Q&A_7_June_18.pdf
PDF 74 KB Posted
- Attached to
- Repair TE/PT Roads
- Solicitation number
- FA462618R0012
About this file
Question and Answer
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q&A_6_June_18.pdf | ||
| Schedule_Disclaimer.pdf | ||
| PreProposal_SiteVisit_Minutes.pdf | ||
| Q&A.pdf | ||
| Amendment_0001.pdf | ||
| Attach_2_Submittal_Schedule_TE_PT_Road.xlsx | XLSX spreadsheet | |
| Attach_1_Specifications_Combined.pdf | ||
| Attach_7_Special_Contract_Requirements.docx | DOCX document | |
| Attach_9_Subcontractor_Consent.doc | DOC document | |
| Attach_4_Drawings.zip | ZIP file | |
| Attach_6_Installation_Perimeter_Access.pdf | ||
| Attach_3_SCHEDULE_OF_DRAWINGS.pdf | ||
| Attach_8_Past_Performance_Questionaire.docx | DOCX document | |
| FA4626-18-R-0012.pdf | ||
| Attach_5_Wage_Determination.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question: What does the DEQ utility permit cover? For example will the contractor need to file for a SWPPP permit through DEQ, and will the contractor be able to transfer the permit to the owner after construction? Will the contractor need to get a dewatering permit?
Answer: The DEQ permit is for the re-route of the waterline only. This permit requires the contractor to install the waterline according to the approved plans and submit a certification tothe State saying that the waterline was installed in accordance with the plans and specifications that were approved as well as submitting as-built drawings to the State. This permit does not cover any other activities that may require permitting by the contractor. Any other permitting required is the responsibility of the Contractor.
SARAH R. MARKOVICH
Contract Administrator
| 2018-06-07T13:20:10-0600 | |
| MARKOVICH.SARAH.RENEE.1085521450 |