Atch 3 Mission Essential Ktr Svc Plan.docx

DOCX document 24 KB Posted

Attached to
Closed Circuit Television (CCTV) System Maintenance AMD03 Federal contract opportunity
Solicitation number
FA461323R0005
Issued by
Department of the Air Force Global Strike Command

About this file

This document outlines a Mission-Essential Contractor Services Plan for closed circuit television (CCTV) system repair, replacement, and maintenance services at FE Warren Air Force Base in Wyoming. The contractor must provide semi-annual maintenance, replacement parts, and emergency services for the CCTV system in multiple dormitories. The services will be paid at the prices in the contract when the plan is activated during periods of crisis. The plan details provisions for acquiring essential personnel and resources for continuity of operations up to 30 days. It also addresses maintaining staffing levels during repeated pandemic waves, timelines for obtaining personnel and resources on-site, identifying and training remote workers, notification procedures, and communicating expectations to employees. The contractor must utilize its internal quality control plan and perform the essential services until notified to cease by the contracting officer.

View the file

Other files for this federal contract opportunity

Other files attached to Closed Circuit Television (CCTV) System Maintenance AMD03, newest first.
File Type Posted
FA461323R00050003 AMD 03.pdf PDF
Atch 6 Contractor Repair Quote Example.pdf PDF
Atch 1 PWS 24 Mar 23 REV01.pdf PDF
Atch 5 Q and A as of 27 Mar 23.pdf PDF
Atch 4 WD 2015-5405 27 Dec 22.pdf PDF
Atch 2 Cost Proposal REV01.xlsx XLSX spreadsheet
Atch 4 WD 2015-5405 27 Dec 22.pdf PDF
FA461323R00050002 AMD 02.pdf PDF
Atch 6 Contractor Repair Quote Example.pdf PDF
Atch 3 Mission Essential Ktr Svc Plan.docx DOCX document
Atch 2 Cost Proposal.xlsx XLSX spreadsheet
Atch 1 PWS 20 Mar 23.pdf PDF
FA461323R0005 RFP.pdf PDF
FA461323R00050001 AMD 01.pdf PDF
Atch 5 Q and A Rev03 as of 20 Mar 23.pdf PDF
Atch 6 Q and A Rev03 as of 13 Mar 23.pdf PDF
Atch 3 Replacement Parts Price List Rev01.pdf PDF
Atch 5 WD 2015-5405 27 Dec 22.pdf PDF
Atch 1 PWS 13 Mar 23.pdf PDF
Atch 4 Mission Essential Ktr Svc Plan.docx DOCX document
Atch 2 Vendor Confirmation Form Rev01.xlsx XLSX spreadsheet
FA461323R00050001 AMD 01.pdf PDF
Atch 6 Q and A Rev2 as of 9 March 2023.pdf PDF
Atch 6 Q and A Rev1 as of 9 March 2023.pdf PDF
Atch 6 Q and A as of 9 Mar 2023.pdf PDF
Atch 5 WD 2015-5405 27 Dec 22.pdf PDF
Atch 3 Replacement Parts Price List.pdf PDF
Atch 2 Vendor Confirmation Form.xlsx XLSX spreadsheet
Atch 1 PWS 13 Feb 2023.pdf PDF
Atch 4 Mission Essential Ktr Svc Plan.docx DOCX document
Solicitation - FA461323R0005.pdf PDF
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Mission-Essential Contractor Services Plan for Closed Circuit Television (CCTV) System Repair, Replacement and Maintenance Services

FE Warren AFB, Wyoming Date

1. INTRODUCTION. This Mission-Essential Contractor Services Plan has been developed in accordance with DFARS Clause 252.237-7023 – Continuation of Essential Contractor Services. It addresses how [Insert Name of Contractor] will continue providing the mission-essential CCTV Maintenance service identified in the solicitation during periods of crisis, upon notification by the Contracting Officer (CO) to activate the plan.

2. OBJECTIVE. In support of the 90th Civil Engineering Squadron, the objective is to provide mission-essential CCTV Maintenance services for FE Warren AFB, Wyoming during a crisis. The essential contractor services are identified below and will be performed at the prices in the contract at the time the plan is activated.

3. CONTRACTOR PROCEDURES. Contractor MUST answer the following in this plan:

a. Identify provisions made for the acquisition of essential personnel and resources, if necessary, for continuity of operations for up to 30 days or until normal operations can be resumed;

1)

b. How you will address challenges associated with maintaining essential contractor services during an extended event, such as a pandemic that occurs in repeated waves (i.e. list efforts taken to maintain sufficient level of staff and ensure adequate supplies);

1)

c. How you will address time lapse associated with the initiation of the acquisition of essential personnel and resources and their actual availability on site (i.e. discuss actions/time needed to get personnel and resources in place, actions to expedite the process, ability to work extended hours if base access is restricted);

1)

d. How you will address components, processes, and requirements for the identification, training, and preparedness of personnel who are capable of relocating to alternate facilities or performing work from home (i.e. list actions that can be performed remotely, contract manager duty location, etc);

1)

e. How you will establish an alert and notification procedure for mobilizing identified “essential contractor service” personnel (i.e. explain if alert/notification will be made after Government direction and means of notification, etc); and 1)

f. The approach you will use for communicating expectations to contractor employees regarding their roles and responsibilities during a crisis (i.e. explain means of communication, use of Quality Control Plan, checklists, or other additional duties).

1)

g. Identify how you will conduct plant operations to overcome adverse conditions and situations, such as significant weather situations, employee illnesses, or unexpected vacancies (i.e. explain means of maintaining operations if weather limits travel or loss of employees).

1)

4. PRICING. The mission-essential CCTV Maintenance services are identified in paragraph 5 and will be paid at the prices in the contract at the time the Plan is activated. The prices will also be used as the basis for any equitable adjustments resulting from the activation of the Plan.

5. Mission-Essential Contractor Services.

CLIN

Description of Service
Qty
Unit
Unit Price
Total Price
X001
Semi-Annual Maintenance
1
JOB
Current Price
Current Price
X002
Replacement Parts
1
JOB
Current Price
Current Price
X003
Emergency Service
20
HOURS
Current Price
Current Price

6. QUALITY CONTROL PLAN (QCP). The contractor shall utilize its own internal QCP during the performance of this plan.

7. DEACTIVATION OF PLAN. [Insert Name of Contractor] shall perform the mission-essential contractor services during a crisis until notified by the CO to cease performance of the Plan.

SIGNATURE PAGE

Contractor Point of Contact:_______________________________________

Phone Number(s):_______________________________________

Email Address:_______________________________________

Date:_____________________________