Headquarters Air Mobility Command Unrivaled Global Reach for America…ALWAYS!
Aviation Operational Risk Management (AvORM) Chris Scroggins Program Manager 7 May 2012
FOUO
AvORM Background Program Manager: Michael Polley, A6IM Project Manager: Chris Scroggins, A6IM Functional Manager: LtCol Mark Hale, AMC SE/SEF
Currently defined as a MAC 1, National Security System as part of the GDSS overall system
AISS Support Testing Level 1, Level 2, & Level 3 operations & maintenance (O&M), Configuration Management Engineering, Modernization, Fielding, Testing, Integration, and etc. per the PWS
Production
Level 3 O&M, CM, Engineering, Modernization, Fielding, Testing, Integration, and etc. per the PWS
AvORM Technical Overview
| AvORM in the MAF C2 Enclaves |
| Distributed to 2 geographical locations for survivability |
Scott AFB and McConnell AFB Plans to utilizes multi-master replication to ensure data currency at all locations MAF C2 enclaves own and manage the IP space, domain name, and security posture
AvORM uses 2 Web servers and 1 DB server Part of the GDSS Enclave
| User interface applications: Web-based interface |
| Security level: Unclassified |
| Enclave Summary |
| GDSS Hardware suite per enclave: |
Dell M610 Blade servers (32-128) Web servers, Enterprise management Security services, Domain controllers Dell R900 database servers (3-7) (Upgrade to R910 within 12 months) Infrastructure components Sidewinder Firewalls, Cisco Routers, Cisco Switches, F5 LTM, F5 GTM, EMC SANs, Cisco FC Switches, Quantum backup units, SMTP, OCSP, IBM WebSphere
| Operating system: Primarily MS Server 2003 (2008 in Jun 13) |
| Database: |
SQL Server AvORM Technical Overview
Aircrew Analytics Aircrew fatigue factor analytical capabilities:
Graphical circadian rhythm representation of whole mission Drill down capability to specific Flight Duty Period (FDP) AMC/SG “Go Pill” recommendation and effectiveness feedback Pre-population of itinerary, MDS, and priority Auto population of risk factors – Priority, Legs in FDP, Night departures/arrivals
AvORM Capabilities
Mission Analytics Current real-time view of operational mission scoring Sortable via all key mission data fields Filtered by aircraft MDS and mission type Day/night departure/arrival indication
AvORM Capabilities (Con’t)
Who We Support
GDSS Supports Global Mobility
| 220+ Major Sites |
| 1,600 Concurrent Users |
| 6,000 Avg User Logins/24hr |
| 40 NIPR and 15 SIPR interfaces |
19,000+ User Accounts
| ANG: 2,604 | AMC: 9,442 | |
| AFR: 2,376 | USAFE: 1,095 | |
| PACAF: 1,166 | Joint: 454 | |
| Foreign Nationals: 50 | Other: 2,273 |
AvORM Fielding Schedule Planned Completion New Estimate Test Phase Field Phase Develop Phase Legend:
v2.7.5 v2.9.1 v2.9.5 v3.0.0
2.7.4 Features and performance fixes
Predictive analysis Additional Auto-population of fields
2.9.1 Features and performance enhancements
50% of auto-populated fields v2.7.4
| Dec | ||
| 2011 | Jan | |
| 2012 | Feb | |
| 2012 | Mar | |
| 2012 | Apr | |
| 2012 | May | |
| 2012 | Jun | |
| 2012 | Jul | |
| 2012 | Aug | |
| 2012 | Sep 2012 | Oct |
| 2012 | Nov | |
| 2012 | Dec | |
| 2012 | Jan | |
| 2013 | Feb | |
| 2013 | Mar | |
| 2013 | Apr | |
| 2013 | May | |
| 2013 | Jun | |
| 2013 | Jul |
Headquarters Air Mobility Command
Aviation Operational Risk Management (AvORM) Chris Scroggins Program Manager 7 May 2012