Attach 17 - Sample Project SOW.docx

DOCX document 19 KB Posted

Attached to
3d Generation Multiple Award Construction Contract Federal contract opportunity
Solicitation number
FA4690-10-R-K102
Issued by
Department of the Air Force Air Combat Command

About this file

Solicitation Attach 17 - Sample Project SOW

View the file

Other files for this federal contract opportunity

Other files attached to 3d Generation Multiple Award Construction Contract, newest first.
File Type Posted
FA4690-10-R-K102 Amendment 03.pdf PDF
Attach 15 - Revised Sample Project AF Form 3052(Page 2-3) 8 Mar 11.xlsx XLSX spreadsheet
Attach 15 - Revised Sample Project Contractor Bid Schedule —
FA4690-10-R-K102 Ammendment 02.pdf PDF
Attach 2 - AF Form 103.pdf PDF
Attach 24 - Past Performance Questionnaire - 24 Feb.pdf PDF
Attach 9 - Material Approval Submittal Form 3000.pdf PDF
FA4690-10-R-K102 Ammendment 01.pdf PDF
Attach 6 - Design Standards - 30 Oct 10.doc DOC document
Attach 22 - Wage Det SD100009 03-12-2010 SD9.pdf PDF
Attach 12 - ACC Mechanical Room Standards.doc DOC document
Attach 24 - Past Performance Questionnaire - 19 Jul 10.doc DOC document
Attach 20 - Wage Det SD100004 1-7-2011 SD4.pdf PDF
Attach 15 - Sample Project Contractor Bid Schedule.doc DOC document
Attach 3 - Submittal Schedule.xls XLS spreadsheet
Attach 18 - Wage Det SD100002 03-12-2010 SD2.pdf PDF
Attach 7 - Ellsworth AFB Fire Protection Standards.pdf PDF
Attach 8 - EAFB Sup 1 to ACC Instruction 32-1054 Exterior Signs - 10 Jun 05.pdf PDF
Attach 21 - Wage Det SD100006 01-07-2011 SD6.pdf PDF
Attach 13 - General Provisions MACC - 10 Feb 11.doc DOC document
Attach 19 - Wage Det SD100003 12-31-2010 SD3.pdf PDF
Attach 2 - AF Form 103.xfd —
Attach 6 - Base Overview Analysis - 30 Oct 10.doc DOC document
Attach 6 - Executive Summary - 30 Oct 10.doc DOC document
Attach 6 - Appendix 2 Standards - 30 Oct 10.doc DOC document
Attach 16 - MACC Sample Project Drawings 001.tif TIF image
Attach 6 - Introduction Base Mission - 30 Oct 10.doc DOC document
Attach 6 - Appendix1 Plants - 30 Oct 10.doc DOC document
Attach 5 - Spec Section 01800 - 17 Nov 10.doc DOC document
Attach 6 - Table of Contents - 30 Oct 10.doc DOC document
Attach 10 - ACC Supplement 1 to AFI 32-1063 - 16 Oct 06.pdf PDF
Attach 1 - Utility Outages.doc DOC document
Attach 23 - NAF General Provisions - 10 Sep 07.doc DOC document
Attach 9 - Material Approval Submittal Form 3000.xfd —
Attach 11 - Ellsworth AFB Underground Electrical Rqmts.pdf PDF
Attach 4 - Spec Section 01000 - 30 Oct 10.doc DOC document
FA4690-10-R-K102 solicitation.doc DOC document
Attach 14 - Sample Project General Information and Project Requirements —
Attach 25 - Historical Data.xls XLS spreadsheet
Show all 39

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4690-10-R-K102

Attachment 17

SAMPLE PROJECT

Statement of Work Construct Storage & Restrooms - Facility 5025 Project # FXBM 01-1000 30 Oct 10

The contractor shall prepare a proposal to construct an addition on the east side of existing facility #5025. The addition shall be a combination storage facility and restrooms. Specific requirements are as follows:

