FA4809-10-R-0004 SJAFB NC Appendix F - AF Form 66.xls
XLS spreadsheet 38 KB Posted
- Attached to
- Multiple Award Construction Contract (MACC)
- Solicitation number
- FA480910R0004
About this file
Atch 1 Appendix F to SOW
View the file
Other files
Show 40 more
Latest 50 of 233 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER | PROJECT TITLE | SOLICITATION/CONTRACT NUMBER | |
| VKAG 10-1200 | MACC-SAMPLE | |||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, |
CONTRACT REFERENCE, TYPE
OF SUBMITTAL NUMBER OF COPIES REQUIRED REQUIRED SUBMISSION DATE REQUIRED SUBMISSION DATE REQUIRED SUBMISSION DATE REQUIRED SUBMISSION DATE REQUIRED SUBMISSION DATE DATE
CONTRACTOR
| NOTIFIED | REQUIRED SUBMISSION DATE | REQUIRED SUBMISSION DATE | REMARKS | |||||||||||
| CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | OTHER | SUBMITTAL CODE | |||||
| APPROVED | DISAPPROVED | |||||||||||||
| EMS Awareness Training | ||||||||||||||
| 1 | SECTION 01560 | 3 | A | |||||||||||
| PARA 3 | ||||||||||||||
| Erosion Plan | ||||||||||||||
| 2 | SECTION 01560 | 3 | A | |||||||||||
| PARA 5 | ||||||||||||||
| Inspection Reports | ||||||||||||||
| 3 | SECTION 01560 | 3 | B | |||||||||||
| PARA 5 | ||||||||||||||
| NOI | ||||||||||||||
| 4 | SECTION 01560 | 3 | A | |||||||||||
| PARA 5 | ||||||||||||||
| Permit | ||||||||||||||
| 5 | SECTION 01560 | 3 | A | |||||||||||
| PARA 5 | ||||||||||||||
| SWPPP Plan | ||||||||||||||
| 6 | SECTION 01560 | 3 | A | |||||||||||
| PARA 5 | ||||||||||||||
| Approval | ||||||||||||||
| 7 | SECTION 01560 | 3 | A | |||||||||||
| PARA 5 | ||||||||||||||
| Termination | ||||||||||||||
| 8 | SECTION 01560 | 3 | B | |||||||||||
| PARA 5 | ||||||||||||||
| Solid Waste report | ||||||||||||||
| 9 | SECTION 01560 | 3 | B | |||||||||||
| PARA 8 | ||||||||||||||
| Hazardous Waste Report | ||||||||||||||
| 10 | SECTION 01560 | 3 | B | |||||||||||
| PARA 9 |
&L&"Arial,Bold"&8SUBMITTAL CODES: A: 120 DAYS AFTER NTP B: DURING CONSTRUCTION &L&Z&F&R&8