Attachment_5_Blank_Cost_Spreadsheet_(Revision_01).xls

XLS spreadsheet 66 KB Posted

Attached to
Maintain Airfield and Base Stripping Federal contract opportunity
Solicitation number
FA4803-18-B-0001
Issued by
Department of the Air Force Air Combat Command

About this file

Attachment 05

View the file

Other files for this federal contract opportunity

Other files attached to Maintain Airfield and Base Stripping, newest first.
File Type Posted
Amendment_05.pdf PDF
Attachment_5_Blank_Cost_Spreadsheet_(Revision_03).xls XLS spreadsheet
FA4803-18-B-0001_-_Amendment_4_-_Maintain_Airfield_&_Striping.pdf PDF
Attachment_5_Blank_Cost_Spreadsheet_(Revision_02).xls XLS spreadsheet
Attachment_9_Questions_&_Answers_Vol_02.docx DOCX document
Amendment_03.pdf PDF
FA4803-18-B-0001-0002.pdf PDF
Attachment_8_Questions_&_Answers.docx DOCX document
Attachment_7_CONTRACTOR__EAL_Base_Pass_Request.docx DOCX document
FA4803-18-B-0001-0001_Amendment_01.pdf PDF
Attachment_6_Flight_Line_Drawings.pdf PDF
Attachment_5_Blank_Cost_Spreadsheet.xls XLS spreadsheet
Attachment_2_Shaw_AFB_Design_Constr_23_Mar.pdf PDF
FA4803-18-B-0001.pdf PDF
Attachment_1_Statement_of_Work.pdf PDF
Attachment_3_Shaw_AFB_ID2_Handbook--October_201.pdf PDF
Attachment_4_Wage_Determination.pdf PDF
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VSLB 18-0003

