Attachment_5_Blank_Cost_Spreadsheet_(Revision_03).xls
XLS spreadsheet 66 KB Posted
- Attached to
- Maintain Airfield and Base Stripping Federal contract opportunity
- Solicitation number
- FA4803-18-B-0001
About this file
Attachment 5 Blank Cost Spreadsheet (Revision 03)
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_05.pdf | ||
| Attachment_5_Blank_Cost_Spreadsheet_(Revision_02).xls | XLS spreadsheet | |
| FA4803-18-B-0001_-_Amendment_4_-_Maintain_Airfield_&_Striping.pdf | ||
| Attachment_9_Questions_&_Answers_Vol_02.docx | DOCX document | |
| Amendment_03.pdf | ||
| Attachment_5_Blank_Cost_Spreadsheet_(Revision_01).xls | XLS spreadsheet | |
| FA4803-18-B-0001-0002.pdf | ||
| Attachment_8_Questions_&_Answers.docx | DOCX document | |
| FA4803-18-B-0001-0001_Amendment_01.pdf | ||
| Attachment_7_CONTRACTOR__EAL_Base_Pass_Request.docx | DOCX document | |
| FA4803-18-B-0001.pdf | ||
| Attachment_1_Statement_of_Work.pdf | ||
| Attachment_3_Shaw_AFB_ID2_Handbook--October_201.pdf | ||
| Attachment_4_Wage_Determination.pdf | ||
| Attachment_6_Flight_Line_Drawings.pdf | ||
| Attachment_5_Blank_Cost_Spreadsheet.xls | XLS spreadsheet | |
| Attachment_2_Shaw_AFB_Design_Constr_23_Mar.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VSLB 18-0003
| Exihibit A | |||||
| Contract: TBD | |||||
| REPAIR BASE PAVEMENTS VLSB 10-0064 | |||||
| For VLSB 18-0003 Maintain Airfield and Base Stripping | |||||
| Government | |||||
| CLIN | Description | ||||
| 0001 | U/I | PRICE | Total | ||
| SITE WORK/GENERAL TASK | |||||
| AA | Mobilization | LOT | 1 | $0.00 | |
| AB | Back fill (Unwashed Sand) | TON | $0.00 | ||
| AC | Back fill (Flowable Fill) | CY | $0.00 | ||
| AD | Back fill (Pea Gravel) | TON | $0.00 | ||
| AE | 4 inch sewer line service | LF | $0.00 | ||
| AF | 4 inch electrical conduit | LF | $0.00 | ||
| AG | Water line service up to two inch | LF | $0.00 | ||
| AH | Hauling | CY | $0.00 | ||
| AI | Key Stone Retaining Wall with Back Fill and footings | LF | $0.00 | ||
| AJ | Utility Boring, Horizontal, 6 in dia. | LF | $0.00 | ||
| AK | Utility Boring, Horizontal, 24 in dia. | LF | $0.00 | ||
| AL | Cross tie timber walls/max 48"H | SF | $0.00 | ||
| AM | Top Soil 4 inches thick and spread | SY | $0.00 | ||
| EARTH WORK | |||||
| AN | Sand Clay Fill | CY | $0.00 | ||
| AO | Surface Preparation | SY | $0.00 | ||
| AP | Subgrade Preparation +or-3" | SY | $0.00 | ||
| AQ | Unclassified Excavation including haul off site | CY | $0.00 | ||
| CLEARING AND GRUBBING | |||||
| AR | Clearing and grubbing/all roots and stumps1-500 ACRES | ACRE | $0.00 | ||
| AS | Remove Trees 6 " to 12 " | EA | $0.00 | ||
| AT | Remove Trees 12 " to 18 " | EA | $0.00 | ||
| AU | Remove Trees 18 " to 28 " | EA | $0.00 | ||
| EROSION CONTRTOL | |||||
| AV | Erosion Control Temporary Seeding /Acre 1-500 | ACRE | $0.00 | ||
| AW | Silt Fence Erosion Control Temporary Seeding 1 to 2500 | LF | $0.00 | ||
| AX | Anchored Straw Bale | EA | $0.00 | ||
| STORM WATER | |||||
| AY | Headwalls 8 inch Thick x 15 Long x 5' H RPCC | CY | $0.00 | ||
| AZ | 4' Dia. Manhole 6 ' Deep precast concrete w/frame & cover | EA | $0.00 | ||
