Base Year
| BID SCHEDULE - BASE YEAR |
| MAINTAIN BASE PAINT |
(Note: Prices must be no more than two decimal points)
| The following SubCLINs 0001AA through 0001FE correspond to the pricing for Basic Year CLIN |
| 0001 above. The total of these SubCLINs should equal the amount listed for Basic Year CLIN |
| 0001 in the Bid Summary Schedule below. Please limit pricing to two (2) decimal spaces. |
| CLIN 0001 BASE YEAR | | | | | |
| INTERIOR PAINT | | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 0001AA | Install Plastic | 50,000 | SF | | $0.00 |
| 0001AB | Minor Prep for Painting | 54,000 | SF | | $0.00 |
| 0001AC | Major Prep for Painting | 5,000 | SF | | $0.00 |
| 0001AD | Mud/ Tape/ Sand Joints | 5,000 | LF | | $0.00 |
| 0001AE | Remove Wall Covering | 45,000 | SF | | $0.00 |
| 0001AF | Paint Primer | 200,000 | SF | | $0.00 |
| 0001AG | Textured Finish | 50,000 | SF | | $0.00 |
| 0001AH | Paint | 320,000 | SF | | $0.00 |
| 0001AI | Replacement of Cove Base | 4,000 | LF | | $0.00 |
| 0001AJ | Remove trim/chair rail and repair area | 1,800 | LF | | $0.00 |
| 0001AK | Replacement of Hardware | 1,800 | EA | | $0.00 |
| 0001AL | Install/Repair Metal Corner Bead | 500 | LF | | $0.00 |
| 0001AM | Strip/Refinish Varnish Surfaces (Wood) | 1,000 | SF | | $0.00 |
| EXTERIOR PAINT | | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 0001AN | Minor Prep of Wood Surface under 10' | 4,000 | SF | | $0.00 |
| 0001AO | Major Prep of Wood Surface under 10' | 4,000 | SF | | $0.00 |
| 0001AP | Minor Prep of Wood Surface over 10' | 4,000 | SF | | $0.00 |
| 0001AQ | Major Prep of Wood Surface over 10' | 4,000 | SF | | $0.00 |
| 0001AR | Minor Prep of Metal Surface under 10' | 3,000 | SF | | $0.00 |
| 0001AS | Major Prep of Metal Surface under 10' | 2,000 | SF | | $0.00 |
| 0001AT | Minor Prep of Metal Surface over 10' | 3,000 | SF | | $0.00 |
| 0001AU | Major Prep of Metal Surface over 10' | 2,000 | SF | | $0.00 |
| 0001AV | Total Abatement of Lead Based Surface under 10' | 20,000 | SF | | $0.00 |
| 0001AW | Total Abatement of Lead Based Surface over 10' | 10,500 | SF | | $0.00 |
| 0001AX | Primer application 2 coat under 10' w/ brush or roller | 32,000 | SF | | $0.00 |
| 0001AY | Primer application 2 coat over 10' w/ brush or roller | 77,000 | SF | | $0.00 |
| 0001AZ | Paint application 2 coat under 10' w/ brush or roller | 54,000 | SF | | $0.00 |
| 0001BA | Paint application 2 coat over 10' w/ brush or roller | 77,000 | SF | | $0.00 |
| METAL APPURTENANCES | | | | | |
| General Conditions | | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 0001BB | Not Used | NA | NA | NA | NA |
| 0001BC | Abrasive Blasting Enclosure | 25 | EA | | $0.00 |
| Cast Iron Coatings | | | | | |
| Fire Hydrant | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 0001BD | Fire Hydrant Prep (Manual Scraping) | 30 | EA | | $0.00 |
| 0001BE | Fire Hydrant Prep (Chemical Stripping) | 30 | EA | | $0.00 |
| 0001BF | Fire Hydrant Prep (Abrasive Blasting) | 30 | EA | | $0.00 |
| 0001BG | Fire Hydrant Prep (Power Washer) | 30 | EA | | $0.00 |
| 0001BH | Primer | 30 | EA | | $0.00 |
| 0001BI | Topcoat | 30 | EA | | $0.00 |
| 0001BJ | Chemical Bonding Wipe | 30 | EA | | $0.00 |
| Other Surfaces | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 0001BK | Prep (Manual Scraping) | 500 | SF | | $0.00 |
| 0001BL | Prep (Chemical Stripping) | 500 | SF | | $0.00 |
| 0001BM | Prep (Abrasive Blasting) | 500 | SF | | $0.00 |
| 0001BN | Prep (Power Washer) | 500 | SF | | $0.00 |
| 0001BO | Primer | 500 | SF | | $0.00 |
| 0001BP | Topcoat | 500 | SF | | $0.00 |
| 0001BQ | Chemical Bonding Wipe | 500 | SF | | $0.00 |
| Black Steel Coatings | | | | | |
| Street Lighting Standard | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 0001BR | Street Light Prep (Manual Scraping/Wire Brushing) | 50 | EA | | $0.00 |
| 0001BS | Street Light Prep (Chemical Stripping) | 50 | EA | | $0.00 |
| 0001BT | Street Light Prep (Abrasive Blasting) | 50 | EA | | $0.00 |
| 0001BU | Street Light Prep (Power Washer) | 50 | EA | | $0.00 |
| 0001BV | Primer | 50 | EA | | $0.00 |
| 0001BW | Topcoat | 50 | EA | | $0.00 |
| 0001BX | Chemical Bonding Wipe | 50 | EA | | $0.00 |
| Pipe Railings 2-3 Inch Round or Square | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 0001BY | Prep (Manual Scraping/Wire Brushing) | 2,200 | LF | | $0.00 |
| 0001BZ | Prep (Chemical Stripping) | 2,200 | LF | | $0.00 |
| 0001CA | Prep (Abrasive Blasting) | 2,200 | LF | | $0.00 |
| 0001CB | Prep (Power Washer) | 2,200 | LF | | $0.00 |
| 0001CC | Primer | 2,200 | LF | | $0.00 |
| 0001CD | Topcoat | 2,200 | LF | | $0.00 |
| 0001CE | Chemical Bonding Wipe | 2,200 | LF | | $0.00 |
| Other Surfaces | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 0001CF | Prep (Manual Scraping/Wire Brushing) | 2,500 | SF | | $0.00 |
| 0001CG | Prep (Chemical Stripping) | 2,500 | SF | | $0.00 |
| 0001CH | Prep (Abrasive Blasting) | 2,500 | SF | | $0.00 |
| 0001CI | Prep (Power Washer) | 2,500 | SF | | $0.00 |
| 0001CJ | Primer | 2,500 | SF | | $0.00 |
| 0001CK | Topcoat | 2,500 | SF | | $0.00 |
| 0001CL | Chemical Bonding Wipe | 2,500 | SF | | $0.00 |
| Pipe Railings Round or Square 3 1/2-6 inch | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 0001CM | Prep (Manual Scraping/Wire Brushing) | 1,500 | LF | | $0.00 |
| 0001CN | Prep (Chemical Stripping) | 1,500 | LF | | $0.00 |
| 0001CO | Prep (Abrasive Blasting) | 1,500 | LF | | $0.00 |
| 0001CP | Prep (Power Washer) | 1,500 | LF | | $0.00 |
| 0001CQ | Primer | 1,500 | LF | | $0.00 |
| 0001CR | Topcoat | 1,500 | LF | | $0.00 |
| 0001CS | Enclosure, Bridge | 5 | EA | | $0.00 |
| 0001CT | Chemical Bonding Wipe | 1,500 | LF | | $0.00 |
| Pipe Railings Round or Square 8 inch | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 0001CU | Prep (Manual Scraping/Wire Brushing) | 250 | LF | | $0.00 |
| 0001CV | Prep (Chemical Stripping) | 250 | LF | | $0.00 |
| 0001CW | Prep (Abrasive Blasting) | 250 | LF | | $0.00 |
| 0001CX | Prep (Power Washer) | 250 | LF | | $0.00 |
| 0001CY | Primer | 250 | LF | | $0.00 |
| 0001CZ | Topcoat | 250 | LF | | $0.00 |
| 0001DA | Chemical Bonding Wipe | 250 | LF | | $0.00 |
| Pipe Railings Round or Square 10 inch | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 0001DB | Prep (Manual Scraping/Wire Brushing) | 250 | LF | | $0.00 |
| 0001DC | Prep (Chemical Stripping) | 250 | LF | | $0.00 |
| 0001DD | Prep (Abrasive Blasting) | 250 | LF | | $0.00 |
| 0001DE | Prep (Power Washer) | 250 | LF | | $0.00 |
| 0001DF | Primer | 250 | LF | | $0.00 |
| 0001DG | Topcoat | 250 | LF | | $0.00 |
