Amendment 0004.rtf

RTF text file 238 KB Posted

Attached to
Simplified Acquisition of Base Engineering Requirements (SABER) VIII Federal contract opportunity
Solicitation number
FA4809-10-R-0001
Issued by
Department of the Air Force Air Combat Command

About this file

Amendment 0004

Text of this file

file_0.wmf file_1.wmf

FA4809-10-R-0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The purpose of this amendment is to incorporate the following changes to the subject solicitation:

A. Reference SF 1442, Block 10, Item 5, second sentence. Cost Limitation for (522 funding) is changed to $5,000,000.

B. Reference Part I - The Schedule, Section C, Description/Specifications/Work Statement, Section C-104, Coefficients, change the sentence, FROM: "Work in these areas will be priced in the normal fashion but will have the Controlled/Restricted area coefficient applied to it due to the fact that escorts may be required, additional identification may be required, and the possibility of interruptions in work."

TO: : "Work in these areas will be priced in the normal fashion but will have the Non-Standard Hours coefficient applied to it due to the fact that escorts may be required, additional identification may be required, and the possibility of interruptions in work."

C. Reference Part I - The Schedule, Section C, Description/Specifications/Work Statement, Section C-130.b (7). Change the sentence

FROM: "If there is a price difference between 4 CLICKS and R.S. Means the 4 CLICKS software shall take precedence over the R.S. Means Master File."

TO: "If there is a price difference in 4 CLICKS and R.S. Means, the R.S. Means master file shall take precedence over the 4 CLICKS software."

D. Reference Section J, List of Documents, Exhibits, and Other Attachments. Delete Attachment 8, entitled, "Task Magnitude Project History", 1 pg, and incorporate the attached revised Attachment 8, entitled, "Task Magnitude Project History", 1 pg, dated 17 May 2010.

E. Reference Section J, List of Documents, Exhibits, and Other Attachments. Architectural Compatibility Standards for Seymour Johnson AFB are incorporated as Attachment 9.

F. The date/time specified for receipt of proposals remains unchanged.

G. All other terms and conditions remain unchanged.

Other files for this federal contract opportunity

Other files attached to Simplified Acquisition of Base Engineering Requirements (SABER) VIII, newest first.
File Type Posted
Amendment 0005 correcting Amendment 0004.pdf PDF
Additional Questions and Answers 17 May 2010.docx DOCX document
Attachment 9 Architectural Compatability 18 Dec 2003.pdf PDF
J. Atch 8 - Project History.doc DOC document
Section J.dot DOT file
Site Visit Minutes with Attachments.pdf PDF
Amendment 0003.pdf PDF
Amend 02 SABER VIII.doc.pdf PDF
Amendment 0001 SABER VIII.doc DOC document
SABER VIII Offeror Questions.doc DOC document
A. Cover Sheet and Instructions for RFP IFB.doc DOC document
I. Atch 7 - AF FORM 66.XLS XLS spreadsheet
D. Atch 2 - 10 WDs Consolidated.docx DOCX document
G. Atch 5 - Demonstration Project.pdf PDF
J. Atch 8 - Project History.doc DOC document
E. Atch 3 - Past Performance Questionnaire w Cvr Ltr.doc DOC document
H. Atch 6 - Location Plan SABER VIII.pdf PDF
B. Solicitation No. FA4809-10-R-0001 SABER VIII.rtf RTF text file
C. Atch 1 - Environmental Protection Specs.doc DOC document
F. Atch 4 - Deter. of Ktr. Respons..doc DOC document
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .