PROJECT NO.

JFSD

201152

APPROVED DISAPPROVED

1 Contractor Warranty. Sec. 01000 Para. 3.3

Within 30 days of NTP

2 Base CE Work Clearance Request. Sec. 01000, Para. 4.1 3 As Required

3 Welding Certification AF Form 592, Sec. 01000, Para. 6.1

Within 10 days of NTP

4 Project Site Plan. Sec. 01000, Para. 7.2.1

Within 10 days of NTP

5 Dirt and Dust Control Plan. Sec. 01000, Para. 7.2.2

Within 10 days of NTP

6 Contractor's Health and Safety Plan. Sec. 01000, Para. 7.2.3

Prior to start of any work

Site Superintendent/ Project Manager Designation Letter. Sec.

01000, Para. 10.1.2 3 -30 days of BO

8 Site Conditions Photographs. Sec. 01000, Para. 12.5

Beneficial

Occupancy (BO)

Critical Path Method (CPM) Network Schedule. Sec. 01000, Para. 12.6.1 3

NLT + 30 days

BO

Schedule Showing Procurement Plans for Materials and

Equipment. Sec. 01000, Para. 12.6.2.1 3

NLT + 30 days

BO

11 As-Built Redline Markup Drawings Sect. 01000, Para. 12.8.1

NLT + 30 days

BO

12 Final As-Built Drawings. Sec. 01000, Para. 12.8.3

At Final

Inspection

13 Real Property Record - Form DD1354. Sec. 01000, Para. 12.9 1 NLT + 90 days

14 Environmental Pollution Control Plans. Sec. 01000, Para. 13.3.1 3 NLT + 90 days

15 Storm Water Protection Plan. Sec. 01000, Para. 13.5

16 Waste Disposal Plan. Sec. 01000, Para. 13.6

17 Hazardous Materials List, Sec. 01000, Para. 13.7

18 Spill Control Plan. Sec. 01000, Para. 13.8

19 Dust Control Plan. Sec. 01000, Para. 13.10

20 Contractor Quality Control Plan. Sec. 01000, Para. 14.4

21 O & M Manuals. Sec. 01000, Para. 16 1

22 SCHEDULE OF SUBMITTALS 3 01000

23 SUSTAINABILITY REQUIREMENTS 3 1 01 33 29

24 COMMISSIONING 3 01 91 00

25 SITE DEMOLITION 3 1 02 20 00

26 BUILDING DEMOLITION 3 1 02 41 00

27 ASBESTOS REMOVAL AND DISPOSAL 3 1 02 82 14

28 MOLD REMEDIATION 3 3 1 1 02 85 00

29 CONCRETE REINFORCEMENT 3 03 20 00

FOLLOW-UP

REQUIRED

SUBMITTAL

DATE

DATE

RECEIVED

IN

CONTRACT

ING

O T

H E

R M

A T

E R

IA

L O

R

D A

T A

S

E E

I N

D

IV

ID

U

L

S P

E C

S E

C T

IO

N

S

C O

L O

R S

E L E

C T

IO

N

M A

N U

F A

C T

U R

E

'S

E

C O

M M

E N

D A

T

IO

N S

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,

TYPE OF SUBMITTAL

C A

T A

L O

G D

A T

A

L

IN

E N

U M

B E

R

S A

M P

L E

S

C E

R T

IF

IC

A T

IO

N

F

C

M P

L

IA

N C

E A

N

O

S E

O U

T

DATE CONTRACTOR NOTIFIED

REMARKS

FINAL

APPROVAL

CONTRACTOR

RESUBMITTAL

O P

E R

A T

IN

G

T R

U C

T

IO

N S

DATE

TO

CIVIL

ENGR.

