Q&A.docx

DOCX document 13 KB Posted

Attached to
SOF Construct Pad Federal contract opportunity
Solicitation number
FA4855-18-R-0013
Issued by
Department of the Air Force Special Operations Command

About this file

Questions and Answers

View the file

Other files for this federal contract opportunity

Other files attached to SOF Construct Pad, newest first.
File Type Posted
FA4855-18-R-0013_Rev._2_conformed_copy.pdf PDF
FA4855-18-R-0013-0002_Solicitation_Amendment_2.pdf PDF
SOW_-_CZQZ_17-0014_SOF_Costruct_PAD_Rev._2.pdf PDF
DBA_Wage_Determination_NM180023.pdf PDF
Amend_1.pdf PDF
Attachment_6_-_CAFB_and_Melrose_AFR_Civilian_Contractor_Environment_Guide_2015.pdf PDF
8.0_IDS_(373765-E104)_Updated-20171213.pdf PDF
Attachment_5_-_COMM_Inputs.pdf PDF
7.0_Fire_AlarmSupression_(373765-FA1.1)_Update-20171128.pdf PDF
Attachment_9_-_CAFB_Sustainable_Landscape_Development_Plan__2012.pdf PDF
2.0_Structure_(373765-S.01)__20171213.pdf PDF
FA4855-18-R-0013.pdf PDF
3.0_Concrete_Pad_(373765-S.01)__20171213.pdf PDF
Attachment_8_-_CAFB_Electrical_Standards__2014.pdf PDF
4.0_Mechanical_(373765-H.101)_20171213.pdf PDF
Attachment_2_-_SPECIFICATIONS_-_CZQZ_17-0014_SOF.pdf PDF
2.2_Structure_(373765)_StructuralCalculations.pdf PDF
Attachment_7_-_CAFB_Architectural_Compatibility_Guide_2012.pdf PDF
6.0_Electrical_(373765-E.000)_Updated-20171213.pdf PDF
1.0_Floorplan_(373765-S1.01)_20171213.pdf PDF
5.0_COM_(373765-C.101)_Updated-20171213.pdf PDF
Attachment_3_-_SOMS_-_CZQZ170014_-_SOF_Construct_PAD_For_Train_Sim.pdf PDF
2.1_Truss_System_(373765-S1.01)_20171213.pdf PDF
Attachment_4_-_One_Line_Electrical_Source.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q1. Is the Right Side of building facing towards the dirt field where the existing utilities are located?

A1. Correct refer to " 1.0 USAF JTC-TRS-RSS Floorplan" the right side has the entry points for Electrical and Comm. Which are facing towards the dirt.

Q2. Main Feeder wire size is insufficient to provide 300 amps when applying the 4-6 wire derating- NEC310.15(B)(3)(A) - adjustment factor is 80%. Can you provide us with the proper wire size?

A2. 2 runs each with 4 #350 AWG, #1/0 GND in 2-3" conduits run 24" below grade U.O.N. Note that in E100 it is #1/0 replace this for #350.

Q3. Can you provide the necessary drawings and details for Electrical Grounding for this project?

A3. Please refer to "6.0 USAF JTC-TRS-RSS Electrical" E101 attachment.

Q4. According the drawing Sheet E100 a (GFE) panel RSS is shown. Are we to mount and wire this on the concrete pad?

A4. Feeder cable from the Transformer & disconnect shall include protection and termination to the RSS MDP. The RSS MDP will be provided by the STS Facility contractor, and they shall perform connections from the termination.

Please refer to "6.0 USAF JTC-TRS-RSS Electrical" E000 Panelboard Schedule, E002 one line, E104 for the Panel floor plan.

Q5. Please clarify the SOW for the Division 27-Communications portion of the is project? We are under the assumption that 2-4" Sch. 40 PVC empty sealed raceways are the extent of work for this project. Is this correct?

A5.1.Per the SOW, 2-4" Sch.40 conduit to be stubbed up 12" above finished slab.
A5.2.Both the OSP telephone cable and fiber optic cable shall be extended from

the outside plant distribution system Into the facility with protection and termination at the entry point Provided in "5.0 USAF JTC-TRS-RSS COM" attachment. Termination are not to be exposed to elements provide protection A5.3. Anticipate Coordination with Comms. Shop in location outside source plant for comm. Wires. See Attachment for handhole location, note that the building in the picture no longer exists.

Q6. Please provide the location for the concrete handhole? Is a handhole needed for this project?

A6.1. Handholes for Comm. Please refer to "6.0 USAF JTC-TRS-RSS Electrical" E102. For electrical handhole, similar to the Comm. Handhole 10' from the electrical entry point.

A6.2. Please coordinate with CE for your handhole placement before placing pre-cast concrete for handhole.

A6.3. Anticipate Coordination with base electricians/Comms. Shop in locating outside source plant for comm. Wires. See Attachment "JTC HH" for outside source plant handhole location for Comm., note that the building in the picture no longer exists.

File details come from the government source that posted it.