Workload_data_esitmates.doc

DOC document 26 KB Posted

Attached to
AFICA Executive Airlift Flight Dispach
Solicitation number
FA4452-16-R-0005
Issued by

About this file

Historical Workload for PWS Covered Aircraft.

View the file

Other files

File Type Posted
Updated_Exhibit_B-BD.pdf PDF
Amendment_0003.pdf PDF
Q_and_A_4.docx DOCX document
Q A_Round_3.doc DOC document
Conformed_FA4452-16-R-0005_thru_Amendment_2.doc DOC document
Q A_Round_2.docx DOCX document
Amendment_0002.doc DOC document
Updated_Exhibit_B-BD.pdf PDF
FA4452-16-R-0005_Amendment_0001.pdf PDF
Q A_round_1.docx DOCX document
Conformed_FA4452-16-R-0005-0001.pdf PDF
Exhibit_A-AD.pdf PDF
Attachment_4_-_Sample_Client_Letter.docx DOCX document
Exhibit_B-BD.pdf PDF
Attachment_3_-_Sample_Consent_Letter.docx DOCX document
Attachment_7_-_Subcontracting_Plan_Checklist.pdf PDF
Attachment_1_-_QASP1.doc DOC document
FA4452-16-R-0005.pdf PDF
Attachment_5_-_PPQ_Cover_Letter.docx DOCX document
Attachment_2_-_PPIS.docx DOCX document
Attachment_6_-_PPQ.docx DOCX document
Section_C_-_PWS.docx DOCX document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Historical Workload for Covered Aircraft This information is provided to assist the contractor in accurately staffing the requirement and preparing a proposal. This is for informational purposes only and represents the Government's historical requirement for the number of sorties dispatched.

Number of Sorties The term sortie captures a flight plan for a single aircraft from take-off to landing. A mission describes a flight plan for a single aircraft from their origin to their final destination, and their return flight to the origin. A mission usually includes multiple sorties. International sorties are defined as any leg that departs or arrives at an airfield not beginning in a "K" International Civil Aviation Organization (ICAO). An ICAO airport code is the designation for each airfield world-wide. ICAOs beginning with the letter “K” represent airfields within the continental United States. Any airfields without this designation are considered “international” airfields.

Domestic

The aircraft covered by the PWS completed 217 total domestic missions with 662 total domestic sorties. On average, 55 sorties and 18 missions were completed per month, with an average of 3 sorties per mission.

International

The aircraft covered completed 179 total international missions with 959 total international sorties. On average, 79.9 sorties and 14.9 missions were completed per month, with an average of 5.4 sorties per mission.

Overall In total, the covered aircraft completed 396 total missions with 1621 total sorties. On average, 135 sorties and 33 missions were completed per month, with an average of 4.1 sorties per mission. 75% of those missions included at least three sorties.

File details come from the government source that posted it. Updated .