FA4659-16-R-0008_Amendment_0003.pdf
PDF 124 KB Posted
- Attached to
- Repair/Reconfigure Gray Hall Dorm Bldg 222
- Solicitation number
- FA4659-16-R-0008
About this file
Amendment 0003. All other terms and conditions remain unchanged. The proposal due date will not be extended.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F2A3E16165A001 JFSD201152
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment to FA4659-16-R-0008 is to answ er questions presented from potential offerors, to include the attendance sheet from the site visit on 22 Aug 2016 at 1000, to update Specif ication Section 230593 to remove the acceptable vendor list updated 30 Aug 2016, and to add JFSD 201152 Revised Draw ing G-010 (Dated 6 Sep 2016). All other terms and conditions remain unchanged. The proposal due date w ill not be extended.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 16
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 07-Sep-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA4659-16-R-0008
X 9B. DATED (SEE ITEM 11)
12-Aug-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
07-Sep-2016
CODE
319 CONTRACTING FLIGHT
575 TUSKEGEE AIRMEN BLVD
GRAND FORKS AFB ND 58205 6436
FA4659 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA4659-16-R-0008
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been modified:
LIST OF DOCUMENTS
ATTACHMENTS
LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J
ITEM # of Pages
1. Building Wage Decision ND160022 Dated 07/22/2016 5
2. Schedule of Drawings and As-builts 4
3. Waiver Green Procurements Form 1
4. Technical specification table of contents 4
LIST OF EXTERNAL ATTACHMENTS
1. JFSD 201152 Technical Specifications 484
2. JFSD 201152 Drawings 161
3. JFSD 201152 Material Submittal Schedule 4
4. Past Performance Questionnaire w/cover letter 5
5. Financial Institution Reference sheet 1
6. 2012 – 2015 Climatological Summary for Grand Forks AFB, ND 3
7. Questions and Answers 1
8. Questions and Answers (Dated 6 Sep 2016) 2
10. Attendance Sheet (Site Visit-22 Aug 2016) 1
General Decision Number: ND160022 07/22/2016 ND22
Superseded General Decision Number: ND20150022
State: North Dakota
Construction Type: Building
County: Grand Forks County in North Dakota.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/08/2016 1 03/04/2016 2 07/22/2016
BOIL0647-006 01/01/2014
Rates Fringes
BOILERMAKER......................$ 32.75 26.42
ELEC1426-007 06/01/2014
Rates Fringes
ELECTRICIAN......................$ 27.59 11.37
IRON0512-006 05/01/2015
Rates Fringes
IRONWORKER, STRUCTURAL...........$ 29.80 23.74
PLAS0633-003 05/01/2015
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 27.90 13.60
PLASTERER........................$ 23.92 12.83
* PLUM0300-020 05/30/2016
Rates Fringes
PIPEFITTER.......................$ 33.74 13.82
SHEE9010-002 06/09/2014
Rates Fringes
SHEET METAL WORKER (HVAC Duct Installation Only)...............$ 26.45 13.95
SUND2012-003 08/18/2014
Rates Fringes
BRICKLAYER.......................$ 23.47 12.34
CARPENTER........................$ 19.16 3.88
DRYWALL FINISHER/TAPER...........$ 21.48 6.66
DRYWALL HANGER AND METAL STUD
INSTALLER........................$ 19.60 4.34
INSULATOR - MECHANICAL
(Duct, Pipe & Mechanical System Insulation)...............$ 15.80 2.60
LABORER: Common or General......$ 12.99 2.81
LABORER: Mason Tender - Brick...$ 15.32 0.00
LABORER: Mason Tender - Cement/Concrete..................$ 14.54 3.41
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 26.00 3.82
OPERATOR: Crane.................$ 26.18 9.39
OPERATOR: Forklift..............$ 23.06 15.47
OPERATOR: Loader................$ 23.75 0.00
PAINTER (BRUSH AND ROLLER),
Excludes Drywall Finishing/Taping.................$ 21.86 8.41
PLUMBER..........................$ 21.64 4.98
ROOFER...........................$ 16.37 2.84
SHEET METAL WORKER, Excludes
HVAC Duct Installation...........$ 27.27 7.76
TRUCK DRIVER: Dump Truck........$ 19.81 5.42
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
Drawing Schedule
Ref. Num Drawing Name Sheet # Date G001 Cover Sheet 1 of 161 3/26/2015 G002 Schedule of Drawings 2 of 161 3/26/2015 G003 Abbreviations 3of 161 3/26/2015 G004 Abbreviations and Legend 4 of 161 3/26/2015 G005 Egress and Occupancy Plans 5of 161 3/26/2015 G006 Crawl Space/Tunnel and First Floor Fire Protection Plans 6 of 161 3/26/2015 G007 Second and Third Floor Fire Protection Plan 7 of 161 3/26/2015 G008 Attic Fire Protection Plan 8 of 161 3/26/2015 G009 Code Analysis 9 of 161 3/26/2015 G010 Staging Plan 10 of 161 9/6/2016 CD101 Site Demolition Plan 11 of 161 3/26/2015 CS101 Site Layout Plan 12 of 161 3/26/2015 CU101 Existing Site Utility Plan 13 of 161 3/26/2015 L-501 Site Details 14 of 161 3/26/2015 AD101 Demolition First Floor Plan 15 of 161 3/26/2015 AD102 Demolition Second Floor Plan 16 of 161 3/26/2015 AD103 Demolition Third Floor Plan 17 of 161 3/26/2015 AD104 Demolition Attic and Roof Plans 18 of 161 3/26/2015 AD105 First Floor Reflected Ceiling Demolition Plan 19 of 161 3/26/2015 AD106 Second and Third Floor Reflected Ceiling Demolition Plans 20 of 161 3/26/2015 AD107 Asbestos/Mold Removal Plans 21 of 161 9/03/2015 AD108 Asbestos/Mold Removal Plans 22 of 161 3/26/2015 A-100 Crawl Space/Tunnel Plan 23 of 161 3/26/2015 A-101 First Floor Plan 24 of 161 3/26/2015 A-102 Second Floor Plan 25 of 161 3/26/2015 A-103 Third Floor Plan 26 of 161 3/26/2015 A-104 Attic Plan 27 of 161 3/26/2015 A-105 Roof Plan 28 of 161 3/26/2015 A-106 First Floor Reflected Ceiling Plan 29 of 161 3/26/2015 A-107 Second and Third Floor Reflected Ceiling Demolition Plans 30 of 161 9/3/2015 A-201 Exterior Demolition Elevations 31 of 161 3/26/2015 A-202 Exterior Demolition Elevations 32 of 161 3/26/2015 A-203 Exterior Elevations 33 of 161 3/26/2015 A-204 Exterior Elevations 34 of 161 3/26/2015 A-205 Interior Elevations 35 of 161 9/04/2015 A-401 Enlarged Plans 36 of 161 9/04/2015 A-402 Enlarged Plans 37 of 161 9/04/2015 A-403 Enlarged Plans 38 of 161 9/04/2015 A-404 Enlarged Plans, Sections, and Details 39 of 161 3/26/2015 A-501 Wall Types and Typical Partition Details 40 of 161 3/26/2015 A-502 Building and Wall Sections 41 of 161 3/26/2015 A-503 Casework Sections and Details 42 of 161 3/26/2015 A-601 Room Finish Schedule 43 of 161 3/26/2015 A-602 Door and Frame Schedule and Types 44 of 161 3/26/2015
A-701 Door and Frame Details 45 of 161 3/26/2015 A-702 Details 46 of 161 3/26/2015 A-703 Details 47 of 161 3/26/2015 AF101 Finish Plans 48 of 161 3/26/2015 AG101 Signage Plans 49 of 161 3/26/2015 AG601 Signage Schedules 50 of 161 3/26/2015 AG602 Signage Types 51 of 161 3/26/2015 FG101 Fire Protection General Notes, Schedules, & Symbols 52 of 161 3/26/2015 FD101 Fire Protection Demolition First Floor and 53 of 161 3/26/2015 Typical Dorm Suite Plans FD102 Fire Proction Demolition Second Floor Plan 54 of 161 3/26/2015 FD103 Fire Protection Demolition Third Floor Plan 55 of 161 3/26/2015 FX101 Fire Protection First Floor Plan and Typical Suite Plans 56 of 161 3/26/2015 FX102 Fire Protection Second Floor Plan 57 of 161 3/26/2015 FX103 Fire Protection Third Floor Plan 58 of 161 3/26/2015 FX201 Fire Protection Details and Schedules 59 of 161 3/26/2015 FA100 Fire Alarm Crawlspace Plan and Fire Alarm Symbols Legend 60 of 161 3/26/2015 FA101 Fire Alarm First Floor Plan 61 of 161 3/26/2015 FA102 Fire Alarm Second Floor Plan 62 of 161 3/26/2015 FA103 Fire Alarm Third Floor Plan 63 of 161 3/26/2015 FA104 Fire Alarm Attic Floor Plan 64 of 161 3/26/2015 FA201 Fire Alarm Details and Schedules 65 of 161 3/26/2015 S-100 Foundation/First Floor Slab Plan 66 of 161 3/26/2015 S-101 Second and Third Floor Slab Plans 67 of 161 3/26/2015 S-102 Attic Slab Plan 68 of 161 3/26/2015 S-501 Structural Details 69 of 161 9/03/2015 PG101 Plumbing Symbols Legend 70 of 161 3/26/2015 PS101 Plumbing Demolition Site Plan 71 of 161 3/26/2015 PS102 Plumbing Site Plan 72 of 161 3/26/2015 PD100 Plumbing Demolition Crawlspace Plan 73 of 161 3/26/2015 PD101 Plumbing Demolition First Floor and Typical Dorm Suite Plans 74 of 161 3/26/2015 PD102 Plumbing Demolition Second Floor Plan 75 of 161 3/26/2015 PD103 Plumbing Demolition Third Floor Plan 76 of 161 3/26/2015 PD104 Plumbing Demolition Attic Floor Plan 77 of 161 3/26/2015 PD105 Plumbing Demolition Roof Plan 78 of 161 3/26/2015 P-100 Sanitary Sewer and Vent Crawlspace Floor Plan 79 of 161 3/26/2015 P-101 Sanitary Sewer and Vent First Floor Plan 80 of 161 3/26/2015 P-102 Sanitary Sewer and Vent Second Floor Plan 81 of 161 3/26/2015 P-103 Sanitary Sewer and Vent Third Floor Plan 82 of 161 3/26/2015 P-104 Sanitary Sewer and Vent Attic Floor Plan 83 of 161 3/26/2015 P-105 Sanitary Sewer and Vent Roof Plan 84 of 161 3/26/2015 P-201 Domestic Water First Floor Plan 85 of 161 3/26/2015 P-202 Domestic Water Second Floor Plan 86 of 161 3/26/2015 P-203 Domestic Water Third Floor Plan 87 of 161 3/26/2015 P-301 Plumbing Enlarged Plans 88 of 161 3/26/2015 P-302 Plumbing Enlarged Plans 89 of 161 3/26/2015 P-401 Plumbing Riser Diagrams 90 of 161 3/26/2015
P-402 Plumbing Riser Diagrams 91 of 161 3/26/2015 P-403 Plumbing Riser Diagrams 92 of 161 3/26/2015 P-404 Plumbing Riser Diagrams 93 of 161 3/26/2015 P-405 Plumbing Riser Diagrams 94 of 161 3/26/2015 P-406 Plumbing Riser Diagrams 95 of 161 3/26/2015 P-407 Plumbing Riser Diagrams 96 of 161 3/26/2015 P-501 Plumbing Details 97 of 161 9/03/2015 P-601 Plumbing Fixture Schedules 98 of 161 3/26/2015 MG101 Mechanical Symbols Legend 99 of 161 3/26/2015 MG102 Mechanical General Notes 100 of 161 3/26/2015 MS101 Mechanical Demolition Site Plan 101 of 161 3/26/2015 MS102 Mechanical Site Plan 102 of 161 3/26/2015 MD100 Mechanical Demolition Crawlspace Plan 103 of 161 3/26/2015 MD101 Mechanical Demolition First Floor and 104 of 161 3/26/2015 Typical Dorm Suite Plans MD102 Mechanical Demolition Second Floor Plan 105 of 161 3/26/2015 MD103 Mechanical Tdemolition Third Floor Plan 106 of 161 3/26/2015 MD104 Mechanical Demolition Attic Floor Plan 107 of 161 3/26/2015 MD105 Mechanical Demolition Roof Plan 108 of 161 3/26/2015 MH100 Mechanical Crawlspace Plan 109 of 161 3/26/2015 MH101 Mechanical First Floor Plan 110 of 161 3/26/2015 MH102 Mechanical Second Floor Plan 111 of 161 3/26/2015 MH103 Mechanical Third Floor Plan 112 of 161 3/26/2015 MH104 Mechanical Attic Floor Plan 113 of 161 3/26/2015 MP100 Mechanical Piping Crawlspace Plan 114 of 161 3/26/2015 MP101 Mechanical Piping First Floor and Typical Dorm Suite Plans 115 of 161 3/26/2015 MP102 Mechanical Piping Second Floor Plan 116 of 161 3/26/2015 MP103 Mechanical Piping Third Floor Plan 117 of 161 3/26/2015 MP104 Mechanical Piping Attic Floor Plan 118 of 161 3/26/2015 M-301 Mechanical Enlarged Plans and Sections 119 of 161 3/26/2015 M-401 Mechanical Controls 120 of 161 3/26/2015 M-402 Mechanical Controls 121 of 161 3/26/2015 M-403 Mechanical Controls 122 of 161 3/26/2015 M-501 Mechanical Details 123 of 161 9/02/2015 M-502 Mechanical Details 124 of 161 3/26/2015 M-503 Mechanical Details 125 of 161 3/26/2015 M-504 Mechanical Details 126 of 161 3/26/2015 M-505 Mechanical Details 127 of 161 3/26/2015 M-601 Mechanical Schedules 128 of 161 3/26/2015 M-602 Mechanical Schedules 129 of 161 3/26/2015 M-603 Mechanical Schedules 130 of 161 3/26/2015 M-701 Mechanical Schematics 131 of 161 3/26/2015 M-702 Mechanical Duct Riser Diagram 132 of 161 3/26/2015 M-703 Mechanical Schematics 133 of 161 3/26/2015 EG101 Electrical Symbols Legend 134 of 161 3/26/2015 ES101 Electrical Site Plan 135 of 161 3/26/2015 ED100 Electrical Demolition Crawlspace Floor Plan 136 of 161 3/26/2015
ED101 Electrical Demolition First Floor and Typical Dorm Suite Plans 137 of 161 3/26/2015 ED102 Electrical Demolition Second Floor Plan 138 of 161 3/26/2015 ED103 Electrical Demolition Third Floor Plan 139 of 161 3/26/2015 ED104 Electrical Demolition Attic Floor Plan 140 of 161 3/26/2015 EL100 Lighting Crawlspace Floor Plan 141 of 161 3/26/2015 EL101 Lighting First Floor and Typical Dorm Suite Plans 142 of 161 3/26/2015 EL102 Lighting Second Floor Plan 143 of 161 3/26/2015 EL103 Lighting Third Floor Plan 144 of 161 3/26/2015 EL104 Lighting Attic Floor Plan 145 of 161 3/26/2015 EP100 Power Crawlspace Floor Plan 146 of 161 3/26/2015 EP101 Power First Floor and Typical Dorm Suite Plans 147 of 161 3/26/2015 EP102 Power Second Floor Plan 148 of 161 3/26/2015 EP103 Power Third Floor Plan 149 of 161 3/26/2015 EP104 Power Attic Floor Plan 150 of 161 3/26/2015 EY101 Special Systems Firt Floor and Typical Dorm Suite Plans 151 of 161 3/26/2015 EY102 Special Systems Second Floor 152 of 161 3/26/2015 EY103 Special Systems Third Floor 153 of 161 3/26/2015 EY201 Special Systems Riser Diagrams 154 of 161 3/26/2015 EY202 Special Systems Riser Diagrams 155 of 161 9/02/2015 EY203 Special Systems Riser Diagrams 156 of 161 3/26/2015 E-401 Electrical Riser Diagrams 157 of 161 3/26/2015 E-501 Electrical Details 158 of 161 3/26/2015 E-601 Electrical Schedules 159 of 161 3/26/2015 E-602 Electrical Schedules 160 of 161 3/26/2015 E-603 Electrical Schedules 161 of 161 3/26/2015
WAIVER GREEN PROCUREMENT FORM
(Documentation of Non Purchases)
This form is to be utilized by the contractor to record non-purchases of Green Procurement Products Listed on the EPA’s Web Site www.epa.gov/cpg/products.htm
ITEM:______________________________________________
I have determined that the following Affirmative Procurement Product was considered for purchase but will not be purchased for the following reasons:
Item is not available within a reasonable period of time.