RETURN

SUSPENSE

DATE

S H

O P

D R

A W

IN

G

S

BEFORE CONSTR AFTER CONSTR

W A

R R

A N

T Y

C L O

S E

O U

T

SOLICITATION/CONTRACT NO.PROJECT TITLE

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

Repair/Reconfigure Gray Hall Dorm B222

Grand Forks AFB, North Dakota

SCHEDULE OF MATERIAL SUBMITTALS

(AF Form 66)

NO. OF COPIES REQUIRED

TO BE COMPLETED BY PROJECT ENGINEER

Repair/Reconfigure Gray Hall Dorm B222

Grand Forks AFB, ND JFSD201152 1 156-019

201152

APPROVED DISAPPROVED

FOLLOW-UP

REQUIRED

SUBMITTAL

DATE

DATE

RECEIVED

IN

CONTRACT

ING

O T

H E

R M

A T

E R

IA

L

T A

S

E E

I N

D

IV

ID

U

E C

S E

C T

IO

N

S

C O

L O

R S

E L E

C T

IO

N

M A

N U

F A

C T

U R

E

C O

M M

E N

D A

T

IO

N S

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,

TYPE OF SUBMITTAL

C A

T A

L O

G D

A T

A

L

IN

E N

U M

B E

R

S A

M P

L E

S

C E

R T

IF

IC

A T

IO

N

M P

L

IA

N C

E A

O

S E

O U

T

DATE CONTRACTOR NOTIFIED

REMARKS

FINAL

APPROVAL

CONTRACTOR

RESUBMITTAL

O P

E R

A T

T R

U C

T

IO

N S

DATE

TO

CIVIL

ENGR.

RETURN

SUSPENSE

DATE

S H

O P

D R

A W

IN

G

S

BEFORE CONSTR AFTER CONSTR

W A

R R

A N

T Y

C L O

S E

O U

T

SOLICITATION/CONTRACT NO.PROJECT TITLE

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

Repair/Reconfigure Gray Hall Dorm B222

Grand Forks AFB, North Dakota

SCHEDULE OF MATERIAL SUBMITTALS

(AF Form 66)

