Statement_of_Objectives_(3).pdf

PDF 18 KB Posted

Attached to
MACC Federal contract opportunity
Solicitation number
FA4830-12-R-0004
Issued by
Department of the Air Force Air Combat Command

About this file

Revised SOO associated with FA4830-12-R-0004-0002

View the file

Other files for this federal contract opportunity

Other files attached to MACC, newest first.
File Type Posted
MACC_QUESTIONS-ANSWERS_2013-10-30.pdf PDF
FA4830-12-R-0004-0007.pdf PDF
Statement_of_Objectives_2013-10-17.pdf PDF
MACC_QUESTIONS-ANSWERS_2013-10-17.pdf PDF
FA4830-12-R-0004-0006.pdf PDF
FA4830-12-R-0004-0005.pdf PDF
Base_Pass.pdf PDF
MACC_QUESTIONS-ANSWERS.pdf PDF
FA4830-12-R-0004-0004.pdf PDF
FA4830-12-R-0004-0003.pdf PDF
RevQUESTION_FORM.pdf PDF
Building_648_Floor_Plan.pdf PDF
Amendment_2.pdf PDF
Amendment_1.pdf PDF
QSEU03-0214_CONSTRUCT_ADDITION_FLOOR_PLAN.PDF PDF
Site_Visit_Attendance_Sheets.pdf PDF
Conventional_Construction_Parameters.pdf PDF
Specifications_Guide.pdf PDF
DD1354_sep_2009.pdf PDF
CATCODE_2010 1 .pdf PDF
Architecture_Engineering_Design_Guide_-_Moody_AFB _GA.pdf PDF
All_Wage_Determinations_for_MACC.pdf PDF
Contractor_Information.pdf PDF
AF_Form_66.xls XLS spreadsheet
MES-A5_As-built.pdf PDF
Statement_of_Objectives.pdf PDF
SITE_VISIT_CONFERENCE_RESERVATION_FORM.doc DOC document
MESSITE_As-Built.pdf PDF
FA4830-12-R-0004_Moody_MACC_Solicitation.pdf PDF
QUESTION_FORM.pdf PDF
MES-A1_As-built.pdf PDF
SF_LLL_Lobbying_Disclosure.doc DOC document
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Objectives 9 Nov 2012

QSEU 12-3003 ADD HC-130J AIRCRAFT MAINTENANCE UNIT FACILITY , B648

Statement of Objectives:

This project will consist of adding 8,300 SF to the existing maintenance unit, B648. Work will include, but not be limited to, reinforced concrete foundation and floor slab, split-faced stacked blocked walls, structural steel frame, standing seam metal roof (3/12 min slope) with one foot perforated soffits, fire detection/suppression, utilities, landscaping and other site improvements, communications support and all other necessary work to provide a complete and usable facility.

Assume that the building is vacant, that utilities will be supplied by the government, that you will make your own connections to utilities and that new construction will match existing building (interior and exterior). See floor plan layout for direction on what the addition consist of. Work will also include constructing a covered canopy over outside equipment storage area (approx.

100 ft x 47 ft) with appropriate tie-in to the existing facility, flashing and lighting. Work will include all appropriate structural and utility tie-ins to the existing structure. This project will comply with DoD antiterrorism force protection requirements (ATFP) per unified facilities criteria. This project will include the relocation of an existing air handler unit that supplies B643.

The design of this project shall comply with the Moody AFB Architecture Engineering Design Guide, Specifications and applicable Life Safety Codes. All drawings shall be completed in AutoCAD. Drawings shall be placed on 30”x42” sheets. Final drawings shall be approved by Fire Protection Engineer (FPE) and other appropriate disciplines.

Initial Construction Document at 35% “may” include at time of proposal:

• Site Plan

• Floor Plan

• Section

• Elevations

• Mechanical

• Electrical

• Plumbing

• Life Safety Plan

Final Construction Documents will consist of the following (shall be a minimum of 65%):

• Site Plan

• Floor Plan

• Section

• Elevations

• Mechanical

• Electrical

• Plumbing

• Life Safety Plan

• Air Force (AF) form 66

• Completed AF form 1354

• ATFP Standoff Criteria

• Reference Engineering Technical

Letters (ETL’s)

• Progress Schedule should be in electrical format such as, or equivalent to Microsoft Project.