Date Needed: _________________ Date Item would be available: _______________
Item fails to meet a performance standard in the specifications.
Specifically, Item Cost More than the Green Procurement Item.
Price of Green Procurement Item ________________________________________
Price of Non-Green Procurement Item ____________________________________
Contractor Name Contractor Signature Date
COR/Inspector Name COR/Inspector Signature Date
Contracting Officer Name Contracting Officer Signature Date http://www.epa.gov/cpg/products.htm
REPAIR/RECONFIGURE GRAY HALL DORM B222
GRAND FORKS AFB, NORTH DAKOTA
PROJECT NO. JFSD201152
TABLE OF CONTENTS
Division 0 – Procurement and Contracting Requirements Technical Provisions 01000-1; 46
Division 1 - General Requirements Summary of the Work 01 11 00-1; 2 Coordination 01 14 00-1; 2 Definitions and Standards 01 19 00-1; 2 Sustainability Requirements 01 33 29-1; 9 Attachment: Air Force Milcon Sustainability Requirement Scoresheet 5 pages Attachment: LEED 2009 Project Scorecard 3 pages Testing Laboratory Services 01 40 00-1; 2 Material and Equipment 01 60 00-1 Commissioning 019100-1;7
Division 2 - Site Work Site Demolition 02 20 00-1; 2 Building Demolition 02 41 00-1; 3 Asbestos Removal and Disposal 02 82 14-1; 4 Attachment: Asbestos and Lead-Based Paint Survey Report 28 Pages Mold Remediation 02 85 00-1; 11 Attachment: Mold Survey Report 11 Pages
Division 3 - Concrete Concrete Formwork 03 10 00-1; 2 Expansion and Contraction Joints 03 15 00-1 Concrete Reinforcement 03 20 00-1 Cast-In-Place Concrete 03 30 00-1; 4 Concrete Floor Sealer 03 31 12-1; 2 Cast Stone 03 45 00-1; 2
Division 4 – Masonry Unit Masonry 04 20 00-1; 6
Division 5 – Metals Metal Deck 05 30 00-1 Cold-Formed Metal Framing 05 40 00-1; 3 Metal Fabrications 05 50 00-1; 3
Division 6 – Wood, Plastics and Composites Rough Carpentry 06 10 00-1; 2
Finish Carpentry 06 20 00-1; 3 Wood Treatment 06 30 00-1 Architectural Casework 06 40 00-1; 4 Division 7 - Thermal and Moisture Protection Dampproofing System 07 10 00-1; 2 Building Insulation 07 20 00-1; 4 Manufactured Wall and Soffit Panels 07 42 13-1; 5 Membrane Roofing System 07 53 23-1; 2 Flashing and Sheet Metal 07 60 00-1; 7 Roof Accessories 07 72 00-1; 2 Joint Sealers 07 92 00-1; 4
Division 8 – Openings Metal Doors and Frames 08 11 13-1; 5 Aluminum Doors, Windows and Frames 08 11 16-1; 5 Wood Doors 08 14 00-1; 4 Access Doors 08 30 00-1 Aluminum Windows 08 52 10-1; 6 Hardware and Specialties 08 71 00-1; 6 Glazing 08 81 00-1; 4
Division 9 – Finishes-1 Color Schedule 09 06 90-1; 3 Gypsum Drywall 09 29 00-1; 6 Acoustical Treatment 09 51 00-1; 2 Resilient Flooring 09 65 00-1; 3 Carpet 09 68 00-1; 4 Painting 09 90 00-1; 4
