Text version
E103#___________ DP#_____
General BMPs *to be reviewed by all
_____ * All equipment and vehicles must be maintained on paved/gravel surfaces or in the designated work area.
_____ * All materials, vehicle parking, and staging areas shall be designated by CEIE and located at least 25 feet away from drainages and other wetlands. Storage of all construction material/debris shall be kept to the designated storage/staging area. Excess soils temporarily stored on-site during construction, and stockpiles, must be covered with stabilization blankets/tarp and wattles to prevent exposure to the elements and to lessen chances of sedimentation due to storm water runoff and wind erosion.
_____ * All vegetated areas disturbed by construction shall be re-vegetated with a CEIE approved seed and certified weed free straw mulch upon completion. All landscaped areas disturbed by construction shall be restored to their original condition or better, e.g., sod, trees, shrubs and mulch replaced along with any irrigation systems. When the soil is re-vegetated the contractor/shop will remove the erosion control systems. All disturbed areas will be backfilled and returned to normal grade.
_____ * 9 CES/CEIE will be notified in the case of any spills of any size in the project area. 9 CES/CEIE SPILL CELL: 530-301-9413.
_____ * Any worker who inadvertently kills or injures any animal, especially a special status species, or finds one injured or trapped, will immediately report the incident to the CEIE biological monitor at 530-634-2835.
_____ * All open trenches/holes shall be covered with plywood or adequate cover before leaving the worksite to prevent wildlife from falling in and becoming trapped or personnel from becoming injured.
Air Quality
_____ *Air Quality (FRAQMD compliance): The contractor/shop shall comply with the Feather River Air Quality Management District (FRAQMD) Standard
Mitigation Measures for All Projects and Fugitive Dust Control Mitigation Measures during construction to minimize construction related air quality impacts.
Reference: FRAQMD requirements at http://www.fraqmd.org/StandardMitigation.htm
_____ *Air Quality (Title 13 CCR): In accordance with Title 13 CCR, Section 2485, all diesel-fueled commercial vehicles operating in the State of California with a gross vehicular weight of greater than 10,000 lbs. and are or must be licensed to operate on highways shall not be idled for greater than five (5) minutes at any location. See Title 13 CCR, Section 2485, Subsection (d) for exceptions.
Additional comments:
Natural Resources
_____ * Burrowing owls may be in the project area. No disturbance should occur within 50 m (approx. 160 ft.) of occupied burrows during the non-breeding season of September 1 through January 31 or within 75 m (approx. 250 ft.) during the breeding season of February 1 through August 31.
______ * Hawks may be nesting in the project area. No disturbance should occur within 1/2 mile of an active nest during the breeding season of February 1 through
August 31, unless approved by 9 CES/CEIE.
______ * Nesting birds protected under the Migratory Bird Treaty Act may be present within the construction area. Birds, nests, and eggs are protected by law from
15 February - 31 August (nesting season). A pre-construction site survey must be performed by a qualified biologist at least 30 days before construction to determine whether any protected species are present on or near the site. If protected birds are present and nesting on or near the site, construction may be temporarily postponed until the nesting season is over. Contact CEIE at least 30 days in advance to arrange the pre-construction site survey. Other measures which may be necessary if protected species are found on or near the site during the pre-construction survey include: (1) the contractor may be prohibited from disturbing areas within a specified distance of owl burrows or bird nests; (2) the contractor may be required to shut down or restrict activities during breeding and nesting seasons; (3) construction may be temporarily delayed while birds are encouraged to relocate away from the construction area.
______ * Raptor Protection: See attached notes on ways to make utility equipment safe for animals. New installation of equipment is required to have protection measures installed for safety.
______ * All trees scheduled for preservation shall be temporarily fenced during construction. Fencing shall be installed prior to the commencement of construction and shall remain in place until all construction is completed. As a minimum, fencing shall be located at the edge of the root zone. The root zone is determined to be the entire ground surface located underneath the tree canopy, commonly referred to as the drip line of the tree. Fencing shall consist of chain link or plastic link fence.