| BA | 18 Inch RCP Class III | LF | $0.00 | ||
| BB | 24 Inch RCP Class III | LF | $0.00 | ||
| BC | 36 Inch RCP Class III | LF | $0.00 | ||
| BD | Reset Valve Box | EA | $0.00 | ||
| BE | 4" Plastic Under drain with Sock | LF | $0.00 | ||
| BF | Convert Inlets w/frame and grate | EA | $0.00 | ||
| BG | Florida Catch Basin | EA | $0.00 | ||
| ASPHALT PAVING | |||||
| BH | Asphalt Emulsion | SY | $0.00 | ||
| BI | Petrotac Fabric | SF | $0.00 | ||
| BJ | Hand Asphalt Placement | TON | $0.00 | ||
| BK | Slurry Seal | SY | $0.00 | ||
| BL | Pot Hole Repair (per/SY) | SY | $0.00 | ||
| BM | Crack Seal | LF | $0.00 | ||
| BN | 6 inch SABC # 1 Base Course | TON | $0.00 | ||
| BO | 3 inch AC Binder Course | TON | $0.00 | ||
| BP | AC Surface Course Per Inch | TON | $0.00 | ||
| BQ | Surface Sterilization | SY | $0.00 | ||
| BR | Asphalt Pavement Removal Per Inch thickness (asphalt) 1 to 25,000.00 | SY | $0.00 | ||
| BS | reflective yellow/with layout | SF | $0.00 | ||
| BT | reflective white/with layout | SF | $0.00 | ||
| BU | Prime Coat | SY | $0.00 | ||
| BV | Haul Spread Asphalt Millings | TON | $0.00 | ||
| BW | Demo Curb & Gutter | LF | $0.00 | ||
| BX | Hooded Catch basin 2x3x4 | EA | $0.00 | ||
| BY | Slurry seal Emulsion | SY | $0.00 | ||
| BZ | Rem /Reinstall wheel stops | EA | $0.00 | ||
| CA | New Wheel Stops | EA | $0.00 | ||
| CB | Sawcutting asphalt to 4" 1 to 1000 | LF | $0.00 | ||
| CC | Reserved | N/A | |||
| CD | Demo Wheel Stops | EA | $0.00 | ||
| GRASSING | |||||
| CE | Bermuda Sod 419 | SY | $0.00 | ||
| CF | Hydro seed large area's 80,000 to 350,000 | SY | $0.00 | ||
| CG | Centipede Sod | SY | $0.00 | ||
| CH | Hydroseed and Finish Grade 1 to 80,000 | SY | $0.00 | ||
| CONCRETE PAVING | |||||
| CI | New 24 Inch Concrete Curb and Gutter | LF | $0.00 | ||
| CJ | Replace 24 inch Concrete Curb and Gutter | LF | $0.00 | ||
| CK | Remove and Replace Sidewalk 4" thick (0-200 SF) | SF | $0.00 | ||
| CL | Remove and Replace Sidewalk 4" thick (over 200 SF) | SF | $0.00 | ||
| CM | New Sidewalk 4 Inches (0-200 SF) | SF | $0.00 | ||
| CN | New Side Walk 4 Inches Thick (over 200 SF) | SF | $0.00 | ||
| CO | Install 650 flex PCC pavement 14" thick>5000<10000 | SY | $0.00 | ||
| CP | Install 650 flex PCC pavement 14" thick>1000<5000 | SY | $0.00 | ||
| CQ | Install 650 flex PCC pavement 14" thick>1<1000 | SY | $0.00 | ||
| CR | Partial depth spall repairs-epoxy bonded PCC | SF | $0.00 | ||
| CS | Full depth (up to T=14") spall repair | SF | $0.00 | ||
| CT | Provide/install 1" dia smooth dowels-24"L,drill&epoxy | EA | $0.00 | ||
| CU | Provide/install 1-1/2" dia smooth dowels-24"L,drill&epoxy | EA | $0.00 | ||
| CV | Provide/install #3 rebars, 0.376LBS/LF | PND | $0.00 | ||
| CW | Provide/install #4 rebars, 0.668LBS/LF | PND | $0.00 | ||
| CX | Provide/install #5 rebars, 1.043LBS/LF | PND | $0.00 | ||
| CY | Provide/install #5 deformed tie bars-2.5' L (new pavement) | EA | $0.00 | ||
| CZ | Provide/install 3/4" dia smooth dowels-24"L (new pavement) | EA | $0.00 | ||
| DA | Provide/install 1" dia smooth dowels-24"L (new pavement) | EA | $0.00 | ||
| DB | Provide/install 1-1/2" dia smooth dowels-24"L (new pavement) | EA | $0.00 | ||
