Attch_1_BID_SCHEDULE_-_11_Mar_14.pdf

PDF 115 KB Posted

Attached to
Maintain Base Interior/Exterior Paint Federal contract opportunity
Solicitation number
FA4613-14-R-0003
Issued by
Department of the Air Force Global Strike Command

About this file

Attachment 1. Bid Schedule

View the file

Other files for this federal contract opportunity

Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Maintain Base Paint FA4613-14-R-0003

F.E. Warren AFB WY Attachment 1

Bid Schedule Pg. 1

BID SCHEDULE - BASE YEAR

BID SCHEDULE

MAINTAIN BASE PAINT

BASE YEAR

(Note: Prices must be no more than two decimal points)

The following SubCLINs 0001AA through 0001EG correspond to the pricing for Basic Year CLIN 0001 above. The total of these SubCLINs should equal the amount listed for Basic Year CLIN 0001 in the Bid

Summary Schedule below. Please limit pricing to two (2) decimal spaces.

CLIN 0001

INTERIOR PAINT

CLIN DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL PRICE

0001AA Install Plastic 90,000 SF __________ ____________

0001AB Minor Prep for Painting 100,000 SF __________ ____________

0001AC Major Prep for Painting 5,000 SF __________ ____________

0001AD Mud/ Tape/ Sand Joints 5,000 LF __________ ____________

0001AE Remove Wall Covering 45,000 SF __________ ____________

0001AF Paint Primer 200,000 SF __________ ____________

0001AG Textured Finish 50,000 SF __________ ____________

0001AH Paint 400,000 SF __________ ____________

0001AI Replacement of Cove Base 5,000 LF __________ ____________

0001AJ Remove trim/chair rail and repair area 2,000 LF __________ ____________

0001AK Replacement of Hardware 2,500 EA __________ ____________

0001AL Install/Repair Metal Corner Bead 500 LF __________ ____________

0001AM Strip/Refinish Varnish Surfaces (Wood) 1,000 SF __________ ____________

EXTERIOR PAINT

CLIN DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL PRICE

0001AN Minor Prep of Wood Surface under 10' 4,000 SF __________ ____________

0001AO Major Prep of Wood Surface under 10' 4,000 SF __________ ____________

0001AP Minor Prep of Wood Surface over 10' 4,000 SF __________ ____________

0001AQ Major Prep of Wood Surface over 10' 4,000 SF __________ ____________

0001AR Minor Prep of Metal Surface under 10' 3,000 SF __________ ____________

0001AS Major Prep of Metal Surface under 10' 2,000 SF __________ ____________

0001AT Minor Prep of Metal Surface over 10' 3,000 SF __________ ____________

0001AU Major Prep of Metal Surface over 10' 2,000 SF __________ ____________

0001AV Prep of Lead Based Surface under 10' 50,000 SF __________ ____________

0001AW Prep of Lead Based Surface over 10' 80,000 SF __________ ____________

0001AX Primer application 2 coat under 10' w/ brush or roller 63,000 SF __________ ____________

0001AY Primer application 2 coat over 10' w/ brush or roller 93,000 SF __________ ____________

0001AZ Paint application 2 coat under 10' w/ brush or roller 63,000 SF __________ ____________

0001BA Paint application 2 coat over 10' w/ brush or roller 93,000 SF __________ ____________

METAL APPURTENANCES

General Conditions

CLIN DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL PRICE

0001BB Paint application 2 coat over 10' w/ brush or roller 93,000 SF __________ ____________

0001BC Abrasive Blasting Enclosure 50 EA __________ ____________

Cast Iron Coatings

Fire Hydrant

Bid Schedule Pg. 2

0001BD Fire Hydrant Prep (Manual Scraping) 50 EA __________ ____________

0001BE Fire Hydrant Prep (Chemical Stripping) 50 EA __________ ____________

0001BF Fire Hydrant Prep (Abrasive Blasting) 50 EA __________ ____________

0001BG Fire Hydrant Prep (Power Washer) 50 EA __________ ____________

0001BH Primer 50 EA __________ ____________

0001BI Topcoat 50 EA __________ ____________

0001BJ Chemical Bonding Wipe 50 EA __________ ____________

Other Surfaces

0001BK Prep (Manual Scraping) 500 SF __________ ____________

0001BL Prep (Chemical Stripping) 500 SF __________ ____________

0001BM Prep (Abrasive Blasting) 500 SF __________ ____________

0001BN Prep (Power Washer) 500 SF __________ ____________

0001BO Primer 500 SF __________ ____________

0001BP Topcoat 500 SF __________ ____________

0001BQ Chemical Bonding Wipe 500 SF __________ ____________

Black Steel Coatings

Street Lighting Standard

CLIN DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL PRICE

0001BR Street Light Prep (Manual Scraping/Wire Brushing) 50 EA __________ ____________

