AMENDMENT_1.pdf
PDF 248 KB Posted
- Solicitation number
- FA4613-14-R-0005
About this file
Revisions to the SOW and Technical Subfactor 1
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Revised Statement of Work and Revision of Technical Subfactor
1. CONTRACT ID CODE PAGE OF PAGES
J 1 8
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 23-May-2014
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA4613-14-R-0005
X 9B. DATED (SEE ITEM 11)
06-May-2014
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
23-May-2014
CODE
90TH CONTRACTING SQUADRON
7505 BARNES LOOP
FE WARREN AFB WY 82005-2860
FA4613 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA4613-14-R-0005
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
The following have been modified:
ADDENDUM 52.212-1
THIS SECTION IS FOR SOLICITATION PURPOSES ONLY. THIS SECTION WILL BE PHYSICALLY
REMOVED FROM ANY RESULTANT AWARD, BUT WILL BE DEEMED INCORPORATED BY
REFERENCE.
ADDENDA TO 52.212-1 INSTRUCTIONS TO OFFERORS--COMMERCIAL ITEMS
Addendum to 52.212-1(c), Period for Acceptance of Offers. The paragraph is tailored as follows: “The offeror agrees to hold the prices in its offer firm for 120 calendar days from the date specified for receipt of offers.”
PROPOSAL PREPARATION INSTRUCTIONS
1. General Information:
(a) The offeror's proposal must include all data and information requested by this ITO and must be submitted in accordance with these instructions. The offer shall be compliant with the requirements as stated in the
Statement of Work (SOW) and the Model Contract. To assure timely and equitable evaluation of the proposal, the offeror must follow the instructions contained herein. The proposal must be complete, self-sufficient, and respond directly to the requirements of this solicitation. The response shall consist of three (3) separate parts; Part I – Price
Proposal, Part II - Technical Proposal, and Part III – Past Performance Information. Non-conformance with the instructions provided in this ITO may result in an unfavorable proposal evaluation.
(b) The proposal shall be clear, concise, and shall include sufficient detail for effective evaluation and for substantiating the validity of stated claims. The proposal should not simply rephrase or restate the Government's requirements but rather shall provide convincing rationale to address how the offeror intends to meet these requirements. Offerors shall assume that the Government has no prior knowledge of their facilities and experience and will base its evaluation on the information presented in the offeror's proposal.
(c) Elaborate brochures or documentation, binding, detailed art work, or other embellishments are unnecessary and are not desired. Similarly, for oral presentations, elaborate productions are unnecessary and not desired.
(d) In accordance with FAR Subpart 4.8 (Government Contract Files), the Government will retain one copy of all unsuccessful proposals. Unless the offeror requests otherwise, the Government will destroy extra copies of such unsuccessful proposals.
(e) The contracting officer has determined there is a high probability of adequate price competition in this acquisition. Upon examination of the initial offers, the contracting officer will review this determination and if, in the contracting officer's opinion, adequate price competition exists no additional data will be requested and certification under FAR 15.406-2 will not be required. However, if at any time during this competition the contracting officer determines that adequate price competition no longer exists; offerors may be required to submit cost data to the extent necessary for the contracting officer to determine the reasonableness and affordability of the price.
(f) The Contracting Officer (CO) is the sole point of contact for this acquisition. Address any questions or concerns you may have to the CO.
(g) The CO will promptly notify offerors of any decision to exclude them from the competitive range;
whereupon, they may request and receive a debriefing in accordance with FAR 15.505. Offerors excluded from the competitive range may request a preaward debriefing or they may choose to wait until after the source selection decision to request a postaward debriefing. However, offerors excluded from the competitive range are entitled to no more than one debriefing for each proposal. The CO will notify unsuccessful offerors in the competitive range of the source selection decision in accordance with FAR 15.506. Upon such notification, unsuccessful offerors may request and receive a debriefing. Offerors desiring a debriefing must make their request in accordance with the requirements of FAR 15.505 or 15.506, as applicable.
