Questions and Answers 23 Jul 10.docx

DOCX document 11 KB Posted

Attached to
Multiple Award Construction Contract (MACC)
Solicitation number
FA480910R0004
Issued by

About this file

Questions Answers dated 23 Jul 10

View the file

Other files

File Type Posted
info.pdf PDF
NOTICE.docx DOCX document
Amendment 10 and Attch 5.pdf PDF
Amendment 0009.doc DOC document
95 ISA - 30Sep2010.pdf PDF
95 ID2 - 30Sep2010.pdf PDF
Amendment 0008.doc DOC document
Questions and answers 21 Oct 10.docx DOCX document
FA4809-10-R-0004 SJAFB NC Atch 5 Atch 2 Blank 3052.xls XLS spreadsheet
MACC SOW Revised pages 2 and 9.docx DOCX document
REV 10-10 SOW-Sample Project 35 .docx DOCX document
3803rooff.dwg DWG drawing
Tsaec.mln —
Telecommunications.dwt —
Tsaec_2_0.shx —
Architectural.dwt —
Survey.dwt —
Tsaec8-NJ.lin —
Structural.dwt —
3803elev.dwg DWG drawing
Civil.dwt —
SJAFB CADD Standards.pdf PDF
Tsaec_2_0.mln —
Electrical.dwt —
flyover.dwg DWG drawing
3803sect.dwg DWG drawing
Amendment 0007.rtf RTF text file
3803roofd.dwg DWG drawing
(CAD Standard 4_0) ERDC-ITL-TR-09-2.pdf PDF
G-1 COVERSHEET.dwt —
Bldg 3803 1st Floor.ppt PPT presentation
Tsaec_2_0.lin —
Tsaec.shx —
Fire Protection.dwt —
Plumbing.dwt —
Mechanical.dwt —
3803roofn.dwg DWG drawing
Tsaec32.lin —
Tsaec8.lin —
Bldg 3803 2nd floor.ppt PPT presentation
SJAFB wiring policy.doc DOC document
c1site.dwg DWG drawing
3803-1.dwg DWG drawing
Landscape.dwt —
3803-2.dwg DWG drawing
Tsaec4.lin —
border.dwg DWG drawing
Amendment 0006.rtf RTF text file
Amendment 0005.doc DOC document
Amendment 0004.doc DOC document
Show 40 more

Latest 50 of 233 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4809-10-R-0004

Questions & Answers 23 Jul 2010

1. QUESTION: Are any As-Built Drawings available in CADD Format?

RESPONSE: See upload of previous drawings dtd 16 Jul 10.

2. QUESTION: Will the Government issue standard Title Block in CADD Format for use in the proposal?

RESPONSE: Standard SJAFB cover sheet is not required for the sample project. However, the successful MACC contractors will be issued it and expect to use it for future projects.

3. QUESTION: Do the 35% fire protection drawings need to be signed by a PE?

RESPONSE: PE seal not required for 35%.

4. . QUESTION: Is a sprinkler line flow test available. Pipe sizing cannot be performed without a test.

RESPONSE: Hydrant flow data is attached and current.

5. QUESTION: The past performance questionnaire (PPQ)references R-0001. If the PPQ has been forwarded already, is it necessary to submit a revised PPQ?

RESPONSE: No, unless the offeror desires to submit a revised PPQ. However, ensure l PPQs are forwarded by the date and time for receipt of offers, or along with your proposal. s

File details come from the government source that posted it. Updated .