Attachment__3._JFSD201152_Material_Submittal_Schedule.pdf
PDF 87 KB Posted
- Attached to
- Repair/Reconfigure Gray Hall Dorm Bldg 222
- Solicitation number
- FA4659-16-R-0008
About this file
Section J 3 External Attachment- Material Submittal Schedule
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NO.
JFSD
201152
APPROVED DISAPPROVED
1 Contractor Warranty. Sec. 01000 Para. 3.3
Within 30 days of NTP
2 Base CE Work Clearance Request. Sec. 01000, Para. 4.1 3 As Required
3 Welding Certification AF Form 592, Sec. 01000, Para. 6.1
Within 10 days of NTP
4 Project Site Plan. Sec. 01000, Para. 7.2.1
Within 10 days of NTP
5 Dirt and Dust Control Plan. Sec. 01000, Para. 7.2.2
Within 10 days of NTP
6 Contractor's Health and Safety Plan. Sec. 01000, Para. 7.2.3
Prior to start of any work
Site Superintendent/ Project Manager Designation Letter. Sec.
01000, Para. 10.1.2 3 -30 days of BO
8 Site Conditions Photographs. Sec. 01000, Para. 12.5
Beneficial
Occupancy (BO)
Critical Path Method (CPM) Network Schedule. Sec. 01000, Para. 12.6.1 3
NLT + 30 days
BO
Schedule Showing Procurement Plans for Materials and
Equipment. Sec. 01000, Para. 12.6.2.1 3
NLT + 30 days
BO
11 As-Built Redline Markup Drawings Sect. 01000, Para. 12.8.1
NLT + 30 days
BO
12 Final As-Built Drawings. Sec. 01000, Para. 12.8.3
At Final
Inspection
13 Real Property Record - Form DD1354. Sec. 01000, Para. 12.9 1 NLT + 90 days
14 Environmental Pollution Control Plans. Sec. 01000, Para. 13.3.1 3 NLT + 90 days
15 Storm Water Protection Plan. Sec. 01000, Para. 13.5
16 Waste Disposal Plan. Sec. 01000, Para. 13.6
17 Hazardous Materials List, Sec. 01000, Para. 13.7
18 Spill Control Plan. Sec. 01000, Para. 13.8
19 Dust Control Plan. Sec. 01000, Para. 13.10
20 Contractor Quality Control Plan. Sec. 01000, Para. 14.4
21 O & M Manuals. Sec. 01000, Para. 16 1
22 SCHEDULE OF SUBMITTALS 3 01000
23 SUSTAINABILITY REQUIREMENTS 3 1 01 33 29
24 COMMISSIONING 3 01 91 00
25 SITE DEMOLITION 3 1 02 20 00
26 BUILDING DEMOLITION 3 1 02 41 00
27 ASBESTOS REMOVAL AND DISPOSAL 3 1 02 82 14
28 MOLD REMEDIATION 3 3 1 1 02 85 00
29 CONCRETE REINFORCEMENT 3 03 20 00
FOLLOW-UP
REQUIRED
SUBMITTAL
DATE
DATE
RECEIVED
IN
CONTRACT
ING
O T
H E
R M
A T
E R
IA
L O
R
D A
T A
S
E E
I N
D
IV
ID
U
L
S P
E C
S E
C T
IO
N
S
C O
L O
R S
E L E
C T
IO
N
M A
N U
F A
C T
U R
E
'S
E
C O
M M
E N
D A
T
IO
N S
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,
TYPE OF SUBMITTAL
C A
T A
L O
G D
A T
A
L
IN
E N
U M
B E
R
S A
M P
L E
S
C E
R T
IF
IC
A T
IO
N
F
C
M P
L
IA
N C
E A
N
O
S E
O U
T
DATE CONTRACTOR NOTIFIED
REMARKS
FINAL
APPROVAL
CONTRACTOR
RESUBMITTAL
O P
E R
A T
IN
G
T R
U C
T
IO
N S
DATE
TO
CIVIL
ENGR.