(h) If an offeror believes that the requirements in these instructions contain an error, omission, or are otherwise unsound, the offeror shall immediately notify the CO in writing with supporting rationale as well as the remedies the offeror is asking the CO to consider as related to the omission or error. The offeror is reminded that the Government reserves the right to award this effort based on the initial proposal, as received, without discussion.
This reservation includes matters of additional or substitute pages of the initial proposal.
(i) All referenced documents for this solicitation are available on the Federal Business Opportunities
(FedBizOpps) website at http://www.fedbizopps.gov. Potential offerors are encouraged to subscribe for real-time e-mail notifications when information has been posted to the website.
(j) The content and page size of electronic copies must be identical to the hard copies. For electronic copies, indicate on each CD the volume number and title. Use separate files to permit rapid location of all portions, including sub factors, exhibits, annexes, and attachments, if any. In the event that hard copies and electronic copies of a proposal are submitted and if there are any discrepancies between the hard copies and the electronic copies of the proposal, the hard copies will be used for evaluation.
(k) Provide the name, title, and telephone number of the company/division point of contact regarding decisions made with respect to your proposal and who can obligate your company contractually. Also, identify those individuals authorized to negotiate with the Government.
2. Proposal Submission Instructions:
NOTE: Read entire solicitation including all provisions, clauses, and attachments. Ensure all instructions have been read and followed. Failure to complete any portion of the below instructions could result in the offeror’s proposal being considered non-responsive and rejected by the Government. The Government reserves the right to allow or not allow offerors to correct any administrative errors after proposal due date.
PART I – PRICE PROPOSAL
(a) Complete blocks 12, 17a, and 30a, b, and c of the SF1449. In doing so, the offeror accedes to the contract terms and conditions as written in the solicitation, with attachments. The solicitation constitutes the model contract.
(b) Insert proposed unit and extended prices in the Pricing Schedule. The extended amount must equal the whole dollar unit price multiplied by the number of units. The proposal must be submitted for a base year plus two
(2) Option Years. Completion of the price proposal includes following instructions for completion of Attachment 2–
COCESS Bid List. Individual Unit Prices must be completed using Attachment 2 and submitted as part of the price proposal. Total annual amounts will be completed on the pricing schedule (by assigning a dollar amount to CLINS
0001, 0002, 1001, 1002, 2001, 2002) in addition to Attachment 2.
(c) Provide a letter on offeror’s letterhead identifying financial institution, point of contact, phone number, and a statement authorizing the Government to verify financial responsibility of offeror.
Price reasonableness and price realism: Note that unrealistically low or high proposed costs or prices, initially or subsequently, may be grounds for eliminating a proposal from competition either on the basis that the offeror does https://cs.eis.af.mil/airforcecontracting/knowledge_center/Documents/AFFARS_Library/5315/templates/AppData/Local/Microsoft/Windows/Temporary%20Internet%20Files/AFAC%20Working%20Folders%20--%20PM/far/FAR15.DOC#b15505 https://cs.eis.af.mil/airforcecontracting/knowledge_center/Documents/AFFARS_Library/5315/templates/AppData/Local/Microsoft/Windows/Temporary%20Internet%20Files/AFAC%20Working%20Folders%20--%20PM/far/FAR15.DOC#b15506 not understand the requirement or has submitted an unrealistic proposal. Additionally, unbalanced pricing poses an unacceptable risk to the Government and may be a reason to reject an offeror’s proposal. Offers should be sufficiently detailed to demonstrate their reasonableness. The burden of proof for credibility of proposed costs/prices rests with the offeror.
(d) Complete the necessary fill-ins and certifications in ALL provisions. The provisions FAR 52.212-3, Offeror
Representations and Certifications – Commercial Items, and 252.209-7994 Representation by Corporations
Regarding an Unpaid Delinquent Tax Liability or Felony Conviction under any Federal Law, shall be returned along with the proposal.