0001BS Street Light Prep (Chemical Stripping) 50 EA __________ ____________

0001BT Street Light Prep (Abrasive Blasting) 50 EA __________ ____________

0001BU Street Light Prep (Power Washer) 50 EA __________ ____________

0001BV Primer 50 EA __________ ____________

0001BW Topcoat 50 EA __________ ____________

0001BX Chemical Bonding Wipe 50 EA __________ ____________

Pipe Railings 2-3 Inch Round or Square

0001BY Prep (Manual Scraping/Wire Brushing) 2,500 LF __________ ____________

0001BZ Prep (Chemical Stripping) 2,500 LF __________ ____________

0001CA Prep (Abrasive Blasting) 2,500 LF __________ ____________

0001CB Prep (Power Washer) 2,500 LF __________ ____________

0001CC Primer 2,500 LF __________ ____________

0001CD Topcoat 2,500 LF __________ ____________

0001CE Chemical Bonding Wipe 2,500 LF __________ ____________

0001CF Prep (Manual Scraping/Wire Brushing) 3,000 SF __________ ____________

0001CG Prep (Chemical Stripping) 3,000 SF __________ ____________

0001CH Prep (Abrasive Blasting) 3,000 SF __________ ____________

0001CI Prep (Power Washer) 3,000 SF __________ ____________

0001CJ Primer 3,000 SF __________ ____________

0001CK Topcoat 3,000 SF __________ ____________

0001CL Chemical Bonding Wipe 3,000 SF __________ ____________

Pipe Railings Round or Square 3 1/2-6 inch

0001CM Prep (Manual Scraping/Wire Brushing) 1,500 LF __________ ____________

0001CN Prep (Chemical Stripping) 1,500 LF __________ ____________

0001CO Prep (Abrasive Blasting) 1,500 LF __________ ____________

0001CP Prep (Power Washer) 1,500 LF __________ ____________

0001CQ Primer 1,500 LF __________ ____________

Bid Schedule Pg. 3

0001CR Topcoat 1,500 LF __________ ____________

0001CS Enclosure, Bridge 5 EA __________ ____________

0001CT Chemical Bonding Wipe 1,500 LF __________ ____________

Pipe Railings Round or Square 8 inch

0001CU Prep (Manual Scraping/Wire Brushing) 250 LF __________ ____________

0001CV Prep (Chemical Stripping) 250 LF __________ ____________

0001CW Prep (Abrasive Blasting) 250 LF __________ ____________

0001CX Prep (Power Washer) 250 LF __________ ____________

0001CY Primer 250 LF __________ ____________

0001CZ Topcoat 250 LF __________ ____________

0001DA Chemical Bonding Wipe 250 LF __________ ____________

Pipe Railings Round or Square 10 inch

0001DB Prep (Manual Scraping/Wire Brushing) 250 LF __________ ____________

0001DC Prep (Chemical Stripping) 250 LF __________ ____________

0001DD Prep (Abrasive Blasting) 250 LF __________ ____________

0001DE Prep (Power Washer) 250 LF __________ ____________

0001DF Primer 250 LF __________ ____________

0001DG Topcoat 250 LF __________ ____________

0001DH Chemical Bonding Wipe 250 LF __________ ____________

Galvanized Steel Coatings

Railings Round or Square 2-3 inch

CLIN DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL PRICE

0001DI Prep (Power Washer) 1,000 LF __________ ____________

0001DJ Prep (Solvent Cleaning) 1,000 LF __________ ____________

0001DK Primer 1,000 LF __________ ____________

0001DL Topcoat 1,000 LF __________ ____________

0001DM Chemical Bonding Wipe 1,000 LF __________ ____________

0001DN Prep (Power Washer) 1,000 SF __________ ____________

0001DO Prep (Solvent Cleaning) 1,000 SF __________ ____________

0001DP Primer 1,000 SF __________ ____________

0001DQ Topcoat 1,000 SF __________ ____________

0001DR Chemical Bonding Wipe 1,000 SF __________ ____________

Aluminum Coatings

Round Surfaces (Poles, Posts, Etc)

CLIN DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL PRICE

0001DS Prep (Power Washer) 3,500 SF __________ ____________

0001DT Prep (Solvent Cleaning) 3,500 SF __________ ____________

0001DU Primer 3,500 SF __________ ____________

0001DV Topcoat 3,500 SF __________ ____________

0001DW Chemical Bonding Wipe 3,500 SF __________ ____________

0001DX Prep Chemical Stripping 3,500 SF __________ ____________

Flat Surfaces

0001DY Prep (Power Washer) 1,000 SF __________ ____________

0001DZ Prep (Solvent Cleaning) 1,000 SF __________ ____________

0001EA Primer 1,000 SF __________ ____________

0001EB Topcoat 1,000 SF __________ ____________

0001EC Chemical Bonding Wipe 1,000 SF __________ ____________

Bid Schedule Pg. 4

0001ED Prep Chemical Stripping 1,000 SF __________ ____________

Rust Conversion Coating

0001EE Pipe Railing Round or Square 2-3 inch 1,000 LF __________ ____________

0001EF Pipe Railing Round or Square 3 1/2-6 inch 1,000 LF __________ ____________

0001EG Other Surfaces 1,000 SF __________ ____________

Total for SubCLINs 0001AA through 0001EG

Enter this amount for CLIN 0001

(Please limit pricing to two (2) decimal spaces.) $___________________________

BID SCHEDULE - OPTION YEAR 1

OPTION YEAR ONE

The following SubCLINs 1001AA through 1001EG correspond to the pricing for Option Year 1 CLIN 1001 above. The total of these SubCLINs should equal the amount listed for Option Year 1 CLIN 1001 in the Bid