| 0001DH | Chemical Bonding Wipe | 250 | LF | | $0.00 |
| Galvanized Steel Coatings | | | | | |
| Railings Round or Square 2-3 inch | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 0001DI | Prep (Power Washer) | 1,000 | LF | | $0.00 |
| 0001DJ | Prep (Solvent Cleaning) | 1,000 | LF | | $0.00 |
| 0001DK | Primer | 1,000 | LF | | $0.00 |
| 0001DL | Topcoat | 1,000 | LF | | $0.00 |
| 0001DM | Chemical Bonding Wipe | 1,000 | LF | | $0.00 |
| Other Surfaces | | | |
| 0001DN | Prep (Power Washer) | 1,000 | SF | $0.00 |
| 0001DO | Prep (Solvent Cleaning) | 1,000 | SF | $0.00 |
| 0001DP | Primer | 1,000 | SF | $0.00 |
| 0001DQ | Topcoat | 1,000 | SF | $0.00 |
| 0001DR | Chemical Bonding Wipe | 1,000 | SF | $0.00 |
| Aluminum Coatings | | | | | |
| Round Surfaces (Poles, Posts, Etc) | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 0001DS | Prep (Power Washer) | 2,100 | SF | | $0.00 |
| 0001DT | Prep (Solvent Cleaning) | 2,100 | SF | | $0.00 |
| 0001DU | Primer | 2,100 | SF | | $0.00 |
| 0001DV | Topcoat | 2,100 | SF | | $0.00 |
| 0001DW | Chemical Bonding Wipe | 2,100 | SF | | $0.00 |
| 0001DX | Prep Chemical Stripping | 2,100 | SF | | $0.00 |
| Flat Surfaces | | | |
| 0001DY | Prep (Power Washer) | 1,000 | SF | $0.00 |
| 0001DZ | Prep (Solvent Cleaning) | 1,000 | SF | $0.00 |
| 0001EA | Primer | 1,000 | SF | $0.00 |
| 0001EB | Topcoat | 1,000 | SF | $0.00 |
| 0001EC | Chemical Bonding Wipe | 1,000 | SF | $0.00 |
| 0001ED | Prep Chemical Stripping | 1,000 | SF | $0.00 |
| Rust Conversion Coating | | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 0001EE | Pipe Railing Round or Square 2-3 inch | 1,000 | LF | | $0.00 |
| 0001EF | Pipe Railing Round or Square 3 1/2-6 inch | 1,000 | LF | | $0.00 |
| 0001EG | Other Surfaces | 800 | SF | | $0.00 |
| Miscellaneous Features | | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 0001EH | Prep and paint window, 1 side, w/trim | 432 | ea | | $0.00 |
| 0001EI | Prep and paint window, 1 side, w/trim, above 10' | 288 | ea | | $0.00 |
| 0001EJ | Prep and paint door, 1 side, w/frame | 96 | ea | | $0.00 |
| 0001EK | Prep and paint wood trim, up to 8" wide | 1700 | lf | | $0.00 |
| 0001EL | Prep and paint wood trim, up to 8" wide, above 10' | 2800 | lf | | $0.00 |
| 0001EM | Prep and paint metal trim, up to 8" wide | 1400 | lf | | $0.00 |
| 0001EN | Prep and paint metal trim, up to 8" wide, above 10' | 2100 | lf | | $0.00 |
| 0001EO | Prep and paint misc. feature, up to 6" wide | 1400 | lf | | $0.00 |
| 0001EP | Prep and paint misc. feature, up to 6" wide, above 10' | 2100 | lf | | $0.00 |
| 0001EQ | Remove window screen to paint; replace after | 432 | ea | | $0.00 |
| 0001ER | Prep, repair and paint column, w/base, crown, and trim | 480 | ea | | $0.00 |
| 0001ES | Prep and paint louver, w/trim | 40 | ea | | $0.00 |
| 0001ET | Prep and paint louver, w/trim, above 10' | 40 | ea | | $0.00 |
| 0001EU | Prep and paint downspout (per story) | 288 | ea | | $0.00 |
| 0001EV | Prep and paint roof edge assembly (soffit, fascia, trim) | 2880 | lf | | $0.00 |
| 0001EW | Prep and paint roof edge assembly; complex | 2880 | lf | | $0.00 |
| 0001EX | Prep and paint large bay door, 1 side, w/trim | 6 | ea | | $0.00 |
| 0001EY | Prep and paint gutters | 1920 | lf | | $0.00 |
| 0001EZ | Floor prep & epoxy coating, 2 base coats plus top coat | 2400 | sf | | $0.00 |
| 0001FA | Paint, spray application, 2 coats | 3600 | sf | | $0.00 |
| 0001FB | Paint, spray application, 2 coats, over 10' | 1800 | sf | | $0.00 |
| 0001FC | Prep and paint metal structural member, over 10' | 1000 | lf | | $0.00 |
| 0001FD | Prep and paint wooden railing assembly; complex | 500 | lf | | $0.00 |
| 0001FE | Replace corner guard | 1000 | lf | | $0.00 |
| Total for SubCLINs 0001AA through 0001FE | | | | | $0.00 |
| Enter this amount for CLIN 0001 | | | | | |
| (Please limit pricing to two (2) decimal spaces.) | | $0.00 | | | |
FA4613-14-R-0003
&A Pg. &P of &N
OPTION YEAR 1
| BID SCHEDULE - OPTION YEAR 1 |
| MAINTAIN BASE PAINT |
(Note: Prices must be no more than two decimal points)
| The following SubCLINs 1001AA through 1001FE correspond to the pricing for Basic Year CLIN |
| 0001 above. The total of these SubCLINs should equal the amount listed for Basic Year CLIN |
| 0001 in the Bid Summary Schedule below. Please limit pricing to two (2) decimal spaces. |
| CLIN 1001 OPTION YEAR 1 | | | | | |
| INTERIOR PAINT | | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 1001AA | Install Plastic | 50,000 | SF | | $0.00 |
| 1001AB | Minor Prep for Painting | 54,000 | SF | | $0.00 |
| 1001AC | Major Prep for Painting | 5,000 | SF | | $0.00 |
| 1001AD | Mud/ Tape/ Sand Joints | 5,000 | LF | | $0.00 |
| 1001AE | Remove Wall Covering | 45,000 | SF | | $0.00 |
| 1001AF | Paint Primer | 200,000 | SF | | $0.00 |
| 1001AG | Textured Finish | 50,000 | SF | | $0.00 |
| 1001AH | Paint | 320,000 | SF | | $0.00 |
| 1001AI | Replacement of Cove Base | 4,000 | LF | | $0.00 |
| 1001AJ | Remove trim/chair rail and repair area | 1,800 | LF | | $0.00 |
| 1001AK | Replacement of Hardware | 1,800 | EA | | $0.00 |
| 1001AL | Install/Repair Metal Corner Bead | 500 | LF | | $0.00 |
| 1001AM | Strip/Refinish Varnish Surfaces (Wood) | 1,000 | SF | | $0.00 |
| EXTERIOR PAINT | | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 1001AN | Minor Prep of Wood Surface under 10' | 4,000 | SF | | $0.00 |
| 1001AO | Major Prep of Wood Surface under 10' | 4,000 | SF | | $0.00 |
| 1001AP | Minor Prep of Wood Surface over 10' | 4,000 | SF | | $0.00 |
| 1001AQ | Major Prep of Wood Surface over 10' | 4,000 | SF | | $0.00 |
| 1001AR | Minor Prep of Metal Surface under 10' | 3,000 | SF | | $0.00 |
| 1001AS | Major Prep of Metal Surface under 10' | 2,000 | SF | | $0.00 |
| 1001AT | Minor Prep of Metal Surface over 10' | 3,000 | SF | | $0.00 |
| 1001AU | Major Prep of Metal Surface over 10' | 2,000 | SF | | $0.00 |
| 1001AV | Total Abatement of Lead Based Surface under 10' | 20,000 | SF | | $0.00 |
| 1001AW | Total Abatement of Lead Based Surface over 10' | 10,500 | SF | | $0.00 |
| 1001AX | Primer application 2 coat under 10' w/ brush or roller | 32,000 | SF | | $0.00 |
| 1001AY | Primer application 2 coat over 10' w/ brush or roller | 77,000 | SF | | $0.00 |
| 1001AZ | Paint application 2 coat under 10' w/ brush or roller | 54,000 | SF | | $0.00 |
| 1001BA | Paint application 2 coat over 10' w/ brush or roller | 77,000 | SF | | $0.00 |
| METAL APPURTENANCES | | | | | |
| General Conditions | | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 1001BB | Not Used | NA | NA | NA | NA |
| 1001BC | Abrasive Blasting Enclosure | 25 | EA | | $0.00 |