| DC | Provide/install expansion joint 3/4" cork | SF | $0.00 | ||
| DD | Provide/install expansion joint 1-1/2" cork | SF | $0.00 | ||
| DE | Provide & install aircraft tie-down | EA | $0.00 | ||
| DF | Weld wire mesh W2.5 x W2.5 | SF | $0.00 | ||
| DG | Concrete joint resealing incl backer mat'l replacement | LF | $0.00 | ||
| DH | Crack routing/sealing (PCC) using crack saw | LF | $0.00 | ||
| DI | Crack routing/sealing (PCC) using crack saw (up to 2"W) | LF | $0.00 | ||
| DJ | Saw cut reservoir then provide & install joint sealant & backer mat'l | LF | $0.00 | ||
| DK | Joint seal neopherene compression seal | LF | $0.00 | ||
| DL | Sawcutting concrete to 4" 1 to 1000 | LF | $0.00 | ||
| DM | Sawcutting concrete full depth / LF inch | LF | $0.00 | ||
| DN | Concrete Driveways 4" thick 1 to 100 SQ-YD, fiber mesh reinforced with 6 inch thickened edge see detail in Section 03300 | SY | $0.00 | ||
| DO | Expansion Board 4" wide (fiber) 1/2 thick | LF | $0.00 | ||
| DP | Expansion Board 14" wide (Cork) 1/2 thick | LF | $0.00 | ||
| DQ | Joint sealer 1/2" wide with backer rod 1 to 100000 LF(Silicone) to include green saw and widen joint | LF | $0.00 | ||
| DR | Joint sealer 1/2" wide with backer rod 10000 to 50000 LF(Silicone) to include green saw and widen joint | LF | $0.00 | ||
| DS | Remove Concrete Pavement 1" to 6 thick with disposal | SY | $0.00 | ||
| DT | Remove Concrete Pavement 6" to 14" thick with disposal | SY | $0.00 | ||
| DU | Install 650 Flex concrete PCC per inch thickness per Square Yard to include white pigmented curing compound | SY | $0.00 | ||
| PAVEMENT MARKINGS | |||||
| DV | Paint Removal Air Field 0to 50,000 SF | SF | $0.00 | ||
| DW | Paint Removal Air Field | SF | 10000 | $0.00 | |
| DX | Paint Removal Air Field 100,000 to Infinity | SF | $0.00 | ||
| DY | Rubber Removal Airfield | SF | 200000 | $0.00 | |
| DZ | reflective yellow/with layout | SF | 75464 | $0.00 | |
| EA | Reflective white/with layout <10000 | SF | $0.00 | ||
| EB | reflective white/with layout | SF | 126387 | $0.00 | |
| EC | Black Non Reflective | SF | 51747 | $0.00 | |
| ED | Yellow Non Reflective | SF | 10000 | $0.00 | |
| EE | Red Non Reflective | SF | 3500 | $0.00 | |
| EF | Red Non Reflective >5000 <75000 | SF | 0 | $1.23 | $0.00 |
| All cost data contians Overhead, Profit and Labor | Total | $0.00 | |||
| Chain Link Fence& Gates | |||||
| EG | 6 foot Chain link fence with 3 strands barbed wire | LF | $27.99 | $0.00 | |
| EH | 7 foot Chain link fence with 3 strands barbed wire | LF | $41.14 | $0.00 | |
| EI | Double Gate's with 25x6 foot clear opening with 3 strands barbed wire | EA | $1,461.28 | $0.00 | |
| EJ | Double Gate's with 25x7 foot clear opening with 3 strands barbed wire | EA | $1,867.19 | $0.00 | |
| EK | Personal Gate 4 x 6 foot high clear opening with 3 strands barbed wire. | EA | $351.79 | $0.00 | |
| EL | Personal Gate 4 x 7 foot high clear opening with 3 strands barbed wire. | EA | $416.73 | $0.00 | |
| $0.00 | |||||
| FA4803-18-B-0001 |
Blank Bid Sheet
&CPage &P of &[4
File details come from the government source that posted it.