DD1354_sep_2009.pdf

PDF 114 KB Posted

Attached to
MACC Federal contract opportunity
Solicitation number
FA4830-12-R-0004
Issued by
Department of the Air Force Air Combat Command

About this file

Attachment 5-DD Form 1354

View the file

Other files for this federal contract opportunity

Other files attached to MACC, newest first.
File Type Posted
MACC_QUESTIONS-ANSWERS_2013-10-30.pdf PDF
FA4830-12-R-0004-0007.pdf PDF
Statement_of_Objectives_2013-10-17.pdf PDF
MACC_QUESTIONS-ANSWERS_2013-10-17.pdf PDF
FA4830-12-R-0004-0006.pdf PDF
FA4830-12-R-0004-0005.pdf PDF
Base_Pass.pdf PDF
MACC_QUESTIONS-ANSWERS.pdf PDF
FA4830-12-R-0004-0004.pdf PDF
FA4830-12-R-0004-0003.pdf PDF
Statement_of_Objectives_(3).pdf PDF
RevQUESTION_FORM.pdf PDF
Building_648_Floor_Plan.pdf PDF
Amendment_2.pdf PDF
QSEU03-0214_CONSTRUCT_ADDITION_FLOOR_PLAN.PDF PDF
Amendment_1.pdf PDF
Site_Visit_Attendance_Sheets.pdf PDF
Statement_of_Objectives.pdf PDF
SITE_VISIT_CONFERENCE_RESERVATION_FORM.doc DOC document
MESSITE_As-Built.pdf PDF
FA4830-12-R-0004_Moody_MACC_Solicitation.pdf PDF
QUESTION_FORM.pdf PDF
MES-A1_As-built.pdf PDF
Conventional_Construction_Parameters.pdf PDF
Specifications_Guide.pdf PDF
CATCODE_2010 1 .pdf PDF
Architecture_Engineering_Design_Guide_-_Moody_AFB _GA.pdf PDF
All_Wage_Determinations_for_MACC.pdf PDF
SF_LLL_Lobbying_Disclosure.doc DOC document
Contractor_Information.pdf PDF
AF_Form_66.xls XLS spreadsheet
MES-A5_As-built.pdf PDF
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TRANSFER AND ACCEPTANCE OF DoD REAL PROPERTY Form Approved OMB No. 0704-0188

PAGE OF PAGES

1. FROM (Organization Name) 2. DATE PREPARED

(YYYYMMDD)

3. PROJECT/JOB

NUMBER

4. SERIAL NUMBER

7. CONTRACT

NUMBER(S)

5. TO (Organization - Installation Code and Name) 6. RPSUID/SITENAME/

INSTCODE/INSTNAME

8. TRANSACTION DETAILS

a. METHOD (X all that apply)

ACQUISITION BY CONSTRUCTION

TRANSFER BETWEEN SERVICES

CAPITAL IMPROVEMENT

INVENTORY ADJUSTMENT

PARTIAL ASSET

PLACED-IN-SERVICE

TOTAL ASSET

PLACED-IN-SERVICE

9.

ITEM

NO.

11.

CATEGORY

CODE

12.

CATCODE

DESCRIPTION

13.

TYPE

CODE

14.

PRIMARY

UM

15.

PRIMARY UM

QUANTITY

18.

COST

22.

ITEM

REMARKS

23. STATEMENT OF COMPLETION. The facilities listed hereon are in accordance with maps, drawings, and specifications and change orders approved by the authorized representative of the using agency except for the deficiencies listed on the reverse side.

24.a. ACCEPTED BY (Typed Name and Signature) b. DATE SIGNED

(YYYYMMDD)

a. TRANSFERRED BY (Typed Name and Signature)

c. TITLE (Area Engr./Base Engr./DPW/Construction Agent)

b. DATE SIGNED

(YYYYMMDD)

c. TITLE (DPW/RPAO) 25. PROPERTY

VOUCHER NUMBER

DD FORM 1354, SEP 2009 PREVIOUS EDITION IS OBSOLETE.

b. WHEN/EVENT (X one)

7a. PLACED-IN-

SERVICE DATE

(YYYYMMDD)

c. TYPE (X one)

DRAFT INTERIMFINAL

10a.

FACILITY

NO.

AREA

16.

SECONDARY

UM

17.

SECONDARY

UM QUANTITY

OTHER 19.

FUND

SOURCE

20.

FUND

ORG

21.

INTER-

EST

CODE

PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THE ABOVE ORGANIZATION.

The public reporting burden for this collection of information is estimated to average 30 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Washington Headquarters Services, Executive Services Directorate, Information Management Division, 1155 Defense Pentagon, Washington, DC 20301-1155 (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Adobe Professional 8.0

10b.

RPUID

26. CONSTRUCTION DEFICIENCIES (Attach blank sheet for continuations) 27. PROJECT REMARKS (Attach blank sheet for continuations)

INSTRUCTIONS

GENERAL. This form has been designed and issued for use in connection with the transfer of military real property between the military departments and to or from other government agencies. It supersedes ENG Forms 290 and 290B (formerly used by the Army and Air Force) and NAVDOCKS Form 2317 (formerly used by the Navy).

Existing instructions issued by the military departments relative to the preparation of DD Form 1354 are applicable to this revised form to the extent that the various items and columns on the superseded forms have been retained. The military departments may promulgate additional instructions, as appropriate.

For detailed instructions on how to fill out this form, please refer to Unified Facilities Criteria (UFC) 1-300-08, dated 16 April 2009 or later.

SPECIFIC DATA ITEMS.

