Q&A_7_June_18.pdf

PDF 74 KB Posted

Attached to
Repair TE/PT Roads
Solicitation number
FA462618R0012
Issued by

About this file

Question and Answer

View the file

Other files

File Type Posted
Q&A_6_June_18.pdf PDF
Schedule_Disclaimer.pdf PDF
PreProposal_SiteVisit_Minutes.pdf PDF
Q&A.pdf PDF
Amendment_0001.pdf PDF
Attach_2_Submittal_Schedule_TE_PT_Road.xlsx XLSX spreadsheet
Attach_1_Specifications_Combined.pdf PDF
Attach_7_Special_Contract_Requirements.docx DOCX document
Attach_9_Subcontractor_Consent.doc DOC document
Attach_4_Drawings.zip ZIP file
Attach_6_Installation_Perimeter_Access.pdf PDF
Attach_3_SCHEDULE_OF_DRAWINGS.pdf PDF
Attach_8_Past_Performance_Questionaire.docx DOCX document
FA4626-18-R-0012.pdf PDF
Attach_5_Wage_Determination.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question: What does the DEQ utility permit cover? For example will the contractor need to file for a SWPPP permit through DEQ, and will the contractor be able to transfer the permit to the owner after construction? Will the contractor need to get a dewatering permit?

Answer: The DEQ permit is for the re-route of the waterline only. This permit requires the contractor to install the waterline according to the approved plans and submit a certification tothe State saying that the waterline was installed in accordance with the plans and specifications that were approved as well as submitting as-built drawings to the State. This permit does not cover any other activities that may require permitting by the contractor. Any other permitting required is the responsibility of the Contractor.

SARAH R. MARKOVICH

Contract Administrator

2018-06-07T13:20:10-0600