8 - AvORM Industry Day.ppt

PPT presentation 2 MB Posted

Attached to
Applications, Infrastructure and Systems Support, Increment 2 (AISS II)
Solicitation number
FA4452-12-R-0002
Issued by

About this file

AvORM PM Presentation

View the file

Other files

File Type Posted
Q A - As of 13 Jun.doc DOC document
FA4452-12-R-0002 Amendment 0003.doc DOC document
Q A - 11 Jun 12 —
HW SW Listing.xlsx XLSX spreadsheet
FA4452-12-R-0002 Amendment 0002.doc DOC document
Q A - 11 Jun 12.docx DOCX document
FA4452-12-R-0002 Conformed - 11 Jun 12.doc DOC document
FA4452-12-R-0002 Conformed - 8 Jun 12.doc DOC document
PWS - 8 Jun 12 —
FA4452-12-R-0002 Amendment 0001.doc DOC document
Q and A —
Signed CDRLs - FINAL.pdf PDF
52.212-1 Atch 2 - Consent Letter.docx DOCX document
RFP Atch 3 - DD254.doc DOC document
52.212-1 Atch 5 - PPQ Cover Letter.docx DOCX document
RFP Atch 1 - PWS.doc DOC document
52.212-1 Atch 1 - PPIS.docx DOCX document
52.212-1 Atch 6 - Technical Proposal Checklist.xlsx XLSX spreadsheet
52.212-1 Atch 4 - PPQ.docx DOCX document
52.212-1 Atch 3 - Client Authorization Letter.docx DOCX document
RFP Atch 2 - QASP.docx DOCX document
Pre and Post Industry Day Q and A.docx DOCX document
1 - AISS II Consolidated Slides Welcome and Contracting.pptx PPTX presentation
9 - MEIS Industry Day.pdf PDF
5 - GATES Industry Day.pptx PPTX presentation
3 - ACFP Industry Day.pptx PPTX presentation
10 - Enclave AISS Industry Day.pdf PDF
11 - COINS Industry Day.pptx PPTX presentation
Final List - Contractor Attendees.xls XLS spreadsheet
4 - CAMPS Industry Day.ppt PPT presentation
6 - GCCS Industry Day.ppt PPT presentation
7 - GDSS Industry Day.ppt PPT presentation
Industry Day Agenda.doc DOC document
Bidder's Library Rules.ppt PPT presentation
MITRE Map.pdf PDF
Draft CLIN structure.docx DOCX document
Draft Evaluation Criteria.docx DOCX document
Draft PWS - 29 Mar 12.docx DOCX document
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Headquarters Air Mobility Command Unrivaled Global Reach for America…ALWAYS!

Aviation Operational Risk Management (AvORM) Chris Scroggins Program Manager 7 May 2012

FOUO

AvORM Background Program Manager: Michael Polley, A6IM Project Manager: Chris Scroggins, A6IM Functional Manager: LtCol Mark Hale, AMC SE/SEF

Currently defined as a MAC 1, National Security System as part of the GDSS overall system

AISS Support Testing Level 1, Level 2, & Level 3 operations & maintenance (O&M), Configuration Management Engineering, Modernization, Fielding, Testing, Integration, and etc. per the PWS

Production

Level 3 O&M, CM, Engineering, Modernization, Fielding, Testing, Integration, and etc. per the PWS

AvORM Technical Overview

AvORM in the MAF C2 Enclaves
Distributed to 2 geographical locations for survivability

Scott AFB and McConnell AFB Plans to utilizes multi-master replication to ensure data currency at all locations MAF C2 enclaves own and manage the IP space, domain name, and security posture

AvORM uses 2 Web servers and 1 DB server Part of the GDSS Enclave

User interface applications: Web-based interface
Security level: Unclassified
Enclave Summary
GDSS Hardware suite per enclave:

Dell M610 Blade servers (32-128) Web servers, Enterprise management Security services, Domain controllers Dell R900 database servers (3-7) (Upgrade to R910 within 12 months) Infrastructure components Sidewinder Firewalls, Cisco Routers, Cisco Switches, F5 LTM, F5 GTM, EMC SANs, Cisco FC Switches, Quantum backup units, SMTP, OCSP, IBM WebSphere

Operating system: Primarily MS Server 2003 (2008 in Jun 13)
Database:

SQL Server AvORM Technical Overview

Aircrew Analytics Aircrew fatigue factor analytical capabilities:

Graphical circadian rhythm representation of whole mission Drill down capability to specific Flight Duty Period (FDP) AMC/SG “Go Pill” recommendation and effectiveness feedback Pre-population of itinerary, MDS, and priority Auto population of risk factors – Priority, Legs in FDP, Night departures/arrivals

AvORM Capabilities

Mission Analytics Current real-time view of operational mission scoring Sortable via all key mission data fields Filtered by aircraft MDS and mission type Day/night departure/arrival indication

AvORM Capabilities (Con’t)

Who We Support

GDSS Supports Global Mobility

220+ Major Sites
1,600 Concurrent Users
6,000 Avg User Logins/24hr
40 NIPR and 15 SIPR interfaces

19,000+ User Accounts

ANG: 2,604AMC: 9,442
AFR: 2,376USAFE: 1,095
PACAF: 1,166Joint: 454
Foreign Nationals: 50Other: 2,273

AvORM Fielding Schedule Planned Completion New Estimate Test Phase Field Phase Develop Phase Legend:

v2.7.5 v2.9.1 v2.9.5 v3.0.0

2.7.4 Features and performance fixes

Predictive analysis Additional Auto-population of fields

2.9.1 Features and performance enhancements

50% of auto-populated fields v2.7.4

Dec
2011Jan
2012Feb
2012Mar
2012Apr
2012May
2012Jun
2012Jul
2012Aug
2012Sep 2012Oct
2012Nov
2012Dec
2012Jan
2013Feb
2013Mar
2013Apr
2013May
2013Jun
2013Jul

Headquarters Air Mobility Command

Aviation Operational Risk Management (AvORM) Chris Scroggins Program Manager 7 May 2012