Fencing shall be rigidly supported and maintained during all construction periods at a minimum height of 4' - 0", above grade. Fenced areas shall not be used for material stockpile, storage or vehicle parking. Dumping of building materials, chemicals, concrete products or garbage shall be prohibited within the fenced area. Do not attach anything to the tree’s limbs or trunk, or cause injury to the bark. Do not irrigate within the root zone of native oak trees. Fenced areas under trees shall be maintained in a natural condition and soils shall not be disturbed or compacted. All trees required to be fenced shall be clearly marked with a spot of yellow paint.
The marking will notify inspectors that the subject tree or tree(s) are to be fenced at all times during construction.
______ * Vernal pools are nearby the project location. Vernal pools are protected as endangered species habitat under the Endangered Species Act (ESA) and as
Jurisdictional Waters of the US under the Clean Water Act (CWA). No construction activities or disposal of materials may occur within vernal pools and all ground disturbing activities within 250 feet of a vernal pool require 9 CES/CEIE approval.
Additional comments:
Cultural Resources
______ * Cultural Resources: If any cultural remains or artifacts are inadvertently discovered, stop all ground disturbing work at the point of discovery, plus a reasonable buffer exclusionary area and notify the installation’s Environmental Office at 634-2593/2645. Unauthorized excavation, removal, damage, alteration, or defacement of archaeological resources on USAF property is prohibited, and punishable by civil and criminal penalties.
Additional comments:
Environmental Restoration Program (ERP) / Resource Conservation Recovery Act (RCRA) Site
On / Near - ERP Site(s): ( closed / open)
On / Near - RCRA Site(s): ( closed / open)
Contaminant(s) of Concern: Fuel hydrocarbons and chlorinated solvents
Other: _____________________________________________________________
______ * Project approved by AFCEC: Date: _______________ By whom: _________________________________
______ * An ERP Construction waiver is not required: Project is located on a site with no known soil contamination
______ * An ERP Construction waiver is not required: (other reason) ____________________________________
______ *An ERP Construction waiver is required (Why)
______ *Disposal of Soils from ERP / RCRA sites: Any excess contaminated soils removed during construction shall be properly disposed of off-base using project funds. Excess soils removed from any ERP site require characterization (usually sampling and analysis) for disposal purposes. Waste characterization and/or waste disposal (including hazardous wastes) are contractor responsibilities that must be coordinated with 9 CES/CEIE (634-2644).
______ *ERP / RCRA Advisory: This project is located on an ERP site with known soil contamination. Personnel working on this site are required to have
HAZWOPER training. Excess soil removed during construction must be completely enclosed during storage to prevent the spread of contaminants until it can be disposed of.
______ *ERP / RCRA Advisory: This project is located on one or more ERP sites. Personnel working on this project site must be informed of the possibility that contaminated soil, soil vapor, and/or groundwater may be encountered on the job site. If signs of contamination are encountered (smell, stain and/or free product), stop work and contact your Contracting Officer.
______ *ERP / RCRA Infrastructure Advisory: The contractor shall be advised that ERP monitoring wells, conveyance piping, etc. located near the project must be avoided. Damaged or destroyed ERP infrastructure must be replaced by the contractor at no additional cost to the government.
______ *ERP Underground Storage Tank Advisory: The contractor shall be advised there may be old underground storage tank sites (closed or undergoing investigation) on or near the project area. Potential hazards at old tank sites include inconsistent compaction of, and debris in backfill material.
UST Site(s) - ( closed / open):
Additional comments:
Hazardous Materials
______ *Hazmat (contractor): Air Force regulation (AFI 32-7086 § 2.5.5) requires that all hazardous materials obtain prior authorization through the Hazardous
Materials Management Process (HMMP) before the material is brought on base. Usage data of approved materials must be reported for tracking in the Enterprise
Environmental, Safety, and Occupational Health - Management Information System (EESOH-MIS). For any work requiring the use of materials that have an
MSDS (hazmats), contractors should have submitted a Contractor Hazmat Worksheets package and received HMMP approval. If this has not been accomplished, submit the package (attached) to the contract QA/representative for HMMP review. Package must receive HMMP approval prior to start of work. Direct any questions to the base Hazardous Materials Program Manager, Christopher Galloway (530-634-3987, christopher.galloway.ctr@us.af.mil)
______ *HazMat (in house): * HazMat: The shop conducting the work will track all hazardous materials used for this project in EESOH-MIS. Prior EESOH-MIS authorization is required for all hazardous materials. Unused chemicals shall be stored and/or disposed of in a manner pursuant to all applicable rules and regulations.