PART II – TECHNICAL PROPOSAL
(a) The Technical Volume should be specific and complete. Legibility, clarity, and coherence are very important. Your responses will be evaluated against the Technical sub factors defined in Addendum to 52.212-2
Evaluation – Commercial Items. All the requirements specified in the solicitation are mandatory. By your proposal submission, you are representing that your firm will perform all the requirements specified in the solicitation. Do not merely reiterate the objectives or reformulate the requirements specified in the solicitation.
(b) In the technical volume, address your technical solution for meeting or exceeding the Government’s minimum performance or capability requirements of each technical sub factor. The criteria for each sub factor to meet technical acceptability are outlined in the Addendum to 52.212-2 Evaluation – Commercial Items.
Technical Sub Factors:
1. Store Manager (IAW Attachment 1-Statement Of Work para 3.3.2). Submit qualifications to comply with paragraph 3.3.2 of the Performance Work Statement (PWS).
2. Control Action Plan (IAW SOW para 1.5). A plan shall be submitted with a minimum of the following included:
a. Personnel position(s) responsible for tracking of all item orders, inventory, and backorders to include a direct chain of supervision for inquiries or concerns.
b. Process for remedy for vendors who fail to deliver items by the assigned delivery dates.
c. Process for remedy for items not delivered by the RDD date to insure delivery.
3. Contractor Driven Inventory Process Plan (IAW SOW para 1.4) A Contractor driven plan to insure minimum levels of fixed price items are available in the onsite inventory.
(c) APPLICABLE TO LARGE BUSINESSES ONLY: If the offeror is other than a small business, the offeror shall submit a Small Business Subcontracting Plan in accordance with FAR 52.219-9 that also identifies and specifies the extent of offeror's commitment to the participation of small businesses (SB), historically black colleges or universities (HBCU) and minority institutions (MI), whether as joint venture members, teaming arrangement partners, or subcontractors. If applicable, submit a copy of your approved Master Plan. In the event the offeror has negotiated a comprehensive subcontracting plan pursuant to DFARS 219.702, the offeror must submit the information that identifies and specifies the extent of its commitment to the participation of SB, HBCU and MI.
PART III – PAST PERFORMANCE INFORMATION
(a) Each offeror shall submit a past performance part with its proposal, containing past performance information in accordance with the format contained in Attachment 6 – Past Performance Information (Microsoft Access attachment).
See submittal instructions in Attachment 7- Instructions for Past Performance Information Tool. This information is required on the offeror and all subcontractors, teaming partners, and/or joint venture partners who are proposed to perform thirty percent or more of the proposed effort based on the total proposed price or perform aspects of the effort the offeror considers critical to overall successful performance. Offerors are cautioned that the Government will use data provided by each offeror in this part and data obtained from other sources in the evaluation of past performance.
Along with the information required in this paragraph, the offeror shall submit a consent letter (sample provided in
Attachment 4) executed by each subcontractor, teaming partner, and/or joint venture partner, authorizing release of adverse past performance information to the offeror so the offeror can respond to such information. For each identified effort for a commercial customer, the offeror shall also submit a client authorization letter, authorizing release to the
Government of requested information on the offeror's performance.
Offerors are required to explain what aspects of the contracts are deemed relevant to the proposed effort and to what aspects of the proposed effort they relate. This may include a discussion of efforts accomplished by the offeror to resolve problems encountered on prior contracts as well as past efforts to identify and manage program risk. Merely having problems does not automatically equate to a limited or no confidence rating, since the problems encountered may have been on a more complex program, or an offeror may have subsequently demonstrated the ability to overcome the problems encountered. The offeror is required to clearly demonstrate management actions employed in overcoming problems and the effects of those actions in terms of improvements achieved or problems rectified.
REFER TO ATTACHMENT #7 INSTRUCTIONS FOR PAST PERFORMANCE INFORMATION
TOOL FOR MORE GUIDANCE
(b) Additional Performance Questionnaires: The government will evaluate the quality and extent of offeror's performance deemed relevant to the requirements of this RFP. The government will use information submitted by the offeror and any other sources of information available to the Government to assess past performance. Provide a list of no more than ten (10), of the most relevant contracts performed for Federal agencies and commercial customers within the last five (5) years. Furnish the information found in Attachment 5 – Past
Performance Questionnaire.