NO. OF COPIES REQUIRED

TO BE COMPLETED BY PROJECT ENGINEER

30 CONCRETE MIX DESIGN 3 1 03 30 00

31 CAST STONE 3 3 03 45 00

32 UNIT MASONRY 3 04 20 00

33 COLD-FORMED METAL FRAMING 3 3 05 40 00

34 METAL FABRICATIONS 3 05 50 00

35 FINISH CARPENTRY 3 3 3 3 06 20 00

36 ARCHITECTURAL CASEWORK 3 3 3 3 1 06 40 00

37 DAMPPROOFING SYSTEM 3 07 10 00

38 BUILDING INSULATION 3 07 20 00

39 MANUFACTURED WALL AND SOFFIT PANELS 3 3 3 07 42 13

40 MEMBRANE ROOFING SYSTEM 3 07 53 23

41 SHEET METAL FLASHING 3 3 1 07 60 00

42 ROOF ACCESSORIES 3 07 72 00

43 JOINT SEALERS 3 3 3 1 07 92 00

44 METAL DOORS AND FRAMES 3 3 1 08 11 13

45 ALUMINUM DOORS, WINDOWS AND FRAMES 3 3 3 1 1 08 11 16

46 WOOD DOORS 3 3 3 1 1 08 14 00

47 ACCESS DOORS 3 08 30 00

48 ALUMINUM WINDOWS 3 3 3 3 1 1 08 52 10

49 HARDWARE 3 3 08 71 00

50 GLASS 3 3 1 1 08 81 00

51 GYPSUM DRYWALL 3 3 1 09 29 00

52 ACOUSTIC CEILING TILE AND GRID 3 3 3 09 51 00

53 RESILIENT FLOORING 3 3 3 1 09 65 00

54 CARPET 3 3 3 3 1 1 09 68 00

55 PAINT AND STAIN 3 3 3 1 09 90 00

56 WALL PROTECTION 3 3 3 1 10 26 13

57 TOILET ACCESSORIES 3 10 28 13

58 SPECIALTY SIGNS 3 3 3 3 10 44 00

Grand Forks AFB, ND JFSD201152 2 156-019

201152

APPROVED DISAPPROVED

FOLLOW-UP

REQUIRED

SUBMITTAL

DATE

DATE

RECEIVED

IN

CONTRACT

ING

O T

H E

R M

A T

E R

IA

L

T A

S

E E

I N

D

IV

ID

U

E C

S E

C T

IO

N

S

C O

L O

R S

E L E

C T

IO

N

M A

N U

F A

C T

U R

E

C O

M M

E N

D A

T

IO

N S

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,

TYPE OF SUBMITTAL

C A

T A

L O

G D

A T

A

L

IN

E N

U M

B E

R

S A

M P

L E

S

C E

R T

IF

IC

A T

IO

N

M P

L

IA

N C

E A

O

S E

O U

T

DATE CONTRACTOR NOTIFIED

REMARKS

FINAL

APPROVAL

CONTRACTOR

RESUBMITTAL

O P

E R

A T

T R

U C

T

IO

N S

DATE

TO

CIVIL

ENGR.

RETURN

SUSPENSE

DATE

S H

O P

D R

A W

IN

G

S

BEFORE CONSTR AFTER CONSTR

W A

R R

A N

T Y

C L O

S E

O U

T

SOLICITATION/CONTRACT NO.PROJECT TITLE

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

Repair/Reconfigure Gray Hall Dorm B222

Grand Forks AFB, North Dakota

SCHEDULE OF MATERIAL SUBMITTALS

(AF Form 66)