1001AA Install Plastic 90,000 SF __________ ____________

10011AB Minor Prep for Painting 100,000 SF __________ ____________

1001AC Major Prep for Painting 5,000 SF __________ ____________

1001AD Mud/ Tape/ Sand Joints 5,000 LF __________ ____________

1001AE Remove Wall Covering 45,000 SF __________ ____________

1001AF Paint Primer 200,000 SF __________ ____________

1001AG Textured Finish 50,000 SF __________ ____________

1001AH Paint 400,000 SF __________ ____________

1001AI Replacement of Cove Base 5,000 LF __________ ____________

1001AJ Remove trim/chair rail and repair area 2,000 LF __________ ____________

1001AK Replacement of Hardware 2,500 EA __________ ____________

1001AL Install/Repair Metal Corner Bead 500 LF __________ ____________

1001AM Strip/Refinish Varnish Surfaces (Wood) 1,000 SF __________ ____________

1001AN Minor Prep of Wood Surface under 10' 4,000 SF __________ ____________

1001AO Major Prep of Wood Surface under 10' 4,000 SF __________ ____________

1001AP Minor Prep of Wood Surface over 10' 4,000 SF __________ ____________

1001AQ Major Prep of Wood Surface over 10' 4,000 SF __________ ____________

1001AR Minor Prep of Metal Surface under 10' 3,000 SF __________ ____________

1001AS Major Prep of Metal Surface under 10' 2,000 SF __________ ____________

1001AT Minor Prep of Metal Surface over 10' 3,000 SF __________ ____________

1001AU Major Prep of Metal Surface over 10' 2,000 SF __________ ____________

1001AV Prep of Lead Based Surface under 10' 50,000 SF __________ ____________

Bid Schedule Pg. 5

1001AW Prep of Lead Based Surface over 10' 80,000 SF __________ ____________

1001AX Primer application 2 coat under 10' w/ brush or roller 63,000 SF __________ ____________

1001AY Primer application 2 coat over 10' w/ brush or roller 93,000 SF __________ ____________

1001AZ Paint application 2 coat under 10' w/ brush or roller 63,000 SF __________ ____________

1001BA Paint application 2 coat over 10' w/ brush or roller 93,000 SF __________ ____________

CLIN DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL PRICE

1001BB Paint application 2 coat over 10' w/ brush or roller 93,000 SF __________ ____________

1001BC Abrasive Blasting Enclosure 50 EA __________ ____________

CLIN DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL PRICE

1001BD Fire Hydrant Prep (Manual Scraping) 50 EA __________ ____________

1001BE Fire Hydrant Prep (Chemical Stripping) 50 EA __________ ____________

1001BF Fire Hydrant Prep (Abrasive Blasting) 50 EA __________ ____________

1001BG Fire Hydrant Prep (Power Washer) 50 EA __________ ____________

1001BH Primer 50 EA __________ ____________

1001BI Topcoat 50 EA __________ ____________

1001BJ Chemical Bonding Wipe 50 EA __________ ____________

1001BK Prep (Manual Scraping) 500 SF __________ ____________

1001BL Prep (Chemical Stripping) 500 SF __________ ____________

1001BM Prep (Abrasive Blasting) 500 SF __________ ____________

1001BN Prep (Power Washer) 500 SF __________ ____________

1001BO Primer 500 SF __________ ____________

1001BP Topcoat 500 SF __________ ____________

1001BQ Chemical Bonding Wipe 500 SF __________ ____________

CLIN DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL PRICE

1001BR Street Light Prep (Manual Scraping/Wire Brushing) 50 EA __________ ____________