For additional information contact the Environmental Hazardous Materials Manager (634-3987)
Additional comments:
Hazardous Waste
______ *HazWaste: Hazardous Wastes must be disposed properly in accordance with local, state, and federal regulations. The contractor or generating organization must submit hazwaste profiles to include MSDS's and/or sampling results to 9 CES/CEIE at least two days prior to shipping hazardous wastes from Beale AFB.
Hazardous Waste shipments and all shipping documents (manifests, BOL's, LDR's, etc.) will be inspected and signed by 9 CES/CEIE before leaving base. The contractor or generating organization will complete manifests with the following information: EPA ID# CA7570024508; Beale 24 hr emergency #530-634-8675;
generator mailing address- 9 CES/CEIE, 6601 B St., Beale AFB 95903; POC- 530-634-2644 Eric Maresh. Alternate POC phone # 634-4452.
Additional comments:
MMRP
On/near Military Munitions Response Program (MMRP) Site(s) ________________________________
______ *Military Munitions Advisory: Past activities at Beale used a variety of munitions and related materials across most of the base property. Because of the base’s history, military munitions related material could be encountered within the project area. If any suspected military munitions related material is found, stop work in the area, move personnel away from the site, and contact the Beale Explosive Ordnance Disposal (EOD) (634-9070/634-9071 or 911 for emergency). Do not touch or attempt to remove any material suspected to be military munitions related.
______ *A Comprehensive Site Evaluation (CSE) was conducted by the U. S. Army Corps of Engineers (USACE). The CSE supports the Military Munitions
Response Program (MMRP). The Report includes evaluations of Munitions Response Sites (MRS) for hazards. The Final Report is available for review.
______ *The proposed intrusive work area shown on the figure attached to the Dig Permit is in an area that has already been disturbed. So long as the intrusive activities are confined to the area already disturbed, the risk of encountering munitions and explosives of concern (MEC) should be low.
______ *Excess digging should be discouraged to minimize the risk of encountering MEC. If MEC is encountered, the Contractor should stop work in the area, move personnel away from the site and contact the Beale Explosive Ordnance Disposal (EOD) flight by calling 911. The Contractor should not touch or attempt to remove any material suspected to be military munitions related. If MEC is discovered a UXO technician support will be required before the project can continue.
Additional comments:
P2/QRP
______ *P2/QRP/Solid Waste (Debris Diversion Report): Contractor should report the construction and demolition debris disposal data each quarter during the project. The data report should include the tonnage of each type of material disposed of in a landfill and the tonnage of each type of material diverted for recycling.
A report template is attached. Submit the report to bruce.reinhardt@us.af.mil, or call 530-634-8237.
______ *P2/QRP/Solid Waste (scrap metal): All scrap metal produced from construction and demolition projects on base is recycled as part of the base Qualified
Recycling Program. Beale’s scrap metal contractor can place a bin for collection at the project location and remove/empty as needed. Please call 530-634-
8327/4452 to request a bin.
______ *P2/QRP/Solid Waste (Sorted Demo Debris): Ensure sorted demo debris does not remain on site for more than 1 year from date of project completion.
(14 CCR 17381.1(d)(2)) Sorted debris piles must be covered when inactive to protect from wind and rain erosion.
______ *P2/QRP/Solid Waste (Unsorted Demo Debris: Do not store unsorted demo debris for more than 30 days on site. (14 CCR 17381.1(d)(1)) Ensure inactive unsorted debris piles are covered to protect from wind and rain erosion.
______ *P2/QRP/Solid Waste (Debris Diversion Report): Use attached C&D Report to report all waste disposed off-base. Do not dispose of any waste on-base.
Send the completed report to bruce.reinhardt@us.af.mil
______ *P2/QRP/Solid Waste (Soil Disposal): All excess soil and construction debris shall be disposed of off-base at an approved landfill facility disposal site.
Soil shall be tested prior to disposal and results shall be sent to CEIE.
______ *P2/QRP/Solid Waste (Soil Storage): Inactive spoil and soil piles must be covered to protect from wind and rain erosion at the end of each working day.
