial resources (including personnel, facilities and support equipment) necessary to effectively and economically support Air Force equipment operational objectives.
MINOR CONSTRUCTION: Building an entire new facility; or modifying, adding to, or otherwise altering an existing building or facility. Examples include: installing new walls or lighting, relocating existing walls or RPIE, and cutting doorways.
MODIFICATION. A change in original design of equipment to improve performance or accuracy.
NON-EXPENDABLE PLANT EQUIPMENT: Material, which is neither consumed nor has their identity lost, for use in performing services or for any administrative or general site purposes. It does not include special tooling or special equipment.
OPERATING INSTRUCTIONS. Specific instructions for accomplishing related tasks, which pertain solely to the mission organization and are not otherwise stated in standard publications.
OPERATIONAL CHECK. A functional test used to determine whether an item is serviceable.
OVERHAUL. Disassembly, cleaning, inspection, repair or replacement of parts or components, reassembly, and test of any item or accessory IAW applicable technical orders (TOs), directives, or authorized manufacturer’s publications to provide a like-new, serviceable, and reliable item.
PERFORMANCE-BASED WORK STATEMENT (PWS). A document that accurately describes essential and technical requirements for items, materials, or services, including the standards used to determine whether requirements have been met.
PERFORMANCE INDICATOR. An output of a work process that can be measured.
PLANT EQUIPMENT. Property of a capital nature (including equipment, machine tools, test equipment, furniture, vehicles, and accessory/auxiliary items) for use in manufacturing supplies in performing services, or for any administrative or general plant service.
PREVENTIVE MAINTENANCE. Recurring work performed to safeguard and/or extend the efficient and effective lifespan of real property, RPIE, or other equipment items. Includes periodic inspections and maintenance of equipment as required by applicable directives to ensure reliability of the equipment.
PRIME MISSION EQUIPMENT. Equipment installed and commissioned to perform an operational mission or requirement (does not include cold spares or off-line equipment.) This includes, but is not limited to, the following equipment: Vehicles, AGE, Generators, Electrical Systems, and Water Plant Systems.
PRODUCT QUALITY DEFICIENCY REPORT (PQDR). A report used to identify, report, and resolve deficiencies on hardware, software, mission critical computer systems, vehicles, clothing, and textiles.
PROGRAM MANAGER. An individual designated by the contractor to act as single point of contact with the government for all matters pertaining to performance of this contract.
REAL PROPERTY. Land, buildings, structures, utility systems, improvements and appurtenances thereto. Includes equipment attached to, and made part of, buildings and structures (such as heating systems), but not movable equipment (such as plant equipment).
REAL PROPERTY INSTALLED EQUIPMENT. Equipment physically installed in a facility that is maintained as a part of the facility.
REPAIR. The restoration or replacement of parts or components of material as necessitated by wear and tear, damage, failure of parts or the like in order to maintain the specific item or material in efficient operating condition.
REPARABLE/RECOVERABLE MATERIAL. Property that can be repaired at organizational, depot, or specialized repair activity.
SCHEDULED MAINTENANCE. Periodic prescribed inspections and or servicing of equipment accomplished on a calendar, mileage or hours of operation basis.
SERVICEABLE. Capable of meeting the requirement and performance of the function for which designed or modified and meets all test requirements established by the work specification.
STANDARD. A known value against which a measure of comparison for quantity or quality is performed.
SUPPORT EQUIPMENT. Equipment such as special testers and fixtures that are required to maintain a system or subsystem. This does not include auxiliary items such as cables, connectors, and adapters.
TECHNICAL ORDER. A publication that gives specific technical direction and guidance required to perform a task.
TRANSIENT AIRCRAFT. Aircraft not assigned to a base that have landed there for either emergency, modification, servicing, or temporary duty.
TIME COMPLIANCE TECHNICAL ORDER. A publication that is issued to provide instructions for accomplishing one-time inspections, equipment modification, or new equipment installation.
UNSCHEDULED MAINTENANCE. Those unpredictable maintenance requirements that had not been previously planned or programmed, but require prompt attention and must be added to, integrated with, or substituted for previously scheduled workloads.