1001BS Street Light Prep (Chemical Stripping) 50 EA __________ ____________

1001BT Street Light Prep (Abrasive Blasting) 50 EA __________ ____________

1001BU Street Light Prep (Power Washer) 50 EA __________ ____________

1001BV Primer 50 EA __________ ____________

1001BW Topcoat 50 EA __________ ____________

1001BX Chemical Bonding Wipe 50 EA __________ ____________

1001BY Prep (Manual Scraping/Wire Brushing) 2,500 LF __________ ____________

1001BZ Prep (Chemical Stripping) 2,500 LF __________ ____________

1001CA Prep (Abrasive Blasting) 2,500 LF __________ ____________

1001CB Prep (Power Washer) 2,500 LF __________ ____________

1001CC Primer 2,500 LF __________ ____________

1001CD Topcoat 2,500 LF __________ ____________

1001CE Chemical Bonding Wipe 2,500 LF __________ ____________

Bid Schedule Pg. 6

1001CF Prep (Manual Scraping/Wire Brushing) 3,000 SF __________ ____________

1001CG Prep (Chemical Stripping) 3,000 SF __________ ____________

1001CH Prep (Abrasive Blasting) 3,000 SF __________ ____________

1001CI Prep (Power Washer) 3,000 SF __________ ____________

1001CJ Primer 3,000 SF __________ ____________

1001CK Topcoat 3,000 SF __________ ____________

1001CL Chemical Bonding Wipe 3,000 SF __________ ____________

1001CM Prep (Manual Scraping/Wire Brushing) 1,500 LF __________ ____________

1001CN Prep (Chemical Stripping) 1,500 LF __________ ____________

1001CO Prep (Abrasive Blasting) 1,500 LF __________ ____________

1001CP Prep (Power Washer) 1,500 LF __________ ____________

1001CQ Primer 1,500 LF __________ ____________

1001CR Topcoat 1,500 LF __________ ____________

1001CS Enclosure, Bridge 5 EA __________ ____________

1001CT Chemical Bonding Wipe 1,500 LF __________ ____________

1001CU Prep (Manual Scraping/Wire Brushing) 250 LF __________ ____________

1001CV Prep (Chemical Stripping) 250 LF __________ ____________

1001CW Prep (Abrasive Blasting) 250 LF __________ ____________

1001CX Prep (Power Washer) 250 LF __________ ____________

1001CY Primer 250 LF __________ ____________

1001CZ Topcoat 250 LF __________ ____________

1001DA Chemical Bonding Wipe 250 LF __________ ____________

1001DB Prep (Manual Scraping/Wire Brushing) 250 LF __________ ____________

1001DC Prep (Chemical Stripping) 250 LF __________ ____________

1001DD Prep (Abrasive Blasting) 250 LF __________ ____________

1001DE Prep (Power Washer) 250 LF __________ ____________

1001DF Primer 250 LF __________ ____________

1001DG Topcoat 250 LF __________ ____________

1001DH Chemical Bonding Wipe 250 LF __________ ____________

CLIN DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL PRICE

1001DI Prep (Power Washer) 1,000 LF __________ ____________

1001DJ Prep (Solvent Cleaning) 1,000 LF __________ ____________

1001DK Primer 1,000 LF __________ ____________

1001DL Topcoat 1,000 LF __________ ____________

1001DM Chemical Bonding Wipe 1,000 LF __________ ____________

1001DN Prep (Power Washer) 1,000 SF __________ ____________

1001DO Prep (Solvent Cleaning) 1,000 SF __________ ____________

1001DP Primer 1,000 SF __________ ____________

1001DQ Topcoat 1,000 SF __________ ____________

1001DR Chemical Bonding Wipe 1,000 SF __________ ____________

Bid Schedule Pg. 7

CLIN DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL PRICE

1001DS Prep (Power Washer) 3,500 SF __________ ____________

1001DT Prep (Solvent Cleaning) 3,500 SF __________ ____________

1001DU Primer 3,500 SF __________ ____________

1001DV Topcoat 3,500 SF __________ ____________

1001DW Chemical Bonding Wipe 3,500 SF __________ ____________

1001DX Prep Chemical Stripping 3,500 SF __________ ____________

1001DY Prep (Power Washer) 1,000 SF __________ ____________

1001DZ Prep (Solvent Cleaning) 1,000 SF __________ ____________

1001EA Primer 1,000 SF __________ ____________

1001EB Topcoat 1,000 SF __________ ____________

1001EC Chemical Bonding Wipe 1,000 SF __________ ____________

1001ED Prep Chemical Stripping 1,000 SF __________ ____________

1001EE Pipe Railing Round or Square 2-3 inch 1,000 LF __________ ____________

1001EF Pipe Railing Round or Square 3 1/2-6 inch 1,000 LF __________ ____________

1001EG Other Surfaces 1,000 SF __________ ____________

Total for SubCLINs 1001AA through 1001EG

Enter this amount for CLIN 1001

BID SCHEDULE - OPTION YEAR 2

OPTION YEAR TWO

The following SubCLINs 2001AA through 2001EG correspond to the pricing for Option Year 2 CLIN 2001 above. The total of these SubCLINs should equal the amount listed for Option Year 2 CLIN 2001 in the Bid

2001AA Install Plastic 90,000 SF __________ ____________

2001AB Minor Prep for Painting 100,000 SF __________ ____________

2001AC Major Prep for Painting 5,000 SF __________ ____________

2001AD Mud/ Tape/ Sand Joints 5,000 LF __________ ____________

2001AE Remove Wall Covering 45,000 SF __________ ____________

2001AF Paint Primer 200,000 SF __________ ____________

2001AG Textured Finish 50,000 SF __________ ____________

2001AH Paint 400,000 SF __________ ____________

2001AI Replacement of Cove Base 5,000 LF __________ ____________

Bid Schedule Pg. 8

2001AJ Remove trim/chair rail and repair area 2,000 LF __________ ____________

2001AK Replacement of Hardware 2,500 EA __________ ____________

2001AL Install/Repair Metal Corner Bead 500 LF __________ ____________

2001AM Strip/Refinish Varnish Surfaces (Wood) 1,000 SF __________ ____________

2001AN Minor Prep of Wood Surface under 10' 4,000 SF __________ ____________

2001AO Major Prep of Wood Surface under 10' 4,000 SF __________ ____________

2001AP Minor Prep of Wood Surface over 10' 4,000 SF __________ ____________

2001AQ Major Prep of Wood Surface over 10' 4,000 SF __________ ____________

2001AR Minor Prep of Metal Surface under 10' 3,000 SF __________ ____________

2001AS Major Prep of Metal Surface under 10' 2,000 SF __________ ____________

2001AT Minor Prep of Metal Surface over 10' 3,000 SF __________ ____________

2001AU Major Prep of Metal Surface over 10' 2,000 SF __________ ____________

2001AV Prep of Lead Based Surface under 10' 50,000 SF __________ ____________

2001AW Prep of Lead Based Surface over 10' 80,000 SF __________ ____________

2001AX Primer application 2 coat under 10' w/ brush or roller 63,000 SF __________ ____________

2001AY Primer application 2 coat over 10' w/ brush or roller 93,000 SF __________ ____________

2001AZ Paint application 2 coat under 10' w/ brush or roller 63,000 SF __________ ____________

2001BA Paint application 2 coat over 10' w/ brush or roller 93,000 SF __________ ____________

CLIN DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL PRICE

2001BB Paint application 2 coat over 10' w/ brush or roller 93,000 SF __________ ____________

2001BC Abrasive Blasting Enclosure 50 EA __________ ____________

CLIN DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL PRICE

2001BD Fire Hydrant Prep (Manual Scraping) 50 EA __________ ____________

2001BE Fire Hydrant Prep (Chemical Stripping) 50 EA __________ ____________

2001BF Fire Hydrant Prep (Abrasive Blasting) 50 EA __________ ____________

2001BG Fire Hydrant Prep (Power Washer) 50 EA __________ ____________

2001BH Primer 50 EA __________ ____________

2001BI Topcoat 50 EA __________ ____________

2001BJ Chemical Bonding Wipe 50 EA __________ ____________

2001BK Prep (Manual Scraping) 500 SF __________ ____________

2001BL Prep (Chemical Stripping) 500 SF __________ ____________

2001BM Prep (Abrasive Blasting) 500 SF __________ ____________

2001BN Prep (Power Washer) 500 SF __________ ____________

2001BO Primer 500 SF __________ ____________

2001BP Topcoat 500 SF __________ ____________

2001BQ Chemical Bonding Wipe 500 SF __________ ____________

CLIN DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL PRICE

2001BR Street Light Prep (Manual Scraping/Wire Brushing) 50 EA __________ ____________