Additional comments:
Storm Water
______ * Ground disturbing work on unpaved areas is typically not allowed during the Limited Operations Period (November 1 through April 30). Permission to work during the Limited Operations Period is being granted for this project but is dependent on prevailing conditions and forecasted weather. Contact 9 CES/
CEIE (4-2645) to obtain permission to begin work. Once work has begun, the following restrictions apply: The only work that is allowed 12 hours before or after a storm event is the inspection, installation and/or maintenance of erosion controls/best management practices. If conditions arise that are unfavorable, CEIE may further restrict activities. Contact 9 CES/CEIE for authorization to resume normal activities (530-634-2645).
______ * Ground disturbing work is authorized for this project between 1 May - 31 October. No ground disturbing work is permitted for 12 hours before or after a storm event with the exception of the inspection, installation and/or maintenance of erosion controls/best management practices. Should the project require ground disturbing work to occur during the base wet season (1 November - 30 April), contact 9 CES/CEIE for authorization.
______ * Ground disturbing work on unpaved areas is not allowed during the wet season (usually November through April). Permission to work outdoors during the Limited Operations Period (November 1 through April 30)may be requested from 9 CES/CEIE if weather continues to be fair but is dependent on prevailing conditions and forecasted weather. Contact 9 CES/ CEIE (4-2835) to obtain permission to begin work. 9 CES/CEIE will evaluate and approve or disapprove outdoor work requests during this time on a case-by-case basis, depending on weather conditions, weather forecast, and whether or not activities will damage soil or vegetative cover. Once work has begun, the following restriction apply: The only outdoor work allowed for 12 hours before or after a storm event is the inspection, installation and/or maintenance of erosion controls/best management practices.
______ * Attached is a map of the site drain inlets, drainage ditches, and wetlands in the project work area. Orange barrier fences or pink flags will designate exclusion zones where construction activities cannot take place. Contractor will install orange fence to keep equipment out of wetland areas. Drain inlets within the project area will be protected from sediment laden water.
______ * The contractor/shop is responsible for implementing best management practices to ensure pollutants are not released or discharged to the drainage ditches, storm drains, seasonal wetlands or other water bodies in the project area. Proper erosion and sediment control measures will be installed. The contractor/shop shall install and maintain erosion control systems such as gravel/sand bags, silt fence, straw bale barriers, erosion control/stabilization blankets, straw wattles, or etc. as needed to protect drainage ditches, storm drains, seasonal wetlands and water bodies from sedimentation resulting from construction activity.
______ * Work disturbing more than 1 acre requires a NPDES construction permit. NPDES permits require that a Notice of Intent (NOI) be submitted to the State of California with a Storm Water Pollution Prevention Plan (SWPPP) developed by a certified Qualified SWPPP Developer (QSD). After September 2, 2011 all
SWPPPs must be implemented in the field by a certified Qualified SWPPP Practitioner (QSP). The contractor must comply with all aspects of the State issued permit and general permit guidelines. For more information reference http://www.swrcb.ca.gov/
______ * Concrete/paint/substance washout must be contained and disposed of properly. No water from the rinsing of equipment shall be discharged to the ground surface or drainages. Any type of rinse or wash water discharged to Beale’s storm water drainage system is considered an unauthorized non-storm water discharge and is strictly prohibited by the industrial storm water general permit.
______ * Contractor must coordinate with CEIE staff for access routes/staging areas prior to beginning work. Call 530-634-2835 to arrange.
______ * Above ground work only is authorized. No ground disturbance is allowed for this project. Any ground disturbance created by equipment access must be repaired and BMP's properly installed to prevent sediment movement off site.
______ * All off-road driving is prohibited. Keep your vehicle on paved or gravel surfaces. Any ruts created on off-road surfaces will need to be remediated.
Contact 9 CES/CEIE (530-634-2835) if this occurs.
Additional comments:
EPA NESHAP, OSHA & CDPH: Asbestos/Lead Based Paint
______ *HAZMAT Disturbance Risk: Project work could disturb hazardous materials such as asbestos or lead based paint, if they are present in the work area.
