B200_Energy_100__Dwg_Set.pdf

PDF 3 MB Posted

Attached to
Bldg 200 HVAC Renovation Federal contract opportunity
Solicitation number
FA4497-15-R-0004
Issued by
Department of the Air Force Air Mobility Command

About this file

B200 Energy 100 Dwg Set

View the file

Other files for this federal contract opportunity

Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UPUP

1. EXTERIOR DOORS: REMOVE SEALANT AND CLEAN FRAME. REMOVE

EXISTING WEATHERSTRIPPING AND SWEEP. INSTALL NEW

WEATHERSTIPPING AND SWEEP. SEAL INTERIOR AND EXTERIOR OF

FRAMES.

2. AT ALUMINUM ENTRANCES, INSTALL NEW PILE WEATHERSTRIPPING.

USE PILE OF SUFFICIENT WIDTH AND LENGTH TO COMPLETELY SEAL

OPENING BETWEEN DOORS AND/OR BETWEEN DOOR AND FRAME.

NO LIGHT SHALL PENETRATE THROUGH JOINT.

3. VESTIBULE: REMOVE GLAZING AND RESET IN EXISTING FRAME WITH

NEW CONTINUOUS WEDGE SEAL AND GASKET.

4. VESTIBULE: REMOVE SEALANT AT VERTICAL JOINTS BETWEEN

FRAME AND MASONRY, AT CORNER MULLIONS, AND AT HORIZONTAL

JOINTS BETWEEN FRAME AND CONCRETE SILL. REMOVE SEALANT

CLEAN FRAMES AND RESEAL.

5. SAW CUT AND GRIND CONCRETE SMOOTH TO CREAT A SLOPED SILL

WITH SLOPE NO LESS THAN 1 INCH IN 12.

6. REMOVE VCT AND STRIP ADHESIVE. GRIND CONCRETE SLAB TO

LEVEL 3 POLISH WITH 800 GRIT DIAMOND ABRASIVE

7. NEW WALK OFF MATT (BY OWNER).

8. EXTERIOR WINDOWS: REMOVE EXISTING SEALANT. CLEAN

WINDOWS, REMOVE EFFLORESCENTS AND CHALKING. RESEAL

PERIMETER OF WINDOW.

9. EXTERIOR WINDOWS: CLEAN MORTAR JOINT AND REPOINT.

10. REMOVE EXISTING MECHANICAL LOUVER. INFILL OPENING WITH CMU

AND BRICK TO MATCH EXISTING CONSTRUCTION.

11. REMOVE WINDOWS, CMU AND BRICK VENEER TO PROVIDE

OPENING FOR MECHANICAL W`ORK, APPROX. 10'W X 10'H.

COORDINATE WITH MECHANICAL CONTRACTOR. BRACE

EXISTING STRUCTURE AS NECESSARY TO TEMPORARILY SUPPORT.

REBUILD WALL: CLEAN AND REUSE EXISTING BRICK, MIXING NEW

BRICK IN AS NECESSARY. TEETH BRICK INTO EXISTING.

SEE DETAIL 5/A2.1

12. PATCH EXISTING BUILT UP ROOF TO MATCH. NEW MECHANICAL

HOOD AND CURB TO BE INSTALLED BY MECHANICAL CONTRACTOR.

REMOVE EXISTING CURBS.

13. REMOVE EXISTING CEILING GRID AND TILE AS NECESSARY TO ACCESS

MECHANICAL WORK. SEE MECHANICAL DWGS AND COORDINATE WITH

MECHANICAL CONTRACTOR FOR SPECIFIC AREA AND SCOPE. SAVE

TILE TO REUSE; REINSTALL WHEN MECHANICAL WORK COMPLETED.

REPLACE DAMAGED TILE FROM EXISTING CEILING DESIGNATED BY

OWNER. REPLACE BORROWED TILES WITH NEW TO MATCH EXISTING.

FLOOR PLAN NOTES

SEE NOTE 1 & 2

SEE NOTE 4

SEE NOTES 8 & 9 (TYP.)

SEE NOTES 8 & 9 (TYP.)

SEE NOTE 5

SEE NOTE 6

SEE NOTE 7

SEE NOTE 4

SEE NOTE 10

SEE NOTE 1 & 2

SEE NOTE 2

SEE NOTE 1 & 2

SEE NOTE 6

SEE NOTE 1

SEE NOTE 11

SEE NOTES 13.

SEE NOTES 8 & 9

(TYP.)

SEE NOTES 8 & 9

(TYP.)

SEE NOTE 12

SEE NOTE 13

EXISTING ALUMINUM STOREFRONT

10°

SAW CUT EXISTING CONCRETE

TO PROVIDE POSITIVE DRAINAGE

REMOVE EXISTING SEALANT AND CLEAN

INSTALL NEW BACKERROD AND RESEAL

SEALANT

REMOVE VCT

GRIND AND POLISHED CONCRETE

W-5134

SHT. OF

DESIGNED BY:DRAWN BY:SCALE:PROJECT #:DATE:

