Schedule_Disclaimer.pdf
PDF 96 KB Posted
- Attached to
- Repair TE/PT Roads
- Solicitation number
- FA462618R0012
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q&A_7_June_18.pdf | ||
| Q&A_6_June_18.pdf | ||
| PreProposal_SiteVisit_Minutes.pdf | ||
| Q&A.pdf | ||
| Amendment_0001.pdf | ||
| Attach_9_Subcontractor_Consent.doc | DOC document | |
| Attach_4_Drawings.zip | ZIP file | |
| Attach_1_Specifications_Combined.pdf | ||
| Attach_7_Special_Contract_Requirements.docx | DOCX document | |
| Attach_2_Submittal_Schedule_TE_PT_Road.xlsx | XLSX spreadsheet | |
| Attach_6_Installation_Perimeter_Access.pdf | ||
| Attach_3_SCHEDULE_OF_DRAWINGS.pdf | ||
| Attach_8_Past_Performance_Questionaire.docx | DOCX document | |
| FA4626-18-R-0012.pdf | ||
| Attach_5_Wage_Determination.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
The actual contract performance period will most likely run beyond the Sept 2018 date. The contractor will be provided an updated calendar to address the work hour restrictions during the actual performance period. The attached schedules are provided to show how the typical CATM schedule will affect access to the work site so that the contractor can better anticipate the affect it will have on their work schedule.