Attached to the 813, 1391, 332, the “Hazardous Materials Survey for Asbestos, Lead Based Paint, PCBs, Mold, Mercury and Recyclable Radioactive Sources” provides guidance for completing a hazardous material survey during the project design phase. The contract must include the requirement for a hazardous material survey, performed by a state certified lead/asbestos and hazardous materials consultant, as a contractor responsibility. This will ensure that hazardous materials, if present, will be identified and properly managed by the contractor.
______ * Health & Safety Work Plan: The contractor must submit a Health and Safety Plan and Abatement Work Plan that includes worker health and safety practices for the abatement activities. The Health and Safety Plan must include valid certificates for each worker that will be involved in the abatement showing they have completed required AHERA and OSHA training requirements. A copy must be provided to the 9 CES/CEIE Toxics Program Manager.
______ * Beale Asbestos M&OP/LBP Plan Compliance: The contractor must comply with Beale AFB Asbestos Management and Operating Plan, Lead Based
Paint Management and Operations Plan, and applicable AHERA, EPA, NESHAP and OSHA laws and regulations when working in areas with asbestos or lead hazards. Contact 9 CES/CEIE at 530-634-2644 for additional information if needed.
______ * Warning Signs Required: The contractor must post warning signs at the entrance of asbestos or lead abatement areas warning of the hazard.
______ * Demolition Written Notification: Written notification of demolition or renovation operations is required. The notification is required for demolition even if there is no asbestos present. Only complete notification forms are acceptable, and incomplete notification can result in enforcement action. The contractor must comply with the NESHAP regulation, and provide copies of all notification forms to 9 CES/CEIE prior to sending them to the regulatory agencies.
______ * Asbestos Abatement Notification: Beale AFB requires notification at least ten days prior to any asbestos abatement project. The Beale AFB notification must go to 9 MDOS/SGOAB, AFGE Local 2025 Safety Officer, and 9 CES/CEIE Toxics Program Manager, 530-634-2644. Notify the Feather River Air Quality
Management District (FRAQMD) five days prior to any demolition, and at least ten working days prior to any project that removes or disturbs regulated asbestos containing materials in excess of specified quantities. Notify Cal-OSHA at least 24 hours prior to removing regulated asbestos containing materials. The contractor must complete all required notifications.
Additional comments:
TANKS
______ * The contractor is not authorized to bring tanks/oil bulk fuel storage containers, to include generator sub-base tanks onto base or install them without prior written approval from 9CES/CEIEC Tank Program Manager, 530-634-2844.
Description of This Digpermit
Title: Replace Wheatland Bridges, #221 and #222 Log Number: 11700 Government
POC: Mr. David Arias
Current Status: UNDER REVIEW
Location: Bridges #221 and #222 - located on S. Beale Rd between the Wheatland Gate and Wastewater Treatment Plant.
Description:
***Urgent - Work scheduled to begin 5 June 2017*** The purpose of this project is to remove the existing dilapidated bridges, #221 and #222, and replace with new concrete bridges so the Wheatland gate and the Commercial Vehicle Inspection Area can reopen. Work required for the completion of this project includes but is not limited to; demolition of existing timber bridges and associated structures/components;
installation of steel piles, concrete abutments/wing walls, precast concrete girders, pavement, guardrail, and signs; and the removal of approximately 5 trees. Some earthwork and grading will be required.
Additionally, a crane will be needed for the construction of the new replacement bridges. It should be noted that due to the load restrictions on the bridges, some material and equipment will need to enter through the Wheatland gate. ***We are requesting that the review/approval process be expedited to allow work to begin Monday, 5 June 2017.***
Excavation Date: 06/05/2017
Date Requested: 5/30/2017 5:01:24 PM
JON / Work Order
Number:
1080506, 1080516
Contract Number: FA468617C0003
Has Been Marked: X
Pavements:
Requestor Information Name: David Arias Rank: CTR
Organization: 9 CES Symbol: CEN Phone: 530-634-2668 Email: david.arias.3.ctr@us.af.mil
Address:
Alternate's Information: View Alternate's Information javascript:openPage('/apps/AF103/Users/alternate.aspx?Log_Number=11700');
J S tre et
Beale AFB 0 50 100
Meters
Legend Vernal Pool
(VP)
Swale (Sw) Wetland/Sh...
