Attach. 2 Pricing Schedule 21Dec23 - JPRA White Bluff Generator Repair and Installation.xlsx
XLSX spreadsheet 25 KB Posted
- Attached to
- JPRA White Bluff Generator Repair and Installation Federal contract opportunity
- Solicitation number
- FA462024QA105
About this file
This pricing schedule and statement of work outline requirements for generator repair and installation services at a Department of the Air Force facility. The contractor will diagnose and repair an existing 750kW generator, inspect and install a second generator and automatic transfer switch to establish a standby power system. The pricing schedule establishes hourly labor rates for a generator mechanic, electrician and general laborer, and allows for negotiation of miscellaneous part and labor costs up to $10,000 and $4,000 respectively. The statement of work specifies inspection and integration of government-furnished equipment in accordance with technical requirements. Bids are due by December 23rd for immediate award and completion of work at the Joint Personnel Recovery Agency White Bluff location in Spokane, Washington.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 4.pdf | ||
| Amendment 3.pdf | ||
| Attach. 4 Questions and Government Responses (Rev.02_17Jan24).pdf | ||
| Attach. 4 Questions and Government Responses (Rev.01_16Jan24).pdf | ||
| FA462024QA105 Revision 2_16Jan24.pdf | ||
| Amend 0003.pdf | ||
| Attach. 4 - Questions and Government Responses.pdf | ||
| Amendment 2.pdf | ||
| Attach. 1 SOW (Rev. 1) 12Jan24 JPRA White Bluff Generator Repair and Installation.pdf | ||
| Amendment 1.pdf | ||
| FA462024QA105 Revision 1.pdf | ||
| FA462024QA105.pdf | ||
| Attach. 1 SOW 21Dec23 - JPRA White Bluff Generator Repair and Installation.pdf | ||
| Attach. 3 WD 15-5537 (Rev 20) 27 Jul 23.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BASE YEAR
| JPRA Generator Repair and Installation Pricing Schedule | ||||||
| ITEM | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE | |
| Labor for a Generator Mechanic | __ | Hours | $___.___ | |||
| DOCKTER, CLIFFORD C GS-12 USAF AMC 92 CONS/PKA: DOCKTER, CLIFFORD C GS-12 USAF AMC 92 CONS/PKA:This is labor rate charge by the vendor for diagnosis and also the rate will be established for hourly wage for time spent repairing the Generators. | $___.___ | |||||
| 0001 | Diagnosis of faults for Repair of Generator 1 (Model DQFA 8919GS 750kw (S/N: 33110332 ST) IAW Attached Pricing Schedule and Statement of Work. | 1 | JOB | $___.___ | $___.___ |
DOCKTER, CLIFFORD C GS-12 USAF AMC 92 CONS/PKA: DOCKTER, CLIFFORD C GS-12 USAF AMC 92 CONS/PKA:
This amount will be uitlized as an item to be added to the Total Evaluated Price (TEP)
| Labor for a Generator Mechanic | __ | Hours | $___.___ | ||
| DOCKTER, CLIFFORD C GS-12 USAF AMC 92 CONS/PKA: DOCKTER, CLIFFORD C GS-12 USAF AMC 92 CONS/PKA:This is the same labor rate as above for diagnosis and rate established for hourly wage for time spent repairing the Generators. | $___.___ | ||||
| Labor for a Certified Eletrician | __ | Hours | $___.___ |
DOCKTER, CLIFFORD C GS-12 USAF AMC 92 CONS/PKA: DOCKTER, CLIFFORD C GS-12 USAF AMC 92 CONS/PKA:
| This rate is established for an electrician for work on this contract. | $___.___ | ||||
| Labor for a General Laborer | __ | Hours | $___.___ |
DOCKTER, CLIFFORD C GS-12 USAF AMC 92 CONS/PKA: DOCKTER, CLIFFORD C GS-12 USAF AMC 92 CONS/PKA:
| This rate is for labor required to complete all other work | $___.___ | |||||
