Attach_2_Submittal_Schedule_TE_PT_Road.xlsx

XLSX spreadsheet 27 KB Posted

Attached to
Repair TE/PT Roads
Solicitation number
FA462618R0012
Issued by

About this file

Submittal Schedule

View the file

Other files

File Type Posted
Q&A_7_June_18.pdf PDF
Q&A_6_June_18.pdf PDF
Schedule_Disclaimer.pdf PDF
PreProposal_SiteVisit_Minutes.pdf PDF
Q&A.pdf PDF
Amendment_0001.pdf PDF
Attach_9_Subcontractor_Consent.doc DOC document
Attach_4_Drawings.zip ZIP file
Attach_1_Specifications_Combined.pdf PDF
Attach_7_Special_Contract_Requirements.docx DOCX document
Attach_6_Installation_Perimeter_Access.pdf PDF
Attach_3_SCHEDULE_OF_DRAWINGS.pdf PDF
Attach_8_Past_Performance_Questionaire.docx DOCX document
FA4626-18-R-0012.pdf PDF
Attach_5_Wage_Determination.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE OF MATERIALS SUBMITTALSProject NumberProject Title:Solicitation/Contract No.
NZAS 15-0040Repair Missile TE/PT RoadFA4626-18-R-0012
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
Number of Copies Required
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONTEST REPORTSMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSNOTIFICATIONOTHERREQUIRED SUBMISSION DATE (BY CONTRACTOR)DATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
APPROVEDDIS- APPROVED
DIVISION 01 - GENERAL REQUIREMENTS
101 00 00 General Requirements - 3.5 As-Built Field Data23 D PTFI
201 00 00 General Requirements - 3.5 Final As Built Data130 D AFI
301 00 00 General Requirements - 3.7 O&M Manuals2130 D AFI
401 00 00 General Requirements - 3.8 Equipment List110 D PTFI
501 00 00 General Requirements - 3.8 Guarantees130 D AFI
601 00 00 General Requirements - 3.11 Start of Work NotificationX5 D - PTSW
701 00 00 General Requirements - 3.12 Pre Final InspectionX14 D PTE
801 00 00 General Requirements - 3.12 Final InspectionX14 D PTFI
901 00 00 General Requirements - 3.13 Work Clearance Request (AF Form 103)X14 D PTSW
1001 00 00 General Requirements - 3.13 Digging Near UtilitiesX3 D PTE
1101 00 00 General Requirements - 3.14 Utility OutagesX14 D PTE
1201 00 00 General Requirements - 3.18 Quality Control Plan and Specified Quality Control SubmittalsX10 D ANP
1301 00 00 General Requirements - 3.19 Project Schedule Form 3064Xbi-monthly
1401 00 00 General Requirements - 3.19 Project Report Form 3065Xbi-monthly
1501 00 00 General Requirements - 3.20 Property Inventory Checklist Form 1354X10 D PTFI
1601 00 00 General Requirements - 3.26 Nuclear DensometersX30 D PTSW
1701 00 10 Site Security - 1.1 Contractor Entry Authorization List (CEAL)X14 D PTSWEAL
1801 36 00 Environmental Protection - 2.3 Copies of Environmental PermitsX5 D PTSW
1901 36 00 Environmental Protection - 4.3 Notice of Intent PackageX10 D PTSW
2001 36 00 Environmental Protection - 8.1.1 List of Hazardous Materials (1360-5) with MSDSsX10 D PTSW
2101 36 00 Environmental Protection - 8.1.2 Authorization Request Worksheets with MSDSsX10 D PTSW
2201 36 00 Environmental Protection - 8.1.4 Final Report of Actual Quantities of Hazardous MaterialsX10 D PTFI
2301 36 00 Environmental Protection - 11.3 Report of Solid Waste Disposal and Diversion Attac. 4 (1360-4)Xby 10th of month
2401 36 00 Environmental Protection - 11.3 Waste Management Plan (Attachment 1)X10 D AFI
2501 36 00 Environmental Protection - Recovered Materials Written Determination Form (Attachment 2)X10 D AFI
2601 36 00 Environmental Protection - Recycled Material Use Report (Attachment 3)X10 D AFI
2701 36 00 Environmental Protection - Monthly Report of Solid Waste Disposal & Diversion (Attachment 4)XMonthly
2801 36 00 Environmental Protection - Hazardous Material List (Attachment 5)X10 D AFI
2901 50 00 - Temp. Construction Facilities - 1.3 Dust Control Responsible PersonX10 D ANP
3001 55 26 Traffic Control - 1.1 Traffic Control PlanX10 D PTSW
DIVISION 03 - CONCRETE
3103 30 00 1.3.A Concrete Mix DesignX30 D PSW10 D PTSW
3203 30 00 1.3.B Product DataXXXPSW BBCW10 D PTSW
3303 30 00 1.3.C Shop DrawingXPSW BBCW10 D PTSW
3403 30 00 1.3.D Cold Weather Placing PlanXPSW BBCW10 D PTSW
3503 30 00 1.3.E Hot Weather Placing PlanXPSW BBCW10 D PTSW
3603 30 00 1.3.F Batch TicketsXBD10 D PTSW
3703 30 00 1.3.G Preconstruction SubmittalsXXPSW BBCW10 D PTSW
DIVISION 05 - METAL FABRICATIONS
3805 12 00 Structural Steel - 1.4. Fabrication Drawings including description fo connections310 D PTSW
3905 12 00 Structural Steel - 1.4. Shop PrimerX10 D PTSW
4005 12 00 Structural Steel - 1.4 Welding electrodes and rodsX10 D PTSW
4105 12 00 Structural Steel - 1.4 Bolts, nuts, and washerX10 D PTSW
4205 12 00 Structural Steel - 1.4 Weld Inspection ReportsX
4305 12 00 Structural Steel - 1.4 Bolt Testing ReportsX
DIVISION 09 - FINISHES
4409 91 00 Painting -1.2 Paint Coating SystemsX10 D PTSW
4509 91 00 Painting - 1.2 ColorX10 D PTSW
4609 91 00 Painting - 1.2 Applicator's QualificationsX10 D PTSW
4709 91 00 Painting - 1.2 Qualifications Testing laboratory for coatingsX10 D PTSW
4809 91 00 Painting - 1.2 Application InstructionsX
4909 91 00 Painting - 1.2 Detail Mixing InstructionsX
5009 91 00 Painting - 1.2 Manufactuer's Material Safety Data SheetsX
5109 91 00 Painting - 1.2 O&M Data CoatingX
DIVISION 31 - EARTHWORK
5231 00 00 Earthwork - 3.1 Borrow Material310 D PTSW
5331 00 00 Earthwork - 3.2 Backfill11 D ATT
5431 00 00 Earthwork - 3.3 Field Density Testing Results11 D ATT
5531 00 00 Earthwork - 3.3 Moisture-Density Curves110 D PTSW
5631 05 19 Geosynthetics for Earthwork - 1.3 Certification of Geotextile or GeogridX10 D PTSW
5731 23 33 Trenching and Backfilling - 2.1 Type I Bedding Gradation & Proctor310 D PTSW
5831 23 33 Trenching and Backfilling - 2.2 Type II Bedding Gradation & Proctor310 D PTSW
5931 23 33 Trenching and Backfilling - 2.4 Plastic Marking Tape310 D PTSW
6031 23 33 Trenching and Backfilling - 2.3 Trench Backfill Compaction Test ResultsX1 D ATT
6131 23 33 Trenching and Backfilling - Utility NoticesX10 D PTSW
6231 23 33 Trenching and Backfilling - Backfill Material Analysis and ProctorX10 D PTSW
6331 37 00 RipRap - Class IX
DIVISION 32 - EXTERIOR IMPROVEMENTS