(WS)
Stream (ST) Ditch (Di)
#0 Curb Inlet "/ Drop Inlet
Linear Surface Inlet Above Ground Storage Tanks
@A
ERP
Monitoring Well
.- ERP- USTs Road Centerline
Review Environmental Protection Measures before starting work. Any questions may be directed to the Environmental Field Inspector at 530-634-2835. The only work allowed 12 hours before, during, or 12 hours after a rain event is the installation and/or maintenance of erosion control measures.
e103 # 11700 Replace Wheatland Bridges #221 & #222
1538763361A Sticky Note None set by 1538763361A
1538763361A Sticky Note MigrationNone set by 1538763361A
1538763361A Sticky Note Unmarked set by 1538763361A
1538763361A Sticky Note None set by 1538763361A
1538763361A Sticky Note MigrationNone set by 1538763361A
1538763361A Sticky Note Unmarked set by 1538763361A
1538763361A Sticky Note None set by 1538763361A
1538763361A Sticky Note MigrationNone set by 1538763361A
1538763361A Sticky Note Unmarked set by 1538763361A
1538763361A Sticky Note None set by 1538763361A
1538763361A Sticky Note MigrationNone set by 1538763361A
1538763361A Sticky Note Unmarked set by 1538763361A
1538763361A Sticky Note None set by 1538763361A
1538763361A Sticky Note MigrationNone set by 1538763361A
1538763361A
Unmarked set by 1538763361A
1538763361A
None set by 1538763361A
1538763361A Sticky Note MigrationNone set by 1538763361A
1538763361A Sticky Note Unmarked set by 1538763361A
1538763361A Sticky Note None set by 1538763361A
1538763361A Sticky Note MigrationNone set by 1538763361A
1538763361A Sticky Note Unmarked set by 1538763361A
1538763361A Sticky Note None set by 1538763361A
1538763361A Sticky Note MigrationNone set by 1538763361A
1538763361A Sticky Note Unmarked set by 1538763361A
1538763361A Sticky Note None set by 1538763361A
1538763361A Sticky Note MigrationNone set by 1538763361A
1538763361A Sticky Note Unmarked set by 1538763361A
1538763361A Sticky Note None set by 1538763361A
1538763361A Sticky Note MigrationNone set by 1538763361A
1538763361A
Unmarked set by 1538763361A
From: notification@usan.org [mailto:notification@usan.org] Sent: Monday, March 27, 2017 3:12 PM
Subject: USA North 811 Confirmation for Ticket W708601559‐00W
EMLCFM 02060 USANW 03/27/17 15:12:08 W708601559-00W NORM NEW POLY LREQ
Message Number: W708601559 Rev: 00W Received by USAN at 15:07 on 03/27/17
Work Begins: 04/03/17 at 08:00 Notice: 032 hrs Priority: 2 Night Work: Weekend Work:
Expires: 04/24/17 at 23:59 Update By: 04/20/17 at 00:00
Caller:
Company:
Address:
City: State: CA Zip:
Business Tel: Fax:
Email Address:
Nature of Work: VERTICAL BORING FOR SOIL SAMPLES Done for: SAME Explosives:
Foreman: CALLER Cell Tel: 916-764-4184 Area Premarked: Y Premark Method: WHITE PAINT Permit Type: NO Vac / Pwr Equip Use In The Approx Location Of Member Facilities Requested: N Excavation Enters Into Street Or Sidewalk Area: Y
Location:
Street Address: S BEALE RD Cross Street: OSTROM RD
CTR/O S. BEALE RD 5900' NE/O OSTROM RD 2) 120' NE/O LOC 1 3) 1200' NE/O LOC 2 4)
100' NE/O LOC 3
Place: MARYSVILLE /U County: YUBA State: CA
Long/Lat Long: -121.415343 Lat: 39.084100 Long: -121.424270 Lat: 39.090896
BRIDGES FAC#221 AND FAC#222
VICINITY AND SITE MAP
BEALE AFB, CA
S. Beale Road
VICINITY
Project Location
1522114908C Rectangle
1522114908C Rectangle
1522114908C Callout
BRIDGE #222
1522114908C Callout
BRIDGE #221
| img-607121648-0001 |
| Reviewer Comments 2017_fill |
| Requestor Information11700 |
| map |
| Plan Drawings - Wheatland Bridges |
| USA ticket - Wheatland Bridges |
| Vicinity and Site Map - Wheatland Bridges |
| E103: 11700 |
| DP: |
| All equipment and vehicles must be maintained on pavedgravel surfaces or in the designated work area: |
| All materials vehicle parking and staging areas shall be designated by CEIE and located at least 25 feet away from drainages and other wetlands Storage: |
| All vegetated areas disturbed by construction shall be revegetated with a CEIE approved seed and certified weed free straw mulch upon completion All: x |
| 9 CESCEIE will be notified in the case of any spills of any size in the project area 9 CESCEIE SPILL CELL 5303019413: X |
| Any worker who inadvertently kills or injures any animal especially a special status species or finds one injured or trapped will immediately report the: |
