Questions and Answers 23 Jul 10.docx
DOCX document 11 KB Posted
- Attached to
- Multiple Award Construction Contract (MACC)
- Solicitation number
- FA480910R0004
About this file
Questions Answers dated 23 Jul 10
View the file
Other files
Show 40 more
Latest 50 of 233 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA4809-10-R-0004
Questions & Answers 23 Jul 2010
1. QUESTION: Are any As-Built Drawings available in CADD Format?
RESPONSE: See upload of previous drawings dtd 16 Jul 10.
2. QUESTION: Will the Government issue standard Title Block in CADD Format for use in the proposal?
RESPONSE: Standard SJAFB cover sheet is not required for the sample project. However, the successful MACC contractors will be issued it and expect to use it for future projects.
3. QUESTION: Do the 35% fire protection drawings need to be signed by a PE?
RESPONSE: PE seal not required for 35%.
4. . QUESTION: Is a sprinkler line flow test available. Pipe sizing cannot be performed without a test.
RESPONSE: Hydrant flow data is attached and current.
5. QUESTION: The past performance questionnaire (PPQ)references R-0001. If the PPQ has been forwarded already, is it necessary to submit a revised PPQ?
RESPONSE: No, unless the offeror desires to submit a revised PPQ. However, ensure l PPQs are forwarded by the date and time for receipt of offers, or along with your proposal. s