| Cast Iron Coatings | | | | | |
| Fire Hydrant | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 1001BD | Fire Hydrant Prep (Manual Scraping) | 30 | EA | | $0.00 |
| 1001BE | Fire Hydrant Prep (Chemical Stripping) | 30 | EA | | $0.00 |
| 1001BF | Fire Hydrant Prep (Abrasive Blasting) | 30 | EA | | $0.00 |
| 1001BG | Fire Hydrant Prep (Power Washer) | 30 | EA | | $0.00 |
| 1001BH | Primer | 30 | EA | | $0.00 |
| 1001BI | Topcoat | 30 | EA | | $0.00 |
| 1001BJ | Chemical Bonding Wipe | 30 | EA | | $0.00 |
| Other Surfaces | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 1001BK | Prep (Manual Scraping) | 500 | SF | | $0.00 |
| 1001BL | Prep (Chemical Stripping) | 500 | SF | | $0.00 |
| 1001BM | Prep (Abrasive Blasting) | 500 | SF | | $0.00 |
| 1001BN | Prep (Power Washer) | 500 | SF | | $0.00 |
| 1001BO | Primer | 500 | SF | | $0.00 |
| 1001BP | Topcoat | 500 | SF | | $0.00 |
| 1001BQ | Chemical Bonding Wipe | 500 | SF | | $0.00 |
| Black Steel Coatings | | | | | |
| Street Lighting Standard | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 1001BR | Street Light Prep (Manual Scraping/Wire Brushing) | 50 | EA | | $0.00 |
| 1001BS | Street Light Prep (Chemical Stripping) | 50 | EA | | $0.00 |
| 1001BT | Street Light Prep (Abrasive Blasting) | 50 | EA | | $0.00 |
| 1001BU | Street Light Prep (Power Washer) | 50 | EA | | $0.00 |
| 1001BV | Primer | 50 | EA | | $0.00 |
| 1001BW | Topcoat | 50 | EA | | $0.00 |
| 1001BX | Chemical Bonding Wipe | 50 | EA | | $0.00 |
| Pipe Railings 2-3 Inch Round or Square | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 1001BY | Prep (Manual Scraping/Wire Brushing) | 2,200 | LF | | $0.00 |
| 1001BZ | Prep (Chemical Stripping) | 2,200 | LF | | $0.00 |
| 1001CA | Prep (Abrasive Blasting) | 2,200 | LF | | $0.00 |
| 1001CB | Prep (Power Washer) | 2,200 | LF | | $0.00 |
| 1001CC | Primer | 2,200 | LF | | $0.00 |
| 1001CD | Topcoat | 2,200 | LF | | $0.00 |
| 1001CE | Chemical Bonding Wipe | 2,200 | LF | | $0.00 |
| Other Surfaces | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 1001CF | Prep (Manual Scraping/Wire Brushing) | 2,500 | SF | | $0.00 |
| 1001CG | Prep (Chemical Stripping) | 2,500 | SF | | $0.00 |
| 1001CH | Prep (Abrasive Blasting) | 2,500 | SF | | $0.00 |
| 1001CI | Prep (Power Washer) | 2,500 | SF | | $0.00 |
| 1001CJ | Primer | 2,500 | SF | | $0.00 |
| 1001CK | Topcoat | 2,500 | SF | | $0.00 |
| 1001CL | Chemical Bonding Wipe | 2,500 | SF | | $0.00 |
| Pipe Railings Round or Square 3 1/2-6 inch | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 1001CM | Prep (Manual Scraping/Wire Brushing) | 1,500 | LF | | $0.00 |
| 1001CN | Prep (Chemical Stripping) | 1,500 | LF | | $0.00 |
| 1001CO | Prep (Abrasive Blasting) | 1,500 | LF | | $0.00 |
| 1001CP | Prep (Power Washer) | 1,500 | LF | | $0.00 |
| 1001CQ | Primer | 1,500 | LF | | $0.00 |
| 1001CR | Topcoat | 1,500 | LF | | $0.00 |
| 1001CS | Enclosure, Bridge | 5 | EA | | $0.00 |
| 1001CT | Chemical Bonding Wipe | 1,500 | LF | | $0.00 |
| Pipe Railings Round or Square 8 inch | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 1001CU | Prep (Manual Scraping/Wire Brushing) | 250 | LF | | $0.00 |
| 1001CV | Prep (Chemical Stripping) | 250 | LF | | $0.00 |
| 1001CW | Prep (Abrasive Blasting) | 250 | LF | | $0.00 |
| 1001CX | Prep (Power Washer) | 250 | LF | | $0.00 |
| 1001CY | Primer | 250 | LF | | $0.00 |
| 1001CZ | Topcoat | 250 | LF | | $0.00 |
| 1001DA | Chemical Bonding Wipe | 250 | LF | | $0.00 |
| Pipe Railings Round or Square 10 inch | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 1001DB | Prep (Manual Scraping/Wire Brushing) | 250 | LF | | $0.00 |
| 1001DC | Prep (Chemical Stripping) | 250 | LF | | $0.00 |
| 1001DD | Prep (Abrasive Blasting) | 250 | LF | | $0.00 |
| 1001DE | Prep (Power Washer) | 250 | LF | | $0.00 |
| 1001DF | Primer | 250 | LF | | $0.00 |
| 1001DG | Topcoat | 250 | LF | | $0.00 |
| 1001DH | Chemical Bonding Wipe | 250 | LF | | $0.00 |
| Galvanized Steel Coatings | | | | | |
| Railings Round or Square 2-3 inch | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 1001DI | Prep (Power Washer) | 1,000 | LF | | $0.00 |
| 1001DJ | Prep (Solvent Cleaning) | 1,000 | LF | | $0.00 |
| 1001DK | Primer | 1,000 | LF | | $0.00 |
| 1001DL | Topcoat | 1,000 | LF | | $0.00 |
| 1001DM | Chemical Bonding Wipe | 1,000 | LF | | $0.00 |
| Other Surfaces | | | |
| 1001DN | Prep (Power Washer) | 1,000 | SF | $0.00 |
| 1001DO | Prep (Solvent Cleaning) | 1,000 | SF | $0.00 |
| 1001DP | Primer | 1,000 | SF | $0.00 |
| 1001DQ | Topcoat | 1,000 | SF | $0.00 |
| 1001DR | Chemical Bonding Wipe | 1,000 | SF | $0.00 |
| Aluminum Coatings | | | | | |
| Round Surfaces (Poles, Posts, Etc) | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 1001DS | Prep (Power Washer) | 2,100 | SF | | $0.00 |
| 1001DT | Prep (Solvent Cleaning) | 2,100 | SF | | $0.00 |
| 1001DU | Primer | 2,100 | SF | | $0.00 |
| 1001DV | Topcoat | 2,100 | SF | | $0.00 |
| 1001DW | Chemical Bonding Wipe | 2,100 | SF | | $0.00 |
| 1001DX | Prep Chemical Stripping | 2,100 | SF | | $0.00 |
| Flat Surfaces | | | |
| 1001DY | Prep (Power Washer) | 1,000 | SF | $0.00 |
| 1001DZ | Prep (Solvent Cleaning) | 1,000 | SF | $0.00 |
| 1001EA | Primer | 1,000 | SF | $0.00 |
| 1001EB | Topcoat | 1,000 | SF | $0.00 |
| 1001EC | Chemical Bonding Wipe | 1,000 | SF | $0.00 |
| 1001ED | Prep Chemical Stripping | 1,000 | SF | $0.00 |
| Rust Conversion Coating | | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 1001EE | Pipe Railing Round or Square 2-3 inch | 1,000 | LF | | $0.00 |
| 1001EF | Pipe Railing Round or Square 3 1/2-6 inch | 1,000 | LF | | $0.00 |
| 1001EG | Other Surfaces | 800 | SF | | $0.00 |
| Miscellaneous Features | | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 1001EH | Prep and paint window, 1 side, w/trim | 432 | ea | | $0.00 |
| 1001EI | Prep and paint window, 1 side, w/trim, above 10' | 288 | ea | | $0.00 |
| 1001EJ | Prep and paint door, 1 side, w/frame | 96 | ea | | $0.00 |
| 1001EK | Prep and paint wood trim, up to 8" wide | 1700 | lf | | $0.00 |
| 1001EL | Prep and paint wood trim, up to 8" wide, above 10' | 2800 | lf | | $0.00 |
| 1001EM | Prep and paint metal trim, up to 8" wide | 1400 | lf | | $0.00 |
| 1001EN | Prep and paint metal trim, up to 8" wide, above 10' | 2100 | lf | | $0.00 |
| 1001EO | Prep and paint misc. feature, up to 6" wide | 1400 | lf | | $0.00 |
| 1001EP | Prep and paint misc. feature, up to 6" wide, above 10' | 2100 | lf | | $0.00 |
| 1001EQ | Remove window screen to paint; replace after | 432 | ea | | $0.00 |
| 1001ER | Prep, repair and paint column, w/base, crown, and trim | 480 | ea | | $0.00 |