1. From. Name of the transferring agency.

2. Date Prepared. Date of actual preparation. Enter all dates in YYYYMMDD format (Example: March 31, 2010 = 20100331).

3. Project/Job Number. Project number on a DD Form 1391 or Individual Job Order Number.

4. Serial Number. Sequential serial number assigned by the preparing organization (e.g., 2010-0001).

5. To. Name and address of the receiving installation, activity, and Service of the Real Property Accountable Officer (RPAO).

6. RPSUID/SITENAME/INSTCODE/INSTNAME. Real Property Site Unique Identifier and Site Name or Installation Code and Installation Name where the constructed facility is located.

7. Contract Number(s). Contract number(s) for this project.

7a. Placed-In-Service Date. RPA Placed In Service Date. This is the date the asset is actually placed-in-service.

8. Transaction Details.

a. Method of Transaction. Mark (X) as many boxes as apply.

b. When/Event. When or event causing preparation of DD Form 1354. X only one box.

c. Type. Draft, interim, or final DD Form 1354. X only one box.

9. Item Number. Use a separate item number for each facility, no item number for additional usages.

10a. Facility Number. Assigned in accordance with the Installation/Base Master Numbering Plan.

10b. RPUID. Real Property Unique Identifier - Identified in Real Property Inventory.

11. Category Code. The category code describes the facility usage.

12. Catcode Description. The category code name which describes the facility usage.

13. Type Code. Construction Type Code - Type of construction: P for Permanent; S for Semi-permanent; T for Temporary.

14. Primary Unit Of Measure. Area unit of measure; use the unit of measure associated with the category code selected in 11.

15. Primary Unit of Measure Quantity. The total area for the measure identified in Item 14. Use negative numbers for demolition.

16. Secondary Unit of Measure. Unit of Measure 2 is the capacity or other measurement unit (e.g., LF, MB, EA, etc.).

17. Secondary Unit of Measure Quantity. The total capacity/other for the measure identified in Item 16.

18. Cost. Cost for each facility; for capital improvements to existing facilities, show amount of increase only. If there is no increase for the capital improvement, enter N/A.

19. Fund Source. Enter the Fund Source Code for this item.

20. Funding Organization. Enter the code for the organization responsible for acquiring this facility.

21. Interest Code. RPA Interest Type Code. Enter the code that reflects government interest or ownership in the facility.

22. Item Remarks. Remarks pertaining only to the item number identified in Item 9; show cost sharing.

23. Statement of Completion. Typed name, signature, title, and date of signature by the responsible transferring individual or agent.

24. Accepted By. Typed name, signature, title, and date of signature by the RPAO or accepting official.

25. Property Voucher Number. Next sequential number assigned by the RPAO in voucher register.

26. Construction Deficiencies. List construction deficiencies in project during contractor turnover inspection.

27. Project Remarks. Project level remarks and continuation of blocks.

DD FORM 1354 (BACK), SEP 2009

page:
pages:
from:
prepdate:
projno:
serial:
to: 23 CES/CEAOR

3485 Georgia St Moody AFB, GA 31699

ctrno:
site_id:
pis_date:
xacq: Off
xtrans: Off
ximp: Off
xinvadj: Off
xevent: Off
xtype: Off
rpuid_1:
primum_1:
primqty_1:
secqty_1:
cost_1:
source_1:
fundorg_1:
intcode_1:
itemrmks_1:
item_2:
item_1:
facno_1:
facno_2:
rpuid_2:
catcode_2:
catcode_1:
descr_1:
type_2:
type_1:
primum_2:
primqty_2:
secum_2:
secum_1:
secqty_2:
cost_2:
source_2:
fundorg_2:
intcode_2:
itemrmks_2:
item_3:
facno_3:
rpuid_3:
catcode_3:
descr_3:
desc_2:
type_3:
primum_3:
primqty_3:
secum_3:
secqty_3:
cost_3:
source_3:
fundorg_3:
intcode_3:
itemrmks_3:
item_4:
facno_4:
rpuid_4:
catcode_4:
descr4:
type_4:
primum_4:
primqty_4:
secum_4:
secqty_4:
cost_4:
source_4:
fundorg_4:
intcode_4:
itemrmks_4:
item_5:
facno_5:
rpuid_5:
catcode5:
descr5:
type_5:
primum_5:
primqty_5:
secum_5:
secqty_5:
cost_5:
source_5:
fundorg_5:
intcode_5:
itemrmks_5:
item_6:
facno_6:
rpuid_6:
catcode_6:
descr_6:
type_6:
primum_6:
primqty_6:
secum_6:
secqty_6:
cost_6:
source_6:
fundorg_6:
intcode_6:
itemrmks_6:
item_7:
facno_7:
rpuid_7:
catcode_7:
descr_7:
type_7:
primum_7:
primqty_7:
secum_7:
secqty_7:
cost_7:
source_7:
fundorg_7:
intcode_7:
itemrmks_7:
item_8:
facno_8:
rpuid_8:
catcode_8:
descr_8:
type_8:
primum_8:
primqty_8:
secum_8:
secqty_8:
cost_8:
source_8:
fundorg_8:
intcode_8:
itemrmks_8:
item_9:
facno_9:
rpuid_9:
catcode_9:
descr_9:
type_9:
primum_9:
primqty_9:
secum_9:
secqty_9:
cost_9:
source_9:
fundorg_9:
intcode_9:
itemrmks_9:
item_10:
facno_10:
rpuid_10:
catcode_10:
descr_10:
type_10:
primum_10:
primqty_10:
secum_10:
secqty_10:
cost_10:
source_10:
fundorg_10:
intcode_10:
itemrmks_10:
transby:
trans_date:
trans_title:
accby:
acc_date:
acc_title:
ptyno:
defic:
projrmks:
Reset:

File details come from the government source that posted it. Updated .