2001BS Street Light Prep (Chemical Stripping) 50 EA __________ ____________

2001BT Street Light Prep (Abrasive Blasting) 50 EA __________ ____________

Bid Schedule Pg. 9

2001BU Street Light Prep (Power Washer) 50 EA __________ ____________

2001BV Primer 50 EA __________ ____________

2001BW Topcoat 50 EA __________ ____________

2001BX Chemical Bonding Wipe 50 EA __________ ____________

2001BY Prep (Manual Scraping/Wire Brushing) 2,500 LF __________ ____________

2001BZ Prep (Chemical Stripping) 2,500 LF __________ ____________

2001CA Prep (Abrasive Blasting) 2,500 LF __________ ____________

2001CB Prep (Power Washer) 2,500 LF __________ ____________

2001CC Primer 2,500 LF __________ ____________

2001CD Topcoat 2,500 LF __________ ____________

2001CE Chemical Bonding Wipe 2,500 LF __________ ____________

2001CF Prep (Manual Scraping/Wire Brushing) 3,000 SF __________ ____________

2001CG Prep (Chemical Stripping) 3,000 SF __________ ____________

2001CH Prep (Abrasive Blasting) 3,000 SF __________ ____________

2001CI Prep (Power Washer) 3,000 SF __________ ____________

2001CJ Primer 3,000 SF __________ ____________

2001CK Topcoat 3,000 SF __________ ____________

2001CL Chemical Bonding Wipe 3,000 SF __________ ____________

2001CM Prep (Manual Scraping/Wire Brushing) 1,500 LF __________ ____________

2001CN Prep (Chemical Stripping) 1,500 LF __________ ____________

2001CO Prep (Abrasive Blasting) 1,500 LF __________ ____________

2001CP Prep (Power Washer) 1,500 LF __________ ____________

2001CQ Primer 1,500 LF __________ ____________

2001CR Topcoat 1,500 LF __________ ____________

2001CS Enclosure, Bridge 5 EA __________ ____________

2001CT Chemical Bonding Wipe 1,500 LF __________ ____________

2001CU Prep (Manual Scraping/Wire Brushing) 250 LF __________ ____________

2001CV Prep (Chemical Stripping) 250 LF __________ ____________

2001CW Prep (Abrasive Blasting) 250 LF __________ ____________

2001CX Prep (Power Washer) 250 LF __________ ____________

2001CY Primer 250 LF __________ ____________

2001CZ Topcoat 250 LF __________ ____________

2001DA Chemical Bonding Wipe 250 LF __________ ____________

2001DB Prep (Manual Scraping/Wire Brushing) 250 LF __________ ____________

2001DC Prep (Chemical Stripping) 250 LF __________ ____________

2001DD Prep (Abrasive Blasting) 250 LF __________ ____________

2001DE Prep (Power Washer) 250 LF __________ ____________

2001DF Primer 250 LF __________ ____________

2001DG Topcoat 250 LF __________ ____________

2001DH Chemical Bonding Wipe 250 LF __________ ____________

Bid Schedule Pg. 10

CLIN DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL PRICE

2001DI Prep (Power Washer) 1,000 LF __________ ____________

2001DJ Prep (Solvent Cleaning) 1,000 LF __________ ____________

2001DK Primer 1,000 LF __________ ____________

2001DL Topcoat 1,000 LF __________ ____________

2001DM Chemical Bonding Wipe 1,000 LF __________ ____________

2001DN Prep (Power Washer) 1,000 SF __________ ____________

2001DO Prep (Solvent Cleaning) 1,000 SF __________ ____________

2001DP Primer 1,000 SF __________ ____________

2001DQ Topcoat 1,000 SF __________ ____________

2001DR Chemical Bonding Wipe 1,000 SF __________ ____________

CLIN DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL PRICE

2001DS Prep (Power Washer) 3,500 SF __________ ____________

2001DT Prep (Solvent Cleaning) 3,500 SF __________ ____________

2001DU Primer 3,500 SF __________ ____________

2001DV Topcoat 3,500 SF __________ ____________

2001DW Chemical Bonding Wipe 3,500 SF __________ ____________

2001DX Prep Chemical Stripping 3,500 SF __________ ____________

2001DY Prep (Power Washer) 1,000 SF __________ ____________

2001DZ Prep (Solvent Cleaning) 1,000 SF __________ ____________

2001EA Primer 1,000 SF __________ ____________

2001EB Topcoat 1,000 SF __________ ____________

2001EC Chemical Bonding Wipe 1,000 SF __________ ____________

2001ED Prep Chemical Stripping 1,000 SF __________ ____________

2001EE Pipe Railing Round or Square 2-3 inch 1,000 LF __________ ____________

2001EF Pipe Railing Round or Square 3 1/2-6 inch 1,000 LF __________ ____________

2001EG Other Surfaces 1,000 SF __________ ____________

Total for SubCLINs 2001AA through 2001EG

Enter this amount for CLIN 2001

BID SCHEDULE - OPTION YEAR 3

OPTION YEAR THREE

The following SubCLINs 3001AA through 3001EG correspond to the pricing for Option Year 3 CLIN 3001 above. The total of these SubCLINs should equal the amount listed for Option Year 3 CLIN 3001 in the Bid

Bid Schedule Pg. 11

3001AA Install Plastic 90,000 SF __________ ____________

3001AB Minor Prep for Painting 100,000 SF __________ ____________

3001AC Major Prep for Painting 5,000 SF __________ ____________

3001AD Mud/ Tape/ Sand Joints 5,000 LF __________ ____________

3001AE Remove Wall Covering 45,000 SF __________ ____________

3001AF Paint Primer 200,000 SF __________ ____________

3001AG Textured Finish 50,000 SF __________ ____________

3001AH Paint 400,000 SF __________ ____________

3001AI Replacement of Cove Base 5,000 LF __________ ____________

3001AJ Remove trim/chair rail and repair area 2,000 LF __________ ____________

3001AK Replacement of Hardware 2,500 EA __________ ____________

3001AL Install/Repair Metal Corner Bead 500 LF __________ ____________

3001AM Strip/Refinish Varnish Surfaces (Wood) 1,000 SF __________ ____________

3001AN Minor Prep of Wood Surface under 10' 4,000 SF __________ ____________

3001AO Major Prep of Wood Surface under 10' 4,000 SF __________ ____________

3001AP Minor Prep of Wood Surface over 10' 4,000 SF __________ ____________

3001AQ Major Prep of Wood Surface over 10' 4,000 SF __________ ____________

3001AR Minor Prep of Metal Surface under 10' 3,000 SF __________ ____________

3001AS Major Prep of Metal Surface under 10' 2,000 SF __________ ____________

3001AT Minor Prep of Metal Surface over 10' 3,000 SF __________ ____________

3001AU Major Prep of Metal Surface over 10' 2,000 SF __________ ____________

3001AV Prep of Lead Based Surface under 10' 50,000 SF __________ ____________

3001AW Prep of Lead Based Surface over 10' 80,000 SF __________ ____________

3001AX Primer application 2 coat under 10' w/ brush or roller 63,000 SF __________ ____________

3001AY Primer application 2 coat over 10' w/ brush or roller 93,000 SF __________ ____________

3001AZ Paint application 2 coat under 10' w/ brush or roller 63,000 SF __________ ____________

3001BA Paint application 2 coat over 10' w/ brush or roller 93,000 SF __________ ____________

CLIN DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL PRICE

3001BB Paint application 2 coat over 10' w/ brush or roller 93,000 SF __________ ____________

3001BC Abrasive Blasting Enclosure 50 EA __________ ____________

CLIN DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL PRICE

3001BD Fire Hydrant Prep (Manual Scraping) 50 EA __________ ____________

3001BE Fire Hydrant Prep (Chemical Stripping) 50 EA __________ ____________

3001BF Fire Hydrant Prep (Abrasive Blasting) 50 EA __________ ____________

3001BG Fire Hydrant Prep (Power Washer) 50 EA __________ ____________

3001BH Primer 50 EA __________ ____________

3001BI Topcoat 50 EA __________ ____________

3001BJ Chemical Bonding Wipe 50 EA __________ ____________

Bid Schedule Pg. 12

3001BK Prep (Manual Scraping) 500 SF __________ ____________

3001BL Prep (Chemical Stripping) 500 SF __________ ____________

3001BM Prep (Abrasive Blasting) 500 SF __________ ____________

3001BN Prep (Power Washer) 500 SF __________ ____________

3001BO Primer 500 SF __________ ____________

3001BP Topcoat 500 SF __________ ____________

3001BQ Chemical Bonding Wipe 500 SF __________ ____________

CLIN DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL PRICE

3001BR Street Light Prep (Manual Scraping/Wire Brushing) 50 EA __________ ____________