| All open trenchesholes shall be covered with plywood or adequate cover before leaving the worksite to prevent wildlife from falling in and becoming: |
| Air Quality FRAQMD compliance The contractorshop shall comply with the Feather River Air Quality Management District FRAQMD Standard: X |
| Air Quality Title 13 CCR In accordance with Title 13 CCR Section 2485 all dieselfueled commercial vehicles operating in the State of California with: X |
| Burrowing owls may be in the project area No disturbance should occur within 50 m approx 160 ft of occupied burrows during the nonbreeding season: |
| Hawks may be nesting in the project area No disturbance should occur within 12 mile of an active nest during the breeding season of February 1 through: |
| Nesting birds protected under the Migratory Bird Treaty Act may be present within the construction area Birds nests and eggs are protected by law from: x |
| Raptor Protection See attached notes on ways to make utility equipment safe for animals New installation of equipment is required to have protection: |
| All trees scheduled for preservation shall be temporarily fenced during construction Fencing shall be installed prior to the commencement of construction: |
| Vernal pools are nearby the project location Vernal pools are protected as endangered species habitat under the Endangered Species Act ESA and as: |
| Text7: Emergency take permit in process for nesting swallows. No response as of 6 Jun from USFWS. |
| Text8: |
| Text9: |
| E103_2: 11700 |
| DP_2: |
| Cultural Resources If any cultural remains or artifacts are inadvertently discovered stop all ground disturbing work at the point of discovery plus a: x |
| fill_4: CG044-013 and LF013 |
| fill_5: |
| Project approved by AFCEC Date: X |
| fill_6: |
| By whom: 06012017 |
| undefined: Michael Mitchener |
| An ERP Construction waiver is not required Project is located on a site with no known soil contamination: |
| An ERP Construction waiver is not required other reason: X |
| undefined_2: Construction will not encounter |
| An ERP Construction waiver is required Why: |
| undefined_3: groundwater and is not working in area of contaminated soil |
| undefined_4: |
| Disposal of Soils from ERP RCRA sites Any excess contaminated soils removed during construction shall be properly disposed of offbase using: |
| undefined_5: |
| ERP RCRA Advisory This project is located on an ERP site with known soil contamination Personnel working on this site are required to have: |
| ERP RCRA Advisory This project is located on one or more ERP sites Personnel working on this project site must be informed of the possibility that: |
| ERP RCRA Infrastructure Advisory The contractor shall be advised that ERP monitoring wells conveyance piping etc located near the project must: |
| ERP Underground Storage Tank Advisory The contractor shall be advised there may be old underground storage tank sites closed or undergoing: |
| fill_22: |
| Hazmat contractor Air Force regulation AFI 327086 255 requires that all hazardous materials obtain prior authorization through the Hazardous: |
| HazMat in house HazMat The shop conducting the work will track all hazardous materials used for this project in EESOHMIS Prior EESOHMIS: |
| HazWaste Hazardous Wastes must be disposed properly in accordance with local state and federal regulations The contractor or generating organization: X |
| Text5: See attached 'Treated Wood Waste Accumulation, Shipping, Disposal' sheet |
| Text6: |
| Text12: |
| Text13: |
| Check Box1: Off |
| Check Box2: Yes |
| Check Box3: Off |
| Check Box4: Yes |
| Check Box5: Off |
| Check Box6: Off |
| Check Box7: Off |
| Check Box8: Off |
| Check Box9: Off |
| Check Box10: Yes |
| Check Box11: Off |
| Check Box12: Off |
| Check Box13: Off |
| Check Box14: Off |
| E103_3: 11700 |
| DP_3: |
| Onnear Military Munitions Response Program MMRP Sites: XU634 |
| Military Munitions Advisory Past activities at Beale used a variety of munitions and related materials across most of the base property Because of the: X |
| A Comprehensive Site Evaluation CSE was conducted by the U S Army Corps of Engineers USACE The CSE supports the Military Munitions: X |
