Maintain Base Paint
FA4613-14-R-0003
F.E. Warren AFB WY
Attachment 1
BID SCHEDULE - BASE YEAR
MAINTAIN BASE PAINT
(Note: Prices must be no more than two decimal points)
The following SubCLINs 0001AA through 0001FE correspond to the pricing for Basic Year CLIN
0001 above. The total of these SubCLINs should equal the amount listed for Basic Year CLIN
0001 in the Bid Summary Schedule below. Please limit pricing to two (2) decimal spaces.
CLIN 0001 BASE YEAR
INTERIOR PAINT
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 0001AA |
| Install Plastic |
| 50,000 |
| SF |
| _________ |
| _________ |
| 0001AB |
| Minor Prep for Painting |
| 54,000 |
| SF |
| _________ |
| _________ |
| 0001AC |
| Major Prep for Painting |
| 5,000 |
| SF |
| _________ |
| _________ |
| 0001AD |
| Mud/ Tape/ Sand Joints |
| 5,000 |
| LF |
| _________ |
| _________ |
| 0001AE |
| Remove Wall Covering |
| 45,000 |
| SF |
| _________ |
| _________ |
| 0001AF |
| Paint Primer |
| 200,000 |
| SF |
| _________ |
| _________ |
| 0001AG |
| Textured Finish |
| 50,000 |
| SF |
| _________ |
| _________ |
| 0001AH |
| Paint |
| 320,000 |
| SF |
| _________ |
| _________ |
| 0001AI |
| Replacement of Cove Base |
| 4,000 |
| LF |
| _________ |
| _________ |
| 0001AJ |
| Remove trim/chair rail and repair area |
| 1,800 |
| LF |
| _________ |
| _________ |
| 0001AK |
| Replacement of Hardware |
| 1,800 |
| EA |
| _________ |
| _________ |
| 0001AL |
| Install/Repair Metal Corner Bead |
| 500 |
| LF |
| _________ |
| _________ |
| 0001AM |
| Strip/Refinish Varnish Surfaces (Wood) |
| 1,000 |
| SF |
| _________ |
| _________ |
EXTERIOR PAINT
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 0001AN |
| Minor Prep of Wood Surface under 10' |
| 4,000 |
| SF |
| _________ |
| _________ |
| 0001AO |
| Major Prep of Wood Surface under 10' |
| 4,000 |
| SF |
| _________ |
| _________ |
| 0001AP |
| Minor Prep of Wood Surface over 10' |
| 4,000 |
| SF |
| _________ |
| _________ |
| 0001AQ |
| Major Prep of Wood Surface over 10' |
| 4,000 |
| SF |
| _________ |
| _________ |
| 0001AR |
| Minor Prep of Metal Surface under 10' |
| 3,000 |
| SF |
| _________ |
| _________ |
| 0001AS |
| Major Prep of Metal Surface under 10' |
| 2,000 |
| SF |
| _________ |
| _________ |
| 0001AT |
| Minor Prep of Metal Surface over 10' |
| 3,000 |
| SF |
| _________ |
| _________ |
| 0001AU |
| Major Prep of Metal Surface over 10' |
| 2,000 |
| SF |
| _________ |
| _________ |
| 0001AV |
| Total Abatement of Lead Based Surface under 10' |
| 20,000 |
| SF |
| _________ |
| _________ |
| 0001AW |
| Total Abatement of Lead Based Surface over 10' |
| 10,500 |
| SF |
| _________ |
| _________ |
| 0001AX |
| Primer application 2 coat under 10' w/ brush or roller |
| 32,000 |
| SF |
| _________ |
| _________ |
| 0001AY |
| Primer application 2 coat over 10' w/ brush or roller |
| 77,000 |
| SF |
| _________ |
| _________ |
| 0001AZ |
| Paint application 2 coat under 10' w/ brush or roller |
| 54,000 |
| SF |
| _________ |
| _________ |
| 0001BA |
| Paint application 2 coat over 10' w/ brush or roller |
| 77,000 |
| SF |
| _________ |
| _________ |
METAL APPURTENANCES
General Conditions
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 0001BB |
| Not Used |
| NA |
| NA |
| NA |
| NA |
| 0001BC |
| Abrasive Blasting Enclosure |
| 25 |
| EA |
| _________ |
| _________ |
Cast Iron Coatings
Fire Hydrant
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 0001BD |
| Fire Hydrant Prep (Manual Scraping) |
| 30 |
| EA |
| _________ |
| _________ |
| 0001BE |
| Fire Hydrant Prep (Chemical Stripping) |
| 30 |
| EA |
| _________ |
| _________ |
| 0001BF |
| Fire Hydrant Prep (Abrasive Blasting) |
| 30 |
| EA |
| _________ |
| _________ |
| 0001BG |
| Fire Hydrant Prep (Power Washer) |
| 30 |
| EA |
| _________ |
| _________ |
| 0001BH |
| Primer |
| 30 |
| EA |
| _________ |
| _________ |
| 0001BI |
| Topcoat |
| 30 |
| EA |
| _________ |
| _________ |
| 0001BJ |
| Chemical Bonding Wipe |
| 30 |
| EA |
| _________ |
| _________ |
Other Surfaces
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 0001BK |
| Prep (Manual Scraping) |
| 500 |
| SF |
| _________ |
| _________ |
| 0001BL |
| Prep (Chemical Stripping) |
| 500 |
| SF |
| _________ |
| _________ |
| 0001BM |
| Prep (Abrasive Blasting) |
| 500 |
| SF |
| _________ |
| _________ |
| 0001BN |
| Prep (Power Washer) |
| 500 |
| SF |
| _________ |
| _________ |
| 0001BO |
| Primer |
| 500 |
| SF |
| _________ |
| _________ |
| 0001BP |
| Topcoat |
| 500 |
| SF |
| _________ |
| _________ |
| 0001BQ |
| Chemical Bonding Wipe |
| 500 |
| SF |
| _________ |
| _________ |
Black Steel Coatings
Street Lighting Standard
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 0001BR |
| Street Light Prep (Manual Scraping/Wire Brushing) |
| 50 |
| EA |
| _________ |
| _________ |
| 0001BS |
| Street Light Prep (Chemical Stripping) |
| 50 |
| EA |
| _________ |
| _________ |
| 0001BT |
| Street Light Prep (Abrasive Blasting) |
| 50 |
| EA |
| _________ |
| _________ |
| 0001BU |
| Street Light Prep (Power Washer) |
| 50 |
| EA |
| _________ |
| _________ |
| 0001BV |
| Primer |
| 50 |
| EA |
| _________ |
| _________ |
| 0001BW |
| Topcoat |
| 50 |
| EA |
| _________ |
| _________ |
| 0001BX |
| Chemical Bonding Wipe |
| 50 |
| EA |
| _________ |
| _________ |
Pipe Railings 2-3 Inch Round or Square
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 0001BY |
| Prep (Manual Scraping/Wire Brushing) |
| 2,200 |
| LF |
| _________ |
| _________ |
| 0001BZ |
| Prep (Chemical Stripping) |
| 2,200 |
| LF |
| _________ |
| _________ |
| 0001CA |
| Prep (Abrasive Blasting) |
| 2,200 |
| LF |
| _________ |
| _________ |
| 0001CB |
| Prep (Power Washer) |
| 2,200 |
| LF |
| _________ |
| _________ |
| 0001CC |
| Primer |
| 2,200 |
| LF |
| _________ |
| _________ |
| 0001CD |
| Topcoat |
| 2,200 |
| LF |
| _________ |
| _________ |
| 0001CE |
| Chemical Bonding Wipe |
| 2,200 |
| LF |
| _________ |
| _________ |
Other Surfaces
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 0001CF |
| Prep (Manual Scraping/Wire Brushing) |
| 2,500 |
| SF |
| _________ |
| _________ |
| 0001CG |
| Prep (Chemical Stripping) |
| 2,500 |
| SF |
| _________ |
| _________ |
| 0001CH |
| Prep (Abrasive Blasting) |
| 2,500 |
| SF |
| _________ |
| _________ |
| 0001CI |
| Prep (Power Washer) |
| 2,500 |
| SF |
| _________ |
| _________ |
| 0001CJ |
| Primer |
| 2,500 |
| SF |
| _________ |
| _________ |
| 0001CK |
| Topcoat |
| 2,500 |
| SF |
| _________ |
| _________ |
| 0001CL |
| Chemical Bonding Wipe |
| 2,500 |
| SF |
| _________ |
| _________ |
Pipe Railings Round or Square 3 1/2-6 inch
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 0001CM |
| Prep (Manual Scraping/Wire Brushing) |
| 1,500 |
| LF |
| _________ |
| _________ |
| 0001CN |
| Prep (Chemical Stripping) |
| 1,500 |
| LF |
| _________ |
| _________ |
| 0001CO |
| Prep (Abrasive Blasting) |
| 1,500 |
| LF |
| _________ |
| _________ |
| 0001CP |
| Prep (Power Washer) |
| 1,500 |
| LF |
| _________ |
| _________ |
| 0001CQ |
| Primer |
| 1,500 |
| LF |
| _________ |
| _________ |
| 0001CR |
| Topcoat |
| 1,500 |
| LF |
| _________ |
| _________ |
| 0001CS |
| Enclosure, Bridge |
| 5 |
| EA |
| _________ |
| _________ |
| 0001CT |
| Chemical Bonding Wipe |
| 1,500 |
| LF |
| _________ |
| _________ |
Pipe Railings Round or Square 8 inch
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 0001CU |
| Prep (Manual Scraping/Wire Brushing) |
| 250 |
| LF |
| _________ |
| _________ |
| 0001CV |
| Prep (Chemical Stripping) |
| 250 |
| LF |
| _________ |
| _________ |
| 0001CW |
| Prep (Abrasive Blasting) |
| 250 |
| LF |
| _________ |
| _________ |
| 0001CX |
| Prep (Power Washer) |
| 250 |
| LF |
| _________ |
| _________ |
| 0001CY |
| Primer |
| 250 |
| LF |
| _________ |
| _________ |
| 0001CZ |
| Topcoat |
| 250 |
| LF |
| _________ |
| _________ |
| 0001DA |
| Chemical Bonding Wipe |
| 250 |
| LF |
| _________ |
| _________ |
Pipe Railings Round or Square 10 inch
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 0001DB |
| Prep (Manual Scraping/Wire Brushing) |
| 250 |
| LF |
| _________ |
| _________ |
| 0001DC |
| Prep (Chemical Stripping) |
| 250 |
| LF |
| _________ |
| _________ |
| 0001DD |
| Prep (Abrasive Blasting) |
| 250 |
| LF |
| _________ |
| _________ |
| 0001DE |
| Prep (Power Washer) |
| 250 |
| LF |
| _________ |
| _________ |
| 0001DF |
| Primer |
| 250 |
| LF |
| _________ |
| _________ |
| 0001DG |
| Topcoat |
| 250 |
| LF |
| _________ |
| _________ |
| 0001DH |
| Chemical Bonding Wipe |
| 250 |
| LF |
| _________ |
| _________ |
Galvanized Steel Coatings
Railings Round or Square 2-3 inch
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 0001DI |
| Prep (Power Washer) |
| 1,000 |
| LF |
| _________ |
| _________ |
| 0001DJ |
| Prep (Solvent Cleaning) |
| 1,000 |
| LF |
| _________ |
| _________ |
| 0001DK |
| Primer |
| 1,000 |
| LF |
| _________ |
| _________ |
| 0001DL |
| Topcoat |
| 1,000 |
| LF |
| _________ |
| _________ |
| 0001DM |
| Chemical Bonding Wipe |
| 1,000 |
| LF |
| _________ |
| _________ |
Other Surfaces
| 0001DN |
| Prep (Power Washer) |
| 1,000 |
| SF |
| _________ |
| _________ |
| 0001DO |
| Prep (Solvent Cleaning) |
| 1,000 |
| SF |
| _________ |
| _________ |
| 0001DP |
| Primer |
| 1,000 |
| SF |
| _________ |
| _________ |
| 0001DQ |
| Topcoat |
| 1,000 |
| SF |
| _________ |
| _________ |
| 0001DR |
| Chemical Bonding Wipe |
| 1,000 |
| SF |
| _________ |
| _________ |
Aluminum Coatings
Round Surfaces (Poles, Posts, Etc)
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 0001DS |
| Prep (Power Washer) |
| 2,100 |
| SF |
| _________ |
| _________ |
| 0001DT |
| Prep (Solvent Cleaning) |
| 2,100 |
| SF |
| _________ |
| _________ |
| 0001DU |
| Primer |
| 2,100 |
| SF |
| _________ |
| _________ |
| 0001DV |
| Topcoat |
| 2,100 |
| SF |
| _________ |
| _________ |
| 0001DW |
| Chemical Bonding Wipe |
| 2,100 |
| SF |
| _________ |
| _________ |
| 0001DX |
| Prep Chemical Stripping |
| 2,100 |
| SF |
| _________ |
| _________ |
Flat Surfaces
| 0001DY |
| Prep (Power Washer) |
| 1,000 |
| SF |
| _________ |
| _________ |
| 0001DZ |
| Prep (Solvent Cleaning) |
| 1,000 |
| SF |
| _________ |
| _________ |
| 0001EA |
| Primer |
| 1,000 |
| SF |
| _________ |
| _________ |
| 0001EB |
| Topcoat |
| 1,000 |
| SF |
| _________ |
| _________ |
| 0001EC |
| Chemical Bonding Wipe |
| 1,000 |
| SF |
| _________ |
| _________ |
| 0001ED |
| Prep Chemical Stripping |
| 1,000 |
| SF |
| _________ |
| _________ |
Rust Conversion Coating
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 0001EE |
| Pipe Railing Round or Square 2-3 inch |
| 1,000 |
| LF |
| _________ |
| _________ |
| 0001EF |
| Pipe Railing Round or Square 3 1/2-6 inch |
| 1,000 |
| LF |
| _________ |
| _________ |
| 0001EG |
| Other Surfaces |
| 800 |
| SF |
| _________ |
| _________ |
Miscellaneous Features
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 0001EH |
| Prep and paint window, 1 side, w/trim |
| 432 |
| ea |
| _________ |
| _________ |
| 0001EI |
| Prep and paint window, 1 side, w/trim, above 10' |
| 288 |
| ea |
| _________ |
| _________ |
| 0001EJ |
| Prep and paint door, 1 side, w/frame |
| 96 |
| ea |
| _________ |
| _________ |
| 0001EK |
| Prep and paint wood trim, up to 8" wide |
| 1700 |
| lf |
| _________ |
| _________ |
| 0001EL |
| Prep and paint wood trim, up to 8" wide, above 10' |
| 2800 |
| lf |
| _________ |
| _________ |
| 0001EM |
| Prep and paint metal trim, up to 8" wide |
| 1400 |
| lf |
| _________ |
| _________ |
| 0001EN |
| Prep and paint metal trim, up to 8" wide, above 10' |
| 2100 |
| lf |
| _________ |
| _________ |
| 0001EO |
| Prep and paint misc. feature, up to 6" wide |
| 1400 |
| lf |
| _________ |
| _________ |
| 0001EP |
| Prep and paint misc. feature, up to 6" wide, above 10' |
| 2100 |
| lf |
| _________ |
| _________ |
| 0001EQ |
| Remove window screen to paint; replace after |
| 432 |
| ea |
| _________ |
| _________ |
| 0001ER |
| Prep, repair and paint column, w/base, crown, and trim |
| 480 |
| ea |
| _________ |
| _________ |
| 0001ES |
| Prep and paint louver, w/trim |
| 40 |
| ea |
| _________ |
| _________ |
| 0001ET |
| Prep and paint louver, w/trim, above 10' |
| 40 |
| ea |
| _________ |
| _________ |
| 0001EU |
| Prep and paint downspout (per story) |
| 288 |
| ea |
| _________ |
| _________ |
| 0001EV |
| Prep and paint roof edge assembly (soffit, fascia, trim) |
| 2880 |
| lf |
| _________ |
| _________ |
| 0001EW |
| Prep and paint roof edge assembly; complex |
| 2880 |
| lf |
| _________ |
| _________ |
| 0001EX |
| Prep and paint large bay door, 1 side, w/trim |
| 6 |
| ea |
| _________ |
| _________ |
| 0001EY |
| Prep and paint gutters |
| 1920 |
| lf |
| _________ |
| _________ |
| 0001EZ |
| Floor prep & epoxy coating, 2 base coats plus top coat |
| 2400 |
| sf |
| _________ |
| _________ |
| 0001FA |
| Paint, spray application, 2 coats |
| 3600 |
| sf |
| _________ |
| _________ |
| 0001FB |
| Paint, spray application, 2 coats, over 10' |
| 1800 |
| sf |
| _________ |
| _________ |
| 0001FC |
| Prep and paint metal structural member, over 10' |
| 1000 |
| lf |
| _________ |
| _________ |
| 0001FD |
| Prep and paint wooden railing assembly; complex |
| 500 |
| lf |
| _________ |
| _________ |
| 0001FE |
| Replace corner guard |
| 1000 |
| lf |
| _________ |
| _________ |
Total for SubCLINs 0001AA through 0001FE
Enter this amount for CLIN 0001
| (Please limit pricing to two (2) decimal spaces.) |
| $ |
BID SCHEDULE - OPTION YEAR 1
MAINTAIN BASE PAINT
(Note: Prices must be no more than two decimal points)
The following SubCLINs 1001AA through 1001FE correspond to the pricing for Basic Year CLIN
0001 above. The total of these SubCLINs should equal the amount listed for Basic Year CLIN
0001 in the Bid Summary Schedule below. Please limit pricing to two (2) decimal spaces.
CLIN 1001 OPTION YEAR 1
INTERIOR PAINT
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 1001AA |
| Install Plastic |
| 50,000 |
| SF |
| _________ |
| _________ |
| 1001AB |
| Minor Prep for Painting |
| 54,000 |
| SF |
| _________ |
| _________ |
| 1001AC |
| Major Prep for Painting |
| 5,000 |
| SF |
| _________ |
| _________ |
| 1001AD |
| Mud/ Tape/ Sand Joints |
| 5,000 |
| LF |
| _________ |
| _________ |
| 1001AE |
| Remove Wall Covering |
| 45,000 |
| SF |
| _________ |
| _________ |
| 1001AF |
| Paint Primer |
| 200,000 |
| SF |
| _________ |
| _________ |
| 1001AG |
| Textured Finish |
| 50,000 |
| SF |
| _________ |
| _________ |
| 1001AH |
| Paint |
| 320,000 |
| SF |
| _________ |
| _________ |
| 1001AI |
| Replacement of Cove Base |
| 4,000 |
| LF |
| _________ |
| _________ |
| 1001AJ |
| Remove trim/chair rail and repair area |
| 1,800 |
| LF |
| _________ |
| _________ |
| 1001AK |
| Replacement of Hardware |
| 1,800 |
| EA |
| _________ |
| _________ |
| 1001AL |
| Install/Repair Metal Corner Bead |
| 500 |
| LF |
| _________ |
| _________ |
| 1001AM |
| Strip/Refinish Varnish Surfaces (Wood) |
| 1,000 |
| SF |
| _________ |
| _________ |
EXTERIOR PAINT
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 1001AN |
| Minor Prep of Wood Surface under 10' |
| 4,000 |
| SF |
| _________ |
| _________ |
| 1001AO |
| Major Prep of Wood Surface under 10' |
| 4,000 |
| SF |
| _________ |
| _________ |
| 1001AP |
| Minor Prep of Wood Surface over 10' |
| 4,000 |
| SF |
| _________ |
| _________ |
| 1001AQ |
| Major Prep of Wood Surface over 10' |
| 4,000 |
| SF |
| _________ |
| _________ |
| 1001AR |
| Minor Prep of Metal Surface under 10' |
| 3,000 |
| SF |
| _________ |
| _________ |
| 1001AS |
| Major Prep of Metal Surface under 10' |
| 2,000 |
| SF |
| _________ |
| _________ |
| 1001AT |
| Minor Prep of Metal Surface over 10' |
| 3,000 |
| SF |
| _________ |
| _________ |
| 1001AU |
| Major Prep of Metal Surface over 10' |
| 2,000 |
| SF |
| _________ |
| _________ |
| 1001AV |
| Total Abatement of Lead Based Surface under 10' |
| 20,000 |
| SF |
| _________ |
| _________ |
| 1001AW |
| Total Abatement of Lead Based Surface over 10' |
| 10,500 |
| SF |
| _________ |
| _________ |
| 1001AX |
| Primer application 2 coat under 10' w/ brush or roller |
| 32,000 |
| SF |
| _________ |
| _________ |
| 1001AY |
| Primer application 2 coat over 10' w/ brush or roller |
| 77,000 |
| SF |
| _________ |
| _________ |
| 1001AZ |
| Paint application 2 coat under 10' w/ brush or roller |
| 54,000 |
| SF |
| _________ |
| _________ |
| 1001BA |
| Paint application 2 coat over 10' w/ brush or roller |
| 77,000 |
| SF |
| _________ |
| _________ |
METAL APPURTENANCES
General Conditions
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 1001BB |
| Not Used |
| NA |
| NA |
| NA |
| NA |
| 1001BC |
| Abrasive Blasting Enclosure |
| 25 |
| EA |
| _________ |
| _________ |
Cast Iron Coatings
Fire Hydrant
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 1001BD |
| Fire Hydrant Prep (Manual Scraping) |
| 30 |
| EA |
| _________ |
| _________ |
| 1001BE |
| Fire Hydrant Prep (Chemical Stripping) |
| 30 |
| EA |
| _________ |
| _________ |
| 1001BF |
| Fire Hydrant Prep (Abrasive Blasting) |
| 30 |
| EA |
| _________ |
| _________ |
| 1001BG |
| Fire Hydrant Prep (Power Washer) |
| 30 |
| EA |
| _________ |
| _________ |
| 1001BH |
| Primer |
| 30 |
| EA |
| _________ |
| _________ |
| 1001BI |
| Topcoat |
| 30 |
| EA |
| _________ |
| _________ |
| 1001BJ |
| Chemical Bonding Wipe |
| 30 |
| EA |
| _________ |
| _________ |
Other Surfaces
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 1001BK |
| Prep (Manual Scraping) |
| 500 |
| SF |
| _________ |
| _________ |
| 1001BL |
| Prep (Chemical Stripping) |
| 500 |
| SF |
| _________ |
| _________ |
| 1001BM |
| Prep (Abrasive Blasting) |
| 500 |
| SF |
| _________ |
| _________ |
| 1001BN |
| Prep (Power Washer) |
| 500 |
| SF |
| _________ |
| _________ |
| 1001BO |
| Primer |
| 500 |
| SF |
| _________ |
| _________ |
| 1001BP |
| Topcoat |
| 500 |
| SF |
| _________ |
| _________ |
| 1001BQ |
| Chemical Bonding Wipe |
| 500 |
| SF |
| _________ |
| _________ |
Black Steel Coatings
Street Lighting Standard
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 1001BR |
| Street Light Prep (Manual Scraping/Wire Brushing) |
