Q&A.pdf

PDF 178 KB Posted

Attached to
Repair TE/PT Roads
Solicitation number
FA462618R0012
Issued by

About this file

Questions and answers/work schedule

View the file

Other files

File Type Posted
Q&A_7_June_18.pdf PDF
Q&A_6_June_18.pdf PDF
Schedule_Disclaimer.pdf PDF
PreProposal_SiteVisit_Minutes.pdf PDF
Amendment_0001.pdf PDF
Attach_9_Subcontractor_Consent.doc DOC document
Attach_4_Drawings.zip ZIP file
Attach_1_Specifications_Combined.pdf PDF
Attach_7_Special_Contract_Requirements.docx DOCX document
Attach_2_Submittal_Schedule_TE_PT_Road.xlsx XLSX spreadsheet
Attach_6_Installation_Perimeter_Access.pdf PDF
Attach_3_SCHEDULE_OF_DRAWINGS.pdf PDF
Attach_8_Past_Performance_Questionaire.docx DOCX document
FA4626-18-R-0012.pdf PDF
Attach_5_Wage_Determination.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

29 May 2018

MEMORANDUM FOR RECORD

SUBJECT: Questions and Answers; FA4626-18-R-0012 Repair TE-PT Roads

A site visit was conducted on 29 May 2018 at 1:00PM MST. These were the following questions and answers:

1. What are the proposed work hours?

a. Due to the road being behind the CATM (firing range) work will not be able to be conducted during fire times. Attached is a schedule of these times which is subject to change based upon CATM’s schedule.

2. Does the Government have a utility permit?

a. The Government has the DEQ utility permit to give to the Contractor.

3. Is there a staging area we are authorized to use?

a. A staging area is authorized as long as the area is cleaned up and returned to the state that it was prior to work starting.

SARAH R. MARKOVICH

Contract Administrator

June 2018 The time periods and dates the road will be closed due to firing on range are listed below The contractor will have access to the site outside of these time periods. These times are subject to change but this provides an indication of the types of work hours the contractor will be allowed to work.

Therefore, the contractor needs to take this into consideration when bidding.

◄ May 2019 June 2018 Jul 2019 ►

Sun Mon Tue Wed Thu Fri Sat 1 2

1200-1400

4 5 6 7

0800-2400

8 9

10 11

1100-1200

1200-1600

13 14

0800-2400

15 16

17 18 19

0800-2400

1600-2400

0800-2400

22 23

24 25

1000-1200

26 27 28

1300-1700

29 30 https://www.wincalendar.com/Holiday-Calendar/May-2019 https://www.wincalendar.com/Holiday-Calendar/July-2019

July 2018 This calander shows the time periods and dates the road will be closed due to firing on range. During these time periods contractors cannot be within the work zone between the locked gates. The contractor will have access to the site outside of these time periods. These times are subject to change but this provides an indication of the types of work hours the contractor will be allowed to work. Therefore, the contractor needs to take this into consideration when bidding.

◄ Jun 2018 July 2018 Aug 2018 ►

Sun Mon Tue Wed Thu Fri Sat 1 2

1300-1700

1300-1700

4 5 6 7

8 9

1100-1200

10 11 12

0800-2400

13 14

15 16

0800-2400

0800-2400

0800-2400

0800-2400

1300-1500

22 23 1100-1200

24 25 26

0800-2400

27 28

29 30 31

0800-2400 https://www.wincalendar.com/Holiday-Calendar/June-2018 https://www.wincalendar.com/Holiday-Calendar/August-2018

August 2018 This calander shows the time periods and dates the road will be closed due to firing on range. During these time periods contractors cannot be within the work zone between the locked gates. The contractor will have access to the site outside of these time periods. These times are subject to change but this provides an indication of the types of work hours the contractor will be allowed to work. Therefore, the contractor needs to take this into consideration when bidding.

◄ Jul 2018 August 2018 Sep 2018 ►

Sun Mon Tue Wed Thu Fri Sat

1300-1500

0800-2400

1000-1200

1600-2400

1200-1600

1000-1200 https://www.wincalendar.com/Holiday-Calendar/July-2018 https://www.wincalendar.com/Holiday-Calendar/September-2018

September 2018 This calander shows the time periods and dates the road will be closed due to firing on range. During these time periods contractors cannot be within the work zone between the locked gates. The contractor will have access to the site outside of these time periods. These times are subject to change but this provides an indication of the types of work hours the contractor will be allowed to work. Therefore, the contractor needs to take this into consideration when bidding.

◄ Aug 2018 September 2018 Oct 2018 ►

Sun Mon Tue Wed Thu Fri Sat

1300-1500

1100-1200

1300-1700

1100-1200

1300-17400 https://www.wincalendar.com/Holiday-Calendar/August-2018 https://www.wincalendar.com/Holiday-Calendar/October-2018

2018-05-29T16:22:43-0600
MARKOVICH.SARAH.RENEE.1085521450

File details come from the government source that posted it.