1. 2500 square feet general, light duty storage (max 125 psf) open bay

a. Minimum 12’ clearance (headroom inside)

b. 2 - 12’ X 10’ high, insulated sectional overhead doors with electric operator (open close-stop functions mounted inside the building near the doors)

c. Overhead lighting per IES Lighting Handbook & outlets per NEC

d. Concrete floor with sealer and floor drain(s) connected to sanitary sewer.

e. Open, unfinished ceiling structure (shop prime finish).

f. Minimum, one 3’-0” X 6’-8” HM pedestrian door from exterior with closer and locking hardware.

g. L:W of floor area to be between 2:1 and 1:1

h. Driveway from existing Access Road to new OH doors (asphalt with concrete curb and gutter) for light duty truck traffic

i. No windows required

j. Unpainted CMU interior walls

2. Men’s and Women’s restrooms

a. Fixtures as required for 5 male and 3 female users

b. Heavy duty, low maintenance interior finishes (gyp board ceilings, 4’ceramic tile wainscot and painted gyp board above on walls, and ceramic tile floor)

c. Lighting per IES Lighting Handbook and outlets per NEC

d. Floor drains

e. Hardwood vanities, plastic laminate countertops, single lever faucets and vitreous china sinks.

f. Floor mounted, head rail braced , metal partitions if / where needed

3. General requirements

a. Masonry exterior to match existing facility

b. Heating system to be gas fired unit heaters for the open bay and electric base-board heaters for restrooms. Design temps to be 65 and 70 degrees respectively.

(1) Ventilation per ASHRAE Standard 62

(2) Heating calculations to include losses due to conduction, infiltration, and internal loads

c. Facility to be in compliance with ADA requirements

d. One 3’-0” X 6’-8” HM pedestrian door from existing facility into new addition with closer and locking hardware

e. Built-up-roof system to be used on new roofing

f. Fire protection / detection system per NFPA

g. Mechanical room to be accessible from building exterior only with vehicle parking nearby for repair personnel. (6'-0" X 6'-8" double access doors)

h. Fire alarm panel to be located in mechanical room (utilize Monaco BT-2 system)

i. No telephone service required

j. Utilize bar joists and metal decking roof structure

k. Install valves at water and gas service connections to mains

4. The following information is provided to assist the contractor in preparation of the proposal:

a. Roof live load shall be 30 psf. Roof design shall be in accordance with the requirements of ASCE Standard ANSI/ASCE 7-95, Section 6 (Wind Loads)

b. Assume soil bearing capacity to be 3,000 psf

c. Existing sanitary sewer (SS) is 12” diameter PVC with adequate additional capacity for the addition

d. Existing water main (W) is 6” diameter C-900 PVC with adequate additional capacity and pressure for the new requirements.

e. Existing gas line (G) is 2”PE with adequate additional capacity

f. Depth of water line is about 6’ below existing grade

g. Depth of gas line is about 3’ below existing grade

h. Existing SS manholes are 4’ diameter, pre-cast concrete with cast iron frames and lids

i. Existing electrical distribution panel has adequate additional capacity for the

addition. Panel is 280V/120V, 42 circuits with 225A main bus and 200A main
breaker. There are 20 available spaces. The panel is fed from within the supply
facility

j. Existing area between the Supply Facility and Base Road is unimproved with native grass cover

k. Water, gas, and sanitary sewer services must be connected to the existing lines in the open field. No connections within the existing supply facility are available

LOGISTICAL ISSUES

The existing facility will remain in use throughout the execution of this project and must be secure at all times when work is not taking place. As there is considerable local pedestrian traffic, the contractor must maintain safety fences and barricades as appropriate to keep the work area safe. The existing water, gas, and sewer lines cannot be isolated, therefore all connections must be made “live”. The electrical distribution panel can be shut down for a maximum of four hours, one day, to make new connections.

Page of 2