Additional Information
INFORMATION REGARDING SUBMISSION OF PROPOSAL: Hand carried proposals must be delivered to 7505
Barnes Loop, F.E. Warren AFB, Cheyenne, WY. The sealed envelope or package used to submit your proposal must show the time and date specified for receipt, the Solicitation Number, and the name and address of the offeror.
Offerors are cautioned that F.E. Warren AFB has visitor control procedures requiring individuals not affiliated with the installation to obtain a visitor pass prior to entrance. SOME DELAY SHOULD BE ANTICIPATED WHEN
HAND CARRYING PROPOSALS. Offerors should allow sufficient time to obtain a visitor pass and arrive at the bid depository PRIOR to the time specified for receipt. Late proposals will be processed in accordance with FAR
52.212-1(f) “Late submission, modifications, revisions, and withdrawals of offers.”
FEDERAL HOLIDAYS: The following Federal Legal Holidays are observed by this base:
New Year’s Day 1 January
Martin Luther King’s Birthday Third Monday in January
Presidents Day Third Monday in February
Memorial Day Last Monday in May
Independence Day 4 July
Labor Day First Monday in September
Columbus Day Second Monday in October
Veterans Day 11 November
Thanksgiving Day Fourth Thursday in November
Christmas Day 25 December
Signature by the offeror on the proposal constitutes an offer, which the Government may accept. The "original" copy should be clearly marked under separate cover and should be provided without any punched holes.
ADDENDUM 52.212-2
BASIS FOR CONTRACT AWARD: This is a competitive selection in which competing offerors past/present performance history and Technical will be evaluated as more significant than price. By submission of its offer in accordance with the instructions provided in clause FAR 52.212-2 Evaluation-Commercial Items, the offeror accedes to the terms of this solicitation and all such offers shall be treated equally except for their prices and performance records. Failure to meet a requirement may result in an offer being determined technically unacceptable. The evaluation process shall proceed as follows:
1. Technical Acceptability:
(a) Initially, the government technical evaluation team shall evaluate the technical proposals on a pass/fail basis, assigning ratings of Acceptable or Unacceptable to each individual technical sub factor, following the criteria laid out in Part II – Technical Proposal found in Addendum to 52.212-1.
TABLE 1 - TECHNICAL RATINGS
Rating Description
ACCEPTABLE
The proposal clearly meets the minimum requirements of the solicitation and demonstrates a clear understanding of the Government’s requirements.
UNACCEPTABLE
Proposal does not clearly meet the minimum requirements of the solicitation.
Technical sub factors:
1. Store Manager (IAW Attachment 1-Statement Of Work para 3.3.2). Submit qualifications to comply with paragraph 3.3.2 of the Performance Work Statement (PWS).
2. Control Action Plan (IAW Attachment 1-SOW para 1.5). A plan shall be submitted with a minimum of the following included:
a. Personnel position(s) responsible for tracking of all item orders, inventory, and backorders to include a direct chain of supervision for inquiries or concerns.
b. Process for remedy for vendors who fail to deliver items by the assigned delivery dates.
c. Process for remedy for items not delivered by the RDD date to insure delivery.
3. Contractor Driven Inventory Process Plan (IAW Attachment 1-SOW para 1.4) A Contractor driven plan to insure minimum levels of fixed price items are available in the onsite inventory.
(b) APPLICABLE TO LARGE BUSINESSES ONLY: The Small Business Subcontracting plan will be evaluated on an acceptable/unacceptable basis.
TABLE 1(a) – SB SUBCONTRACTING PLAN
TECHNICAL RATINGS
ACCEPTABLE
(Required from large businesses only). Offeror’s proposed Small Business Subcontracting Plan provides for proactive minimum small business subcontracting goals, includes sound and effective methods to determine and meet those goals, adequately encourages small business participation, and provides for implementation of policies that meet the requirements of
FAR Part 19, 19.704 and their supplements.