| 1001ES | Prep and paint louver, w/trim | 40 | ea | | $0.00 |
| 1001ET | Prep and paint louver, w/trim, above 10' | 40 | ea | | $0.00 |
| 1001EU | Prep and paint downspout (per story) | 288 | ea | | $0.00 |
| 1001EV | Prep and paint roof edge assembly (soffit, fascia, trim) | 2880 | lf | | $0.00 |
| 1001EW | Prep and paint roof edge assembly; complex | 2880 | lf | | $0.00 |
| 1001EX | Prep and paint large bay door, 1 side, w/trim | 6 | ea | | $0.00 |
| 1001EY | Prep and paint gutters | 1920 | lf | | $0.00 |
| 1001EZ | Floor prep & epoxy coating, 2 base coats plus top coat | 2400 | sf | | $0.00 |
| 1001FA | Paint, spray application, 2 coats | 3600 | sf | | $0.00 |
| 1001FB | Paint, spray application, 2 coats, over 10' | 1800 | sf | | $0.00 |
| 1001FC | Prep and paint metal structural member, over 10' | 1000 | lf | | $0.00 |
| 1001FD | Prep and paint wooden railing assembly; complex | 500 | lf | | $0.00 |
| 1001FE | Replace corner guard | 1000 | lf | | $0.00 |
| Total for SubCLINs 1001AA through 1001FE | | $0.00 |
| Enter this amount for CLIN 0001 | | |
| (Please limit pricing to two (2) decimal spaces.) | $0.00 | |
FA4613-14-R-0003
OPTION YEAR 2
| BID SCHEDULE - OPTION YEAR 2 |
| MAINTAIN BASE PAINT |
(Note: Prices must be no more than two decimal points)
| The following SubCLINs 2001AA through 2001FE correspond to the pricing for Basic Year CLIN |
| 0001 above. The total of these SubCLINs should equal the amount listed for Basic Year CLIN |
| 0001 in the Bid Summary Schedule below. Please limit pricing to two (2) decimal spaces. |
| CLIN 2001 OPTION YEAR 2 | | | | | |
| INTERIOR PAINT | | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 2001AA | Install Plastic | 50,000 | SF | | $0.00 |
| 2001AB | Minor Prep for Painting | 54,000 | SF | | $0.00 |
| 2001AC | Major Prep for Painting | 5,000 | SF | | $0.00 |
| 2001AD | Mud/ Tape/ Sand Joints | 5,000 | LF | | $0.00 |
| 2001AE | Remove Wall Covering | 45,000 | SF | | $0.00 |
| 2001AF | Paint Primer | 200,000 | SF | | $0.00 |
| 2001AG | Textured Finish | 50,000 | SF | | $0.00 |
| 2001AH | Paint | 320,000 | SF | | $0.00 |
| 2001AI | Replacement of Cove Base | 4,000 | LF | | $0.00 |
| 2001AJ | Remove trim/chair rail and repair area | 1,800 | LF | | $0.00 |
| 2001AK | Replacement of Hardware | 1,800 | EA | | $0.00 |
| 2001AL | Install/Repair Metal Corner Bead | 500 | LF | | $0.00 |
| 2001AM | Strip/Refinish Varnish Surfaces (Wood) | 1,000 | SF | | $0.00 |
| EXTERIOR PAINT | | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 2001AN | Minor Prep of Wood Surface under 10' | 4,000 | SF | | $0.00 |
| 2001AO | Major Prep of Wood Surface under 10' | 4,000 | SF | | $0.00 |
| 2001AP | Minor Prep of Wood Surface over 10' | 4,000 | SF | | $0.00 |
| 2001AQ | Major Prep of Wood Surface over 10' | 4,000 | SF | | $0.00 |
| 2001AR | Minor Prep of Metal Surface under 10' | 3,000 | SF | | $0.00 |
| 2001AS | Major Prep of Metal Surface under 10' | 2,000 | SF | | $0.00 |
| 2001AT | Minor Prep of Metal Surface over 10' | 3,000 | SF | | $0.00 |
| 2001AU | Major Prep of Metal Surface over 10' | 2,000 | SF | | $0.00 |
| 2001AV | Total Abatement of Lead Based Surface under 10' | 20,000 | SF | | $0.00 |
| 2001AW | Total Abatement of Lead Based Surface over 10' | 10,500 | SF | | $0.00 |
| 2001AX | Primer application 2 coat under 10' w/ brush or roller | 32,000 | SF | | $0.00 |
| 2001AY | Primer application 2 coat over 10' w/ brush or roller | 77,000 | SF | | $0.00 |
| 2001AZ | Paint application 2 coat under 10' w/ brush or roller | 54,000 | SF | | $0.00 |
| 2001BA | Paint application 2 coat over 10' w/ brush or roller | 77,000 | SF | | $0.00 |
| METAL APPURTENANCES | | | | | |
| General Conditions | | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 2001BB | Not Used | NA | NA | NA | NA |
| 2001BC | Abrasive Blasting Enclosure | 25 | EA | | $0.00 |
| Cast Iron Coatings | | | | | |
| Fire Hydrant | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 2001BD | Fire Hydrant Prep (Manual Scraping) | 30 | EA | | $0.00 |
| 2001BE | Fire Hydrant Prep (Chemical Stripping) | 30 | EA | | $0.00 |
| 2001BF | Fire Hydrant Prep (Abrasive Blasting) | 30 | EA | | $0.00 |
| 2001BG | Fire Hydrant Prep (Power Washer) | 30 | EA | | $0.00 |
| 2001BH | Primer | 30 | EA | | $0.00 |
| 2001BI | Topcoat | 30 | EA | | $0.00 |
| 2001BJ | Chemical Bonding Wipe | 30 | EA | | $0.00 |
| Other Surfaces | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 2001BK | Prep (Manual Scraping) | 500 | SF | | $0.00 |
| 2001BL | Prep (Chemical Stripping) | 500 | SF | | $0.00 |
| 2001BM | Prep (Abrasive Blasting) | 500 | SF | | $0.00 |
| 2001BN | Prep (Power Washer) | 500 | SF | | $0.00 |
| 2001BO | Primer | 500 | SF | | $0.00 |
| 2001BP | Topcoat | 500 | SF | | $0.00 |
| 2001BQ | Chemical Bonding Wipe | 500 | SF | | $0.00 |
| Black Steel Coatings | | | | | |
| Street Lighting Standard | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 2001BR | Street Light Prep (Manual Scraping/Wire Brushing) | 50 | EA | | $0.00 |
| 2001BS | Street Light Prep (Chemical Stripping) | 50 | EA | | $0.00 |
| 2001BT | Street Light Prep (Abrasive Blasting) | 50 | EA | | $0.00 |
| 2001BU | Street Light Prep (Power Washer) | 50 | EA | | $0.00 |
| 2001BV | Primer | 50 | EA | | $0.00 |
| 2001BW | Topcoat | 50 | EA | | $0.00 |
| 2001BX | Chemical Bonding Wipe | 50 | EA | | $0.00 |
| Pipe Railings 2-3 Inch Round or Square | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 2001BY | Prep (Manual Scraping/Wire Brushing) | 2,200 | LF | | $0.00 |
| 2001BZ | Prep (Chemical Stripping) | 2,200 | LF | | $0.00 |
| 2001CA | Prep (Abrasive Blasting) | 2,200 | LF | | $0.00 |
| 2001CB | Prep (Power Washer) | 2,200 | LF | | $0.00 |
| 2001CC | Primer | 2,200 | LF | | $0.00 |
| 2001CD | Topcoat | 2,200 | LF | | $0.00 |
| 2001CE | Chemical Bonding Wipe | 2,200 | LF | | $0.00 |
| Other Surfaces | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 2001CF | Prep (Manual Scraping/Wire Brushing) | 2,500 | SF | | $0.00 |
| 2001CG | Prep (Chemical Stripping) | 2,500 | SF | | $0.00 |
| 2001CH | Prep (Abrasive Blasting) | 2,500 | SF | | $0.00 |
| 2001CI | Prep (Power Washer) | 2,500 | SF | | $0.00 |
| 2001CJ | Primer | 2,500 | SF | | $0.00 |
| 2001CK | Topcoat | 2,500 | SF | | $0.00 |
| 2001CL | Chemical Bonding Wipe | 2,500 | SF | | $0.00 |
| Pipe Railings Round or Square 3 1/2-6 inch | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 2001CM | Prep (Manual Scraping/Wire Brushing) | 1,500 | LF | | $0.00 |
| 2001CN | Prep (Chemical Stripping) | 1,500 | LF | | $0.00 |
| 2001CO | Prep (Abrasive Blasting) | 1,500 | LF | | $0.00 |
| 2001CP | Prep (Power Washer) | 1,500 | LF | | $0.00 |
| 2001CQ | Primer | 1,500 | LF | | $0.00 |
| 2001CR | Topcoat | 1,500 | LF | | $0.00 |
| 2001CS | Enclosure, Bridge | 5 | EA | | $0.00 |
| 2001CT | Chemical Bonding Wipe | 1,500 | LF | | $0.00 |
| Pipe Railings Round or Square 8 inch | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 2001CU | Prep (Manual Scraping/Wire Brushing) | 250 | LF | | $0.00 |
| 2001CV | Prep (Chemical Stripping) | 250 | LF | | $0.00 |
| 2001CW | Prep (Abrasive Blasting) | 250 | LF | | $0.00 |
| 2001CX | Prep (Power Washer) | 250 | LF | | $0.00 |
| 2001CY | Primer | 250 | LF | | $0.00 |
| 2001CZ | Topcoat | 250 | LF | | $0.00 |
| 2001DA | Chemical Bonding Wipe | 250 | LF | | $0.00 |
| Pipe Railings Round or Square 10 inch | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 2001DB | Prep (Manual Scraping/Wire Brushing) | 250 | LF | | $0.00 |
| 2001DC | Prep (Chemical Stripping) | 250 | LF | | $0.00 |
| 2001DD | Prep (Abrasive Blasting) | 250 | LF | | $0.00 |
| 2001DE | Prep (Power Washer) | 250 | LF | | $0.00 |
| 2001DF | Primer | 250 | LF | | $0.00 |
| 2001DG | Topcoat | 250 | LF | | $0.00 |
| 2001DH | Chemical Bonding Wipe | 250 | LF | | $0.00 |
| Galvanized Steel Coatings | | | | | |
| Railings Round or Square 2-3 inch | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 2001DI | Prep (Power Washer) | 1,000 | LF | | $0.00 |
| 2001DJ | Prep (Solvent Cleaning) | 1,000 | LF | | $0.00 |
| 2001DK | Primer | 1,000 | LF | | $0.00 |
| 2001DL | Topcoat | 1,000 | LF | | $0.00 |
| 2001DM | Chemical Bonding Wipe | 1,000 | LF | | $0.00 |
| Other Surfaces | | | |
| 2001DN | Prep (Power Washer) | 1,000 | SF | $0.00 |
| 2001DO | Prep (Solvent Cleaning) | 1,000 | SF | $0.00 |
| 2001DP | Primer | 1,000 | SF | $0.00 |
| 2001DQ | Topcoat | 1,000 | SF | $0.00 |
| 2001DR | Chemical Bonding Wipe | 1,000 | SF | $0.00 |
| Aluminum Coatings | | | | | |
| Round Surfaces (Poles, Posts, Etc) | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 2001DS | Prep (Power Washer) | 2,100 | SF | | $0.00 |
| 2001DT | Prep (Solvent Cleaning) | 2,100 | SF | | $0.00 |
| 2001DU | Primer | 2,100 | SF | | $0.00 |
| 2001DV | Topcoat | 2,100 | SF | | $0.00 |
| 2001DW | Chemical Bonding Wipe | 2,100 | SF | | $0.00 |
| 2001DX | Prep Chemical Stripping | 2,100 | SF | | $0.00 |
| Flat Surfaces | | | |
| 2001DY | Prep (Power Washer) | 1,000 | SF | $0.00 |
| 2001DZ | Prep (Solvent Cleaning) | 1,000 | SF | $0.00 |
| 2001EA | Primer | 1,000 | SF | $0.00 |
| 2001EB | Topcoat | 1,000 | SF | $0.00 |
| 2001EC | Chemical Bonding Wipe | 1,000 | SF | $0.00 |
| 2001ED | Prep Chemical Stripping | 1,000 | SF | $0.00 |
| Rust Conversion Coating | | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 2001EE | Pipe Railing Round or Square 2-3 inch | 1,000 | LF | | $0.00 |
| 2001EF | Pipe Railing Round or Square 3 1/2-6 inch | 1,000 | LF | | $0.00 |
| 2001EG | Other Surfaces | 800 | SF | | $0.00 |
| Miscellaneous Features | | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 2001EH | Prep and paint window, 1 side, w/trim | 432 | ea | | $0.00 |
| 2001EI | Prep and paint window, 1 side, w/trim, above 10' | 288 | ea | | $0.00 |
| 2001EJ | Prep and paint door, 1 side, w/frame | 96 | ea | | $0.00 |
| 2001EK | Prep and paint wood trim, up to 8" wide | 1700 | lf | | $0.00 |
| 2001EL | Prep and paint wood trim, up to 8" wide, above 10' | 2800 | lf | | $0.00 |
| 2001EM | Prep and paint metal trim, up to 8" wide | 1400 | lf | | $0.00 |
| 2001EN | Prep and paint metal trim, up to 8" wide, above 10' | 2100 | lf | | $0.00 |
| 2001EO | Prep and paint misc. feature, up to 6" wide | 1400 | lf | | $0.00 |
| 2001EP | Prep and paint misc. feature, up to 6" wide, above 10' | 2100 | lf | | $0.00 |
| 2001EQ | Remove window screen to paint; replace after | 432 | ea | | $0.00 |
| 2001ER | Prep, repair and paint column, w/base, crown, and trim | 480 | ea | | $0.00 |
| 2001ES | Prep and paint louver, w/trim | 40 | ea | | $0.00 |
| 2001ET | Prep and paint louver, w/trim, above 10' | 40 | ea | | $0.00 |
| 2001EU | Prep and paint downspout (per story) | 288 | ea | | $0.00 |
| 2001EV | Prep and paint roof edge assembly (soffit, fascia, trim) | 2880 | lf | | $0.00 |
| 2001EW | Prep and paint roof edge assembly; complex | 2880 | lf | | $0.00 |
| 2001EX | Prep and paint large bay door, 1 side, w/trim | 6 | ea | | $0.00 |
| 2001EY | Prep and paint gutters | 1920 | lf | | $0.00 |
| 2001EZ | Floor prep & epoxy coating, 2 base coats plus top coat | 2400 | sf | | $0.00 |
| 2001FA | Paint, spray application, 2 coats | 3600 | sf | | $0.00 |
| 2001FB | Paint, spray application, 2 coats, over 10' | 1800 | sf | | $0.00 |
| 2001FC | Prep and paint metal structural member, over 10' | 1000 | lf | | $0.00 |
| 2001FD | Prep and paint wooden railing assembly; complex | 500 | lf | | $0.00 |
| 2001FE | Replace corner guard | 1000 | lf | | $0.00 |
| Total for SubCLINs 2001AA through 2001FE | | $0.00 |
| Enter this amount for CLIN 0001 | | |
| (Please limit pricing to two (2) decimal spaces.) | $0.00 | |
FA4613-14-R-0003
OPTION YEAR 3
| BID SCHEDULE - OPTION YEAR 3 |
| MAINTAIN BASE PAINT |
(Note: Prices must be no more than two decimal points)
| The following SubCLINs 3001AA through 3001FE correspond to the pricing for Basic Year CLIN |
| 0001 above. The total of these SubCLINs should equal the amount listed for Basic Year CLIN |
| 0001 in the Bid Summary Schedule below. Please limit pricing to two (2) decimal spaces. |
| CLIN 3001 OPTION YEAR 3 | | | | | |
| INTERIOR PAINT | | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 3001AA | Install Plastic | 50,000 | SF | | $0.00 |
| 3001AB | Minor Prep for Painting | 54,000 | SF | | $0.00 |
| 3001AC | Major Prep for Painting | 5,000 | SF | | $0.00 |
| 3001AD | Mud/ Tape/ Sand Joints | 5,000 | LF | | $0.00 |
| 3001AE | Remove Wall Covering | 45,000 | SF | | $0.00 |
| 3001AF | Paint Primer | 200,000 | SF | | $0.00 |
| 3001AG | Textured Finish | 50,000 | SF | | $0.00 |
| 3001AH | Paint | 320,000 | SF | | $0.00 |
| 3001AI | Replacement of Cove Base | 4,000 | LF | | $0.00 |
| 3001AJ | Remove trim/chair rail and repair area | 1,800 | LF | | $0.00 |
| 3001AK | Replacement of Hardware | 1,800 | EA | | $0.00 |
| 3001AL | Install/Repair Metal Corner Bead | 500 | LF | | $0.00 |
| 3001AM | Strip/Refinish Varnish Surfaces (Wood) | 1,000 | SF | | $0.00 |
| EXTERIOR PAINT | | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 3001AN | Minor Prep of Wood Surface under 10' | 4,000 | SF | | $0.00 |
| 3001AO | Major Prep of Wood Surface under 10' | 4,000 | SF | | $0.00 |