Exihibit A
Contract: TBD
REPAIR BASE PAVEMENTS VLSB 10-0064
For VLSB 18-0003 Maintain Airfield and Base Stripping
Government
CLINDescription
0001U/IPRICETotal
SITE WORK/GENERAL TASK
AAMobilizationLOT1$0.00
ABBack fill (Unwashed Sand)TON$0.00
ACBack fill (Flowable Fill)CY$0.00
ADBack fill (Pea Gravel)TON$0.00
AE4 inch sewer line serviceLF$0.00
AF4 inch electrical conduitLF$0.00
AGWater line service up to two inchLF$0.00
AHHaulingCY$0.00
AIKey Stone Retaining Wall with Back Fill and footingsLF$0.00
AJUtility Boring, Horizontal, 6 in dia.LF$0.00
AKUtility Boring, Horizontal, 24 in dia.LF$0.00
ALCross tie timber walls/max 48"HSF$0.00
AMTop Soil 4 inches thick and spreadSY$0.00
EARTH WORK
ANSand Clay FillCY$0.00
AOSurface PreparationSY$0.00
APSubgrade Preparation +or-3"SY$0.00
AQUnclassified Excavation including haul off siteCY$0.00
CLEARING AND GRUBBING
ARClearing and grubbing/all roots and stumps1-500 ACRESACRE$0.00
ASRemove Trees 6 " to 12 "EA$0.00
ATRemove Trees 12 " to 18 "EA$0.00
AURemove Trees 18 " to 28 "EA$0.00
EROSION CONTRTOL
AVErosion Control Temporary Seeding /Acre 1-500ACRE$0.00
AWSilt Fence Erosion Control Temporary Seeding 1 to 2500LF$0.00
AXAnchored Straw BaleEA$0.00
STORM WATER
AYHeadwalls 8 inch Thick x 15 Long x 5' H RPCCCY$0.00
AZ4' Dia. Manhole 6 ' Deep precast concrete w/frame & coverEA$0.00
BA18 Inch RCP Class IIILF$0.00
BB24 Inch RCP Class IIILF$0.00
BC36 Inch RCP Class IIILF$0.00
BDReset Valve BoxEA$0.00
BE4" Plastic Under drain with SockLF$0.00
BFConvert Inlets w/frame and grateEA$0.00
BGFlorida Catch BasinEA$0.00
ASPHALT PAVING
BHAsphalt EmulsionSY$0.00
BIPetrotac FabricSF$0.00
BJHand Asphalt PlacementTON$0.00
BKSlurry SealSY$0.00
BLPot Hole Repair (per/SY)SY$0.00
BMCrack SealLF$0.00
BN6 inch SABC # 1 Base CourseTON$0.00
BO3 inch AC Binder CourseTON$0.00
BPAC Surface Course Per InchTON$0.00
BQSurface SterilizationSY$0.00
BRAsphalt Pavement Removal Per Inch thickness (asphalt) 1 to 25,000.00SY$0.00
BSreflective yellow/with layoutSF$0.00
BTreflective white/with layoutSF$0.00
BUPrime CoatSY$0.00
BVHaul Spread Asphalt MillingsTON$0.00
BWDemo Curb & GutterLF$0.00
BXHooded Catch basin 2x3x4EA$0.00
BYSlurry seal EmulsionSY$0.00
BZRem /Reinstall wheel stopsEA$0.00
CANew Wheel StopsEA$0.00
CBSawcutting asphalt to 4" 1 to 1000LF$0.00
CCReservedN/A
CDDemo Wheel StopsEA$0.00
GRASSING
CEBermuda Sod 419SY$0.00
CFHydro seed large area's 80,000 to 350,000SY$0.00
CGCentipede SodSY$0.00
CHHydroseed and Finish Grade 1 to 80,000SY$0.00
CONCRETE PAVING
CINew 24 Inch Concrete Curb and GutterLF$0.00
CJReplace 24 inch Concrete Curb and GutterLF$0.00
CKRemove and Replace Sidewalk 4" thick (0-200 SF)SF$0.00
CLRemove and Replace Sidewalk 4" thick (over 200 SF)SF$0.00
CMNew Sidewalk 4 Inches (0-200 SF)SF$0.00
CNNew Side Walk 4 Inches Thick (over 200 SF)SF$0.00
COInstall 650 flex PCC pavement 14" thick>5000<10000SY$0.00
CPInstall 650 flex PCC pavement 14" thick>1000<5000SY$0.00
CQInstall 650 flex PCC pavement 14" thick>1<1000SY$0.00
CRPartial depth spall repairs-epoxy bonded PCCSF$0.00
CSFull depth (up to T=14") spall repairSF$0.00
CTProvide/install 1" dia smooth dowels-24"L,drill&epoxyEA$0.00
CUProvide/install 1-1/2" dia smooth dowels-24"L,drill&epoxyEA$0.00
CVProvide/install #3 rebars, 0.376LBS/LFPND$0.00
CWProvide/install #4 rebars, 0.668LBS/LFPND$0.00
CXProvide/install #5 rebars, 1.043LBS/LFPND$0.00
CYProvide/install #5 deformed tie bars-2.5' L (new pavement)EA$0.00
CZProvide/install 3/4" dia smooth dowels-24"L (new pavement)EA$0.00
DAProvide/install 1" dia smooth dowels-24"L (new pavement)EA$0.00
DBProvide/install 1-1/2" dia smooth dowels-24"L (new pavement)EA$0.00
DCProvide/install expansion joint 3/4" corkSF$0.00
DDProvide/install expansion joint 1-1/2" corkSF$0.00
DEProvide & install aircraft tie-downEA$0.00
DFWeld wire mesh W2.5 x W2.5SF$0.00
DGConcrete joint resealing incl backer mat'l replacementLF$0.00
DHCrack routing/sealing (PCC) using crack sawLF$0.00
DICrack routing/sealing (PCC) using crack saw (up to 2"W)LF$0.00
DJSaw cut reservoir then provide & install joint sealant & backer mat'lLF$0.00
DKJoint seal neopherene compression sealLF$0.00
DLSawcutting concrete to 4" 1 to 1000LF$0.00
DMSawcutting concrete full depth / LF inchLF$0.00
DNConcrete Driveways 4" thick 1 to 100 SQ-YD, fiber mesh reinforced with 6 inch thickened edge see detail in Section 03300SY$0.00
DOExpansion Board 4" wide (fiber) 1/2 thickLF$0.00
DPExpansion Board 14" wide (Cork) 1/2 thickLF$0.00
DQJoint sealer 1/2" wide with backer rod 1 to 100000 LF(Silicone) to include green saw and widen jointLF$0.00
DRJoint sealer 1/2" wide with backer rod 10000 to 50000 LF(Silicone) to include green saw and widen jointLF$0.00
DSRemove Concrete Pavement 1" to 6 thick with disposalSY$0.00
DTRemove Concrete Pavement 6" to 14" thick with disposalSY$0.00
DUInstall 650 Flex concrete PCC per inch thickness per Square Yard to include white pigmented curing compoundSY$0.00
PAVEMENT MARKINGS
DVPaint Removal Air Field 0to 50,000 SFSF$0.00
DWPaint Removal Air Field 50,000to 100,000 SFSF10000$0.00
DXPaint Removal Air Field 100,000 to InfinitySF$0.00
DYRubber Removal Airfield 0 to 400,000SF20000$0.00
DZreflective yellow/with layout >10000 <500000SF75464$0.00
EAReflective white/with layout <10000SF$0.00
EBreflective white/with layout >10000 <500000SF126387$0.00
ECBlack Non Reflective >5000 <100000SF51747$0.00
EDYellow Non Reflective >10000<75,000 Repair AsphaltSF10000$0.00
EERed Non Reflective <5000SF3500$0.00
EFRed Non Reflective >5000 <75000SF0$1.23$0.00
All cost data contians Overhead, Profit and LaborTotal$0.00
Chain Link Fence& Gates
EG6 foot Chain link fence with 3 strands barbed wireLF$27.99$0.00
EH7 foot Chain link fence with 3 strands barbed wireLF$41.14$0.00
EIDouble Gate's with 25x6 foot clear opening with 3 strands barbed wireEA$1,461.28$0.00
EJDouble Gate's with 25x7 foot clear opening with 3 strands barbed wireEA$1,867.19$0.00
EKPersonal Gate 4 x 6 foot high clear opening with 3 strands barbed wire.EA$351.79$0.00
ELPersonal Gate 4 x 7 foot high clear opening with 3 strands barbed wire.EA$416.73$0.00
$0.00
FA4803-18-B-0001

Blank Bid Sheet

&CPage &P of &[4

File details come from the government source that posted it.