Division 10 - Specialties Wall Protection 10 26 13-1 Toilet Accessories 10 28 13-1; 3 Specialty Signs 10 44 00-1; 4 Fire Fighting Devices 10 44 16-1 Postal Specialties 10 55 00-1; 2
Division 11 – Equipment Electric Kitchen Equipment 11 31 13-1
Division 12 - Furnishings Recessed Entrance Mats 12 48 13-1; 2 Blinds 12 51 00-1 Site Furnishings 12 93 00-1; 2
Divisions 13 thru 20 Not Used
Division 21 – Fire Suppression Fire Protection General Provisions 21 00 00-1; 8 Fire Protection 21 05 00-1; 12
Division 22 – Plumbing Basic Plumbing Materials and Methods 22 05 00-1; 17 Plumbing Insulation 22 07 00-1; 4 Plumbing Piping and Equipment 22 10 00-1; 8 Plumbing Fixtures 22 40 00-1; 4
Division 23 – Heating, Ventilating, and Air Conditioning Mechanical General Provisions 23 00 00-1; 6 Submittals 23 00 10-1; 2 Basic HVAC Materials and Methods 23 05 00-1; 20 Testing, Adjusting and Balancing 23 05 93-1; 4 HVAC Insulation 23 07 00-1; 6 Commissioning of HVAC Systems 23 08 00-1; 30 Electronic Control Systems and Facilities Management Systems 23 09 00-1; 11 Variable Frequency Drives 23 09 15-1; 5 Sequence of Operation 23 09 93-1 HVAC Pumps 23 20 00-1; 3 Hydronic Piping and Specialties 23 21 13-1; 13 Geothermal Loop Heat Exchanger (Loop Field) 23 21 15-1; 9 Hydronic Systems Treatment 23 25 00-1; 5 Geothermal Piping Systems Treatment 23 25 15-1; 4 Air Distribution 23 30 00-1; 13 Energy Recovery Ventilator Units 23 72 00-1; 6 Water-Source Heat Pumps 23 81 46-1; 6 HVAC Equipment 23 82 00-1; 9 Electric Cabinet and Unit Heaters 23 82 39-1; 3
Divisions 24 & 25 – Not Used
Division 26 – Electrical General Electrical 26 05 00-1; 7 Wires and Cables 26 05 19-1; 3 Grounding 26 05 26-1; 2 Supporting Devices 26 05 29-1; 3 Raceways 26 05 33-1; 5 Electrical Boxes and Fittings 26 05 34-1; 3 Electrical Identification 26 05 53-1; 4 Pad-Mounted, Liquid Filled, Medium-Voltage Transformers 26 12 19-1; 10 Switchboards 26 24 13-1; 3 Panelboards 26 24 16-1; 4 Wiring Devices 26 27 26-1; 4 Fuses 26 28 13-1; 2 Circuit and Motor Disconnects 26 28 16-1; 2
Luminaires 26 51 13-1; 6
Division 27 – Communications Telecommunication Conduit Systems 27 05 28-1 Telecommunication Cabling Systems 27 10 10-1; 5 Telephone Cabling System 27 15 10-1 Television System 27 41 33-1
Division 28 – Electronic Safety and Security Digital Addressable Fire Alarm System 28 31 11-1; 15
Divisions 29 & 30 – Not Used
Division 31 – Earthwork Earthwork 31 10 00-1; 3 Building Earthwork 31 10 10-1; 2
Division 32 – Exterior Improvements Pavement and Walks 32 16 23-1; 4 Lawns 32 92 00-1; 2
Divisions 33 thru 49 Not Used
(End of Summary of Changes)
This form is to be utilized by the contractor to record non-purchases of Green Procurement Products Listed on the EPA’s Web Site www.epa.gov/cpg/products.htm
File details come from the government source that posted it. Updated .