AF813,_Replace_Railroad_Bridges.pdf

PDF 119 KB Posted

Attached to
Railroad Bridges Federal contract opportunity
Solicitation number
FA4686-18-R-0006
Issued by
Department of the Air Force Air Combat Command

View the file

Other files for this federal contract opportunity

Other files attached to Railroad Bridges, newest first.
File Type Posted
Amended_RFI_Responses.xls XLS spreadsheet
RFI_Responses.xlsb XLSB spreadsheet
RFI_Att_3_-_Geotechnical_Design_and_Foundation_Report_Redacted.pdf PDF
RFI_Att_6_-_SoBealeRd_Bridges_SHPO_Report_2017-04-19__Redacted.pdf PDF
RFI_Att_4_-_Hydrologic_and_Hydraulic_Report_Redacted.pdf PDF
FA468618R00060003.pdf PDF
RFI_Att_5_-_Permit_Exhibits_Redacted.pdf PDF
RFI_Att_7_ppi_tool.mdb MDB file
RFI_Att_1_-_103_11700_scan_Redacted.pdf PDF
RFI_Att_2_-_404_Signed_Redacted.pdf PDF
Latest_EAL_Template.xls XLS spreadsheet
FA4686-18-R-0006-P00002.pdf PDF
FA468618R0006P0001.pdf PDF
FA4686-18-R-0006_Rail_Road_Bridges_Solicitation.pdf PDF
ITO_Attachment_1.8_-_AF3064_Schedule.pdf PDF
ITO_Attachment_1.7_-_AF3052.xls XLS spreadsheet
ITO_Attachment_1.3_-_PPQ_Letter.pdf PDF
ITO_Attachment_1.4_-_Consent_Letter.pdf PDF
Attachment_1_As-Built_Drawings.pdf PDF
ITO_Attachment_1.1_-_PPI_TOOL.pdf PDF
ITO_Attachment_1.2_-_PPQ.pdf PDF
ITO_Attachment_1.5_-_Client_Authorization_Letter.pdf PDF
ITO_Attachment_1.0_-_Proposed_Team_List.doc DOC document
SON_-_Railroad_Bridges_216_and_228.pdf PDF
Wage_Determination.pdf PDF
Attachment_2_Railroad_Bridge_Map.pdf PDF
ITO_Attachment_1.6-__1_Bid_Schedule.doc DOC document
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attention!

Your administrator has set up required contacts for certain roles in AF Form 813 records. The Biological Resource Manager role has a requirement of Requires At Least One. Please update the Contacts section to include a Biological Resource Manager.

SECTION I - PROPONENT INFORMATION

ID 1388 Status Approved

1. To Organization BEALE AFB - 9 CES 2. From Organization BEALE AFB -

9 CES 2A. From Organization POC Phone Number 634-2623

3. Title REPAIR RAILROAD BRIDGES F216 F228

4. Purpose and Need for Action The railroad bridge adjacent to the Wheatland Gate is proposed for replacement. This project would remove and replace the bridge supports within the creek. The purpose of this project is to replace the railroad bridges, FAC#216 and FAC#228.

5. Description of Proposed Action and Alternatives If there is no action then the railroad bridge will fail and there will be significant unmitigated adverse environmental effects and violations of laws. The treated wood power poles would fall, many into a jurisdictional waterway that is habitat for Federally listed Central Valley steelhead with likely adverse effects to the juvenile fish of this species. The Installation would also continue to ship jet fuel by truck to meet the missions assigned by the President and Congress with significant adverse effects for air quality. The preferred alternative is to renovate the railroad bridge.

There will be no significant direct, indirect, or cumulative environmental effects if the action to renovate the railroad bridge is taken and the Best Management Practices (BMPs) are executed effectively. The infrastructure will be rebuilt, the ability to support the military mission will be improved, and violations of law will be avoided.

6. Proponent Approval (Name and Grade) David Arias, GS-11 6A. Approval Date 10/25/2017

Installation Name BEALE AFB

MAJCOM Name Air Combat Command

SECTION II - PRELIMINARY ENVIRONMENTAL SURVEY

7. Air Installation Compatible Use Zone/Land Use 0 No Effect 7A. Not Applicable

10/25/2017

Remarks No significant adverse direct, indirect, or cumulative effects for the AICUZ or noise are likely. The use of cranes without the required FAA permit is not authorized.

8. Air Quality + Positive Effect 8A. Not Applicable

Remarks No significant adverse direct, indirect, or cumulative adverse effects for air quality is likely with execution of the BMPs.

Control of fugitive dust is required. See the Appendix the air quality environmental Best Management Practices (BMPs) that are required. If the bridge is not replaced then there will be significant adverse effects for air quality because the alternative to truck fuel 1,500 miles results in significantly more air emissions than would rail transport.

9. Water Resources 0 No Effect 9A. Not Applicable

Remarks No significant adverse direct, indirect, or cumulative effects for water resources are likely with effective execution of the required BMPs. A CWA permit and a FONPA are required.

10. Safety and Occupational Health 0 No Effect 10A. Not Applicable

Remarks No significant adverse direct, indirect, or cumulative effects for occupational health and/or safety or are likely.

The risk for discovering dangerous Military Munitions is considered to be low so coordination with the Military Munitions Response Program is not required. However undiscovered munitions may exist.

11. Hazardous Materials/Waste 0 No Effect 11A. Not Applicable

Remarks

No significant adverse direct, indirect, or cumulative effects for hazardous materials/waste are likely with effective execution of the required BMPs. This project must properly dispose of treated wood waste.