UNACCEPTABLE
Offeror (large business) failed to submit a
Subcontracting Plan or the plan is missing one or more of the elements listed.
2. Price Evaluation:
(a) Next, the government shall rank all technically Acceptable offers by price, including all option prices.
An offeror’s proposed prices will be determined by multiplying the quantities identified in the Pricing Schedule by the unit price for each item to confirm the extended amount for each. Offerors whose total evaluated price is unreasonable (in accordance with FAR 15.404 and FAR 31.201-3), unbalanced (in accordance with FAR 15.404-1), or unaffordable (not within any budgetary information included in the solicitation) may not be considered for award.
3. Performance Assessment:
(a) The contracting officer shall seek recent (within the past five years) and relevant performance information based on the references provided by the offeror in Attachment 6-Past Performance Information, Attachment 5-Past Performance Questionnaire (all questionnaires submitted will be evaluated) and data independently obtained from other government and commercial sources. Relevant present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires. The government reserves the right to seek information on higher priced offerors if none of the lower priced offerors receive a “Substantial
Confidence” performance assessment rating. The purpose of the past performance evaluation is to assess the degree of confidence the Government has in the offeror’s ability to supply the services that meet users’ needs, based on the offeror’s demonstrated record of performance. The assessment process will result in an overall performance confidence assessment rating based on the ratings in Table 2 below.
(b) In evaluating past performance, the government reserves the right to give greater consideration to information on those contracts deemed most relevant to the effort described in Table 3 below:
TABLE 3 - PAST PERFORMANCE RELEVANCY RATINGS
TABLE 2 - PERFORMANCE CONFIDENCE ASSESSMENTS
Rating Description
SUBSTANTIAL CONFIDENCE Based on the offeror’s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.
SATISFACTORY CONFIDENCE Based on the offeror’s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.
LIMITED CONFIDENCE Based on the offeror’s recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort.
NO
CONFIDENCE
Based on the offeror’s recent/relevant performance record, the Government has no expectation that the offeror will be able to successfully perform the required effort.
UNKNOWN CONFIDENCE
(Neutral)
No recent/relevant performance record is available or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned.
Rating Definition
RELEVANT
Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
NOT RELEVANT
Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.
(c) If the lowest priced evaluated offer is judged to have a “Substantial Confidence” performance rating and the offeror is determined to be responsible, that offer represents the best value for the government and the evaluation process stops at this point. Award shall be made to that offeror without further consideration of any other offers.
(d) If the lowest priced offeror is not judged to have a “Substantial Confidence” performance assessment, the next lowest priced offeror will be evaluated and the process will continue (in order by price from lowest to highest) until an offeror is judged to have a “Substantial Confidence” performance assessment or until all offerors are evaluated. The Source Selection Authority shall then make an integrated assessment best value award decision.
(e) Offerors are cautioned to submit sufficient information and in the format specified in the proposal preparation instructions to permit a meaningful assessment of past performance. Offerors may be asked to clarify certain aspects of their proposal or respond to adverse past performance information to which the offeror has not previously had an opportunity to respond. Adverse past performance is defined as past performance information that supports a less than satisfactory rating on any evaluation element or any unfavorable comments received from sources without a formal rating system. Communication conducted to resolve minor or clerical errors will not constitute discussions and the contracting officer reserves the right to award a contract without the opportunity for proposal revision.
(f) If, during the evaluation period, it is determined to be in the best interest of the Government to hold discussions, offeror responses to Evaluation Notices (ENs) and the Final Proposal Revision (FPR) will be considered in making the source selection decision. If the offeror’s proposal has been evaluated as acceptable at the time discussions are closed, any changes or exceptions in the Final Proposal Revision are subject to evaluation and may introduce risk that the offeror’s proposal be determined unacceptable and ineligible for award.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .