97 - 2003 Schedule of Material Submittals.xls

XLS spreadsheet 134 KB Posted

Attached to
Repair/Renovate Dorm 748 (USMC)
Solicitation number
FA4460-09-B-0001
Issued by

About this file

Attachment 5 Schedule of Material Submittals

View the file

Other files

File Type Posted
Responses to Questions - 2 April 09-2.doc DOC document
Responses to Questions - 2 April 09.doc DOC document
Responses to Questions - 1 April 09.doc DOC document
Responses to Questions - 31 March 09.doc DOC document
11 A-8 Layout1 —
RFI 39 Supporting Photo.JPG JPG image
Responses to Questions - 27 Mar 09.doc DOC document
Site Visit Attendees.doc DOC document
08 87 16 FRAGMENT RETENTION FILM FOR GLASS.doc DOC document
28 31 00 FIRE DETECTION AND ALARM SYSTEMS.doc DOC document
Responses to Questions - 26 Mar 09.doc DOC document
Responses to Questions - 13 Mar.doc DOC document
Amendment 1.pdf PDF
drawings.pdf PDF
Attachment 2 EMIS Instruction Guide.doc DOC document
Solicitation FA4460-09-B-0001.doc DOC document
Attachment 1 - WAGE DETERMINATION 080175 23 JAN 09.docx DOCX document
Attachment 3 Addendum to MOA.doc DOC document
Attachment 4 C&D Report.doc DOC document
SPEC NKAK 09-1025 REPAIR RENOVATE DORM 748 —
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule

SCHEDULE OF MATERIAL SUBMITTALSNKAK 09-1025REPAIR RENOVATE DORM 748 USMCSOLICITATION NO.: FA4460-09-B-0001
(To be completed by Project Engineer)(To be completed by Contract Administrator)
NUMBER OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSSCHEDULES, LISTINGS, REPORTS, PLANSTECHNICAL DATATEST REPORTSFIELD REPORTSREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
APPROVEDDISAPPROVED
1016999 1.01 Real Property Checklist
2024100 - Demolition 1.03XX
306 15 00 - Finish Carpentry, 1.02 MilworkXXXX
406 16 00 Cementitious Concrete Board SheathingXXXX
506 22 06 - Cabinet and Shelving HardwareXXX
607 27 00 - Caulking and Sealant
708 11 13 Steel Doors and FramesXXXXXX
808 20 10 - Flush Solid Core Wood DoorsXXXXXX
908 30 00 - Access DoorsX
1008 71 00 - Door HardwareXXXXX
1109 25 00 - Gypsum Drywall SystemsX
1209 25 10 - Fiberglass Ceiling PanelXX
1309 51 00 - Suspended Acoustical CeilingXX
1409 66 00 - Resilient Tile FlooringXXXXX
1509 72 00 - Wall CoveringsXXXXX
1609 90 00 - Painting and CoatingXXX
1710 26 13 - Wall and Corner guardsXXXXX
1810 44 16 - Fire Extinguishers and CabinetXXXX
1910 80 20 - Toilet AccessoriesXXX
2010 82 00 - Shower DoorsXXXXXX
2121 05 00 - Common Work Results for Fire ProtX
2221 05 23 - General Duty ValvesXX
2321 05 29 - Hangar and SupportsXXX
24Identification for fire Suppression PipingXX
2521 13 00 - Fire Suppression SystemsXXXXX
2622 05 00 - Common Work Results for PlumbingX
2722 05 23 - General Duty ValvesXX
2822 05 29 - Hangars and SupportsXXXX
2922 05 53 - Identification for Plumbing PipingXX
3022 07 19 - Plumbing Piping InsulationXXX
3122 11 16 - Domestic Water PipingX
3222 40 00 - Plumbing FixturesXX
3323 05 00 - Common Work Results for HVACX
3423 05 23 - General Duty ValvesXX
3523 05 29 - Hangars and SupportsXXXX
3623 05 53 - Identification for HVAC PipingXX
3723 05 93 - Testing, Adjusting, and BalancingXXX
3823 07 19 - HVAC Piping InsulationXXX
3923 33 00 - Duct AccessoriesXXX
4023 81 26 - Split System Air Conditioning UnitsXXX
4126 05 00 - Basic Electrical Materials and MethodsXXXXX
4225 05 04 - RacewaysX
4326 05 19 - Wire and CablesXX
4426 05 43 - Underground Electric ServiceXX
4526 05 48 - Seismic ProtectionXXX
4626 05 53 - IdentificationX
4726 05 73 - Overcurrent Protective DevicesX
4826 05 74 - Transient Voltage Surge SuppressorXX
4926 06 20 - Motor Control CentersXXX
5026 96 25 - Motor StartersXXX
5126 09 13 - MeteringXXX
5226 23 00 - Distribution SwitchboardXXXX
5326 23 05 - Services DisconnectsXX
5426 23 10 - Equipment DisconnectXXX
5526 24 00 - Panel BoardsXXX
5626 27 26 - Wiring DevicesXXX
5726 50 00 - LightingXXXX
5827 20 00 - Computer/Telephone SystemsXX
5932 13 14 - Concrete Work for WalkwaysXX
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
Schedule of Material Submittals Template, Feb 05 (SAF/AQCP)

Enter the due date from the Contractor (MM/DD/YY) Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE

(MM/DD/YY)

Enter the Submittal Number Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

Enter Resubmittal Number Enter the submittal final approval date

(MM/DD/YY)

Enter any comments pertaining to the submittal

File details come from the government source that posted it. Updated .