52.212-1 Atch 6 - Technical Proposal Checklist.xlsx
XLSX spreadsheet 19 KB Posted
- Solicitation number
- FA4452-12-R-0002
About this file
Technical Proposal Checklist
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 Company Name: _______________________________
| Insert the technical proposal page and paragraph numbers that address how your proposal will meet the following subfactors as stated in the evaluation criteria. | |
| Subfactor: TECHNICAL APPROACH | Technical Proposal Page and Paragraph Number |
| (a) Level 3 knowledge of software and systems listed in section 1.2 of the PWS. | |
| (b) Expertise in Enterprise Support Services which pertains to the tasks and work specific to engineering efforts defined in the PWS sections 2.2.3, 2.2.4, 2.2.5, 2.2.6, and 2.2.7. | |
| (c) Requirements analysis and tracking processes | |
| (d) Effective 24/7/365, on-call Level 3 Technical and Engineering Support of production and infrastructure systems as defined in PWS section 2.3.4. | |
| (e) Upgrade, sustainment, and maintenance of the various MAF C2, ITV/Business System environments and infrastructures as defined in PWS sections 2.2 and 2.3. | |
| (f) Exercising and support multiple Continuity of Operations Plans as defined in PWS section 2.3.4.1.1.1. | |
| (g) Compliance with DODD 8570.01-M IAW PWS paragraphs 2.3.6 and 7.12. | |
| (h) Draft Quality Plan (QP) described in CDRL B010 and PWS sections 2.1.1 and 2.1.3. In the QP, provide the process your firm would use to systematically provide for early identification of non-conforming supplies or services, develops metrics to track performance trends, details the corrective actions required to ensure timely and acceptable delivery/performance in accordance with the PWS, and details their partnering approach with the government to ensure mission objectives are met. The QP shall also comply with ISO 10005. | |
| (i) Draft testing plan as described in the PWS section 2.3.7, CDRL C002 and provide an explanation of your approach for testing. The plan must include methodology for reporting test results, managing multiple test activities, assisting in fault isolation, and managing dynamic testing schedules for multiple test events. | |
| (j) Draft training plan as described in the PWS section 2.3.8, CDRL D002 and D003 to include an explanation of your approach for training. | |
| Subfactor: STAFFING APPROACH | |
| (a) A staffing plan containing a personnel matrix that identifies the personnel resources to perform the requirements of the PWS. The plan shall provide a logical approach that ensures timely support and shall specifically address the following requirements: | |
| (1) Process to recruit/retain/replace personnel who have the knowledge, experience, training, language ability, and technical expertise/certification/security clearances commensurate with the requirements of the PWS. | |
| (2) Identification of key personnel listed in 6.3 of the PWS to include position descriptions identifying the educational and experience level, requisite security clearances and (IA) certifications and any other qualifications showing the key individual’s ability to be a focal point for the services required by the PWS. Additionally, the contractor shall include the specific resumes of the key personnel listed in 6.3 of the PWS. Salaries and fringe benefits proposed for the professional employees who will work under the contract should be included in accordance with FAR 52.222-46, incorporated by reference. | |
| (3) Provide a hierarchy chart displaying proposed organizational structure. | |
| (b) Transition Plan: Offerors shall provide a plan for the transition of services that includes specific details of the timelines needed to meet all government requirements as detailed in the PWS. Identify any best practices/innovations proposed. In addition, the proposed plan must provide the following transition plan requirements: | |
| (1) An explanation for start-up, mobilization, and transition depicting the chronological sequence of events which will be accomplished starting at Task Order award in order to meet all requirements of the PWS. | |
| (2) Provide a listing of risks, their severity or probability and what actions you would take to mitigate those risks. | |
| Subfactor: CONFIGURATION MANAGEMENT APPROACH | |
| (a) A draft Configuration Management Plan (CMP) described in CDRL B011 and PWS sections 2.2.2 and 2.3.2, and provide an explanation of how your organization will manage multiple MAF C2, ITV/Business System configurations and baselines. Include with the plan, the organizational structure identifying assignments, roles and responsibilities for each element of the CMP. The CMP should provide an integrated configuration management program as it relates to PWS sections 2.2.2 and 2.3.2. | |
| (b) A draft Asset Management Plan for managing hardware and software assets for each of the MAF C2, ITV/Business Systems as described in PWS Section 2.3.3 and CDRL B013. |
&"Times New Roman,Bold"&12ADDENDUM TO FAR 52.212-1 ATTACHMENT 6
TECHNICAL PROPOSAL CHECKLIST
Sheet2
Sheet3
File details come from the government source that posted it. Updated .