RETURN
SUSPENSE
DATE
S H
O P
D R
A W
IN
G
S
BEFORE CONSTR AFTER CONSTR
W A
R R
A N
T Y
C L O
S E
O U
T
SOLICITATION/CONTRACT NO.PROJECT TITLE
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
Repair/Reconfigure Gray Hall Dorm B222
Grand Forks AFB, North Dakota
SCHEDULE OF MATERIAL SUBMITTALS
(AF Form 66)
NO. OF COPIES REQUIRED
TO BE COMPLETED BY PROJECT ENGINEER
Repair/Reconfigure Gray Hall Dorm B222
Grand Forks AFB, ND JFSD201152 1 156-019
201152
APPROVED DISAPPROVED
FOLLOW-UP
REQUIRED
SUBMITTAL
DATE
DATE
RECEIVED
IN
CONTRACT
ING
O T
H E
R M
A T
E R
IA
L
T A
S
E E
I N
D
IV
ID
U
E C
S E
C T
IO
N
S
C O
L O
R S
E L E
C T
IO
N
M A
N U
F A
C T
U R
E
C O
M M
E N
D A
T
IO
N S
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,
TYPE OF SUBMITTAL
C A
T A
L O
G D
A T
A
L
IN
E N
U M
B E
R
S A
M P
L E
S
C E
R T
IF
IC
A T
IO
N
M P
L
IA
N C
E A
O
S E
O U
T
DATE CONTRACTOR NOTIFIED
REMARKS
FINAL
APPROVAL
CONTRACTOR
RESUBMITTAL
O P
E R
A T
T R
U C
T
IO
N S
DATE
TO
CIVIL
ENGR.
RETURN
SUSPENSE
DATE
S H
O P
D R
A W
IN
G
S
BEFORE CONSTR AFTER CONSTR
W A
R R
A N
T Y
C L O
S E
O U
T
SOLICITATION/CONTRACT NO.PROJECT TITLE
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
Repair/Reconfigure Gray Hall Dorm B222
Grand Forks AFB, North Dakota
SCHEDULE OF MATERIAL SUBMITTALS
(AF Form 66)
NO. OF COPIES REQUIRED
TO BE COMPLETED BY PROJECT ENGINEER
30 CONCRETE MIX DESIGN 3 1 03 30 00
31 CAST STONE 3 3 03 45 00
32 UNIT MASONRY 3 04 20 00
33 COLD-FORMED METAL FRAMING 3 3 05 40 00
34 METAL FABRICATIONS 3 05 50 00
35 FINISH CARPENTRY 3 3 3 3 06 20 00
36 ARCHITECTURAL CASEWORK 3 3 3 3 1 06 40 00
37 DAMPPROOFING SYSTEM 3 07 10 00
38 BUILDING INSULATION 3 07 20 00
39 MANUFACTURED WALL AND SOFFIT PANELS 3 3 3 07 42 13
40 MEMBRANE ROOFING SYSTEM 3 07 53 23
41 SHEET METAL FLASHING 3 3 1 07 60 00
42 ROOF ACCESSORIES 3 07 72 00
43 JOINT SEALERS 3 3 3 1 07 92 00
44 METAL DOORS AND FRAMES 3 3 1 08 11 13
45 ALUMINUM DOORS, WINDOWS AND FRAMES 3 3 3 1 1 08 11 16
46 WOOD DOORS 3 3 3 1 1 08 14 00
47 ACCESS DOORS 3 08 30 00
48 ALUMINUM WINDOWS 3 3 3 3 1 1 08 52 10
49 HARDWARE 3 3 08 71 00
50 GLASS 3 3 1 1 08 81 00
51 GYPSUM DRYWALL 3 3 1 09 29 00
52 ACOUSTIC CEILING TILE AND GRID 3 3 3 09 51 00
53 RESILIENT FLOORING 3 3 3 1 09 65 00
54 CARPET 3 3 3 3 1 1 09 68 00
55 PAINT AND STAIN 3 3 3 1 09 90 00
56 WALL PROTECTION 3 3 3 1 10 26 13
57 TOILET ACCESSORIES 3 10 28 13
58 SPECIALTY SIGNS 3 3 3 3 10 44 00
Grand Forks AFB, ND JFSD201152 2 156-019
201152
APPROVED DISAPPROVED
FOLLOW-UP
REQUIRED
SUBMITTAL
DATE
DATE
RECEIVED
IN
CONTRACT
ING
O T
H E
R M
A T
E R
IA
L
T A
S
E E
I N
D
IV
ID
U
E C
S E
C T
IO
N
S
C O
L O
R S
E L E
C T
IO
N
M A
N U
F A
C T
U R
E
C O
M M
E N
D A
T
IO
N S
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,
TYPE OF SUBMITTAL
C A
T A
L O
G D
A T
A
L
IN
E N
U M
B E
R
S A
M P
L E
S
C E
R T
IF
IC
A T
IO
N
M P
L
IA
N C
E A
O
S E
O U
T
DATE CONTRACTOR NOTIFIED
REMARKS
FINAL
APPROVAL
CONTRACTOR
RESUBMITTAL
O P
E R
A T
T R
U C
T
IO
N S
DATE
TO
CIVIL
ENGR.
RETURN
SUSPENSE
DATE
S H
O P
D R
A W
IN
G
S
BEFORE CONSTR AFTER CONSTR
W A
R R
A N
T Y
C L O
S E
O U
T
SOLICITATION/CONTRACT NO.PROJECT TITLE
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
Repair/Reconfigure Gray Hall Dorm B222
Grand Forks AFB, North Dakota
SCHEDULE OF MATERIAL SUBMITTALS
(AF Form 66)
NO. OF COPIES REQUIRED
TO BE COMPLETED BY PROJECT ENGINEER
59 POSTAL SPECIALTIES 3 10 55 00
60 ELECTRIC KITCHEN EQUIPMENT 3 3 11 31 13
61 BLINDS 3 3 12 51 00
62 RECESSED ENTRANCE MATS 3 3 3 3 3 12 48 13
63 SITE FURNISHINGS 3 3 3 12 93 00
FIRE SPRINKLER EQUIPMENT, LAYOUT DRAWINGS
AND CALCULATIONS
3 3 3 1 1 21 05 00
FIRE WATER SYSTEM PIPING MATERIALS PRODUCT
DATA
3 3 3 21 10 00
PLUMBING VALVES, THERMOMETERS, GAUGES,
VIBRATION ISOLATORS & ACCESS PANELS
3 3 3 22 05 00
PLUMBING INSULATION PRODUCT DATA AND
INSTALLATION INSTRUCTIONS
3 3 3 22 07 00
PLUMBING PIPING & EQUIPMENT, WIRING DIAGRAMS,
METHODS OF ASSEMBLY
3 3 3 22 10 00
69 NATURAL GAS PIPING & FITTINGS 3 3 3 22 10 00
70 PLUMBING FIXTURES & LAYOUT DRAWINGS 3 3 3 1 22 40 00
71 O & M MANUALS 1 23 00 00
72 RECORD DRAWINGS 1 23 00 00
73 PIPE & PIPE FITTINGS 3 3 3 23 05 00
VALVES, PIPE SPECIALTIES, METERS & GAUGES,
AND SUPPORTS & ANCHORS,
3 3 3 23 05 00
MECHANICAL IDENTIFICATION AND VIBRATION
CONTROL
3 3 3 23 05 00
76 TEST & BALANCE REPORTS 3 3 1 23 05 93
77 COMMISSIONING O F HVAC SYSTEMS 3 23 08 00
HVAC INSULATION DATA SHEETS AND MATERIAL
SCHEDULE
3 3 3 23 07 00
DDC CONTROL SYSTEMS INSTALLATION DRAWINGS
AND CONTROL SEQUENCES
3 3 3 23 09 00
80 DDC OPERATION AND MAINTENANCE MANUALS 1 1 23 09 00
81 VARIABLE FREQUENCY DRIVES 3 3 3 23 09 15
VARIABLE FREQUENCY DRIVES FIELD
REPORT/PARAMETERS AND SETTINGS
1 1 23 09 15
83 HVAC PUMPS 3 3 3 23 20 00
HYDRONIC PIPING & SPECIALTIES, AND LAYOUT
DRAWINGS
3 3 3 23 21 13
Grand Forks AFB, ND JFSD201152 3 156-019
201152
APPROVED DISAPPROVED
FOLLOW-UP
REQUIRED
SUBMITTAL
DATE
DATE
RECEIVED
IN
CONTRACT
ING
O T
H E
R M
A T
E R
IA
L
T A
S
E E
I N
D
IV
ID
U
E C
S E
C T
IO
N
S
C O
L O
R S
E L E
C T
IO
N
M A
N U
F A
C T
U R
E
C O
M M
E N
D A
T
IO
N S
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,
TYPE OF SUBMITTAL
C A
T A
L O
G D
A T
A
L
IN
E N
U M
B E
R
S A
M P
L E
S
C E
R T
IF
IC
A T
IO
N
M P
L
IA
N C
E A
O
S E
O U
T
DATE CONTRACTOR NOTIFIED
REMARKS
FINAL
APPROVAL
CONTRACTOR
RESUBMITTAL
O P
E R
A T
T R
U C
T
IO
N S
DATE
TO
CIVIL
ENGR.
RETURN
SUSPENSE
DATE
S H
O P
D R
A W
IN
G
S
BEFORE CONSTR AFTER CONSTR
W A
R R
A N
T Y
C L O
S E
O U
T
SOLICITATION/CONTRACT NO.PROJECT TITLE
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
Repair/Reconfigure Gray Hall Dorm B222
Grand Forks AFB, North Dakota
SCHEDULE OF MATERIAL SUBMITTALS
(AF Form 66)
NO. OF COPIES REQUIRED
TO BE COMPLETED BY PROJECT ENGINEER
85 GEOTHERMAL LOOP HEAT EXCHANGER 3 3 3 23 21 15
WELL DRILLING PROCEDURE, PRESSURE TESTING
PROCEDURE, AND AS BUILT DRWG'S
3 3 3 1 23 21 15
87 HYDRONIC SYSTEMS TREATMENT 3 3 3 1 1 23 25 00
DUCTWORK LAYOUT DRAWINGS, FILTERS, SMOKE
DAMPERS, AND FIRE DAMPERS
3 3 3 23 30 00
89 DIFFUSERS, REGISTERS, & GRILLES, AND LOUVERS 3 3 3 3 3 23 30 00
HIGH EFFICIENCY BOILER ACCESSORIES AND FLUE
STACKS
3 3 3 23 52 16
91 ENERGY RECOVERY VENTILATORS 3 3 3 1 1 1 23 72 00
92 WATER SOURCE HEAT PUMPS 3 3 3 1 1 1 23 81 46
93 FAN COILS AND HYDRONIC UNIT HEATERS 3 3 3 1 1 1 23 82 39
PAD-MOUNTED, LIQUID-FILLED, MEDIUM-VOLTAGE
TRANSFORMERS
3 3 3 1 1 1 26 12 19
WIRING DEVICES - SWITCHES, RECEPTACLES AND
DEVICE WALL PLATES
3 3 3 3 3 1 1 1 26 27 26
96 SWITCHBOARDS 3 3 3 1 1 1 26 24 13
97 PANELBOARDS 3 3 3 3 3 1 1 1 26 24 16
98 LIGHTING FIXTURES 3 3 3 1 1 1 26 51 13
99 FUSES 3 3 3 1 1 1 26 28 13
100 CIRCUIT AND MOTOR DISCONNECTS 3 3 3 1 1 1 26 28 16
101 TELECOMMUNICATION CABLING SYSTEM 3 3 3 1 1 1 27 10 10
102 FIRE ALARM SYSTEMS 3 3 3 1 1 1 28 31 11
103 OCCUPANCY SENSORS 3 3 3 1 1 1 SEE LIGHTING PLANS
104 CONCRETE MIX DESIGN 3 1 32 16 23
NOTE: This Submittal Schedule is for the Contractor's use in assembling and organizing the Submittals to be made to the Government. See individual specification sections for possible additional submittal requirements.
Grand Forks AFB, ND JFSD201152 4 156-019
File details come from the government source that posted it. Updated .