3001BS Street Light Prep (Chemical Stripping) 50 EA __________ ____________

3001BT Street Light Prep (Abrasive Blasting) 50 EA __________ ____________

3001BU Street Light Prep (Power Washer) 50 EA __________ ____________

3001BV Primer 50 EA __________ ____________

3001BW Topcoat 50 EA __________ ____________

3001BX Chemical Bonding Wipe 50 EA __________ ____________

3001BY Prep (Manual Scraping/Wire Brushing) 2,500 LF __________ ____________

3001BZ Prep (Chemical Stripping) 2,500 LF __________ ____________

3001CA Prep (Abrasive Blasting) 2,500 LF __________ ____________

3001CB Prep (Power Washer) 2,500 LF __________ ____________

3001CC Primer 2,500 LF __________ ____________

3001CD Topcoat 2,500 LF __________ ____________

3001CE Chemical Bonding Wipe 2,500 LF __________ ____________

3001CF Prep (Manual Scraping/Wire Brushing) 3,000 SF __________ ____________

3001CG Prep (Chemical Stripping) 3,000 SF __________ ____________

3001CH Prep (Abrasive Blasting) 3,000 SF __________ ____________

3001CI Prep (Power Washer) 3,000 SF __________ ____________

3001CJ Primer 3,000 SF __________ ____________

3001CK Topcoat 3,000 SF __________ ____________

3001CL Chemical Bonding Wipe 3,000 SF __________ ____________

3001CM Prep (Manual Scraping/Wire Brushing) 1,500 LF __________ ____________

3001CN Prep (Chemical Stripping) 1,500 LF __________ ____________

3001CO Prep (Abrasive Blasting) 1,500 LF __________ ____________

3001CP Prep (Power Washer) 1,500 LF __________ ____________

3001CQ Primer 1,500 LF __________ ____________

3001CR Topcoat 1,500 LF __________ ____________

3001CS Enclosure, Bridge 5 EA __________ ____________

3001CT Chemical Bonding Wipe 1,500 LF __________ ____________

3001CU Prep (Manual Scraping/Wire Brushing) 250 LF __________ ____________

3001CV Prep (Chemical Stripping) 250 LF __________ ____________

3001CW Prep (Abrasive Blasting) 250 LF __________ ____________

Bid Schedule Pg. 13

3001CX Prep (Power Washer) 250 LF __________ ____________

3001CY Primer 250 LF __________ ____________

3001CZ Topcoat 250 LF __________ ____________

3001DA Chemical Bonding Wipe 250 LF __________ ____________

3001DB Prep (Manual Scraping/Wire Brushing) 250 LF __________ ____________

3001DC Prep (Chemical Stripping) 250 LF __________ ____________

3001DD Prep (Abrasive Blasting) 250 LF __________ ____________

3001DE Prep (Power Washer) 250 LF __________ ____________

3001DF Primer 250 LF __________ ____________

3001DG Topcoat 250 LF __________ ____________

3001DH Chemical Bonding Wipe 250 LF __________ ____________

CLIN DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL PRICE

3001DI Prep (Power Washer) 1,000 LF __________ ____________

3001DJ Prep (Solvent Cleaning) 1,000 LF __________ ____________

3001DK Primer 1,000 LF __________ ____________

3001DL Topcoat 1,000 LF __________ ____________

3001DM Chemical Bonding Wipe 1,000 LF __________ ____________

3001DN Prep (Power Washer) 1,000 SF __________ ____________

3001DO Prep (Solvent Cleaning) 1,000 SF __________ ____________

3001DP Primer 1,000 SF __________ ____________

3001DQ Topcoat 1,000 SF __________ ____________

3001DR Chemical Bonding Wipe 1,000 SF __________ ____________

CLIN DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL PRICE

3001DS Prep (Power Washer) 3,500 SF __________ ____________

3001DT Prep (Solvent Cleaning) 3,500 SF __________ ____________

3001DU Primer 3,500 SF __________ ____________

3001DV Topcoat 3,500 SF __________ ____________

3001DW Chemical Bonding Wipe 3,500 SF __________ ____________

3001DX Prep Chemical Stripping 3,500 SF __________ ____________

3001DY Prep (Power Washer) 1,000 SF __________ ____________

3001DZ Prep (Solvent Cleaning) 1,000 SF __________ ____________

3001EA Primer 1,000 SF __________ ____________

3001EB Topcoat 1,000 SF __________ ____________

3001EC Chemical Bonding Wipe 1,000 SF __________ ____________

3001ED Prep Chemical Stripping 1,000 SF __________ ____________

3001EE Pipe Railing Round or Square 2-3 inch 1,000 LF __________ ____________

3001EF Pipe Railing Round or Square 3 1/2-6 inch 1,000 LF __________ ____________

3001EG Other Surfaces 1,000 SF __________ ____________

Bid Schedule Pg. 14

Total for SubCLINs 3001AA through 3001EG

Enter this amount for CLIN 3001

BID SCHEDULE - OPTION YEAR 4

OPTION YEAR FOUR

The following SubCLINs 4001AA through 4001EG correspond to the pricing for Option Year 4 CLIN 4001 above. The total of these SubCLINs should equal the amount listed for Option Year 4 CLIN 4001 in the Bid

4001AA Install Plastic 90,000 SF __________ ____________

4001AB Minor Prep for Painting 100,000 SF __________ ____________

4001AC Major Prep for Painting 5,000 SF __________ ____________

4001AD Mud/ Tape/ Sand Joints 5,000 LF __________ ____________

4001AE Remove Wall Covering 45,000 SF __________ ____________

4001AF Paint Primer 200,000 SF __________ ____________

4001AG Textured Finish 50,000 SF __________ ____________

4001AH Paint 400,000 SF __________ ____________

4001AI Replacement of Cove Base 5,000 LF __________ ____________

4001AJ Remove trim/chair rail and repair area 2,000 LF __________ ____________

4001AK Replacement of Hardware 2,500 EA __________ ____________

4001AL Install/Repair Metal Corner Bead 500 LF __________ ____________

4001AM Strip/Refinish Varnish Surfaces (Wood) 1,000 SF __________ ____________

4001AN Minor Prep of Wood Surface under 10' 4,000 SF __________ ____________

4001AO Major Prep of Wood Surface under 10' 4,000 SF __________ ____________

4001AP Minor Prep of Wood Surface over 10' 4,000 SF __________ ____________

4001AQ Major Prep of Wood Surface over 10' 4,000 SF __________ ____________

4001AR Minor Prep of Metal Surface under 10' 3,000 SF __________ ____________

4001AS Major Prep of Metal Surface under 10' 2,000 SF __________ ____________

4001AT Minor Prep of Metal Surface over 10' 3,000 SF __________ ____________

4001AU Major Prep of Metal Surface over 10' 2,000 SF __________ ____________

4001AV Prep of Lead Based Surface under 10' 50,000 SF __________ ____________

4001AW Prep of Lead Based Surface over 10' 80,000 SF __________ ____________

4001AX Primer application 2 coat under 10' w/ brush or roller 63,000 SF __________ ____________

4001AY Primer application 2 coat over 10' w/ brush or roller 93,000 SF __________ ____________

4001AZ Paint application 2 coat under 10' w/ brush or roller 63,000 SF __________ ____________

4001BA Paint application 2 coat over 10' w/ brush or roller 93,000 SF __________ ____________

4001BB Paint application 2 coat over 10' w/ brush or roller 93,000 SF __________ ____________

Bid Schedule Pg. 15

4001BC Abrasive Blasting Enclosure 50 EA __________ ____________

CLIN DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL PRICE

4001BD Fire Hydrant Prep (Manual Scraping) 50 EA __________ ____________

4001BE Fire Hydrant Prep (Chemical Stripping) 50 EA __________ ____________

4001BF Fire Hydrant Prep (Abrasive Blasting) 50 EA __________ ____________

4001BG Fire Hydrant Prep (Power Washer) 50 EA __________ ____________

4001BH Primer 50 EA __________ ____________

4001BI Topcoat 50 EA __________ ____________

4001BJ Chemical Bonding Wipe 50 EA __________ ____________

4001BK Prep (Manual Scraping) 500 SF __________ ____________

4001BL Prep (Chemical Stripping) 500 SF __________ ____________

4001BM Prep (Abrasive Blasting) 500 SF __________ ____________

4001BN Prep (Power Washer) 500 SF __________ ____________

4001BO Primer 500 SF __________ ____________

4001BP Topcoat 500 SF __________ ____________

4001BQ Chemical Bonding Wipe 500 SF __________ ____________

CLIN DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL PRICE

4001BR Street Light Prep (Manual Scraping/Wire Brushing) 50 EA __________ ____________

