Schedule_Disclaimer.pdf

PDF 96 KB Posted

Attached to
Repair TE/PT Roads
Solicitation number
FA462618R0012
Issued by

View the file

Other files

File Type Posted
Q&A_7_June_18.pdf PDF
Q&A_6_June_18.pdf PDF
PreProposal_SiteVisit_Minutes.pdf PDF
Q&A.pdf PDF
Amendment_0001.pdf PDF
Attach_9_Subcontractor_Consent.doc DOC document
Attach_4_Drawings.zip ZIP file
Attach_1_Specifications_Combined.pdf PDF
Attach_7_Special_Contract_Requirements.docx DOCX document
Attach_2_Submittal_Schedule_TE_PT_Road.xlsx XLSX spreadsheet
Attach_6_Installation_Perimeter_Access.pdf PDF
Attach_3_SCHEDULE_OF_DRAWINGS.pdf PDF
Attach_8_Past_Performance_Questionaire.docx DOCX document
FA4626-18-R-0012.pdf PDF
Attach_5_Wage_Determination.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The actual contract performance period will most likely run beyond the Sept 2018 date. The contractor will be provided an updated calendar to address the work hour restrictions during the actual performance period. The attached schedules are provided to show how the typical CATM schedule will affect access to the work site so that the contractor can better anticipate the affect it will have on their work schedule.

SARAH R. MARKOVICH

Contract Administrator

2018-05-30T08:22:41-0600
MARKOVICH.SARAH.RENEE.1085521450