6432 10 00 Asphaltic Concrete Pavement - 1.1.1 Crushed Gravel Material PropertiesX10 D PTSW
6532 10 00 Asphaltic Concrete Pavement - 2.1 Plant Mix GravelX10 D PTSW
6632 10 00 Asphaltic Concrete Pavement - 2.2 Asphalt CementX10 D PTSW
6732 10 00 Asphaltic Concrete Pavement - 2.3 Tack CoatX10 D PTSW
6832 10 00 Asphaltic Concrete Pavement - 1.1.5 Asphaltic Mix DesignX10 D PTSW
6932 10 00 Asphaltic Concrete Pavement - 1.1.6 Quality Control Test ResutlsX1 D ATT
7032 11 23 Aggregate and/or Graded Crushed Aggregate Base Course - 2.2 & 2.3 Crushed Base/Leveling Gravel Gradation & Proctor310 D PTSW
7132 11 23 Aggregate and/or Graded Crushed Aggregate Base Course - 3.3 Field Density TestingX1 D ATT
7232 15 00 Aggregate Surface Course - 2.2 & 2.3 Crushed Aggregate Surfacing Material Gradation & Proctor310 D PTSW
7332 15 00 Aggregate Surface Course - 3.3 Field Density TestingX1 D ATT
7432 31 13 Barbed Wire Fence - 2.2 Barbed Wire310 D PTSW
7532 31 13 Barbed Wire Fence - 2.2 Fasteners310 D PTSW
7632 31 13 Barbed Wire Fence - 2.3 Line Braces310 D PTSW
7732 31 13 Barbed Wire Fence - 2..4 Posts310 D PTSW
7832 92 19 Seeding - 2.1 Seed Mixture Certificate310 D PTSW
7932 92 19 Seeding - 2.2 Topsoil310 D PTSW
8032 92 19 Seeding - 2.3 Fertilizer310 D PTSW
DIVISION 33 - UTILITIES
8133 11 00 Water Utility Distribution Piping - 1.2 Certification310 D PTSW
8233 11 00 Water Utility Distribution Piping - 1.4A PVC Pipe with Joints310 D PTSW
8333 11 00 Water Utility Distribution Piping - 1.4B Fittings310 D PTSW
8433 11 00 Water Utility Distribution Piping - 1.4C Polyethylene Wrap310 D PTSW
8533 11 00 Water Utility Distribution Piping - 1.4D Flexible or Sleeve Couplings310 D PTSW
8633 11 00 Water Utility Distribution Piping - 1.4E Hydrostatic Test Results331D ATT
8733 11 00 Water Utility Distribution Piping - 1.4F Bacteriological Test Results331D ATT
8833 11 00 Water Utility Distribution Piping - 1.4G Wax Tape System310 D PTSW
8933 11 00 Water Utility Distribution Piping - 1.4HTracer Wire10 D PTSW
9033 11 00 Water Utility Distribution Pipig - 1.4.I Tracer Wire Access Box
9133 11 00 Water Utility Distribution Piping - 1.4J Plastic Marking Tape10 D PTSW
9233 12 16 Underground Gate Valves - 1.2A Gate Valve and Valve Boxes310 D PTSW
9333 40 00 Storm Drains - 1.2 Storm Drain Culvert Pipe310 D PTSW
DIVISION 34 - TRANSPORTATION
9434 71 19 Flexible Delineators - 1.2 Flexible Delineators310 D PTSW
9534 71 19 Flexible Delineators - 1.2 Ground anchor and hardware materials310 D PTSW
9634 71 19 Flexible Delineators - 1.2 Installation DetailsX10 D PTSW
AFI =After Final InspectionBD= Before Delivery
ANP=After Notice to ProceedPTB= Prior To Bid
ATT=After Test TakenPTE=Prior to Event
AE=After EventPTFI= Prior to Final Inspection
BBCW=Before Beginning Concrete WorkPTSW= Prior to Start of Work

&"Times New Roman,Regular"&12MALMSTROM AFB, MONTANA &"Times New Roman,Regular"&12

&"Times New Roman,Regular"&12AF Form 66 &F-&D &"Times New Roman,Regular"&12 01330a-&P

REQUIRED TECHNICAL SUBMITTALS

File details come from the government source that posted it.