| 3001AP | Minor Prep of Wood Surface over 10' | 4,000 | SF | | $0.00 |
| 3001AQ | Major Prep of Wood Surface over 10' | 4,000 | SF | | $0.00 |
| 3001AR | Minor Prep of Metal Surface under 10' | 3,000 | SF | | $0.00 |
| 3001AS | Major Prep of Metal Surface under 10' | 2,000 | SF | | $0.00 |
| 3001AT | Minor Prep of Metal Surface over 10' | 3,000 | SF | | $0.00 |
| 3001AU | Major Prep of Metal Surface over 10' | 2,000 | SF | | $0.00 |
| 3001AV | Total Abatement of Lead Based Surface under 10' | 20,000 | SF | | $0.00 |
| 3001AW | Total Abatement of Lead Based Surface over 10' | 10,500 | SF | | $0.00 |
| 3001AX | Primer application 2 coat under 10' w/ brush or roller | 32,000 | SF | | $0.00 |
| 3001AY | Primer application 2 coat over 10' w/ brush or roller | 77,000 | SF | | $0.00 |
| 3001AZ | Paint application 2 coat under 10' w/ brush or roller | 54,000 | SF | | $0.00 |
| 3001BA | Paint application 2 coat over 10' w/ brush or roller | 77,000 | SF | | $0.00 |
| METAL APPURTENANCES | | | | | |
| General Conditions | | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 3001BB | Not Used | NA | NA | NA | NA |
| 3001BC | Abrasive Blasting Enclosure | 25 | EA | | $0.00 |
| Cast Iron Coatings | | | | | |
| Fire Hydrant | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 3001BD | Fire Hydrant Prep (Manual Scraping) | 30 | EA | | $0.00 |
| 3001BE | Fire Hydrant Prep (Chemical Stripping) | 30 | EA | | $0.00 |
| 3001BF | Fire Hydrant Prep (Abrasive Blasting) | 30 | EA | | $0.00 |
| 3001BG | Fire Hydrant Prep (Power Washer) | 30 | EA | | $0.00 |
| 3001BH | Primer | 30 | EA | | $0.00 |
| 3001BI | Topcoat | 30 | EA | | $0.00 |
| 3001BJ | Chemical Bonding Wipe | 30 | EA | | $0.00 |
| Other Surfaces | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 3001BK | Prep (Manual Scraping) | 500 | SF | | $0.00 |
| 3001BL | Prep (Chemical Stripping) | 500 | SF | | $0.00 |
| 3001BM | Prep (Abrasive Blasting) | 500 | SF | | $0.00 |
| 3001BN | Prep (Power Washer) | 500 | SF | | $0.00 |
| 3001BO | Primer | 500 | SF | | $0.00 |
| 3001BP | Topcoat | 500 | SF | | $0.00 |
| 3001BQ | Chemical Bonding Wipe | 500 | SF | | $0.00 |
| Black Steel Coatings | | | | | |
| Street Lighting Standard | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 3001BR | Street Light Prep (Manual Scraping/Wire Brushing) | 50 | EA | | $0.00 |
| 3001BS | Street Light Prep (Chemical Stripping) | 50 | EA | | $0.00 |
| 3001BT | Street Light Prep (Abrasive Blasting) | 50 | EA | | $0.00 |
| 3001BU | Street Light Prep (Power Washer) | 50 | EA | | $0.00 |
| 3001BV | Primer | 50 | EA | | $0.00 |
| 3001BW | Topcoat | 50 | EA | | $0.00 |
| 3001BX | Chemical Bonding Wipe | 50 | EA | | $0.00 |
| Pipe Railings 2-3 Inch Round or Square | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 3001BY | Prep (Manual Scraping/Wire Brushing) | 2,200 | LF | | $0.00 |
| 3001BZ | Prep (Chemical Stripping) | 2,200 | LF | | $0.00 |
| 3001CA | Prep (Abrasive Blasting) | 2,200 | LF | | $0.00 |
| 3001CB | Prep (Power Washer) | 2,200 | LF | | $0.00 |
| 3001CC | Primer | 2,200 | LF | | $0.00 |
| 3001CD | Topcoat | 2,200 | LF | | $0.00 |
| 3001CE | Chemical Bonding Wipe | 2,200 | LF | | $0.00 |
| Other Surfaces | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 3001CF | Prep (Manual Scraping/Wire Brushing) | 2,500 | SF | | $0.00 |
| 3001CG | Prep (Chemical Stripping) | 2,500 | SF | | $0.00 |
| 3001CH | Prep (Abrasive Blasting) | 2,500 | SF | | $0.00 |
| 3001CI | Prep (Power Washer) | 2,500 | SF | | $0.00 |
| 3001CJ | Primer | 2,500 | SF | | $0.00 |
| 3001CK | Topcoat | 2,500 | SF | | $0.00 |
| 3001CL | Chemical Bonding Wipe | 2,500 | SF | | $0.00 |
| Pipe Railings Round or Square 3 1/2-6 inch | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 3001CM | Prep (Manual Scraping/Wire Brushing) | 1,500 | LF | | $0.00 |
| 3001CN | Prep (Chemical Stripping) | 1,500 | LF | | $0.00 |
| 3001CO | Prep (Abrasive Blasting) | 1,500 | LF | | $0.00 |
| 3001CP | Prep (Power Washer) | 1,500 | LF | | $0.00 |
| 3001CQ | Primer | 1,500 | LF | | $0.00 |
| 3001CR | Topcoat | 1,500 | LF | | $0.00 |
| 3001CS | Enclosure, Bridge | 5 | EA | | $0.00 |
| 3001CT | Chemical Bonding Wipe | 1,500 | LF | | $0.00 |
| Pipe Railings Round or Square 8 inch | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 3001CU | Prep (Manual Scraping/Wire Brushing) | 250 | LF | | $0.00 |
| 3001CV | Prep (Chemical Stripping) | 250 | LF | | $0.00 |
| 3001CW | Prep (Abrasive Blasting) | 250 | LF | | $0.00 |
| 3001CX | Prep (Power Washer) | 250 | LF | | $0.00 |
| 3001CY | Primer | 250 | LF | | $0.00 |
| 3001CZ | Topcoat | 250 | LF | | $0.00 |
| 3001DA | Chemical Bonding Wipe | 250 | LF | | $0.00 |
| Pipe Railings Round or Square 10 inch | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 3001DB | Prep (Manual Scraping/Wire Brushing) | 250 | LF | | $0.00 |
| 3001DC | Prep (Chemical Stripping) | 250 | LF | | $0.00 |
| 3001DD | Prep (Abrasive Blasting) | 250 | LF | | $0.00 |
| 3001DE | Prep (Power Washer) | 250 | LF | | $0.00 |
| 3001DF | Primer | 250 | LF | | $0.00 |
| 3001DG | Topcoat | 250 | LF | | $0.00 |
| 3001DH | Chemical Bonding Wipe | 250 | LF | | $0.00 |
| Galvanized Steel Coatings | | | | | |
| Railings Round or Square 2-3 inch | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 3001DI | Prep (Power Washer) | 1,000 | LF | | $0.00 |
| 3001DJ | Prep (Solvent Cleaning) | 1,000 | LF | | $0.00 |
| 3001DK | Primer | 1,000 | LF | | $0.00 |
| 3001DL | Topcoat | 1,000 | LF | | $0.00 |
| 3001DM | Chemical Bonding Wipe | 1,000 | LF | | $0.00 |
| Other Surfaces | | | |
| 3001DN | Prep (Power Washer) | 1,000 | SF | $0.00 |
| 3001DO | Prep (Solvent Cleaning) | 1,000 | SF | $0.00 |
| 3001DP | Primer | 1,000 | SF | $0.00 |
| 3001DQ | Topcoat | 1,000 | SF | $0.00 |
| 3001DR | Chemical Bonding Wipe | 1,000 | SF | $0.00 |
| Aluminum Coatings | | | | | |
| Round Surfaces (Poles, Posts, Etc) | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 3001DS | Prep (Power Washer) | 2,100 | SF | | $0.00 |
| 3001DT | Prep (Solvent Cleaning) | 2,100 | SF | | $0.00 |
| 3001DU | Primer | 2,100 | SF | | $0.00 |
| 3001DV | Topcoat | 2,100 | SF | | $0.00 |
| 3001DW | Chemical Bonding Wipe | 2,100 | SF | | $0.00 |
| 3001DX | Prep Chemical Stripping | 2,100 | SF | | $0.00 |
| Flat Surfaces | | | |
| 3001DY | Prep (Power Washer) | 1,000 | SF | $0.00 |
| 3001DZ | Prep (Solvent Cleaning) | 1,000 | SF | $0.00 |
| 3001EA | Primer | 1,000 | SF | $0.00 |
| 3001EB | Topcoat | 1,000 | SF | $0.00 |
| 3001EC | Chemical Bonding Wipe | 1,000 | SF | $0.00 |
| 3001ED | Prep Chemical Stripping | 1,000 | SF | $0.00 |
| Rust Conversion Coating | | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 3001EE | Pipe Railing Round or Square 2-3 inch | 1,000 | LF | | $0.00 |
| 3001EF | Pipe Railing Round or Square 3 1/2-6 inch | 1,000 | LF | | $0.00 |
| 3001EG | Other Surfaces | 800 | SF | | $0.00 |
| Miscellaneous Features | | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 3001EH | Prep and paint window, 1 side, w/trim | 432 | ea | | $0.00 |
| 3001EI | Prep and paint window, 1 side, w/trim, above 10' | 288 | ea | | $0.00 |
| 3001EJ | Prep and paint door, 1 side, w/frame | 96 | ea | | $0.00 |
| 3001EK | Prep and paint wood trim, up to 8" wide | 1700 | lf | | $0.00 |
| 3001EL | Prep and paint wood trim, up to 8" wide, above 10' | 2800 | lf | | $0.00 |
| 3001EM | Prep and paint metal trim, up to 8" wide | 1400 | lf | | $0.00 |
| 3001EN | Prep and paint metal trim, up to 8" wide, above 10' | 2100 | lf | | $0.00 |
| 3001EO | Prep and paint misc. feature, up to 6" wide | 1400 | lf | | $0.00 |
| 3001EP | Prep and paint misc. feature, up to 6" wide, above 10' | 2100 | lf | | $0.00 |
| 3001EQ | Remove window screen to paint; replace after | 432 | ea | | $0.00 |
| 3001ER | Prep, repair and paint column, w/base, crown, and trim | 480 | ea | | $0.00 |
| 3001ES | Prep and paint louver, w/trim | 40 | ea | | $0.00 |
| 3001ET | Prep and paint louver, w/trim, above 10' | 40 | ea | | $0.00 |
| 3001EU | Prep and paint downspout (per story) | 288 | ea | | $0.00 |
| 3001EV | Prep and paint roof edge assembly (soffit, fascia, trim) | 2880 | lf | | $0.00 |
| 3001EW | Prep and paint roof edge assembly; complex | 2880 | lf | | $0.00 |
| 3001EX | Prep and paint large bay door, 1 side, w/trim | 6 | ea | | $0.00 |
| 3001EY | Prep and paint gutters | 1920 | lf | | $0.00 |
| 3001EZ | Floor prep & epoxy coating, 2 base coats plus top coat | 2400 | sf | | $0.00 |
| 3001FA | Paint, spray application, 2 coats | 3600 | sf | | $0.00 |
| 3001FB | Paint, spray application, 2 coats, over 10' | 1800 | sf | | $0.00 |
| 3001FC | Prep and paint metal structural member, over 10' | 1000 | lf | | $0.00 |
| 3001FD | Prep and paint wooden railing assembly; complex | 500 | lf | | $0.00 |
| 3001FE | Replace corner guard | 1000 | lf | | $0.00 |
| Total for SubCLINs 3001AA through 3001FE | | $0.00 |
| Enter this amount for CLIN 0001 | | |
| (Please limit pricing to two (2) decimal spaces.) | $0.00 | |
FA4613-14-R-0003
OPTION YEAR 4
| BID SCHEDULE - OPTION YEAR 4 |
| MAINTAIN BASE PAINT |
(Note: Prices must be no more than two decimal points)
| The following SubCLINs 4001AA through 4001FE correspond to the pricing for Basic Year CLIN |
| 0001 above. The total of these SubCLINs should equal the amount listed for Basic Year CLIN |
| 0001 in the Bid Summary Schedule below. Please limit pricing to two (2) decimal spaces. |
| CLIN 4001 OPTION YEAR 4 | | | | | |
| INTERIOR PAINT | | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 4001AA | Install Plastic | 50,000 | SF | | $0.00 |
| 4001AB | Minor Prep for Painting | 54,000 | SF | | $0.00 |
| 4001AC | Major Prep for Painting | 5,000 | SF | | $0.00 |
| 4001AD | Mud/ Tape/ Sand Joints | 5,000 | LF | | $0.00 |
| 4001AE | Remove Wall Covering | 45,000 | SF | | $0.00 |
| 4001AF | Paint Primer | 200,000 | SF | | $0.00 |
| 4001AG | Textured Finish | 50,000 | SF | | $0.00 |
| 4001AH | Paint | 320,000 | SF | | $0.00 |
| 4001AI | Replacement of Cove Base | 4,000 | LF | | $0.00 |
| 4001AJ | Remove trim/chair rail and repair area | 1,800 | LF | | $0.00 |
| 4001AK | Replacement of Hardware | 1,800 | EA | | $0.00 |
| 4001AL | Install/Repair Metal Corner Bead | 500 | LF | | $0.00 |
| 4001AM | Strip/Refinish Varnish Surfaces (Wood) | 1,000 | SF | | $0.00 |
| EXTERIOR PAINT | | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 4001AN | Minor Prep of Wood Surface under 10' | 4,000 | SF | | $0.00 |
| 4001AO | Major Prep of Wood Surface under 10' | 4,000 | SF | | $0.00 |
| 4001AP | Minor Prep of Wood Surface over 10' | 4,000 | SF | | $0.00 |
| 4001AQ | Major Prep of Wood Surface over 10' | 4,000 | SF | | $0.00 |
| 4001AR | Minor Prep of Metal Surface under 10' | 3,000 | SF | | $0.00 |
| 4001AS | Major Prep of Metal Surface under 10' | 2,000 | SF | | $0.00 |
| 4001AT | Minor Prep of Metal Surface over 10' | 3,000 | SF | | $0.00 |
| 4001AU | Major Prep of Metal Surface over 10' | 2,000 | SF | | $0.00 |
| 4001AV | Total Abatement of Lead Based Surface under 10' | 20,000 | SF | | $0.00 |
| 4001AW | Total Abatement of Lead Based Surface over 10' | 10,500 | SF | | $0.00 |
| 4001AX | Primer application 2 coat under 10' w/ brush or roller | 32,000 | SF | | $0.00 |
| 4001AY | Primer application 2 coat over 10' w/ brush or roller | 77,000 | SF | | $0.00 |
| 4001AZ | Paint application 2 coat under 10' w/ brush or roller | 54,000 | SF | | $0.00 |
| 4001BA | Paint application 2 coat over 10' w/ brush or roller | 77,000 | SF | | $0.00 |
| METAL APPURTENANCES | | | | | |
| General Conditions | | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 4001BB | Not Used | NA | NA | NA | NA |
| 4001BC | Abrasive Blasting Enclosure | 25 | EA | | $0.00 |
| Cast Iron Coatings | | | | | |
| Fire Hydrant | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 4001BD | Fire Hydrant Prep (Manual Scraping) | 30 | EA | | $0.00 |
| 4001BE | Fire Hydrant Prep (Chemical Stripping) | 30 | EA | | $0.00 |
| 4001BF | Fire Hydrant Prep (Abrasive Blasting) | 30 | EA | | $0.00 |
| 4001BG | Fire Hydrant Prep (Power Washer) | 30 | EA | | $0.00 |
| 4001BH | Primer | 30 | EA | | $0.00 |
| 4001BI | Topcoat | 30 | EA | | $0.00 |
| 4001BJ | Chemical Bonding Wipe | 30 | EA | | $0.00 |
| Other Surfaces | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 4001BK | Prep (Manual Scraping) | 500 | SF | | $0.00 |
| 4001BL | Prep (Chemical Stripping) | 500 | SF | | $0.00 |
| 4001BM | Prep (Abrasive Blasting) | 500 | SF | | $0.00 |
| 4001BN | Prep (Power Washer) | 500 | SF | | $0.00 |
| 4001BO | Primer | 500 | SF | | $0.00 |
| 4001BP | Topcoat | 500 | SF | | $0.00 |
| 4001BQ | Chemical Bonding Wipe | 500 | SF | | $0.00 |
| Black Steel Coatings | | | | | |
| Street Lighting Standard | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 4001BR | Street Light Prep (Manual Scraping/Wire Brushing) | 50 | EA | | $0.00 |
| 4001BS | Street Light Prep (Chemical Stripping) | 50 | EA | | $0.00 |
| 4001BT | Street Light Prep (Abrasive Blasting) | 50 | EA | | $0.00 |
| 4001BU | Street Light Prep (Power Washer) | 50 | EA | | $0.00 |
| 4001BV | Primer | 50 | EA | | $0.00 |
| 4001BW | Topcoat | 50 | EA | | $0.00 |
| 4001BX | Chemical Bonding Wipe | 50 | EA | | $0.00 |