US CONTROLLED AREAS. Areas requiring escort for personnel without appropriate US government identification.
US OWNED AND OCCUPIED FACILITIES. Facilities and their associated support infrastructure which were constructed by the US Government, and are occupied by US personnel supporting the FOL mission.
3.0 ABBREVIATIONS AND ACRONYMS
| ACC | Air Combat Command | ||
| ACC AMIC/PKB | Acquisition Management and Integration Center Contracting | ||
| ACES-FD | Automated Civil Engineering System-Fire Department | ||
| ADO | Assistant Director of Operation | ||
| ADPE | Automated Data Processing Equipment | ||
| A&E | Architecture and Engineering | ||
| AF | Air Force | ||
| AFB | Air Force Base | ||
| AFCEC | Air Force Civil Engineering Center | ||
| AFCERT | Air Force Computer Emergency Response Team | ||
| AFCOMSEC | Air Force Communications Security | ||
| AFEMS | Air Force Equipment Management System | ||
| AFI | Air Force Instruction | ||
| AFJMAN | Air Force Joint Manual |
AFKAO Air Force Cryptological Aids Operations
| AFMAN | Air Force Manual | |
| AFPAM | Air Force Pamphlet | |
| AFPD | Air Force Policy Directive | |
| AFOSH | Air Force Occupational, Safety and Health | |
| AFSOUTH | Air Force South |
AFSSI Air Force Systems Security Instruction
| AFSAS | Air Force Safety Automated System | ||
| AFTO | Air Force Technical Order | ||
| AGE | Aerospace Ground Equipment | ||
| AMC | Air Mobility Command | ||
| AMIC | Acquisition Management and Integration Center | ||
| ANSI | American National Standard Institute | ||
| AOB | Airfield Operations Board | ||
| APO | Army/Air Force Post Office | ||
| ARFF | Aircraft Rescue Fire Fighting Vehicle | ||
| ASC | Allowance Source Code | ||
| ASQ | American Society for Quality | ||
| ASRR | Airfield Suitability and Restrictions Report | ||
| AT | Available Time | ||
| ATO | Air Tasking Orders | ||
| ATP | Anti Terrorism Plan | ||
| AWP | Awaiting Parts | ||
| AZ | Arizona | ||
| BASH | Bird Aircraft Strike Hazard | ||
| BOS | Base Operating Support | ||
| BPA | Blanket Purchase Agreement | ||
| BHWG | Bird Hazard Working Group | ||
| BWC | Bird Watch Condition | ||
| C4I | Command, Control, Communication, Computer and Intelligence | ||
| C&A | Certification and Accreditation | ||
| CA/CRL | Custodian Authorization/Custody Receipt Listing | ||
| CAC | Common Access Card | ||
| CAD | Computer-Aided Design | ||
| CAP | Curacao Airport Partners | ||
| CAR | Corrective Action Request | ||
| CBRNE | Chemical, Biological, Radiological, Nuclear and Enhanced Conventional Weapons | ||
| CBT | Computer Based Training | ||
| CC | Commander | ||
| CCTV | Closed Circuit Television | ||
| CDRL | Contract Data Requirements List | ||
| CDL | Commercial Drivers License | ||
| CE | Civil Engineering | ||
| C-E | Communications-Electronics | ||
| CES | Civil Engineering Squadron | ||
| CEV | Civil Engineering Environmental | ||
| CFE | Contractor Furnished Equipment | ||
| CFR | Code of Federal Regulation | ||
| CIPS | Cyberspace Infrastructure Planning System | ||
| CISIR | Communications and Information Systems Installation Records | ||
| CLIN | Contract Line Item Number | ||
| CM | Corrective Maintenance | ||
| CMMS | Computerized Maintenance Management System | ||
| CMOS | Cargo Movement Operations System | ||
| CO | Contracting Officer | ||
| COMSEC | Communications Security | ||
| CONUS | Contiguous United States | ||
| COPE | Custodian of Postal Effects | ||
| COR | Contracting Officer’s Representative | ||
| COTS | Commercial Off The Shelf | ||
| CPR | Cardio Pulmonary Resuscitation | ||
| CPET | Contract Performance Evaluation Team | ||
| CQA | Certified Quality Auditor | ||
| CR | Cost Reimbursable | ||
| CRA | Central Repair Authority | ||
| CRI | Certificate Registration Instruction | ||
| CRO | COMSEC Responsible Officer | ||
| CSSOR | Contractor Special Security Officer Representative | ||
| C/SSR | Cost/Schedule Status Report | ||
| CVS | Contractor Verification System | ||
| D-O | Driver-Operator | ||
| DO | Director of Operations | ||
| DAC | Days after Contract Start | ||
| DD Form | Department of Defense Form | ||
| DETCO | Detachment Commander | ||
| DISA | Defense Information System Agency | ||
| DLA | Defense Logistics Agency | ||
| DLADS | Defense Logistics Agency Disposition Services | ||
| DLA-E | Defense Logistics Agency-Energy | ||
| DMS | Data Management System | ||
| DoD | Department of Defense | ||
| DoDI | DoD Instruction | ||
| DSN | Defense Switching Network | ||
| DT | Down Time | ||
| DTD | Data Transfer Device | ||
| DTR | Defense Transportation Regulation | ||
| DTS | Data Terminal Set | ||
| DV | Distinguished Visitor | ||
| DVD | Digital Video Disc/Digital Versatile Disc | ||
| EAID | Equipment Authorized Inventory Data | ||
| EC | Electronic Commerce | ||
| EDI | Electronic Data Interchange | ||
| EET | Excusable Equipment Time | ||
| E&I | Engineering and Installation | ||
| EM | Emergency Management | ||
| EMSEC | Emission Security | ||
| EOS | Expeditionary Operations Squadron | ||
| EOSI | Expeditionary Operations Squadron Instruction | ||
| EPP | Environment Protection Plan | ||
| Er | Equipment Reliability | ||
| ESD | Estimated Ship Date | ||
| ES&H | Environmental Safety & Health | ||
| ESN | Equipment Serial Number | ||
| ES-S | Enterprise Solution-Supply | ||
| ESP | Expeditionary Site Plan | ||
| ESR | Equipment Status Reportable | ||
| ETIMS | Electronic Technical Information Management System | ||
| ETL | Engineering Technical Letter | ||
| FAA | Federal Aviation Administration | ||
| FACC | Fire Alarm Communications Center | ||
| FAR | Federal Acquisition Regulation | ||
| FAS | Fuels Automated System | ||
| FB | Base Supply Account | ||
| FCQA | Flight Chief Quality Assurance | ||
| FE | Base Equipment Account | ||
| FED | Federal | ||
| FES | FAS Enterprise Server | ||
| FFP | Firm Fixed Price | ||
| FLIP | Flight Information Publication | ||
| FMC | Fully Mission Capable | ||
| FMD | Fuels Manager Defense | ||
| FOD | Foreign Object Damage | ||
| FOIA | Freedom of Information Act | ||
| FOL | Forward Operating Location | ||
| FOLFOL-BOS | Forward Operating Location-Base Operating Support | ||
| FOL/CC | FOL Commander | ||
| FOUO | For Official Use Only | ||
| FP | Force Protection | ||
| FPCON | Force Protection Condition | ||
| FPFAP | Fire Protection Flight Assessment Program | ||
| FY | Fiscal Year | ||
| GBL | Government Bill of Lading | ||
| GFE | Government Furnished Equipment | ||
| GFP/F | Government Furnished Property/Facilities | ||
| GFP | Government Furnished Property | ||
| GP | General Purpose | ||
| GPV | General Purpose Vehicle | ||
| GSA | General Services Administration | ||
| HAZMAT | Hazardous Materials | ||
| HAZWOPER | Hazardous Waste Operations and Emergency Response | ||
| HF | High Frequency | ||
| HN | Host Nation | ||
| HQ | Headquarters | ||
| HVAC | Heating, Ventilation, and Air Conditioning | ||
| IA | Information Assurance | ||
| IAM | Information Assurance Manager | ||
| IAO | Information Assurance Officer | ||