| 0002 | Inspect Government furnished equipment (Cummins Generator Model DQDAB-1511339 and Thomson Automatic Transfer Switch model TS 870 ATS) and Installation of government furnished equipment and all necessary parts for an operational Stand-by Generator system IAW the Attached Pricing schedule and Statement of Work | 1 | JOB | $___.___ | $___.___ |
DOCKTER, CLIFFORD C GS-12 USAF AMC 92 CONS/PKA: DOCKTER, CLIFFORD C GS-12 USAF AMC 92 CONS/PKA:
This amount will be uitlized as an item to be added to the Total Evaluated Price (TEP)
| Replacement Part, Non Modified: Standard Mark Up. Contractor provides cost of part including shipping. Government reserves right to procure parts when standard markup is determined NOT fair and resonable. | Cost + __% Mark Up | ||||
| 0003 | Miscellaneous Parts in support of repair of Generator 1 and Generator 2 IAW Attached Pricing Schedule and Statement of Work. (Not to Exceed $10,000.00) To be negotiated separately as required. | 1 | LOT | TBD | TBD |
| Labor for a Generator Mechanic | TBD | Hours | $___.___ | $___.___ |
| Labor for a Certified Electrician | TBD | Hours | $___.___ |
DOCKTER, CLIFFORD C GS-12 USAF AMC 92 CONS/PKA: DOCKTER, CLIFFORD C GS-12 USAF AMC 92 CONS/PKA:
| This rate is established for an electrician for work on this contract. | $___.___ | ||||
| Labor for a General Laborer | TBD | Hours | $___.___ |
DOCKTER, CLIFFORD C GS-12 USAF AMC 92 CONS/PKA: DOCKTER, CLIFFORD C GS-12 USAF AMC 92 CONS/PKA:
This rate is for labor required to complete all other work DOCKTER, CLIFFORD C GS-12 USAF AMC 92 CONS/PKA: DOCKTER, CLIFFORD C GS-12 USAF AMC 92 CONS/PKA:This is labor rate charge by the vendor for diagnosis and also the rate will be established for hourly wage for time spent repairing the Generators.
DOCKTER, CLIFFORD C GS-12 USAF AMC 92 CONS/PKA: DOCKTER, CLIFFORD C GS-12 USAF AMC 92 CONS/PKA:
This amount will be uitlized as an item to be added to the Total Evaluated Price (TEP) DOCKTER, CLIFFORD C GS-12 USAF AMC 92 CONS/PKA: DOCKTER, CLIFFORD C GS-12 USAF AMC 92 CONS/PKA:This is the same labor rate as above for diagnosis and rate established for hourly wage for time spent repairing the Generators.
DOCKTER, CLIFFORD C GS-12 USAF AMC 92 CONS/PKA: DOCKTER, CLIFFORD C GS-12 USAF AMC 92 CONS/PKA:
This rate is established for an electrician for work on this contract.
DOCKTER, CLIFFORD C GS-12 USAF AMC 92 CONS/PKA: DOCKTER, CLIFFORD C GS-12 USAF AMC 92 CONS/PKA:
This rate is for labor required to complete all other work DOCKTER, CLIFFORD C GS-12 USAF AMC 92 CONS/PKA: DOCKTER, CLIFFORD C GS-12 USAF AMC 92 CONS/PKA:
| This amount will be uitlized as an item to be added to the Total Evaluated Price (TEP) | $___.___ | |||||
| 0004 | Miscellaneous Labor in support of repair of Generator 1 and Generator 2 IAW Attached Pricing Schedule and Statement of Work. (Not to Exceed $4,000.00) To be negotiated separately as required. | 1 | LOT | TBD | TBD |
| Pricing Worksheet Instructions |
| ITEM 0001 |
Input estimated unit price for labor hours and estimated cost for diagnosis of faults for repair of Generator 1 in the highlighted fields on CLIN 0001
ITEM 0002
Input estimated unit price for labor hours and estimated cost for inspection and installation of government furnished equipmment and all neccessary parts for an operational Stand-by Generator system IAW the attached Statement of Work in the highlighted fields on CLIN 0002
ITEM 0003
Input estimated cost for markup on parts for work provided (as needed). This amount should including shipping plus percentage of standard markup in the highlighted field on CLIN 0003.
ITEM 0004
Input same labor rates for the provided labor categories entered in ITEMs 0001 and 0002.
File details come from the government source that posted it. Updated .