| 50 |
| EA |
| _________ |
| _________ |
| 1001BS |
| Street Light Prep (Chemical Stripping) |
| 50 |
| EA |
| _________ |
| _________ |
| 1001BT |
| Street Light Prep (Abrasive Blasting) |
| 50 |
| EA |
| _________ |
| _________ |
| 1001BU |
| Street Light Prep (Power Washer) |
| 50 |
| EA |
| _________ |
| _________ |
| 1001BV |
| Primer |
| 50 |
| EA |
| _________ |
| _________ |
| 1001BW |
| Topcoat |
| 50 |
| EA |
| _________ |
| _________ |
| 1001BX |
| Chemical Bonding Wipe |
| 50 |
| EA |
| _________ |
| _________ |
Pipe Railings 2-3 Inch Round or Square
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 1001BY |
| Prep (Manual Scraping/Wire Brushing) |
| 2,200 |
| LF |
| _________ |
| _________ |
| 1001BZ |
| Prep (Chemical Stripping) |
| 2,200 |
| LF |
| _________ |
| _________ |
| 1001CA |
| Prep (Abrasive Blasting) |
| 2,200 |
| LF |
| _________ |
| _________ |
| 1001CB |
| Prep (Power Washer) |
| 2,200 |
| LF |
| _________ |
| _________ |
| 1001CC |
| Primer |
| 2,200 |
| LF |
| _________ |
| _________ |
| 1001CD |
| Topcoat |
| 2,200 |
| LF |
| _________ |
| _________ |
| 1001CE |
| Chemical Bonding Wipe |
| 2,200 |
| LF |
| _________ |
| _________ |
Other Surfaces
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 1001CF |
| Prep (Manual Scraping/Wire Brushing) |
| 2,500 |
| SF |
| _________ |
| _________ |
| 1001CG |
| Prep (Chemical Stripping) |
| 2,500 |
| SF |
| _________ |
| _________ |
| 1001CH |
| Prep (Abrasive Blasting) |
| 2,500 |
| SF |
| _________ |
| _________ |
| 1001CI |
| Prep (Power Washer) |
| 2,500 |
| SF |
| _________ |
| _________ |
| 1001CJ |
| Primer |
| 2,500 |
| SF |
| _________ |
| _________ |
| 1001CK |
| Topcoat |
| 2,500 |
| SF |
| _________ |
| _________ |
| 1001CL |
| Chemical Bonding Wipe |
| 2,500 |
| SF |
| _________ |
| _________ |
Pipe Railings Round or Square 3 1/2-6 inch
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 1001CM |
| Prep (Manual Scraping/Wire Brushing) |
| 1,500 |
| LF |
| _________ |
| _________ |
| 1001CN |
| Prep (Chemical Stripping) |
| 1,500 |
| LF |
| _________ |
| _________ |
| 1001CO |
| Prep (Abrasive Blasting) |
| 1,500 |
| LF |
| _________ |
| _________ |
| 1001CP |
| Prep (Power Washer) |
| 1,500 |
| LF |
| _________ |
| _________ |
| 1001CQ |
| Primer |
| 1,500 |
| LF |
| _________ |
| _________ |
| 1001CR |
| Topcoat |
| 1,500 |
| LF |
| _________ |
| _________ |
| 1001CS |
| Enclosure, Bridge |
| 5 |
| EA |
| _________ |
| _________ |
| 1001CT |
| Chemical Bonding Wipe |
| 1,500 |
| LF |
| _________ |
| _________ |
Pipe Railings Round or Square 8 inch
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 1001CU |
| Prep (Manual Scraping/Wire Brushing) |
| 250 |
| LF |
| _________ |
| _________ |
| 1001CV |
| Prep (Chemical Stripping) |
| 250 |
| LF |
| _________ |
| _________ |
| 1001CW |
| Prep (Abrasive Blasting) |
| 250 |
| LF |
| _________ |
| _________ |
| 1001CX |
| Prep (Power Washer) |
| 250 |
| LF |
| _________ |
| _________ |
| 1001CY |
| Primer |
| 250 |
| LF |
| _________ |
| _________ |
| 1001CZ |
| Topcoat |
| 250 |
| LF |
| _________ |
| _________ |
| 1001DA |
| Chemical Bonding Wipe |
| 250 |
| LF |
| _________ |
| _________ |
Pipe Railings Round or Square 10 inch
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 1001DB |
| Prep (Manual Scraping/Wire Brushing) |
| 250 |
| LF |
| _________ |
| _________ |
| 1001DC |
| Prep (Chemical Stripping) |
| 250 |
| LF |
| _________ |
| _________ |
| 1001DD |
| Prep (Abrasive Blasting) |
| 250 |
| LF |
| _________ |
| _________ |
| 1001DE |
| Prep (Power Washer) |
| 250 |
| LF |
| _________ |
| _________ |
| 1001DF |
| Primer |
| 250 |
| LF |
| _________ |
| _________ |
| 1001DG |
| Topcoat |
| 250 |
| LF |
| _________ |
| _________ |
| 1001DH |
| Chemical Bonding Wipe |
| 250 |
| LF |
| _________ |
| _________ |
Galvanized Steel Coatings
Railings Round or Square 2-3 inch
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 1001DI |
| Prep (Power Washer) |
| 1,000 |
| LF |
| _________ |
| _________ |
| 1001DJ |
| Prep (Solvent Cleaning) |
| 1,000 |
| LF |
| _________ |
| _________ |
| 1001DK |
| Primer |
| 1,000 |
| LF |
| _________ |
| _________ |
| 1001DL |
| Topcoat |
| 1,000 |
| LF |
| _________ |
| _________ |
| 1001DM |
| Chemical Bonding Wipe |
| 1,000 |
| LF |
| _________ |
| _________ |
Other Surfaces
| 1001DN |
| Prep (Power Washer) |
| 1,000 |
| SF |
| _________ |
| _________ |
| 1001DO |
| Prep (Solvent Cleaning) |
| 1,000 |
| SF |
| _________ |
| _________ |
| 1001DP |
| Primer |
| 1,000 |
| SF |
| _________ |
| _________ |
| 1001DQ |
| Topcoat |
| 1,000 |
| SF |
| _________ |
| _________ |
| 1001DR |
| Chemical Bonding Wipe |
| 1,000 |
| SF |
| _________ |
| _________ |
Aluminum Coatings
Round Surfaces (Poles, Posts, Etc)
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 1001DS |
| Prep (Power Washer) |
| 2,100 |
| SF |
| _________ |
| _________ |
| 1001DT |
| Prep (Solvent Cleaning) |
| 2,100 |
| SF |
| _________ |
| _________ |
| 1001DU |
| Primer |
| 2,100 |
| SF |
| _________ |
| _________ |
| 1001DV |
| Topcoat |
| 2,100 |
| SF |
| _________ |
| _________ |
| 1001DW |
| Chemical Bonding Wipe |
| 2,100 |
| SF |
| _________ |
| _________ |
| 1001DX |
| Prep Chemical Stripping |
| 2,100 |
| SF |
| _________ |
| _________ |
Flat Surfaces
| 1001DY |
| Prep (Power Washer) |
| 1,000 |
| SF |
| _________ |
| _________ |
| 1001DZ |
| Prep (Solvent Cleaning) |
| 1,000 |
| SF |
| _________ |
| _________ |
| 1001EA |
| Primer |
| 1,000 |
| SF |
| _________ |
| _________ |
| 1001EB |
| Topcoat |
| 1,000 |
| SF |
| _________ |
| _________ |
| 1001EC |
| Chemical Bonding Wipe |
| 1,000 |
| SF |
| _________ |
| _________ |
| 1001ED |
| Prep Chemical Stripping |
| 1,000 |
| SF |
| _________ |
| _________ |
Rust Conversion Coating
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 1001EE |
| Pipe Railing Round or Square 2-3 inch |
| 1,000 |
| LF |
| _________ |
| _________ |
| 1001EF |
| Pipe Railing Round or Square 3 1/2-6 inch |
| 1,000 |
| LF |
| _________ |
| _________ |
| 1001EG |
| Other Surfaces |
| 800 |
| SF |
| _________ |
| _________ |
Miscellaneous Features
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 1001EH |
| Prep and paint window, 1 side, w/trim |
| 432 |
| ea |
| _________ |
| _________ |
| 1001EI |
| Prep and paint window, 1 side, w/trim, above 10' |
| 288 |
| ea |
| _________ |
| _________ |
| 1001EJ |
| Prep and paint door, 1 side, w/frame |
| 96 |
| ea |
| _________ |
| _________ |
| 1001EK |
| Prep and paint wood trim, up to 8" wide |
| 1700 |
| lf |
| _________ |
| _________ |
| 1001EL |
| Prep and paint wood trim, up to 8" wide, above 10' |
| 2800 |
| lf |
| _________ |
| _________ |
| 1001EM |
| Prep and paint metal trim, up to 8" wide |
| 1400 |
| lf |
| _________ |
| _________ |
| 1001EN |
| Prep and paint metal trim, up to 8" wide, above 10' |
| 2100 |
| lf |
| _________ |
| _________ |
| 1001EO |
| Prep and paint misc. feature, up to 6" wide |
| 1400 |
| lf |
| _________ |
| _________ |
| 1001EP |
| Prep and paint misc. feature, up to 6" wide, above 10' |
| 2100 |
| lf |
| _________ |
| _________ |
| 1001EQ |
| Remove window screen to paint; replace after |
| 432 |
| ea |
| _________ |
| _________ |
| 1001ER |
| Prep, repair and paint column, w/base, crown, and trim |
| 480 |
| ea |
| _________ |
| _________ |
| 1001ES |
| Prep and paint louver, w/trim |
| 40 |
| ea |
| _________ |
| _________ |
| 1001ET |
| Prep and paint louver, w/trim, above 10' |
| 40 |
| ea |
| _________ |
| _________ |
| 1001EU |
| Prep and paint downspout (per story) |
| 288 |
| ea |
| _________ |
| _________ |
| 1001EV |
| Prep and paint roof edge assembly (soffit, fascia, trim) |
| 2880 |
| lf |
| _________ |
| _________ |
| 1001EW |
| Prep and paint roof edge assembly; complex |
| 2880 |
| lf |
| _________ |
| _________ |
| 1001EX |
| Prep and paint large bay door, 1 side, w/trim |
| 6 |
| ea |
| _________ |
| _________ |
| 1001EY |
| Prep and paint gutters |
| 1920 |
| lf |
| _________ |
| _________ |
| 1001EZ |
| Floor prep & epoxy coating, 2 base coats plus top coat |
| 2400 |
| sf |
| _________ |
| _________ |
| 1001FA |
| Paint, spray application, 2 coats |
| 3600 |
| sf |
| _________ |
| _________ |
| 1001FB |
| Paint, spray application, 2 coats, over 10' |
| 1800 |
| sf |
| _________ |
| _________ |
| 1001FC |
| Prep and paint metal structural member, over 10' |
| 1000 |
| lf |
| _________ |
| _________ |
| 1001FD |
| Prep and paint wooden railing assembly; complex |
| 500 |
| lf |
| _________ |
| _________ |
| 1001FE |
| Replace corner guard |
| 1000 |
| lf |
| _________ |
| _________ |
Total for SubCLINs 1001AA through 1001FE
Enter this amount for CLIN 0001
| (Please limit pricing to two (2) decimal spaces.) |
| $ |
BID SCHEDULE - OPTION YEAR 2
MAINTAIN BASE PAINT
(Note: Prices must be no more than two decimal points)
The following SubCLINs 2001AA through 2001FE correspond to the pricing for Basic Year CLIN
0001 above. The total of these SubCLINs should equal the amount listed for Basic Year CLIN
0001 in the Bid Summary Schedule below. Please limit pricing to two (2) decimal spaces.