NO. OF COPIES REQUIRED

TO BE COMPLETED BY PROJECT ENGINEER

59 POSTAL SPECIALTIES 3 10 55 00

60 ELECTRIC KITCHEN EQUIPMENT 3 3 11 31 13

61 BLINDS 3 3 12 51 00

62 RECESSED ENTRANCE MATS 3 3 3 3 3 12 48 13

63 SITE FURNISHINGS 3 3 3 12 93 00

FIRE SPRINKLER EQUIPMENT, LAYOUT DRAWINGS

AND CALCULATIONS

3 3 3 1 1 21 05 00

FIRE WATER SYSTEM PIPING MATERIALS PRODUCT

DATA

3 3 3 21 10 00

PLUMBING VALVES, THERMOMETERS, GAUGES,

VIBRATION ISOLATORS & ACCESS PANELS

3 3 3 22 05 00

PLUMBING INSULATION PRODUCT DATA AND

INSTALLATION INSTRUCTIONS

3 3 3 22 07 00

PLUMBING PIPING & EQUIPMENT, WIRING DIAGRAMS,

METHODS OF ASSEMBLY

3 3 3 22 10 00

69 NATURAL GAS PIPING & FITTINGS 3 3 3 22 10 00

70 PLUMBING FIXTURES & LAYOUT DRAWINGS 3 3 3 1 22 40 00

71 O & M MANUALS 1 23 00 00

72 RECORD DRAWINGS 1 23 00 00

73 PIPE & PIPE FITTINGS 3 3 3 23 05 00

VALVES, PIPE SPECIALTIES, METERS & GAUGES,

AND SUPPORTS & ANCHORS,

3 3 3 23 05 00

MECHANICAL IDENTIFICATION AND VIBRATION

CONTROL

3 3 3 23 05 00

76 TEST & BALANCE REPORTS 3 3 1 23 05 93

77 COMMISSIONING O F HVAC SYSTEMS 3 23 08 00

HVAC INSULATION DATA SHEETS AND MATERIAL

SCHEDULE

3 3 3 23 07 00

DDC CONTROL SYSTEMS INSTALLATION DRAWINGS

AND CONTROL SEQUENCES

3 3 3 23 09 00

80 DDC OPERATION AND MAINTENANCE MANUALS 1 1 23 09 00

81 VARIABLE FREQUENCY DRIVES 3 3 3 23 09 15

VARIABLE FREQUENCY DRIVES FIELD

REPORT/PARAMETERS AND SETTINGS

1 1 23 09 15

83 HVAC PUMPS 3 3 3 23 20 00

HYDRONIC PIPING & SPECIALTIES, AND LAYOUT

DRAWINGS

3 3 3 23 21 13

Grand Forks AFB, ND JFSD201152 3 156-019

201152

APPROVED DISAPPROVED

FOLLOW-UP

REQUIRED

SUBMITTAL

DATE

DATE

RECEIVED

IN

CONTRACT

ING

O T

H E

R M

A T

E R

IA

L

T A

S

E E

I N

D

IV

ID

U

E C

S E

C T

IO

N

S

C O

L O

R S

E L E

C T

IO

N

M A

N U

F A

C T

U R

E

C O

M M

E N

D A

T

IO

N S

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,

TYPE OF SUBMITTAL

C A

T A

L O

G D

A T

A

L

IN

E N

U M

B E

R

S A

M P

L E

S

C E

R T

IF

IC

A T

IO

N

M P

L

IA

N C

E A

O

S E

O U

T

DATE CONTRACTOR NOTIFIED

REMARKS

FINAL

APPROVAL

CONTRACTOR

RESUBMITTAL

O P

E R

A T

T R

U C

T

IO

N S

DATE

TO

CIVIL

ENGR.

RETURN

SUSPENSE

DATE

S H

O P

D R

A W

IN

G

S

BEFORE CONSTR AFTER CONSTR

W A

R R

A N

T Y

C L O

S E

O U

T

SOLICITATION/CONTRACT NO.PROJECT TITLE

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

Repair/Reconfigure Gray Hall Dorm B222

Grand Forks AFB, North Dakota

SCHEDULE OF MATERIAL SUBMITTALS

(AF Form 66)

NO. OF COPIES REQUIRED

TO BE COMPLETED BY PROJECT ENGINEER

85 GEOTHERMAL LOOP HEAT EXCHANGER 3 3 3 23 21 15

WELL DRILLING PROCEDURE, PRESSURE TESTING

PROCEDURE, AND AS BUILT DRWG'S

3 3 3 1 23 21 15

87 HYDRONIC SYSTEMS TREATMENT 3 3 3 1 1 23 25 00

DUCTWORK LAYOUT DRAWINGS, FILTERS, SMOKE

DAMPERS, AND FIRE DAMPERS

3 3 3 23 30 00

89 DIFFUSERS, REGISTERS, & GRILLES, AND LOUVERS 3 3 3 3 3 23 30 00

HIGH EFFICIENCY BOILER ACCESSORIES AND FLUE

STACKS

3 3 3 23 52 16

91 ENERGY RECOVERY VENTILATORS 3 3 3 1 1 1 23 72 00

92 WATER SOURCE HEAT PUMPS 3 3 3 1 1 1 23 81 46

93 FAN COILS AND HYDRONIC UNIT HEATERS 3 3 3 1 1 1 23 82 39

PAD-MOUNTED, LIQUID-FILLED, MEDIUM-VOLTAGE

TRANSFORMERS

3 3 3 1 1 1 26 12 19

WIRING DEVICES - SWITCHES, RECEPTACLES AND

DEVICE WALL PLATES

3 3 3 3 3 1 1 1 26 27 26

96 SWITCHBOARDS 3 3 3 1 1 1 26 24 13

97 PANELBOARDS 3 3 3 3 3 1 1 1 26 24 16

98 LIGHTING FIXTURES 3 3 3 1 1 1 26 51 13

99 FUSES 3 3 3 1 1 1 26 28 13

100 CIRCUIT AND MOTOR DISCONNECTS 3 3 3 1 1 1 26 28 16

101 TELECOMMUNICATION CABLING SYSTEM 3 3 3 1 1 1 27 10 10

102 FIRE ALARM SYSTEMS 3 3 3 1 1 1 28 31 11

103 OCCUPANCY SENSORS 3 3 3 1 1 1 SEE LIGHTING PLANS

104 CONCRETE MIX DESIGN 3 1 32 16 23

NOTE: This Submittal Schedule is for the Contractor's use in assembling and organizing the Submittals to be made to the Government. See individual specification sections for possible additional submittal requirements.

Grand Forks AFB, ND JFSD201152 4 156-019