| Pipe Railings 2-3 Inch Round or Square | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 4001BY | Prep (Manual Scraping/Wire Brushing) | 2,200 | LF | | $0.00 |
| 4001BZ | Prep (Chemical Stripping) | 2,200 | LF | | $0.00 |
| 4001CA | Prep (Abrasive Blasting) | 2,200 | LF | | $0.00 |
| 4001CB | Prep (Power Washer) | 2,200 | LF | | $0.00 |
| 4001CC | Primer | 2,200 | LF | | $0.00 |
| 4001CD | Topcoat | 2,200 | LF | | $0.00 |
| 4001CE | Chemical Bonding Wipe | 2,200 | LF | | $0.00 |
| Other Surfaces | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 4001CF | Prep (Manual Scraping/Wire Brushing) | 2,500 | SF | | $0.00 |
| 4001CG | Prep (Chemical Stripping) | 2,500 | SF | | $0.00 |
| 4001CH | Prep (Abrasive Blasting) | 2,500 | SF | | $0.00 |
| 4001CI | Prep (Power Washer) | 2,500 | SF | | $0.00 |
| 4001CJ | Primer | 2,500 | SF | | $0.00 |
| 4001CK | Topcoat | 2,500 | SF | | $0.00 |
| 4001CL | Chemical Bonding Wipe | 2,500 | SF | | $0.00 |
| Pipe Railings Round or Square 3 1/2-6 inch | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 4001CM | Prep (Manual Scraping/Wire Brushing) | 1,500 | LF | | $0.00 |
| 4001CN | Prep (Chemical Stripping) | 1,500 | LF | | $0.00 |
| 4001CO | Prep (Abrasive Blasting) | 1,500 | LF | | $0.00 |
| 4001CP | Prep (Power Washer) | 1,500 | LF | | $0.00 |
| 4001CQ | Primer | 1,500 | LF | | $0.00 |
| 4001CR | Topcoat | 1,500 | LF | | $0.00 |
| 4001CS | Enclosure, Bridge | 5 | EA | | $0.00 |
| 4001CT | Chemical Bonding Wipe | 1,500 | LF | | $0.00 |
| Pipe Railings Round or Square 8 inch | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 4001CU | Prep (Manual Scraping/Wire Brushing) | 250 | LF | | $0.00 |
| 4001CV | Prep (Chemical Stripping) | 250 | LF | | $0.00 |
| 4001CW | Prep (Abrasive Blasting) | 250 | LF | | $0.00 |
| 4001CX | Prep (Power Washer) | 250 | LF | | $0.00 |
| 4001CY | Primer | 250 | LF | | $0.00 |
| 4001CZ | Topcoat | 250 | LF | | $0.00 |
| 4001DA | Chemical Bonding Wipe | 250 | LF | | $0.00 |
| Pipe Railings Round or Square 10 inch | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 4001DB | Prep (Manual Scraping/Wire Brushing) | 250 | LF | | $0.00 |
| 4001DC | Prep (Chemical Stripping) | 250 | LF | | $0.00 |
| 4001DD | Prep (Abrasive Blasting) | 250 | LF | | $0.00 |
| 4001DE | Prep (Power Washer) | 250 | LF | | $0.00 |
| 4001DF | Primer | 250 | LF | | $0.00 |
| 4001DG | Topcoat | 250 | LF | | $0.00 |
| 4001DH | Chemical Bonding Wipe | 250 | LF | | $0.00 |
| Galvanized Steel Coatings | | | | | |
| Railings Round or Square 2-3 inch | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 4001DI | Prep (Power Washer) | 1,000 | LF | | $0.00 |
| 4001DJ | Prep (Solvent Cleaning) | 1,000 | LF | | $0.00 |
| 4001DK | Primer | 1,000 | LF | | $0.00 |
| 4001DL | Topcoat | 1,000 | LF | | $0.00 |
| 4001DM | Chemical Bonding Wipe | 1,000 | LF | | $0.00 |
| Other Surfaces | | | |
| 4001DN | Prep (Power Washer) | 1,000 | SF | $0.00 |
| 4001DO | Prep (Solvent Cleaning) | 1,000 | SF | $0.00 |
| 4001DP | Primer | 1,000 | SF | $0.00 |
| 4001DQ | Topcoat | 1,000 | SF | $0.00 |
| 4001DR | Chemical Bonding Wipe | 1,000 | SF | $0.00 |
| Aluminum Coatings | | | | | |
| Round Surfaces (Poles, Posts, Etc) | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 4001DS | Prep (Power Washer) | 2,100 | SF | | $0.00 |
| 4001DT | Prep (Solvent Cleaning) | 2,100 | SF | | $0.00 |
| 4001DU | Primer | 2,100 | SF | | $0.00 |
| 4001DV | Topcoat | 2,100 | SF | | $0.00 |
| 4001DW | Chemical Bonding Wipe | 2,100 | SF | | $0.00 |
| 4001DX | Prep Chemical Stripping | 2,100 | SF | | $0.00 |
| Flat Surfaces | | | |
| 4001DY | Prep (Power Washer) | 1,000 | SF | $0.00 |
| 4001DZ | Prep (Solvent Cleaning) | 1,000 | SF | $0.00 |
| 4001EA | Primer | 1,000 | SF | $0.00 |
| 4001EB | Topcoat | 1,000 | SF | $0.00 |
| 4001EC | Chemical Bonding Wipe | 1,000 | SF | $0.00 |
| 4001ED | Prep Chemical Stripping | 1,000 | SF | $0.00 |
| Rust Conversion Coating | | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 4001EE | Pipe Railing Round or Square 2-3 inch | 1,000 | LF | | $0.00 |
| 4001EF | Pipe Railing Round or Square 3 1/2-6 inch | 1,000 | LF | | $0.00 |
| 4001EG | Other Surfaces | 800 | SF | | $0.00 |
| Miscellaneous Features | | | | | |
| CLIN | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | TOTAL PRICE |
| 4001EH | Prep and paint window, 1 side, w/trim | 432 | ea | | $0.00 |
| 4001EI | Prep and paint window, 1 side, w/trim, above 10' | 288 | ea | | $0.00 |
| 4001EJ | Prep and paint door, 1 side, w/frame | 96 | ea | | $0.00 |
| 4001EK | Prep and paint wood trim, up to 8" wide | 1700 | lf | | $0.00 |
| 4001EL | Prep and paint wood trim, up to 8" wide, above 10' | 2800 | lf | | $0.00 |
| 4001EM | Prep and paint metal trim, up to 8" wide | 1400 | lf | | $0.00 |
| 4001EN | Prep and paint metal trim, up to 8" wide, above 10' | 2100 | lf | | $0.00 |
| 4001EO | Prep and paint misc. feature, up to 6" wide | 1400 | lf | | $0.00 |
| 4001EP | Prep and paint misc. feature, up to 6" wide, above 10' | 2100 | lf | | $0.00 |
| 4001EQ | Remove window screen to paint; replace after | 432 | ea | | $0.00 |
| 4001ER | Prep, repair and paint column, w/base, crown, and trim | 480 | ea | | $0.00 |
| 4001ES | Prep and paint louver, w/trim | 40 | ea | | $0.00 |
| 4001ET | Prep and paint louver, w/trim, above 10' | 40 | ea | | $0.00 |
| 4001EU | Prep and paint downspout (per story) | 288 | ea | | $0.00 |
| 4001EV | Prep and paint roof edge assembly (soffit, fascia, trim) | 2880 | lf | | $0.00 |
| 4001EW | Prep and paint roof edge assembly; complex | 2880 | lf | | $0.00 |
| 4001EX | Prep and paint large bay door, 1 side, w/trim | 6 | ea | | $0.00 |
| 4001EY | Prep and paint gutters | 1920 | lf | | $0.00 |
| 4001EZ | Floor prep & epoxy coating, 2 base coats plus top coat | 2400 | sf | | $0.00 |
| 4001FA | Paint, spray application, 2 coats | 3600 | sf | | $0.00 |
| 4001FB | Paint, spray application, 2 coats, over 10' | 1800 | sf | | $0.00 |
| 4001FC | Prep and paint metal structural member, over 10' | 1000 | lf | | $0.00 |
| 4001FD | Prep and paint wooden railing assembly; complex | 500 | lf | | $0.00 |
| 4001FE | Replace corner guard | 1000 | lf | | $0.00 |
| Total for SubCLINs 4001AA through 4001FE | | $0.00 |
| Enter this amount for CLIN 0001 | | |
| (Please limit pricing to two (2) decimal spaces.) | $0.00 | |
FA4613-14-R-0003
SUMMARY SHEET
| BID SUMMARY SCHEDULE | | MAINTAIN BASE PAINT |
| CLIN | |
| ESTIMATED BASIC YEAR | 0001 | $0.00 |
ESTIMATED OPTION YEAR ONE 1001 $0.00
ESTIMATED OPTION YEAR TWO 2001 $0.00
ESTIMATED OPTION YEAR THREE 3001 $0.00
ESTIMATED OPTION YEAR FOUR 4001 $0.00
TOTAL ESTIMATED COST (BASIC YEAR PLUS FOUR OPTIONS) $0.00
FA4613-14-R-0003