CLIN 2001 OPTION YEAR 2
INTERIOR PAINT
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 2001AA |
| Install Plastic |
| 50,000 |
| SF |
| _________ |
| _________ |
| 2001AB |
| Minor Prep for Painting |
| 54,000 |
| SF |
| _________ |
| _________ |
| 2001AC |
| Major Prep for Painting |
| 5,000 |
| SF |
| _________ |
| _________ |
| 2001AD |
| Mud/ Tape/ Sand Joints |
| 5,000 |
| LF |
| _________ |
| _________ |
| 2001AE |
| Remove Wall Covering |
| 45,000 |
| SF |
| _________ |
| _________ |
| 2001AF |
| Paint Primer |
| 200,000 |
| SF |
| _________ |
| _________ |
| 2001AG |
| Textured Finish |
| 50,000 |
| SF |
| _________ |
| _________ |
| 2001AH |
| Paint |
| 320,000 |
| SF |
| _________ |
| _________ |
| 2001AI |
| Replacement of Cove Base |
| 4,000 |
| LF |
| _________ |
| _________ |
| 2001AJ |
| Remove trim/chair rail and repair area |
| 1,800 |
| LF |
| _________ |
| _________ |
| 2001AK |
| Replacement of Hardware |
| 1,800 |
| EA |
| _________ |
| _________ |
| 2001AL |
| Install/Repair Metal Corner Bead |
| 500 |
| LF |
| _________ |
| _________ |
| 2001AM |
| Strip/Refinish Varnish Surfaces (Wood) |
| 1,000 |
| SF |
| _________ |
| _________ |
EXTERIOR PAINT
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 2001AN |
| Minor Prep of Wood Surface under 10' |
| 4,000 |
| SF |
| _________ |
| _________ |
| 2001AO |
| Major Prep of Wood Surface under 10' |
| 4,000 |
| SF |
| _________ |
| _________ |
| 2001AP |
| Minor Prep of Wood Surface over 10' |
| 4,000 |
| SF |
| _________ |
| _________ |
| 2001AQ |
| Major Prep of Wood Surface over 10' |
| 4,000 |
| SF |
| _________ |
| _________ |
| 2001AR |
| Minor Prep of Metal Surface under 10' |
| 3,000 |
| SF |
| _________ |
| _________ |
| 2001AS |
| Major Prep of Metal Surface under 10' |
| 2,000 |
| SF |
| _________ |
| _________ |
| 2001AT |
| Minor Prep of Metal Surface over 10' |
| 3,000 |
| SF |
| _________ |
| _________ |
| 2001AU |
| Major Prep of Metal Surface over 10' |
| 2,000 |
| SF |
| _________ |
| _________ |
| 2001AV |
| Total Abatement of Lead Based Surface under 10' |
| 20,000 |
| SF |
| _________ |
| _________ |
| 2001AW |
| Total Abatement of Lead Based Surface over 10' |
| 10,500 |
| SF |
| _________ |
| _________ |
| 2001AX |
| Primer application 2 coat under 10' w/ brush or roller |
| 32,000 |
| SF |
| _________ |
| _________ |
| 2001AY |
| Primer application 2 coat over 10' w/ brush or roller |
| 77,000 |
| SF |
| _________ |
| _________ |
| 2001AZ |
| Paint application 2 coat under 10' w/ brush or roller |
| 54,000 |
| SF |
| _________ |
| _________ |
| 2001BA |
| Paint application 2 coat over 10' w/ brush or roller |
| 77,000 |
| SF |
| _________ |
| _________ |
METAL APPURTENANCES
General Conditions
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 2001BB |
| Not Used |
| NA |
| NA |
| NA |
| NA |
| 2001BC |
| Abrasive Blasting Enclosure |
| 25 |
| EA |
| _________ |
| _________ |
Cast Iron Coatings
Fire Hydrant
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 2001BD |
| Fire Hydrant Prep (Manual Scraping) |
| 30 |
| EA |
| _________ |
| _________ |
| 2001BE |
| Fire Hydrant Prep (Chemical Stripping) |
| 30 |
| EA |
| _________ |
| _________ |
| 2001BF |
| Fire Hydrant Prep (Abrasive Blasting) |
| 30 |
| EA |
| _________ |
| _________ |
| 2001BG |
| Fire Hydrant Prep (Power Washer) |
| 30 |
| EA |
| _________ |
| _________ |
| 2001BH |
| Primer |
| 30 |
| EA |
| _________ |
| _________ |
| 2001BI |
| Topcoat |
| 30 |
| EA |
| _________ |
| _________ |
| 2001BJ |
| Chemical Bonding Wipe |
| 30 |
| EA |
| _________ |
| _________ |
Other Surfaces
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 2001BK |
| Prep (Manual Scraping) |
| 500 |
| SF |
| _________ |
| _________ |
| 2001BL |
| Prep (Chemical Stripping) |
| 500 |
| SF |
| _________ |
| _________ |
| 2001BM |
| Prep (Abrasive Blasting) |
| 500 |
| SF |
| _________ |
| _________ |
| 2001BN |
| Prep (Power Washer) |
| 500 |
| SF |
| _________ |
| _________ |
| 2001BO |
| Primer |
| 500 |
| SF |
| _________ |
| _________ |
| 2001BP |
| Topcoat |
| 500 |
| SF |
| _________ |
| _________ |
| 2001BQ |
| Chemical Bonding Wipe |
| 500 |
| SF |
| _________ |
| _________ |
Black Steel Coatings
Street Lighting Standard
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 2001BR |
| Street Light Prep (Manual Scraping/Wire Brushing) |
| 50 |
| EA |
| _________ |
| _________ |
| 2001BS |
| Street Light Prep (Chemical Stripping) |
| 50 |
| EA |
| _________ |
| _________ |
| 2001BT |
| Street Light Prep (Abrasive Blasting) |
| 50 |
| EA |
| _________ |
| _________ |
| 2001BU |
| Street Light Prep (Power Washer) |
| 50 |
| EA |
| _________ |
| _________ |
| 2001BV |
| Primer |
| 50 |
| EA |
| _________ |
| _________ |
| 2001BW |
| Topcoat |
| 50 |
| EA |
| _________ |
| _________ |
| 2001BX |
| Chemical Bonding Wipe |
| 50 |
| EA |
| _________ |
| _________ |
Pipe Railings 2-3 Inch Round or Square
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 2001BY |
| Prep (Manual Scraping/Wire Brushing) |
| 2,200 |
| LF |
| _________ |
| _________ |
| 2001BZ |
| Prep (Chemical Stripping) |
| 2,200 |
| LF |
| _________ |
| _________ |
| 2001CA |
| Prep (Abrasive Blasting) |
| 2,200 |
| LF |
| _________ |
| _________ |
| 2001CB |
| Prep (Power Washer) |
| 2,200 |
| LF |
| _________ |
| _________ |
| 2001CC |
| Primer |
| 2,200 |
| LF |
| _________ |
| _________ |
| 2001CD |
| Topcoat |
| 2,200 |
| LF |
| _________ |
| _________ |
| 2001CE |
| Chemical Bonding Wipe |
| 2,200 |
| LF |
| _________ |
| _________ |
Other Surfaces
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 2001CF |
| Prep (Manual Scraping/Wire Brushing) |
| 2,500 |
| SF |
| _________ |
| _________ |
| 2001CG |
| Prep (Chemical Stripping) |
| 2,500 |
| SF |
| _________ |
| _________ |
| 2001CH |
| Prep (Abrasive Blasting) |
| 2,500 |
| SF |
| _________ |
| _________ |
| 2001CI |
| Prep (Power Washer) |
| 2,500 |
| SF |
| _________ |
| _________ |
| 2001CJ |
| Primer |
| 2,500 |
| SF |
| _________ |
| _________ |
| 2001CK |
| Topcoat |
| 2,500 |
| SF |
| _________ |
| _________ |
| 2001CL |
| Chemical Bonding Wipe |
| 2,500 |
| SF |
| _________ |
| _________ |
Pipe Railings Round or Square 3 1/2-6 inch
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 2001CM |
| Prep (Manual Scraping/Wire Brushing) |
| 1,500 |
| LF |
| _________ |
| _________ |
| 2001CN |
| Prep (Chemical Stripping) |
| 1,500 |
| LF |
| _________ |
| _________ |
| 2001CO |
| Prep (Abrasive Blasting) |
| 1,500 |
| LF |
| _________ |
| _________ |
| 2001CP |
| Prep (Power Washer) |
| 1,500 |
| LF |
| _________ |
| _________ |
| 2001CQ |
| Primer |
| 1,500 |
| LF |
| _________ |
| _________ |
| 2001CR |
| Topcoat |
| 1,500 |
| LF |
| _________ |
