Q&A.pdf
PDF 178 KB Posted
- Attached to
- Repair TE/PT Roads
- Solicitation number
- FA462618R0012
About this file
Questions and answers/work schedule
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q&A_7_June_18.pdf | ||
| Q&A_6_June_18.pdf | ||
| Schedule_Disclaimer.pdf | ||
| PreProposal_SiteVisit_Minutes.pdf | ||
| Amendment_0001.pdf | ||
| Attach_9_Subcontractor_Consent.doc | DOC document | |
| Attach_4_Drawings.zip | ZIP file | |
| Attach_1_Specifications_Combined.pdf | ||
| Attach_7_Special_Contract_Requirements.docx | DOCX document | |
| Attach_2_Submittal_Schedule_TE_PT_Road.xlsx | XLSX spreadsheet | |
| Attach_6_Installation_Perimeter_Access.pdf | ||
| Attach_3_SCHEDULE_OF_DRAWINGS.pdf | ||
| Attach_8_Past_Performance_Questionaire.docx | DOCX document | |
| FA4626-18-R-0012.pdf | ||
| Attach_5_Wage_Determination.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
29 May 2018
MEMORANDUM FOR RECORD
SUBJECT: Questions and Answers; FA4626-18-R-0012 Repair TE-PT Roads
A site visit was conducted on 29 May 2018 at 1:00PM MST. These were the following questions and answers:
1. What are the proposed work hours?
a. Due to the road being behind the CATM (firing range) work will not be able to be conducted during fire times. Attached is a schedule of these times which is subject to change based upon CATM’s schedule.
2. Does the Government have a utility permit?
a. The Government has the DEQ utility permit to give to the Contractor.
3. Is there a staging area we are authorized to use?
a. A staging area is authorized as long as the area is cleaned up and returned to the state that it was prior to work starting.
SARAH R. MARKOVICH
Contract Administrator
June 2018 The time periods and dates the road will be closed due to firing on range are listed below The contractor will have access to the site outside of these time periods. These times are subject to change but this provides an indication of the types of work hours the contractor will be allowed to work.
Therefore, the contractor needs to take this into consideration when bidding.
◄ May 2019 June 2018 Jul 2019 ►
Sun Mon Tue Wed Thu Fri Sat 1 2
1200-1400
4 5 6 7
0800-2400
8 9
10 11
1100-1200
1200-1600
13 14
0800-2400
15 16
17 18 19
0800-2400
1600-2400
0800-2400
22 23
24 25
1000-1200
26 27 28
1300-1700
29 30 https://www.wincalendar.com/Holiday-Calendar/May-2019 https://www.wincalendar.com/Holiday-Calendar/July-2019
July 2018 This calander shows the time periods and dates the road will be closed due to firing on range. During these time periods contractors cannot be within the work zone between the locked gates. The contractor will have access to the site outside of these time periods. These times are subject to change but this provides an indication of the types of work hours the contractor will be allowed to work. Therefore, the contractor needs to take this into consideration when bidding.
◄ Jun 2018 July 2018 Aug 2018 ►
Sun Mon Tue Wed Thu Fri Sat 1 2
1300-1700
1300-1700
4 5 6 7
8 9
1100-1200
10 11 12
0800-2400
13 14
15 16
0800-2400
0800-2400
0800-2400
0800-2400
1300-1500
22 23 1100-1200
24 25 26
0800-2400
27 28
29 30 31
0800-2400 https://www.wincalendar.com/Holiday-Calendar/June-2018 https://www.wincalendar.com/Holiday-Calendar/August-2018
August 2018 This calander shows the time periods and dates the road will be closed due to firing on range. During these time periods contractors cannot be within the work zone between the locked gates. The contractor will have access to the site outside of these time periods. These times are subject to change but this provides an indication of the types of work hours the contractor will be allowed to work. Therefore, the contractor needs to take this into consideration when bidding.
◄ Jul 2018 August 2018 Sep 2018 ►
Sun Mon Tue Wed Thu Fri Sat
1300-1500
0800-2400
1000-1200
1600-2400
1200-1600
1000-1200 https://www.wincalendar.com/Holiday-Calendar/July-2018 https://www.wincalendar.com/Holiday-Calendar/September-2018
September 2018 This calander shows the time periods and dates the road will be closed due to firing on range. During these time periods contractors cannot be within the work zone between the locked gates. The contractor will have access to the site outside of these time periods. These times are subject to change but this provides an indication of the types of work hours the contractor will be allowed to work. Therefore, the contractor needs to take this into consideration when bidding.
◄ Aug 2018 September 2018 Oct 2018 ►
Sun Mon Tue Wed Thu Fri Sat
1300-1500
1100-1200
1300-1700
1100-1200
1300-17400 https://www.wincalendar.com/Holiday-Calendar/August-2018 https://www.wincalendar.com/Holiday-Calendar/October-2018
| 2018-05-29T16:22:43-0600 | |
| MARKOVICH.SARAH.RENEE.1085521450 |
File details come from the government source that posted it.