APPROVEDAPPROVEDSUBMITTED

COMMANDERCHIEF ENGINEERCHIEF ENGINEER

AS NOTED

BLDG. 200 ENERGY UPGRADES AT DOVER AFB, DE

AIR MOBILITY COMMAND

DOVER AIR FORCE BASE, DELAWARE

DESCRIPTIONDATEREV

M D A

6100% DESIGN

ISSUED FOR 95% REVIEW

DRAWN APPR'D

31AUG12 RGC GRR

G. CAMPBELL G. RICHTERS

ISSUED FOR INSTALLATION12APR13 RGC GRR

A1.1

FLOOR PLANS

BLDG. 200

04/12/2013

1/8" = 1'-0"A1.1

1 FIRST FLOOR PLAN

1/8" = 1'-0"A1.1

2 SECOND FLOOR PLAN

3" = 1'-0"A1.1

3 STOREFRONT DETAIL

SEE NOTE 5

SEE NOTE 8

SEE NOTE 9

SEE NOTE 3 (TYP)

SEE NOTE 4

SEE NOTE 1 & 2

SEE NOTE 8

SEE NOTE 9

SEE NOTE 8

SEE NOTE 9

SEE NOTE 4

SEE NOTE 10

SEE NOTE 3 (TYP)

SEE NOTE 11

SEE NOTE 1 & 2

SEE NOTE 8

SEE NOTE 9

SEE NOTE 1 & 2

SEE NOTE 8

SEE NOTE 9

1. EXTERIOR DOORS: REMOVE SEALANT AND CLEAN FRAME. REMOVE

EXISTING WEATHERSTRIPPING AND SWEEP. INSTALL NEW

WEATHERSTIPPING AND SWEEP. SEAL INTERIOR AND EXTERIOR OF

FRAMES.

2. AT ALUMINUM ENTRANCES, INSTALL NEW PILE WEATHERSTRIPPING.

USE PILE OF SUFFICIENT WIDTH AND LENGTH TO COMPLETELY SEAL

OPENING BETWEEN DOORS AND/OR BETWEEN DOOR AND FRAME. NO

LIGHT SHALL PENETRATE THROUGH JOINT.

3. VESTIBULE: REMOVE GLAZING AND RESET IN EXISTING FRAME WITH

NEW CONTINUOUS WEDGE SEAL AND GASKET.

4. VESTIBULE: REMOVE SEALANT BETWEEN FRAME AND MASONRY AT

VERTICAL AND HORIZONTALS. CLEAN FRAMES AND RESEAL.

5. SAW CUT AND GRIND CONCRETE SMOOTH TO CREAT A SLOPED SILL

WITH SLOPE NO LESS THAN 1 INCH IN 12.

6. REMOVE VCT AND STRIP ADHESIVE. GRIND AND POLISH CONCRETE

SLAB SMOOTH TO LEVEL 3 POLISH WITH 800 GRIT DIAMOND ABRASIVE.

7. NEW WALK OFF MATT (BY OWNER).

8. EXTERIOR WINDOWS: CLEAN WINDOWS, REMOVE EFFLORESCENTS AND

CHALKING.

9. EXTERIOR WINDOWS: CLEAN MORTAR JOINT AND REPOINT.

10. REMOVE EXISTING MECHANICAL LOUVER. INFILL OPENING WITH CMU

AND BRICK TO MATCH EXISTING CONSTRUCTION.

11. REMOVE WINDOWS, CMU AND BRICK VENEER TO PROVIDE OPENING

FOR MECHANICAL WORK, APPROX. 10'W X 10'H. COORDINATE WITH

MECHANICAL CONTRACTOR. BRACE EXISTING STRUCTURE AS

NECESSARY TO TEMPORARILY SUPPORT. REBUILD WALL: CLEAN AND

REUSE EXISTING BRICK, MIXING NEW BRICK IN AS NECESSARY. TEETH

BRICK INTO EXISTING. SEE DETAIL 5/A2.1.

12. PATCH EXISTING BUILT UP ROOF TO MATCH. NEW MECHANICAL HOOD

AND CURB TO BE INSTALLED BY MECHANICAL CONTRACTOR. REMOVE

EXISTING CURBS.

FLOOR PLAN NOTES

ADJUSTABLE BRICK TIES @ 16" O.C.

VERTICAL, @ 16" O.C. HORIZONTAL

4" BRICK VENEER TO

MATCH EXIST.

8" CMU

6 GA. LADDER HORIZ.

REINFORCEMENT @

16" O.C. VERTICAL

FIELD VERIFY

W-5134

SHT. OF

DESIGNED BY:DRAWN BY:SCALE:PROJECT #:DATE:

APPROVEDAPPROVEDSUBMITTED

COMMANDERCHIEF ENGINEERCHIEF ENGINEER

AS NOTED

BLDG. 200 ENERGY UPGRADES AT DOVER AFB, DE

AIR MOBILITY COMMAND

DOVER AIR FORCE BASE, DELAWARE

DESCRIPTIONDATEREV

M D A

6100% DESIGN

ISSUED FOR 95% REVIEW

DRAWN APPR'D

31AUG12 RGC GRR

G. CAMPBELL G. RICHTERS

ISSUED FOR INSTALLATION12APR13 RGC GRR

A2.1

EXTERIOR

ELEVATIONS

BLDG. 200

04/12/2013

1/8" = 1'-0"A2.1

1 NORTH ELEVATION

1/8" = 1'-0"A2.1

2 SOUTH ELEVATION

1/8" = 1'-0"A2.1

3 WEST ELEVATION

1/8" = 1'-0"A2.1

4 EAST ELEVATION

1 1/2" = 1'-0"A2.1

5 TYP. WALL SECTION

G-1.1
A-1.1
A-2.1
P-1.1
M-1.1
M-1.2
M-1.3
M-1.4
M-1.5
M-2.1
M-2.2
M-3.1
M-3.2
M-4.1
E-1.1
E-2.1
E-3.1

File details come from the government source that posted it. Updated .