| _________ |
| 2001CS |
| Enclosure, Bridge |
| 5 |
| EA |
| _________ |
| _________ |
| 2001CT |
| Chemical Bonding Wipe |
| 1,500 |
| LF |
| _________ |
| _________ |
Pipe Railings Round or Square 8 inch
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 2001CU |
| Prep (Manual Scraping/Wire Brushing) |
| 250 |
| LF |
| _________ |
| _________ |
| 2001CV |
| Prep (Chemical Stripping) |
| 250 |
| LF |
| _________ |
| _________ |
| 2001CW |
| Prep (Abrasive Blasting) |
| 250 |
| LF |
| _________ |
| _________ |
| 2001CX |
| Prep (Power Washer) |
| 250 |
| LF |
| _________ |
| _________ |
| 2001CY |
| Primer |
| 250 |
| LF |
| _________ |
| _________ |
| 2001CZ |
| Topcoat |
| 250 |
| LF |
| _________ |
| _________ |
| 2001DA |
| Chemical Bonding Wipe |
| 250 |
| LF |
| _________ |
| _________ |
Pipe Railings Round or Square 10 inch
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 2001DB |
| Prep (Manual Scraping/Wire Brushing) |
| 250 |
| LF |
| _________ |
| _________ |
| 2001DC |
| Prep (Chemical Stripping) |
| 250 |
| LF |
| _________ |
| _________ |
| 2001DD |
| Prep (Abrasive Blasting) |
| 250 |
| LF |
| _________ |
| _________ |
| 2001DE |
| Prep (Power Washer) |
| 250 |
| LF |
| _________ |
| _________ |
| 2001DF |
| Primer |
| 250 |
| LF |
| _________ |
| _________ |
| 2001DG |
| Topcoat |
| 250 |
| LF |
| _________ |
| _________ |
| 2001DH |
| Chemical Bonding Wipe |
| 250 |
| LF |
| _________ |
| _________ |
Galvanized Steel Coatings
Railings Round or Square 2-3 inch
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 2001DI |
| Prep (Power Washer) |
| 1,000 |
| LF |
| _________ |
| _________ |
| 2001DJ |
| Prep (Solvent Cleaning) |
| 1,000 |
| LF |
| _________ |
| _________ |
| 2001DK |
| Primer |
| 1,000 |
| LF |
| _________ |
| _________ |
| 2001DL |
| Topcoat |
| 1,000 |
| LF |
| _________ |
| _________ |
| 2001DM |
| Chemical Bonding Wipe |
| 1,000 |
| LF |
| _________ |
| _________ |
Other Surfaces
| 2001DN |
| Prep (Power Washer) |
| 1,000 |
| SF |
| _________ |
| _________ |
| 2001DO |
| Prep (Solvent Cleaning) |
| 1,000 |
| SF |
| _________ |
| _________ |
| 2001DP |
| Primer |
| 1,000 |
| SF |
| _________ |
| _________ |
| 2001DQ |
| Topcoat |
| 1,000 |
| SF |
| _________ |
| _________ |
| 2001DR |
| Chemical Bonding Wipe |
| 1,000 |
| SF |
| _________ |
| _________ |
Aluminum Coatings
Round Surfaces (Poles, Posts, Etc)
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 2001DS |
| Prep (Power Washer) |
| 2,100 |
| SF |
| _________ |
| _________ |
| 2001DT |
| Prep (Solvent Cleaning) |
| 2,100 |
| SF |
| _________ |
| _________ |
| 2001DU |
| Primer |
| 2,100 |
| SF |
| _________ |
| _________ |
| 2001DV |
| Topcoat |
| 2,100 |
| SF |
| _________ |
| _________ |
| 2001DW |
| Chemical Bonding Wipe |
| 2,100 |
| SF |
| _________ |
| _________ |
| 2001DX |
| Prep Chemical Stripping |
| 2,100 |
| SF |
| _________ |
| _________ |
Flat Surfaces
| 2001DY |
| Prep (Power Washer) |
| 1,000 |
| SF |
| _________ |
| _________ |
| 2001DZ |
| Prep (Solvent Cleaning) |
| 1,000 |
| SF |
| _________ |
| _________ |
| 2001EA |
| Primer |
| 1,000 |
| SF |
| _________ |
| _________ |
| 2001EB |
| Topcoat |
| 1,000 |
| SF |
| _________ |
| _________ |
| 2001EC |
| Chemical Bonding Wipe |
| 1,000 |
| SF |
| _________ |
| _________ |
| 2001ED |
| Prep Chemical Stripping |
| 1,000 |
| SF |
| _________ |
| _________ |
Rust Conversion Coating
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 2001EE |
| Pipe Railing Round or Square 2-3 inch |
| 1,000 |
| LF |
| _________ |
| _________ |
| 2001EF |
| Pipe Railing Round or Square 3 1/2-6 inch |
| 1,000 |
| LF |
| _________ |
| _________ |
| 2001EG |
| Other Surfaces |
| 800 |
| SF |
| _________ |
| _________ |
Miscellaneous Features
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 2001EH |
| Prep and paint window, 1 side, w/trim |
| 432 |
| ea |
| _________ |
| _________ |
| 2001EI |
| Prep and paint window, 1 side, w/trim, above 10' |
| 288 |
| ea |
| _________ |
| _________ |
| 2001EJ |
| Prep and paint door, 1 side, w/frame |
| 96 |
| ea |
| _________ |
| _________ |
| 2001EK |
| Prep and paint wood trim, up to 8" wide |
| 1700 |
| lf |
| _________ |
| _________ |
| 2001EL |
| Prep and paint wood trim, up to 8" wide, above 10' |
| 2800 |
| lf |
| _________ |
| _________ |
| 2001EM |
| Prep and paint metal trim, up to 8" wide |
| 1400 |
| lf |
| _________ |
| _________ |
| 2001EN |
| Prep and paint metal trim, up to 8" wide, above 10' |
| 2100 |
| lf |
| _________ |
| _________ |
| 2001EO |
| Prep and paint misc. feature, up to 6" wide |
| 1400 |
| lf |
| _________ |
| _________ |
| 2001EP |
| Prep and paint misc. feature, up to 6" wide, above 10' |
| 2100 |
| lf |
| _________ |
| _________ |
| 2001EQ |
| Remove window screen to paint; replace after |
| 432 |
| ea |
| _________ |
| _________ |
| 2001ER |
| Prep, repair and paint column, w/base, crown, and trim |
| 480 |
| ea |
| _________ |
| _________ |
| 2001ES |
| Prep and paint louver, w/trim |
| 40 |
| ea |
| _________ |
| _________ |
| 2001ET |
| Prep and paint louver, w/trim, above 10' |
| 40 |
| ea |
| _________ |
| _________ |
| 2001EU |
| Prep and paint downspout (per story) |
| 288 |
| ea |
| _________ |
| _________ |
| 2001EV |
| Prep and paint roof edge assembly (soffit, fascia, trim) |
| 2880 |
| lf |
| _________ |
| _________ |
| 2001EW |
| Prep and paint roof edge assembly; complex |
| 2880 |
| lf |
| _________ |
| _________ |
| 2001EX |
| Prep and paint large bay door, 1 side, w/trim |
| 6 |
| ea |
| _________ |
| _________ |
| 2001EY |
| Prep and paint gutters |
| 1920 |
| lf |
| _________ |
| _________ |
| 2001EZ |
| Floor prep & epoxy coating, 2 base coats plus top coat |
| 2400 |
| sf |
| _________ |
| _________ |
| 2001FA |
| Paint, spray application, 2 coats |
| 3600 |
| sf |
| _________ |
| _________ |
| 2001FB |
| Paint, spray application, 2 coats, over 10' |
| 1800 |
| sf |
| _________ |
| _________ |
| 2001FC |
| Prep and paint metal structural member, over 10' |
| 1000 |
| lf |
| _________ |
| _________ |
| 2001FD |
| Prep and paint wooden railing assembly; complex |
| 500 |
| lf |
| _________ |
| _________ |
| 2001FE |
| Replace corner guard |
| 1000 |
| lf |
| _________ |
| _________ |
Total for SubCLINs 2001AA through 2001FE
Enter this amount for CLIN 0001
| (Please limit pricing to two (2) decimal spaces.) |
| $ |
BID SCHEDULE - OPTION YEAR 3
MAINTAIN BASE PAINT
(Note: Prices must be no more than two decimal points)
The following SubCLINs 3001AA through 3001FE correspond to the pricing for Basic Year CLIN
0001 above. The total of these SubCLINs should equal the amount listed for Basic Year CLIN
0001 in the Bid Summary Schedule below. Please limit pricing to two (2) decimal spaces.
CLIN 3001 OPTION YEAR 3
INTERIOR PAINT
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 3001AA |
| Install Plastic |
| 50,000 |
| SF |
| _________ |
| _________ |
| 3001AB |
| Minor Prep for Painting |
| 54,000 |
| SF |
| _________ |
| _________ |
| 3001AC |
| Major Prep for Painting |
| 5,000 |
| SF |
| _________ |
| _________ |
| 3001AD |
| Mud/ Tape/ Sand Joints |
| 5,000 |
| LF |
| _________ |
| _________ |
| 3001AE |
| Remove Wall Covering |
| 45,000 |
| SF |
| _________ |
| _________ |
| 3001AF |
| Paint Primer |
| 200,000 |
| SF |
| _________ |
| _________ |
| 3001AG |
| Textured Finish |
| 50,000 |
| SF |
| _________ |
| _________ |
| 3001AH |
| Paint |
| 320,000 |
| SF |
| _________ |
| _________ |
| 3001AI |
| Replacement of Cove Base |
| 4,000 |
| LF |
| _________ |
| _________ |
| 3001AJ |
| Remove trim/chair rail and repair area |
| 1,800 |
| LF |
| _________ |
| _________ |
| 3001AK |
| Replacement of Hardware |
| 1,800 |
| EA |
| _________ |
| _________ |
| 3001AL |
| Install/Repair Metal Corner Bead |
| 500 |
| LF |
| _________ |
| _________ |
| 3001AM |
| Strip/Refinish Varnish Surfaces (Wood) |
| 1,000 |
| SF |
| _________ |
| _________ |
EXTERIOR PAINT
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 3001AN |
| Minor Prep of Wood Surface under 10' |
| 4,000 |
| SF |
| _________ |
| _________ |
| 3001AO |
| Major Prep of Wood Surface under 10' |
| 4,000 |
| SF |
| _________ |
| _________ |
| 3001AP |
| Minor Prep of Wood Surface over 10' |
| 4,000 |
| SF |
| _________ |
| _________ |
| 3001AQ |
| Major Prep of Wood Surface over 10' |
| 4,000 |
| SF |
| _________ |
| _________ |
| 3001AR |
| Minor Prep of Metal Surface under 10' |
| 3,000 |
| SF |
| _________ |
| _________ |
| 3001AS |
| Major Prep of Metal Surface under 10' |
| 2,000 |
| SF |
| _________ |
| _________ |
| 3001AT |
| Minor Prep of Metal Surface over 10' |
| 3,000 |
| SF |
| _________ |
| _________ |
| 3001AU |
| Major Prep of Metal Surface over 10' |
| 2,000 |
| SF |
| _________ |
| _________ |
| 3001AV |
| Total Abatement of Lead Based Surface under 10' |
| 20,000 |
| SF |
| _________ |
| _________ |
| 3001AW |
| Total Abatement of Lead Based Surface over 10' |
| 10,500 |
| SF |
| _________ |
| _________ |
| 3001AX |
| Primer application 2 coat under 10' w/ brush or roller |
| 32,000 |
| SF |
| _________ |
| _________ |
| 3001AY |
| Primer application 2 coat over 10' w/ brush or roller |
| 77,000 |
| SF |
| _________ |
| _________ |
| 3001AZ |
| Paint application 2 coat under 10' w/ brush or roller |
| 54,000 |
| SF |
| _________ |
| _________ |
| 3001BA |
| Paint application 2 coat over 10' w/ brush or roller |
| 77,000 |
| SF |
| _________ |
| _________ |
METAL APPURTENANCES
General Conditions
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 3001BB |
| Not Used |
| NA |
| NA |
| NA |
| NA |
| 3001BC |
| Abrasive Blasting Enclosure |
| 25 |
| EA |
| _________ |
| _________ |
Cast Iron Coatings
Fire Hydrant
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 3001BD |
| Fire Hydrant Prep (Manual Scraping) |
| 30 |
| EA |
| _________ |
| _________ |
| 3001BE |
| Fire Hydrant Prep (Chemical Stripping) |
| 30 |
| EA |
| _________ |
| _________ |
| 3001BF |
| Fire Hydrant Prep (Abrasive Blasting) |
| 30 |
| EA |
| _________ |
| _________ |
| 3001BG |
| Fire Hydrant Prep (Power Washer) |
| 30 |
| EA |
| _________ |
| _________ |
| 3001BH |
| Primer |
| 30 |
| EA |
| _________ |
| _________ |
| 3001BI |
| Topcoat |
| 30 |
| EA |
| _________ |
| _________ |
| 3001BJ |
| Chemical Bonding Wipe |
| 30 |
| EA |
| _________ |
| _________ |
Other Surfaces
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 3001BK |
| Prep (Manual Scraping) |
| 500 |
| SF |
| _________ |
| _________ |
| 3001BL |
| Prep (Chemical Stripping) |
| 500 |
| SF |
| _________ |
| _________ |
| 3001BM |
| Prep (Abrasive Blasting) |
| 500 |
| SF |
| _________ |
| _________ |
| 3001BN |
| Prep (Power Washer) |
| 500 |
| SF |
| _________ |
| _________ |
| 3001BO |
| Primer |
| 500 |
| SF |
| _________ |
| _________ |
| 3001BP |
| Topcoat |
| 500 |
| SF |
| _________ |
| _________ |
| 3001BQ |
| Chemical Bonding Wipe |
| 500 |
| SF |
| _________ |
| _________ |
Black Steel Coatings
Street Lighting Standard
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 3001BR |
| Street Light Prep (Manual Scraping/Wire Brushing) |
| 50 |
| EA |
| _________ |
| _________ |
| 3001BS |
| Street Light Prep (Chemical Stripping) |
| 50 |
| EA |
| _________ |
| _________ |
| 3001BT |
| Street Light Prep (Abrasive Blasting) |
| 50 |
| EA |
| _________ |
| _________ |
| 3001BU |
| Street Light Prep (Power Washer) |
| 50 |
| EA |
| _________ |
| _________ |
| 3001BV |
| Primer |
| 50 |
| EA |
| _________ |
| _________ |
| 3001BW |
| Topcoat |
| 50 |
| EA |
| _________ |
| _________ |
| 3001BX |
| Chemical Bonding Wipe |
| 50 |
| EA |
| _________ |
| _________ |
Pipe Railings 2-3 Inch Round or Square
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 3001BY |
| Prep (Manual Scraping/Wire Brushing) |
| 2,200 |
| LF |
| _________ |
| _________ |
| 3001BZ |
| Prep (Chemical Stripping) |
| 2,200 |
| LF |
| _________ |
| _________ |
| 3001CA |
| Prep (Abrasive Blasting) |
| 2,200 |
| LF |
| _________ |
| _________ |
| 3001CB |
| Prep (Power Washer) |
| 2,200 |
| LF |
| _________ |
| _________ |
| 3001CC |
| Primer |
| 2,200 |
| LF |
| _________ |
| _________ |
| 3001CD |
| Topcoat |
| 2,200 |
| LF |
| _________ |
| _________ |
| 3001CE |
| Chemical Bonding Wipe |
| 2,200 |
| LF |
| _________ |
| _________ |
Other Surfaces
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 3001CF |
| Prep (Manual Scraping/Wire Brushing) |
| 2,500 |
| SF |
| _________ |
| _________ |
| 3001CG |
| Prep (Chemical Stripping) |
| 2,500 |
| SF |
| _________ |
| _________ |
| 3001CH |
| Prep (Abrasive Blasting) |
| 2,500 |
| SF |
| _________ |
| _________ |
| 3001CI |
| Prep (Power Washer) |
| 2,500 |
| SF |
| _________ |
| _________ |
| 3001CJ |
| Primer |
| 2,500 |
| SF |
| _________ |
| _________ |
| 3001CK |
| Topcoat |
| 2,500 |
| SF |
| _________ |
| _________ |
| 3001CL |
| Chemical Bonding Wipe |
| 2,500 |
| SF |
| _________ |
| _________ |
Pipe Railings Round or Square 3 1/2-6 inch
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 3001CM |
| Prep (Manual Scraping/Wire Brushing) |
| 1,500 |
| LF |
| _________ |
| _________ |
| 3001CN |
| Prep (Chemical Stripping) |
| 1,500 |
| LF |
| _________ |
| _________ |
| 3001CO |
| Prep (Abrasive Blasting) |
| 1,500 |
| LF |
| _________ |
| _________ |
| 3001CP |
| Prep (Power Washer) |
| 1,500 |
| LF |
| _________ |
| _________ |
| 3001CQ |
| Primer |
| 1,500 |
| LF |
| _________ |
| _________ |
| 3001CR |
| Topcoat |
| 1,500 |
| LF |
| _________ |
| _________ |
| 3001CS |
| Enclosure, Bridge |
| 5 |
| EA |
| _________ |
| _________ |
| 3001CT |
| Chemical Bonding Wipe |
| 1,500 |
| LF |
| _________ |
| _________ |
Pipe Railings Round or Square 8 inch
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 3001CU |
| Prep (Manual Scraping/Wire Brushing) |
| 250 |
| LF |
| _________ |
| _________ |
| 3001CV |
| Prep (Chemical Stripping) |
| 250 |
| LF |
| _________ |
| _________ |
| 3001CW |
| Prep (Abrasive Blasting) |
| 250 |
| LF |
| _________ |
| _________ |
| 3001CX |
| Prep (Power Washer) |
| 250 |
| LF |
| _________ |
| _________ |
| 3001CY |
| Primer |
| 250 |
| LF |
| _________ |
| _________ |
| 3001CZ |
| Topcoat |
| 250 |
| LF |
| _________ |
| _________ |
| 3001DA |
| Chemical Bonding Wipe |
| 250 |
| LF |
| _________ |
| _________ |
Pipe Railings Round or Square 10 inch
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 3001DB |
| Prep (Manual Scraping/Wire Brushing) |
| 250 |
| LF |
| _________ |
| _________ |
| 3001DC |
| Prep (Chemical Stripping) |
| 250 |
| LF |
| _________ |
| _________ |
| 3001DD |
| Prep (Abrasive Blasting) |
| 250 |
| LF |
| _________ |
| _________ |
| 3001DE |
| Prep (Power Washer) |
| 250 |
| LF |
| _________ |
| _________ |
| 3001DF |
| Primer |
| 250 |
| LF |
| _________ |
| _________ |
| 3001DG |
| Topcoat |
| 250 |
| LF |
| _________ |
| _________ |
| 3001DH |
| Chemical Bonding Wipe |
| 250 |
| LF |
| _________ |
| _________ |
Galvanized Steel Coatings
Railings Round or Square 2-3 inch
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 3001DI |
| Prep (Power Washer) |
| 1,000 |
| LF |
| _________ |
| _________ |
| 3001DJ |
| Prep (Solvent Cleaning) |
| 1,000 |
| LF |
| _________ |
| _________ |
| 3001DK |
| Primer |
| 1,000 |
| LF |
| _________ |
| _________ |
| 3001DL |
| Topcoat |
| 1,000 |
| LF |
| _________ |
| _________ |
| 3001DM |
| Chemical Bonding Wipe |
| 1,000 |
| LF |
| _________ |
| _________ |
Other Surfaces
| 3001DN |
| Prep (Power Washer) |
| 1,000 |
| SF |
| _________ |
| _________ |
| 3001DO |
| Prep (Solvent Cleaning) |
| 1,000 |
| SF |
| _________ |
| _________ |
| 3001DP |
| Primer |
| 1,000 |
| SF |
| _________ |
| _________ |
| 3001DQ |
| Topcoat |
| 1,000 |
| SF |
| _________ |
| _________ |
| 3001DR |
| Chemical Bonding Wipe |
| 1,000 |
| SF |
| _________ |
| _________ |
Aluminum Coatings
Round Surfaces (Poles, Posts, Etc)
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 3001DS |
| Prep (Power Washer) |
| 2,100 |
| SF |
| _________ |
| _________ |
| 3001DT |
| Prep (Solvent Cleaning) |
| 2,100 |
| SF |
| _________ |
| _________ |
| 3001DU |
| Primer |
| 2,100 |
| SF |
| _________ |
| _________ |
| 3001DV |
| Topcoat |
| 2,100 |
| SF |
| _________ |
| _________ |
| 3001DW |
| Chemical Bonding Wipe |
| 2,100 |
| SF |
| _________ |
| _________ |
| 3001DX |
| Prep Chemical Stripping |
| 2,100 |
| SF |
| _________ |
| _________ |
Flat Surfaces
| 3001DY |
| Prep (Power Washer) |
| 1,000 |
| SF |
| _________ |
| _________ |
| 3001DZ |
| Prep (Solvent Cleaning) |
| 1,000 |
| SF |
| _________ |
| _________ |
| 3001EA |
| Primer |
| 1,000 |
| SF |
| _________ |
| _________ |
| 3001EB |
| Topcoat |
| 1,000 |
| SF |
| _________ |
| _________ |
| 3001EC |
| Chemical Bonding Wipe |
| 1,000 |
| SF |
| _________ |
| _________ |
| 3001ED |
| Prep Chemical Stripping |
| 1,000 |
| SF |
| _________ |
| _________ |
Rust Conversion Coating
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 3001EE |
| Pipe Railing Round or Square 2-3 inch |
| 1,000 |
| LF |
| _________ |
| _________ |
| 3001EF |
| Pipe Railing Round or Square 3 1/2-6 inch |
| 1,000 |
| LF |
| _________ |
| _________ |
| 3001EG |
| Other Surfaces |
| 800 |
| SF |
| _________ |
| _________ |
Miscellaneous Features
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 3001EH |
| Prep and paint window, 1 side, w/trim |
| 432 |
| ea |
| _________ |
| _________ |
| 3001EI |
| Prep and paint window, 1 side, w/trim, above 10' |
| 288 |
| ea |
| _________ |
| _________ |
| 3001EJ |
| Prep and paint door, 1 side, w/frame |
| 96 |
| ea |
| _________ |
| _________ |
| 3001EK |
| Prep and paint wood trim, up to 8" wide |
| 1700 |
| lf |
| _________ |
| _________ |
| 3001EL |
| Prep and paint wood trim, up to 8" wide, above 10' |
| 2800 |
| lf |
| _________ |
| _________ |
| 3001EM |
| Prep and paint metal trim, up to 8" wide |
| 1400 |
| lf |
| _________ |
| _________ |
| 3001EN |
| Prep and paint metal trim, up to 8" wide, above 10' |
| 2100 |
| lf |
| _________ |
| _________ |
| 3001EO |
| Prep and paint misc. feature, up to 6" wide |
| 1400 |
| lf |
| _________ |
| _________ |
| 3001EP |
| Prep and paint misc. feature, up to 6" wide, above 10' |
| 2100 |
| lf |
| _________ |
| _________ |
| 3001EQ |
| Remove window screen to paint; replace after |
| 432 |
| ea |
| _________ |
| _________ |
| 3001ER |
| Prep, repair and paint column, w/base, crown, and trim |
| 480 |
| ea |
| _________ |
| _________ |
| 3001ES |
| Prep and paint louver, w/trim |
| 40 |
| ea |
| _________ |
| _________ |
| 3001ET |
| Prep and paint louver, w/trim, above 10' |
| 40 |
| ea |
| _________ |
| _________ |
| 3001EU |
| Prep and paint downspout (per story) |
| 288 |
| ea |
| _________ |
| _________ |
| 3001EV |
| Prep and paint roof edge assembly (soffit, fascia, trim) |
| 2880 |
| lf |
| _________ |
| _________ |
| 3001EW |
| Prep and paint roof edge assembly; complex |
| 2880 |
| lf |
| _________ |
| _________ |
| 3001EX |
| Prep and paint large bay door, 1 side, w/trim |
| 6 |
| ea |
| _________ |
| _________ |
| 3001EY |
| Prep and paint gutters |
| 1920 |
| lf |
| _________ |
| _________ |
| 3001EZ |
| Floor prep & epoxy coating, 2 base coats plus top coat |
| 2400 |
| sf |
| _________ |
| _________ |
| 3001FA |
| Paint, spray application, 2 coats |
| 3600 |
| sf |
| _________ |
| _________ |
| 3001FB |
| Paint, spray application, 2 coats, over 10' |
| 1800 |
| sf |
| _________ |
| _________ |
| 3001FC |
| Prep and paint metal structural member, over 10' |
| 1000 |
| lf |
| _________ |
| _________ |
| 3001FD |
| Prep and paint wooden railing assembly; complex |
| 500 |
| lf |
| _________ |
| _________ |
| 3001FE |
| Replace corner guard |
| 1000 |
| lf |
| _________ |
| _________ |
Total for SubCLINs 3001AA through 3001FE
Enter this amount for CLIN 0001
| (Please limit pricing to two (2) decimal spaces.) |
| $ |
BID SCHEDULE - OPTION YEAR 4
MAINTAIN BASE PAINT
(Note: Prices must be no more than two decimal points)
The following SubCLINs 4001AA through 4001FE correspond to the pricing for Basic Year CLIN
0001 above. The total of these SubCLINs should equal the amount listed for Basic Year CLIN
0001 in the Bid Summary Schedule below. Please limit pricing to two (2) decimal spaces.
CLIN 4001 OPTION YEAR 4
INTERIOR PAINT
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 4001AA |
| Install Plastic |
| 50,000 |
| SF |
| _________ |
| _________ |
| 4001AB |
| Minor Prep for Painting |
| 54,000 |
| SF |
| _________ |
| _________ |
| 4001AC |
| Major Prep for Painting |
| 5,000 |
| SF |
| _________ |
| _________ |
| 4001AD |
| Mud/ Tape/ Sand Joints |
| 5,000 |
| LF |
| _________ |
| _________ |
| 4001AE |
| Remove Wall Covering |
| 45,000 |
| SF |
| _________ |
| _________ |
| 4001AF |
| Paint Primer |
| 200,000 |
| SF |
| _________ |
| _________ |
| 4001AG |
| Textured Finish |
| 50,000 |
| SF |
| _________ |
| _________ |
| 4001AH |
| Paint |
| 320,000 |
| SF |
| _________ |
| _________ |
| 4001AI |
| Replacement of Cove Base |
| 4,000 |
| LF |
| _________ |
| _________ |
| 4001AJ |
| Remove trim/chair rail and repair area |
| 1,800 |
| LF |
| _________ |
| _________ |
| 4001AK |
| Replacement of Hardware |
| 1,800 |
| EA |
| _________ |
| _________ |
| 4001AL |
| Install/Repair Metal Corner Bead |
| 500 |
| LF |
| _________ |
| _________ |
| 4001AM |
| Strip/Refinish Varnish Surfaces (Wood) |
| 1,000 |
| SF |
| _________ |
| _________ |
EXTERIOR PAINT
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 4001AN |
| Minor Prep of Wood Surface under 10' |
| 4,000 |
| SF |
| _________ |
| _________ |
| 4001AO |
| Major Prep of Wood Surface under 10' |
| 4,000 |
| SF |
| _________ |
| _________ |
| 4001AP |
| Minor Prep of Wood Surface over 10' |
| 4,000 |
| SF |
| _________ |
| _________ |
| 4001AQ |
| Major Prep of Wood Surface over 10' |
| 4,000 |
| SF |
| _________ |
| _________ |
| 4001AR |
| Minor Prep of Metal Surface under 10' |
| 3,000 |
| SF |
| _________ |
| _________ |
| 4001AS |
| Major Prep of Metal Surface under 10' |
| 2,000 |
| SF |
| _________ |
| _________ |
| 4001AT |
| Minor Prep of Metal Surface over 10' |
| 3,000 |
| SF |
| _________ |
| _________ |
| 4001AU |
| Major Prep of Metal Surface over 10' |
| 2,000 |
| SF |
| _________ |
| _________ |
| 4001AV |
| Total Abatement of Lead Based Surface under 10' |
| 20,000 |
| SF |
| _________ |
| _________ |
| 4001AW |
| Total Abatement of Lead Based Surface over 10' |
| 10,500 |
| SF |
| _________ |
| _________ |
| 4001AX |
| Primer application 2 coat under 10' w/ brush or roller |
| 32,000 |
| SF |
| _________ |
| _________ |
| 4001AY |
| Primer application 2 coat over 10' w/ brush or roller |
| 77,000 |
| SF |
| _________ |
| _________ |
| 4001AZ |
| Paint application 2 coat under 10' w/ brush or roller |
| 54,000 |
| SF |
| _________ |
| _________ |
| 4001BA |
| Paint application 2 coat over 10' w/ brush or roller |
| 77,000 |
| SF |
| _________ |
| _________ |
METAL APPURTENANCES
General Conditions
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 4001BB |
| Not Used |
| NA |
| NA |
| NA |
| NA |
| 4001BC |
| Abrasive Blasting Enclosure |
| 25 |
| EA |
| _________ |
| _________ |
Cast Iron Coatings
Fire Hydrant
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 4001BD |
| Fire Hydrant Prep (Manual Scraping) |
| 30 |
| EA |
| _________ |
| _________ |
| 4001BE |
| Fire Hydrant Prep (Chemical Stripping) |
| 30 |
| EA |
| _________ |
| _________ |
| 4001BF |
| Fire Hydrant Prep (Abrasive Blasting) |
| 30 |
| EA |
| _________ |
| _________ |
| 4001BG |
| Fire Hydrant Prep (Power Washer) |
| 30 |
| EA |
| _________ |
| _________ |
| 4001BH |
| Primer |
| 30 |
| EA |
| _________ |
| _________ |
| 4001BI |
| Topcoat |
| 30 |
| EA |
| _________ |
| _________ |
| 4001BJ |
| Chemical Bonding Wipe |
| 30 |
| EA |
| _________ |
| _________ |
Other Surfaces
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 4001BK |
| Prep (Manual Scraping) |
| 500 |
| SF |
| _________ |
| _________ |
| 4001BL |
| Prep (Chemical Stripping) |
| 500 |
| SF |
| _________ |
| _________ |
| 4001BM |
| Prep (Abrasive Blasting) |
| 500 |
| SF |
| _________ |
| _________ |
| 4001BN |
| Prep (Power Washer) |
| 500 |
| SF |
| _________ |
| _________ |
| 4001BO |
| Primer |
| 500 |
| SF |
| _________ |
| _________ |
| 4001BP |
| Topcoat |
| 500 |
| SF |
| _________ |
| _________ |
| 4001BQ |
| Chemical Bonding Wipe |
| 500 |
| SF |
| _________ |
| _________ |
Black Steel Coatings
Street Lighting Standard
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 4001BR |
| Street Light Prep (Manual Scraping/Wire Brushing) |
| 50 |
| EA |
| _________ |
| _________ |
| 4001BS |
| Street Light Prep (Chemical Stripping) |
| 50 |
| EA |
| _________ |
| _________ |
| 4001BT |