| The proposed intrusive work area shown on the figure attached to the Dig Permit is in an area that has already been disturbed So long as the intrusive: X |
| Excess digging should be discouraged to minimize the risk of encountering MEC If MEC is encountered the Contractor should stop work in the area: X |
| P2QRPSolid Waste Debris Diversion Report Contractor should report the construction and demolition debris disposal data each quarter during the: X |
| P2QRPSolid Waste scrap metal All scrap metal produced from construction and demolition projects on base is recycled as part of the base Qualified: X |
| P2QRPSolid Waste Sorted Demo Debris Ensure sorted demo debris does not remain on site for more than 1 year from date of project completion: X |
| P2QRPSolid Waste Unsorted Demo Debris Do not store unsorted demo debris for more than 30 days on site 14 CCR 173811d1 Ensure: X |
| P2QRPSolid Waste Debris Diversion Report Use attached CD Report to report all waste disposed offbase Do not dispose of any waste onbase: X |
| P2QRPSolid Waste Soil Disposal All excess soil and construction debris shall be disposed of offbase at an approved landfill facility disposal site: X |
| P2QRPSolid Waste Soil Storage Inactive spoil and soil piles must be covered to protect from wind and rain erosion at the end of each working day: X |
| Ground disturbing work on unpaved areas is typically not allowed during the Exclusion Period November 1 through April 30 Permission to work: |
| Ground disturbing work is authorized for this project between 1 May 31 October No ground disturbing work is permitted for 12 hours before or after a: X |
| Ground disturbing work on unpaved areas is not allowed during the wet season usually November through April Permission to work outdoors in: |
| Text10: |
| Text11: The southern (closest to Wheatland Gate) bridge is just to the north and west of MRS XU634, but not within the MRS. Caution should still be taken. |
| E103_4: 11700 |
| DP_4: |
| Attached is a map of the site drain inlets drainage ditches and wetlands in the project work area Orange barrier fences or pink flags will designate: |
| The contractorshop is responsible for implementing best management practices to ensure pollutants are not released or discharged to the drainage: X |
| Work disturbing more than 1 acre requires a NPDES construction permit NPDES permits require that a Notice of Intent NOI be submitted to the State: |
| Concretepaintsubstance washout must be contained and disposed of properly No water from the rinsing of equipment shall be discharged to the ground: |
| Contractor must coordinate with CEIE staff for access routesstaging areas prior to beginning work Call 5306344451 to arrange: |
| Above ground work only is authorized No ground disturbance is allowed for this project Any ground disturbance created by equipment access must be: |
| All offroad driving is prohibited Keep your vehicle on paved or gravel surfaces Any ruts created on offroad surfaces will need to be remediated: |
| HAZMAT Disturbance Risk Project work could disturb hazardous materials such as asbestos or lead based paint if they are present in the work area: X |
| Health Safety Work Plan The contractor must submit a Health and Safety Plan and Abatement Work Plan that includes worker health and safety: X |
| Beale Asbestos MOPLBP Plan Compliance The contractor must comply with Beale AFB Asbestos Management and Operating Plan Lead Based: X |
| Warning Signs Required The contractor must post warning signs at the entrance of asbestos or lead abatement areas warning of the hazard: X |
| Demolition Written Notification Written notification of demolition or renovation operations is required The notification is required for demolition: X |
| Asbestos Abatement Notification Beale AFB requires notification at least ten days prior to any asbestos abatement project The Beale AFB notification: X |
| The contractor is not authorized to bring tanksoil bulk fuel storage containers to include generator subbase tanks onto base or install them without prior: |
| Text2: |
| Text3: |
| Text4: Work under the scope of this project could potentially uncover asbestos piping |