4001BS Street Light Prep (Chemical Stripping) 50 EA __________ ____________

4001BT Street Light Prep (Abrasive Blasting) 50 EA __________ ____________

4001BU Street Light Prep (Power Washer) 50 EA __________ ____________

4001BV Primer 50 EA __________ ____________

4001BW Topcoat 50 EA __________ ____________

4001BX Chemical Bonding Wipe 50 EA __________ ____________

4001BY Prep (Manual Scraping/Wire Brushing) 2,500 LF __________ ____________

4001BZ Prep (Chemical Stripping) 2,500 LF __________ ____________

4001CA Prep (Abrasive Blasting) 2,500 LF __________ ____________

4001CB Prep (Power Washer) 2,500 LF __________ ____________

4001CC Primer 2,500 LF __________ ____________

4001CD Topcoat 2,500 LF __________ ____________

4001CE Chemical Bonding Wipe 2,500 LF __________ ____________

4001CF Prep (Manual Scraping/Wire Brushing) 3,000 SF __________ ____________

4001CG Prep (Chemical Stripping) 3,000 SF __________ ____________

4001CH Prep (Abrasive Blasting) 3,000 SF __________ ____________

4001CI Prep (Power Washer) 3,000 SF __________ ____________

4001CJ Primer 3,000 SF __________ ____________

4001CK Topcoat 3,000 SF __________ ____________

4001CL Chemical Bonding Wipe 3,000 SF __________ ____________

Bid Schedule Pg. 16

4001CM Prep (Manual Scraping/Wire Brushing) 1,500 LF __________ ____________

4001CN Prep (Chemical Stripping) 1,500 LF __________ ____________

4001CO Prep (Abrasive Blasting) 1,500 LF __________ ____________

4001CP Prep (Power Washer) 1,500 LF __________ ____________

4001CQ Primer 1,500 LF __________ ____________

4001CR Topcoat 1,500 LF __________ ____________

4001CS Enclosure, Bridge 5 EA __________ ____________

4001CT Chemical Bonding Wipe 1,500 LF __________ ____________

4001CU Prep (Manual Scraping/Wire Brushing) 250 LF __________ ____________

4001CV Prep (Chemical Stripping) 250 LF __________ ____________

4001CW Prep (Abrasive Blasting) 250 LF __________ ____________

4001CX Prep (Power Washer) 250 LF __________ ____________

4001CY Primer 250 LF __________ ____________

4001CZ Topcoat 250 LF __________ ____________

4001DA Chemical Bonding Wipe 250 LF __________ ____________

4001DB Prep (Manual Scraping/Wire Brushing) 250 LF __________ ____________

4001DC Prep (Chemical Stripping) 250 LF __________ ____________

4001DD Prep (Abrasive Blasting) 250 LF __________ ____________

4001DE Prep (Power Washer) 250 LF __________ ____________

4001DF Primer 250 LF __________ ____________

4001DG Topcoat 250 LF __________ ____________

4001DH Chemical Bonding Wipe 250 LF __________ ____________

CLIN DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL PRICE

4001DI Prep (Power Washer) 1,000 LF __________ ____________

4001DJ Prep (Solvent Cleaning) 1,000 LF __________ ____________

4001DK Primer 1,000 LF __________ ____________

4001DL Topcoat 1,000 LF __________ ____________

4001DM Chemical Bonding Wipe 1,000 LF __________ ____________

4001DN Prep (Power Washer) 1,000 SF __________ ____________

4001DO Prep (Solvent Cleaning) 1,000 SF __________ ____________

4001DP Primer 1,000 SF __________ ____________

4001DQ Topcoat 1,000 SF __________ ____________

4001DR Chemical Bonding Wipe 1,000 SF __________ ____________

CLIN DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL PRICE

4001DS Prep (Power Washer) 3,500 SF __________ ____________

4001DT Prep (Solvent Cleaning) 3,500 SF __________ ____________

4001DU Primer 3,500 SF __________ ____________

4001DV Topcoat 3,500 SF __________ ____________

4001DW Chemical Bonding Wipe 3,500 SF __________ ____________

4001DX Prep Chemical Stripping 3,500 SF __________ ____________

Bid Schedule Pg. 17

4001DY Prep (Power Washer) 1,000 SF __________ ____________

4001DZ Prep (Solvent Cleaning) 1,000 SF __________ ____________

4001EA Primer 1,000 SF __________ ____________

4001EB Topcoat 1,000 SF __________ ____________

4001EC Chemical Bonding Wipe 1,000 SF __________ ____________

4001ED Prep Chemical Stripping 1,000 SF __________ ____________

4001EE Pipe Railing Round or Square 2-3 inch 1,000 LF __________ ____________

4001EF Pipe Railing Round or Square 3 1/2-6 inch 1,000 LF __________ ____________

4001EG Other Surfaces 1,000 SF __________ ____________

Total for SubCLINs 4001AA through 4001EG

Enter this amount for CLIN 4001

BID SUMMARY SCHEDULE

BID SUMMARY SCHEDULE

MAINTAIN BASE PAVEMENTS

ESTIMATED BASIC YEAR

ESTIMATED OPTION YEAR ONE $____________

ESTIMATED OPTION YEAR TWO $____________

ESTIMATED OPTION YEAR THREE $____________

ESTIMATED OPTION YEAR FOUR $____________

TOTAL ESTIMATED COST (BASIC YEAR PLUS FOUR OPTIONS) $____________

File details come from the government source that posted it. Updated .