| Street Light Prep (Abrasive Blasting) |
| 50 |
| EA |
| _________ |
| _________ |
| 4001BU |
| Street Light Prep (Power Washer) |
| 50 |
| EA |
| _________ |
| _________ |
| 4001BV |
| Primer |
| 50 |
| EA |
| _________ |
| _________ |
| 4001BW |
| Topcoat |
| 50 |
| EA |
| _________ |
| _________ |
| 4001BX |
| Chemical Bonding Wipe |
| 50 |
| EA |
| _________ |
| _________ |
Pipe Railings 2-3 Inch Round or Square
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 4001BY |
| Prep (Manual Scraping/Wire Brushing) |
| 2,200 |
| LF |
| _________ |
| _________ |
| 4001BZ |
| Prep (Chemical Stripping) |
| 2,200 |
| LF |
| _________ |
| _________ |
| 4001CA |
| Prep (Abrasive Blasting) |
| 2,200 |
| LF |
| _________ |
| _________ |
| 4001CB |
| Prep (Power Washer) |
| 2,200 |
| LF |
| _________ |
| _________ |
| 4001CC |
| Primer |
| 2,200 |
| LF |
| _________ |
| _________ |
| 4001CD |
| Topcoat |
| 2,200 |
| LF |
| _________ |
| _________ |
| 4001CE |
| Chemical Bonding Wipe |
| 2,200 |
| LF |
| _________ |
| _________ |
Other Surfaces
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 4001CF |
| Prep (Manual Scraping/Wire Brushing) |
| 2,500 |
| SF |
| _________ |
| _________ |
| 4001CG |
| Prep (Chemical Stripping) |
| 2,500 |
| SF |
| _________ |
| _________ |
| 4001CH |
| Prep (Abrasive Blasting) |
| 2,500 |
| SF |
| _________ |
| _________ |
| 4001CI |
| Prep (Power Washer) |
| 2,500 |
| SF |
| _________ |
| _________ |
| 4001CJ |
| Primer |
| 2,500 |
| SF |
| _________ |
| _________ |
| 4001CK |
| Topcoat |
| 2,500 |
| SF |
| _________ |
| _________ |
| 4001CL |
| Chemical Bonding Wipe |
| 2,500 |
| SF |
| _________ |
| _________ |
Pipe Railings Round or Square 3 1/2-6 inch
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 4001CM |
| Prep (Manual Scraping/Wire Brushing) |
| 1,500 |
| LF |
| _________ |
| _________ |
| 4001CN |
| Prep (Chemical Stripping) |
| 1,500 |
| LF |
| _________ |
| _________ |
| 4001CO |
| Prep (Abrasive Blasting) |
| 1,500 |
| LF |
| _________ |
| _________ |
| 4001CP |
| Prep (Power Washer) |
| 1,500 |
| LF |
| _________ |
| _________ |
| 4001CQ |
| Primer |
| 1,500 |
| LF |
| _________ |
| _________ |
| 4001CR |
| Topcoat |
| 1,500 |
| LF |
| _________ |
| _________ |
| 4001CS |
| Enclosure, Bridge |
| 5 |
| EA |
| _________ |
| _________ |
| 4001CT |
| Chemical Bonding Wipe |
| 1,500 |
| LF |
| _________ |
| _________ |
Pipe Railings Round or Square 8 inch
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 4001CU |
| Prep (Manual Scraping/Wire Brushing) |
| 250 |
| LF |
| _________ |
| _________ |
| 4001CV |
| Prep (Chemical Stripping) |
| 250 |
| LF |
| _________ |
| _________ |
| 4001CW |
| Prep (Abrasive Blasting) |
| 250 |
| LF |
| _________ |
| _________ |
| 4001CX |
| Prep (Power Washer) |
| 250 |
| LF |
| _________ |
| _________ |
| 4001CY |
| Primer |
| 250 |
| LF |
| _________ |
| _________ |
| 4001CZ |
| Topcoat |
| 250 |
| LF |
| _________ |
| _________ |
| 4001DA |
| Chemical Bonding Wipe |
| 250 |
| LF |
| _________ |
| _________ |
Pipe Railings Round or Square 10 inch
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 4001DB |
| Prep (Manual Scraping/Wire Brushing) |
| 250 |
| LF |
| _________ |
| _________ |
| 4001DC |
| Prep (Chemical Stripping) |
| 250 |
| LF |
| _________ |
| _________ |
| 4001DD |
| Prep (Abrasive Blasting) |
| 250 |
| LF |
| _________ |
| _________ |
| 4001DE |
| Prep (Power Washer) |
| 250 |
| LF |
| _________ |
| _________ |
| 4001DF |
| Primer |
| 250 |
| LF |
| _________ |
| _________ |
| 4001DG |
| Topcoat |
| 250 |
| LF |
| _________ |
| _________ |
| 4001DH |
| Chemical Bonding Wipe |
| 250 |
| LF |
| _________ |
| _________ |
Galvanized Steel Coatings
Railings Round or Square 2-3 inch
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 4001DI |
| Prep (Power Washer) |
| 1,000 |
| LF |
| _________ |
| _________ |
| 4001DJ |
| Prep (Solvent Cleaning) |
| 1,000 |
| LF |
| _________ |
| _________ |
| 4001DK |
| Primer |
| 1,000 |
| LF |
| _________ |
| _________ |
| 4001DL |
| Topcoat |
| 1,000 |
| LF |
| _________ |
| _________ |
| 4001DM |
| Chemical Bonding Wipe |
| 1,000 |
| LF |
| _________ |
| _________ |
Other Surfaces
| 4001DN |
| Prep (Power Washer) |
| 1,000 |
| SF |
| _________ |
| _________ |
| 4001DO |
| Prep (Solvent Cleaning) |
| 1,000 |
| SF |
| _________ |
| _________ |
| 4001DP |
| Primer |
| 1,000 |
| SF |
| _________ |
| _________ |
| 4001DQ |
| Topcoat |
| 1,000 |
| SF |
| _________ |
| _________ |
| 4001DR |
| Chemical Bonding Wipe |
| 1,000 |
| SF |
| _________ |
| _________ |
Aluminum Coatings
Round Surfaces (Poles, Posts, Etc)
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 4001DS |
| Prep (Power Washer) |
| 2,100 |
| SF |
| _________ |
| _________ |
| 4001DT |
| Prep (Solvent Cleaning) |
| 2,100 |
| SF |
| _________ |
| _________ |
| 4001DU |
| Primer |
| 2,100 |
| SF |
| _________ |
| _________ |
| 4001DV |
| Topcoat |
| 2,100 |
| SF |
| _________ |
| _________ |
| 4001DW |
| Chemical Bonding Wipe |
| 2,100 |
| SF |
| _________ |
| _________ |
| 4001DX |
| Prep Chemical Stripping |
| 2,100 |
| SF |
| _________ |
| _________ |
Flat Surfaces
| 4001DY |
| Prep (Power Washer) |
| 1,000 |
| SF |
| _________ |
| _________ |
| 4001DZ |
| Prep (Solvent Cleaning) |
| 1,000 |
| SF |
| _________ |
| _________ |
| 4001EA |
| Primer |
| 1,000 |
| SF |
| _________ |
| _________ |
| 4001EB |
| Topcoat |
| 1,000 |
| SF |
| _________ |
| _________ |
| 4001EC |
| Chemical Bonding Wipe |
| 1,000 |
| SF |
| _________ |
| _________ |
| 4001ED |
| Prep Chemical Stripping |
| 1,000 |
| SF |
| _________ |
| _________ |
Rust Conversion Coating
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 4001EE |
| Pipe Railing Round or Square 2-3 inch |
| 1,000 |
| LF |
| _________ |
| _________ |
| 4001EF |
| Pipe Railing Round or Square 3 1/2-6 inch |
| 1,000 |
| LF |
| _________ |
| _________ |
| 4001EG |
| Other Surfaces |
| 800 |
| SF |
| _________ |
| _________ |
Miscellaneous Features
| CLIN |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 4001EH |
| Prep and paint window, 1 side, w/trim |
| 432 |
| ea |
| _________ |
| _________ |
| 4001EI |
| Prep and paint window, 1 side, w/trim, above 10' |
| 288 |
| ea |
| _________ |
| _________ |
| 4001EJ |
| Prep and paint door, 1 side, w/frame |
| 96 |
| ea |
| _________ |
| _________ |
| 4001EK |
| Prep and paint wood trim, up to 8" wide |
| 1700 |
| lf |
| _________ |
| _________ |
| 4001EL |
| Prep and paint wood trim, up to 8" wide, above 10' |
| 2800 |
| lf |
| _________ |
| _________ |
| 4001EM |
| Prep and paint metal trim, up to 8" wide |
| 1400 |
| lf |
| _________ |
| _________ |
| 4001EN |
| Prep and paint metal trim, up to 8" wide, above 10' |
| 2100 |
| lf |
| _________ |
| _________ |
| 4001EO |
| Prep and paint misc. feature, up to 6" wide |
| 1400 |
| lf |
| _________ |
| _________ |
| 4001EP |
| Prep and paint misc. feature, up to 6" wide, above 10' |
| 2100 |
| lf |
| _________ |
| _________ |
| 4001EQ |
| Remove window screen to paint; replace after |
| 432 |
| ea |
| _________ |
| _________ |
| 4001ER |
| Prep, repair and paint column, w/base, crown, and trim |
| 480 |
| ea |
| _________ |
| _________ |
| 4001ES |
| Prep and paint louver, w/trim |
| 40 |
| ea |
| _________ |
| _________ |
| 4001ET |
| Prep and paint louver, w/trim, above 10' |
| 40 |
| ea |
| _________ |
| _________ |
| 4001EU |
| Prep and paint downspout (per story) |
| 288 |
| ea |
| _________ |
| _________ |
| 4001EV |
| Prep and paint roof edge assembly (soffit, fascia, trim) |
| 2880 |
| lf |
| _________ |
| _________ |
| 4001EW |
| Prep and paint roof edge assembly; complex |
| 2880 |
| lf |
| _________ |
| _________ |
| 4001EX |
| Prep and paint large bay door, 1 side, w/trim |
| 6 |
| ea |
| _________ |
| _________ |
| 4001EY |
| Prep and paint gutters |
| 1920 |
| lf |
| _________ |
| _________ |
| 4001EZ |
| Floor prep & epoxy coating, 2 base coats plus top coat |
| 2400 |
| sf |
| _________ |
| _________ |
| 4001FA |
| Paint, spray application, 2 coats |
| 3600 |
| sf |
| _________ |
| _________ |
| 4001FB |
| Paint, spray application, 2 coats, over 10' |
| 1800 |
| sf |
| _________ |
| _________ |
| 4001FC |
| Prep and paint metal structural member, over 10' |
| 1000 |
| lf |
| _________ |
| _________ |
| 4001FD |
| Prep and paint wooden railing assembly; complex |
| 500 |
| lf |
| _________ |
| _________ |
| 4001FE |
| Replace corner guard |
| 1000 |
| lf |
| _________ |
| _________ |
Total for SubCLINs 4001AA through 4001FE
Enter this amount for CLIN 0001
| (Please limit pricing to two (2) decimal spaces.) |
| $ |
BID SUMMARY SCHEDULE
MAINTAIN BASE PAINT
CLIN
| ESTIMATED BASIC YEAR |
| 0001 |
| $0.00 |
| ESTIMATED OPTION YEAR ONE |
| 1001 |
| $0.00 |
| ESTIMATED OPTION YEAR TWO |
| 2001 |
| $0.00 |
| ESTIMATED OPTION YEAR THREE |
| 3001 |
| $0.00 |
| ESTIMATED OPTION YEAR FOUR |
| 4001 |
| $0.00 |
TOTAL ESTIMATED COST (BASIC YEAR PLUS FOUR OPTIONS)
$0.00
Revised Bid Schedule_13 May 2014