| IAP | International Airport | ||
| IATA | International Air Transport Association | ||
| IAW | In Accordance With | ||
| ICAO | International Civil Aviation Organization | ||
| ID | Identification | ||
| IDMT | Independent Duty Medical Technician | ||
| IDS | Intrusion Detection System | ||
| IDP | Integrated Defense Plan | ||
| IED | Improvised Explosive Device | ||
| IHA | International Hotel Association | ||
| IEMP | Installation Emergency Management Plan | ||
| IM | Information Management | ||
| IMDS | Integrated Maintenance Data System | ||
| INMARSAT | International Maritime Satellite | ||
| I-NOSC | Network Operations Security Center | ||
| INTEL | Intelligence | ||
| ISO | International Organization for Standardization | ||
| ISU | Internal Airlift/ Helicopter Slingable Container Unit | ||
| ITV | In-Transit Visibility | ||
| ITAR | International Traffic in Arms Regulation | ||
| ITHAM | Information Technology Hardware Asset Management | ||
| IUID | Item Unique Identification | ||
| JFTR | Joint Federal Travel Regulation | ||
| JKO | Joint Knowledge Online | ||
| JOC | Joint Operations Center | ||
| JTR | Joint Travel Regulation | ||
| JWICS | Joint Worldwide Intelligence Communications System | ||
| KAM | Cryptographic Equipment Maintenance Instructions | ||
| KAO | Cryptographic Equipment Operational Manual | ||
| KPI | Key Performance Indicator | ||
| LAN | Local Area Network | ||
| LGT | Logistics Transportation | ||
| LMR | Land Mobile Radio | ||
| LRA | Local Registration Authority | ||
| MA&I | Measurement, Analysis, and Improvement | ||
| MAJCOM | Major Command | ||
| MARE | Major Accident Response Exercise | ||
| MC | Minor Construction | ||
| MCP | Maintenance Control Plan | ||
| MDM | Mobile Depot Maintenance | ||
| MDR | Material Deficiency Report | ||
| MICAP | Mission Capability | ||
| MIS | Management Information System | ||
| M&R | Maintenance and Repair | ||
| MRE | Meals Ready to Eat | ||
| MPS | Military Postal Service | ||
| MRSP | Mobility Readiness Spares Package | ||
| MS | Microsoft | ||
| MSDS | Material Safety Data Sheets | ||
| MSI | Maintenance Supply Issue (Transaction Identification Code) | ||
| MSL | Mean Sea Level | ||
| MWR | Morale Welfare and Recreation | ||
| NAC | National Agency Check | ||
| NAVAIDS | Navigational Aids | ||
| NFPA | National Fire Protection Association | ||
| NIPR | Non-secure IP Router | ||
| NIPRNet | Non-secure IP Router Network | ||
| NLT | No Later Than | ||
| NMCS | Non-Mission Capable Supply | ||
| NOSC | Network Operations & Security Center | ||
| NOTAM | Notice to Airmen | ||
| NSN | National Stock Number | ||
| OEBGD | Overseas Environmental Baseline Guidance Document | ||
| OEL | Organizational Equipment Listing | ||
| OI | Operating Instruction | ||
| O&M | Operations & Maintenance | ||
| OPLAN | Operational Plan | ||
| OPSEC | Operations Security | ||
| OPR | Office of Primary Responsibility | ||
| ORE | Operational Readiness Exercise | ||
| OSHA | Occupational Safety and Health Administration | ||
| PCS | Permanent Change of Station | ||
| Portable Document Format (Adobe Acrobat) | |||
| PKI | Public Key Infrastructure | ||
| PM | Program Manager | ||
| PMCS | Partial Non-Mission Capable | ||
| PMEL | Precision Measurement Equipment Laboratory | ||
| PMI | Preventive Maintenance Inspection | ||
| PMO | Program Management Office | ||
| PMR | Program Management Review | ||
| PO | Purchase Order | ||
| POC | Point of Contact | ||
| POL | Petroleum, Oil and Lubricants | ||
| POS | Peacetime Operating Stocks | ||