No effects from asbestos or lead-based paint containing material are believed to be likely. If these materials are discovered they then must be managed as required by the 9 RW Plans and the expenses will be covered by the proponent.

12. Biological Resources 0 No Effect 12A. Not Applicable

Remarks No significant adverse direct, indirect, or cumulative effects are likely for biological resources with effective execution of the required BMPs.

Section 7 consultation is not required. Noncompliance with the BMPs may require consultation and result in a significant costs and delay. The contractor will then be responsible for the associated expenses.

No significant adverse direct, indirect, or cumulative effects are likely with the effective execution of the required BMPs.

Migratory birds and their nests are protected and generally may not be removed. This project should either plan to prevent nesting or be conducted between October and February.

No significant adverse direct, indirect, or cumulative effects for migratory birds are likely with effective execution of the required BMPs. Bird and bats may not be removed during their breeding season. Between 1 March and 15 September 30 days prior to execution a breeding bird survey must be conducted by or provided to 9 CES/CEIEC.

13. Cultural Resources 0 No Effect 13A. Not Applicable

Remarks No significant adverse direct, indirect, or cumulative effects for cultural resources are likely.

SHPO coordination has been completed.

The site has been surveyed for archeological resources prior. The site has also been heavily disturbed.

A Tribal Consultation is not required.

14. Geology and Soils 0 No Effect 14. Not Applicable

Remarks No significant adverse direct, indirect, or cumulative effects for Geology & Soils are likely with effective execution of the required BMPs.

The movement of soil outside of the project footprint is not authorized.

This project will submit to the Water Quality Manager an erosion control plan when AF Form 103 is filed. This plan will incorporate the requirements of a SWPP, but need not be filed as such.

15. Socioeconomic + Positive Effect 15. Not Applicable

Remarks Significant local beneficial economic effects are expected.

16. Other + Positive Effect 16A. Not Applicable

Remarks No significant adverse direct, indirect, or cumulative other effects are likely.

This project will have significant beneficial effects for the military and national defense missions.

This project is not within an area where it is likely to affect the Environmental Restoration Program.

813 Legal Review Not Applicable

Remarks

SECTION III - ENVIRONMENTAL ANALYSIS DETERMINATION

17. PROPOSED ACTION QUALIFIES FOR CATEGORICAL EXCLUSION (CATEX)

PROPOSED ACTION DOES NOT QUALIFY FOR CATEX, FURTHER ENVIRONMENTAL ANALYSIS IS REQUIRED

18. Environmental Remarks

A2.3.11. Actions similar to other actions which have been determined to have an insignificant impact in a similar setting as established in an EIS or an EA resulting in a FONSI. The EPF must document application of this CATEX on AF Form 813, specifically identifying the previous Air Force approved environmental document which provides the basis for this determination. Final Environmental Assessment Addressing New Construction and Demolition at Beale Air Force Base, California. April 2014. FONSI May 2014. FONPA 1 May 2014.

19. Environmental Planning Function Certification R. HASEY, GS-12 19b. Date of Certification 10/25/2017

Additional EIAP Fields

Cooperating Agencies Type of EA Effort

Consultations Planned Mitigations Adopted in Decision Document See Appendix

Attention!

Your administrator has set up required contacts for certain roles in AF Form 813 records. The Biological Resource Manager role has a requirement of Requires At Least One. Please update the Contacts section to include a Biological Resource Manager.

Contacts ! Role Person Work Phone Fax Email Primary Organization

Biological Resource Manager Civil Engineer ERP Cultural Resources Manager EIAP Manager RAYMOND HASEY 530-634-9568 (530) 634-2845 raymond.hasey@us.af.mil Air Combat Command Hazardous Materials Manager Land Use - Community Planner Other Resource Managers Safety Office Socioeconomic - Community Planner Water Quality Manager

Comments

! Comment Type Created By Reference

Date Comment

No data to display

Related Documents ! Document Name Document Number Document Status Revision Revision Date File Name

Beale Rail repair overview map.pdf Work In Progress 0.0 10/25/2017 06:01 PM Beale Rail repair overview map.pdf EIAP 17.067 Replace Railroad Bridges Appendix.pdf Work In Progress 0.0 10/25/2017 06:01 PM EIAP 17.067 Replace Railroad Bridges Appendix.pdf Railroad Bridge Map.pdf Work In Progress 0.0 10/25/2017 06:01 PM Railroad Bridge Map.pdf

Attention!

Your administrator has set up required contacts for certain roles in AF Form 813 records. The Biological Resource Manager role has a requirement of Requires At Least One. Please update the Contacts section to include a Biological Resource Manager.

General

Legacy Data

Attention!

Your administrator has set up required contacts for certain roles in AF Form 813 records. The Biological Resource Manager role has a requirement of Requires At Least One. Please update the Contacts section to include a Biological Resource Manager.

Record Information

System Geography \Geography\North America\United States of America\California\BAEY-BEALE AFB

System Organization \Organizations\United States Air Force\A4C USAF\Air Combat Command

System Location \Locations\BEALE AF BASE SITE # 1

Record Language US English Record Form AF Form 813

Business Object AF Form 813 Record Name 1388

Project Name Record State cstCompleted

Created Date/Time 10/12/2017 12:17:26 Modified By HASEY, RAYMOND - HASEY.RAYMOND.A.1172207550

Modified Date/Time 10/25/2017 11:08:16