| PPP | Permanent Party Personnel | ||
| PPPO | Personal Property Processing Office | ||
| PPSO | Personal Property Shipping Office | ||
| PROMINA/IDNX | Multiplexer | ||
| PS-OI | Postal Services Operating Instruction | ||
| PWS | Performance-based Work Statement | ||
| QC | Quality Control | ||
| QMS | Quality Management System | ||
| QDR | Quality Deficiency Report | ||
| QMS | Quality Management System | ||
| QRC | Quick Reaction Checklist | ||
| RA | Registration Authority | ||
| RAM | Random Access Measure | ||
| RAMP | Risk Assessment Management Program | ||
| RAPIDS | Real-Time Automated Personnel Identification System | ||
| RF | Radio Frequency | ||
| RFI | Request For Information | ||
| RP | Real Property | ||
| RPAO | RP Accountable Officer | ||
| RPIE | Real Property Installed Equipment | ||
| RPSE | Real Property Similar Equipment | ||
| SAT | Simplified Acquisition Threshold | ||
| SATCOM | Satellite Communications | ||
| SBSS | Standard Base Supply System | ||
| SC | Communications-Computer Systems | ||
| SCBA | Self Contained Breathing Apparatus | ||
| Sensitive Compartmented Information | |||
| SCIF | Sensitive Compartmentalized Information Facility | ||
| SCMG | Supply Chain Management Group | ||
| SEI | Special Experience Identifier | ||
| SF | Security Forces | ||
| S&HP | Safety and Health Plan | ||
| S&H | Safety and Health | ||
| SIPR | Secret IP Router | ||
| SIPRNet | Secret IP Router Network | ||
| SKL | Simple Key Loader | ||
| SMAG | Supply Management Activity Group | ||
| SOP | Standard Operating Procedure | ||
| SOW | Statement Of Work | ||
| SPOT | Synchronized Predeployment and Operational Tracker | ||
| SPTS | Support Squadron | ||
| SP | Special Purpose | ||
| SPV | Special Purpose Vehicle | ||
| SRM | Sustainment Restoration and Modernization | ||
| SS | Service Summary | ||
| SSPC | Society for Protective Coatings | ||
| STD | Standard | ||
| STIG | Security Information Technical Guide | ||
| TACAN | Tactical Air Navigation |
TACLANE KG-175
| TACR | Allowance Change Request | ||
| TACSAT | Tactical Satellite | ||
| TADIL | Tactical Data Information Link | ||
| TCTO | Time Compliance Technical Order | ||
| TDY | Temporary Duty | ||
| TERPS | Terminal Instrument Procedures | ||
| TMDE | Test, Measurement, and Diagnostic Equipment | ||
| TMO | Traffic Management Office | ||
| TO | Technical Order | ||
| TODO | Technical Order Distribution Office | ||
| TOG | Theatre Operations Group | ||
| TS/SCI | TOP SECRET clearance with Sensitive Compartmented Information | ||
| TV | Television | ||
| TX | Texas | ||
| UA | User Account | ||
| UFC | Unified Facilities Criteria | ||
| UHF | Ultra Hugh Frequency | ||
| US | United States | ||
| USAF | United States Air Force | ||
| USAFCENT | United States Air Forces Central | ||
| USC | US Customs | ||
| USCG | United States Coast Guard | ||
| USPS | United States Postal Service | ||
| USAFSOUTH | United States Air Forces Southern | ||
| USSOUTHCOM | United States Southern Command | ||
| VA | Virginia | ||
| VA | Vulnerability Assessment | ||
| VGSA | Visitor Group Security Agreement | ||
| VHF | Very High Frequency | ||
| VIP | Very Important Person | ||
| VoIP | Voice over Internet Protocol | ||
| VTC | Video Teleconferencing | ||
| WAN | Wide Area Network | ||
| WINMASS | Windows Mission Capable Asset Sourcing System | ||
| WO | Work Order | ||
| WOMS | Work Order Management System | ||
| WRM | War Reserve Materiel |
A-3
File details come from the government source that posted it. Updated .